Loading...
HomeMy WebLinkAboutPLANS - 22-00502 - Mountain West Rental and Salesliability. Gauge: Gauge: Gauge: Gauge:Shadow Gutter: Shadow Rake: Corner: Accessory: SMP Black TRIM COLOR 26 26 26 26 Gauge:Downspouts:26 Gauge:Base:26 Gauge:Wainscot Trim:26 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. SMP Black SMP Black SMP Black SMP Black SMP Black SMP Old Town Gray DATE DESCRIPTION 06.09.22 C1 - Cover Sheet F1 - Anchor Bolt Plan F2 - Anchor Bolt Reactions DRAWING INDEX E1 - Roof Framing Plan E3 - Elevation Framing D1 - Standard Details D2 - Standard Details P1 - Rigid Frame Elevation 06.09.22 06.09.22 06.11.22 06.11.22 06.11.22 06.11.22 06.11.22 06.11.22 P2 - Rigid Frame Elevation06.11.22 W1 - Portal Frame Elevation06.11.22 P3 - Rigid Frame Elevation06.11.22 P4 - Rigid Frame Elevation06.11.22 F3 - Anchor Bolt Reactions06.09.22 E2 - Roof Sheeting Plan06.11.22 E4 - Elevation Framing06.11.22 E5 - Elevation Framing06.11.22 E6 - Elevation Framing06.11.22 E7 - Wall Liner Panel 06.11.22 E8 - Crane Framing Plan 06.11.22 E9 - Buildings Sections 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. BUILDING "A"BUILDING "B" DETAIL @ SHEAR WASHERS SECTION "X"SECTION "Y" @ONLY FOR BLDG. "A" TYPICAL AT BASE DETAIL ~ 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer's responsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. BUILDING "A" 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind Steel Buildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. BUILDING "B" 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer's responsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. DETAIL @ RIDGE CAPDETAIL @ PANEL END BUILDING "A" BUILDING "A" DETAIL @ FLANGE BRACE ATTACHMENT DETAIL @ SHEAR WASHERS @ONLY FOR BLDG. "A" 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer's responsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. DETAIL @ RIDGE CAPDETAIL @ PANEL END BUILDING "A" DETAIL @ FLANGE BRACE ATTACHMENT DETAIL @ SHEAR WASHERS @ONLY FOR BLDG. "A" 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer's responsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. DETAIL @ RIDGE CAPDETAIL @ PANEL END BUILDING "B" DETAIL @ FLANGE BRACE ATTACHMENT 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. DETAIL @ RIDGE CAPDETAIL @ PANEL END DETAIL @ FLANGE BRACE ATTACHMENT BUILDING "B" 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. X X 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. BUILDING "A"BUILDING "B" 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete.06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. BUILDING "A" BUILDING "B" BUILDING "A" BUILDING "B" Detail at Rake Angle SECTION "X" DETAIL AT CORNER TRIM 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. BUILDING "B" Detail at Rake Angle BUILDING "B" WALL DIAPHRAGM DETAIL (typical connection at each end) SECTION "Z" DETAILS AT FRAMED OPENINGS FOR OVERHEAD DOOR DETAIL AT CORNER TRIM 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. DETAILS AT FRAMED OPENINGS FOR OVERHEAD DOOR BUILDING "A"BUILDING "B" BUILDING "A"BUILDING "B" (girt to eave strut connection) DETAIL AT CORNER TRIM 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. DETAILS AT FRAMED OPENINGS FOR OVERHEAD DOOR BUILDING "B" BUILDING "A" (girt to eave strut connection) DETAIL AT CORNER TRIM 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. Liner Detail 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer's responsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. SECTION "AA" ERECTOR NOTE: Bolts for crane systems should be installed with the bolt above and the nut below the connected parts. OWNER/ERECTOR NOTE: Due to the dynamic nature of a crane system, bolts will tend to loosen over time. As a part of periodic maintenance all of the bolts for the crane runway system should be checked for tightness. CRANE DATA 06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. 06/14/2022 =EE LAP AT LONG AND S+ORT FLANGES X LF SF Lap SF LF SECTION "X" LF SFSF LF LF Long Flange SF Short Flange LAP LA<OUT SF LF SF LF =ee typ. Top flange typ. Rotate each ]ee as reTuired to alternate between the long and short flanges. TRAPEZE HANGER ~ 4" MAX. PIPE HANGER ~ 2-1/2" MAX. PIPE ACCEPTABLE CONNECTION METHODS Flange C-Clamp is not an acceptable connection NOTE: Whirlwind only provides the roof purlin. All other material and hardware is by others. COLLATERAL LOADS FOR HANGER ATTACHMENT flange is not acceptable Connection through the not an acceptable connection Caddy clip attached to lip is ACCEPTABLE CONNECTIONS FOR ALL CAUTION: Erector Note! Failure to tuck facing of insulation back from panel edge at the base and eave could result in irreparable panel damage and will void the panel warranty. STANDARD DETAIL @ BLANKET INSULATION BUILT-UP SECTION LEGEND W20851 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer's responsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete.06/14/2022 The Engineer whose seal and signature appear on these documents represent Whirlwind SteelBuildings, Inc., and is not the Engineer of Record for the overall project. The Engineer'sresponsibility is limited to material designed and manufactured by Whirlwind Steel Buildings, Inc.,and excludes parts such as doors, windows, foundation design, and erection of the building. DRAWING STATUS FOR APPROVAL: These drawings, being for approval, are by definition not final and are for conceptual representation only. Their purpose is to confirm the FOR CONSTRUCTION PERMIT: These drawings, being for permit, are by definition not final. Only drawings issued "For Erector Installation" can be considered complete. FOR ERECTOR INSTALLATION: Final drawings for construction. proper interpretation of the project documents. Only drawings issued "For Erector Installation" can be considered complete. 06/14/2022