HomeMy WebLinkAboutPLAT - 23-00264 - Stonebridge Townhomes Div 1 - Plat-Reviewed-Corrections-Required (1)Author Name Author Email Author Phone No.:
Keith Davidson Keith.Davidson@rexburg.org 208-372-2320
Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314
Alan Parkinson Alan.Parkinson@rexburg.org 208-372-2165
Cole Hibbard Cole.Hibbard@rexburg.org 208-372-2154
Katie Saurey Katie.Saurey@rexburg.org 208-372-2167
Description : Stonebridge Townhomes Division 1
Address :
Application Type :
Document Filename : PLAT - 23-00264 - Stonebridge Townhomes Div 1 - Plat.pdf Array
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Revisions Required
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
2 Callout Keith Davidson : PW Open 2 The development needs to dedicate 65' of right of way as
stipulated in the development agreement.
2 Callout Keith Davidson : PW Open 2 There needs to be a 15' utility easement on Stonebridge and
7th North
2 Callout Keith Davidson : PW Open 2 water and sewer easements need to be shown on the plat.
3 Callout Keith Davidson : PW Open 3 The Irrigation Certificate needs to say;
Irrigation Certificate
All statutory requirements of Idaho Code have been met,
including 31-3805. The lots on this plat will not receive any
irrigation water rights or shares in an irrigation company,
other than have been agreed to in writing between developer
and Irrigation District.
# 23-00264
Plat
Please digitally re-submit all pages of the plan set in response to requested revisions
for our next review cycle, with noted items resolved.
Report Date: 06.06.2023
Approval of plans does not constitute approval of variance from code
Page 1 of 2
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
The irrigation company has no issues with this development.
____________________________
Irrigation Company President Signature
____________________________
Irrigation Company
Report Date: 06.06.2023
Approval of plans does not constitute approval of variance from code
Page 2 of 2
Powered by TCPDF (www.tcpdf.org)
There needs to be a 15'
utility easement on
Stonebridge and 7th North
w ater and sew er
easements need to be
The dev elop ment needs to dedic ate
6 5' of right of w ay as stip ulated in the
dev elop ment agreement.
The Irrigation C ertific ate needs to say;
Irrigation Certificate
A ll statutory req uirements of Idaho C ode hav e been met,
inc luding 3 1-3 8 0 5. The lots on this p lat w ill not rec eiv e any
irrigation w ater rights or shares in an irrigation c omp any,
other than hav e been agreed to in w riting betw een
dev elop er and Irrigation D istric t.
The irrigation c omp any has no issues w ith this
dev elop ment.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Irrigation C omp any P resident Signature
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Irrigation C omp any