HomeMy WebLinkAboutAPPROVED BID PROPOSAL - 23-00506 - Rexburg Temple Damper ReplacementAuthor Name Author Email Author Phone No.:
Don Allen Don.Allen@rexburg.org 208-372-2174
Description : Rexburg Temple Damper Replacement
Address : 750 S 2nd E
Record Type : Commercial Mechanical Misc.
Document Filename : Building Plan forBid_DamperProject - LewisMechanical.pdf
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Approved
# 23-00506
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 1 Stamp Don Allen : Mechanical Open 1 Approved - Mechanical Inspector
Commercial Mechanical Misc.
Approval of plans does not constitute approval of variance from code
Powered by TCPDF (www.tcpdf.org)
Rexburg Idaho Temple
750 S 2nd E
Rexburg, ID 83440
June 6, 2023
Lewis Corpora�on
Via Email: kenyan@ lcorp.com
Dear Kenyan,
We are reaching out to request a bid proposal for the Lower-Level Damper Replacement Project. We
believe that your company has the skills, exper�se, and experience necessary to complete this project
successfully, and on �me. This project involves the replacement of five (5) dampers and four (4) damper
motors with associated hardware. Based on our understanding of the project, we believe that it will
require five to seven working days to complete. We are looking for a vendor who can provide the
following deliverables:
1.Electrical Room Exhaust Damper 36”x48” with damper motor.
2.Electrical Room Supply Damper 36”x48” with damper motor.
3.AHU 200 Exhaust Damper 121”x61” rough opening:
a.Two sec�ons 60”x42” each, with one damper motor.
b.One building exhaust sec�on 36”x36” with one damper motor.
4.AHU 300 intake:
a.1-each EBTron Thermal dispersion airflow measurement GTA116 Transmiter or
equivalent.
Construc�on Timelines:
Task Start Date End Date Duration
Contract Award 6/26/2023 6/28/2023 1 day
Certs of insurance provided by
contractor 6/28/23
Contract Signatures 7/3/2023 5 days
Shop Drawings / cut sheets 7/3/2023 7/10/2023 7 days
Order Materials by 7/10/2023
Receive Materials 8/18/2023 6 weeks
Temple Fall Shut Down Start Date 8/28/2023 9/11/2023 15 days
Demolition and installation of
Equipment 8/30/2023 9/6/2023 8 days
User Acceptance Testing
AHJ inspections 9/6/2023 9/6/2023 1 days
Project Closeout 9/7/2023 9/8/2023 2 days
Lewis Corpora�on
Page 2_______________________
Scope of Work
(See page 5 for pictures)
Electrical Room:
1. Remove and replace 36”x48” exhaust damper. Replace flashing around damper. Install new
damper motor and integrate with exis�ng controls.
2. Disconnect the intake air handler from the intake damper. Remove and replace 36”x48”
intake damper. Reconnect intake air handler. Replace flashing around damper. Install new
damper motor and integrate with exis�ng controls.
3. Dispose of old dampers and debris.
AHU 200:
1. Remove and replace 2 each 60”x48” exhaust damper. Install new damper motor and
integrate with exis�ng controls.
2. Remove and replace 36”x36” Building exhaust damper. Install new damper motor and
integrate with exis�ng controls.
3. Dispose of old dampers and debris.
AHU 300:
1. Remove and replace the EBTron Thermal dispersion airflow measurement GTA116
Transmiter on AHU 300 air intake. Use EBTron or equal.
Permits, Inspec�ons and Insurance
1. Provide all required permits and inspec�ons as required by the State of Idaho and the City of
Rexburg.
2. Authority Having Jurisdic�on (AHJ) is the City of Rexburg Building Department.
3. Applicable building codes see Rexburg Codes and Standards.
htps://www.rexburg.org/building/page/codes-standards
4. Acord addi�onally insured cer�ficate and endorsement required prior to signing contract
(see sec�on 13 of the enclosed contract template)
Submission Guidelines
1. Proposal Format:
Bidders are requested to submit their proposals in electronic format (PDF or Word document). Please
ensure that all documents are clearly labeled and organized for ease of review.
2. Required Documents:
Bidders must include the following documents in their submission:
Lewis Corpora�on
Page 3_______________________
• Technical Proposal: A detailed descrip�on of the proposed solu�on (Shop Drawings),
including approaches to achieving the project objec�ves. Please address each
requirement outlined in the Project Descrip�on sec�on.
• Pricing Proposal: A comprehensive breakdown of all costs associated with the project,
including labor, materials, equipment, and any addi�onal expenses. Clearly indicate any
assump�ons made in the pricing.
• Team Composi�on: Provide a list of key personnel who will be involved in the project,
along with their qualifica�ons and Temple Recommend status.
• Cer�fica�ons: Be prepared to provide upon request copies of relevant cer�fica�ons or
licenses that may be required to perform the services outlined in the project.
3. Deadline for Submissions:
All proposals must be submited no later than 6/22/2023 by 5 pm mountain daylight �me. Late
submissions will not be accepted. Bidders are encouraged to submit their proposals well in advance to
avoid any poten�al technical issues.
4. Submission Method:
Proposals shall be submited electronically via email to Briansheetz@ChurchofJesusChrist.org. Please use
the subject line: "Bid Submission – Lower-Level Damper Replacement Project - [Your Company Name]".
5. Inquiries and Clarifica�ons:
Bidders may seek clarifica�ons or ask ques�ons regarding the bid by sending an email to
Briansheetz@ChurchofJesusChrist.org. All inquiries must be submited no later than 6/12/2023.
Responses to inquiries will be provided by 6/15/2023.
In Closing
Thank you for your interest in par�cipa�ng in our bid process. We appreciate the �me and effort you
have dedicated to preparing your proposal. Should you have any further ques�ons or need clarifica�ons,
please don't hesitate to contact me at Briansheetz@ChurchofJesusChrist.org or call me at (208)240-
0561.
Please take note of the following:
1. No�fica�on of Selec�on:
Bidders will be no�fied of the selec�on results no later than 6/28/2023. The selected bidder will
be contacted directly.
2. Next Steps:
Upon selec�on, the successful bidder will enter into contract nego�a�ons to finalize the terms,
condi�ons, and any addi�onal agreements. Signed contracts by 7/3/2023. I understand there is a
holiday immediately following this step in the process and would like this to be completed
Lewis Corpora�on
Page 4_______________________
before the 4th of July to keep on schedule. Site visits or mee�ngs may be scheduled during this
phase to further discuss the project and address any specific requirements. No later than
7/10/2023.
3.Workdays are Monday through Saturday. No work to be done on Sunday.
4.Confiden�ality:
All informa�on submited in response to this request for bid will be treated as confiden�al and
used solely for evalua�on purposes. Please clearly mark any proprietary or confiden�al
informa�on in your proposal.
5.Disqualifica�on:
Bidders not adhering to the specified submission guidelines, missing the deadline, or failing to
provide the required informa�on may be disqualified from further considera�on.
We once again extend our gra�tude for your interest and look forward to receiving your proposal. We
value your contribu�on to this process and look forward to collabora�ng with you on this project. Should
you have any ques�ons or require further assistance, please do not hesitate to reach out.
Sincerely,
Brian K. Sheetz
Temple Facili�es Assistant
Enclosure: contract template
Lewis Corpora�on
Page 5_______________________
Electrical room exhaust damper Electrical room Intake Air damper and air handler
Air handler 200 exhaust damper and building exhaust damper