Loading...
HomeMy WebLinkAboutCONCRETE FIELD TEST 8 - 23-00332 - Madison Jr High - AdditionPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6B6E67AA-860A-4C0D-9210-81F4D405C0A1 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File name: 23252FB09152023MDH Compressive Strength of Concrete Test Specimens Project Number: 23-252 Cumulative Test Load Amount: 10.0 Project Name: Madison JR. High Test Location: Northeast corner slab Client: Madison School District Admixtures: 322-N, POLY1025 Ticket Number: 2565 Contractor: Headwaters Construction Supplier: Valley Ready Mix Mix Number: 71FVALLY Date: 9/8/2023 Cylinder Log #: 537 Set #: 1 Entrained Air (%): 1.4 Concrete Temperature (°F): 67 Ambient Temperature (°F): 69 Unit Weight (PCF): 146.2 Tested By: Michael Hammar Time Tested: 01:52 PM Field Test Results: Pick Up Date: 9/9/2023 Picked Up By: Matthew Hammar Time: 12:33 PM Max, Min Temperature: 80, 60 Compressive Strength Data Initial Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 9/15/2023 4.000 12.57 47350.0 3767 3500.0 Type 2 Date: 09/19/2023 Reviewed By: Luke Hammar Signature: