Loading...
HomeMy WebLinkAboutPLAT - 23-00264 - Stonebridge Townhomes Div 1 - Plat-Reviewed-Corrections-Required (1)Author Name Author Email Author Phone No.: Keith Davidson Keith.Davidson@rexburg.org 208-372-2320 Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Alan Parkinson Alan.Parkinson@rexburg.org 208-372-2165 Cole Hibbard Cole.Hibbard@rexburg.org 208-372-2154 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : Stonebridge Townhomes Division 1 Address : Application Type : Document Filename : PLAT - 23-00264 - Stonebridge Townhomes Div 1 - Plat.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 2 Callout Keith Davidson : PW Open 2 The development needs to dedicate 65' of right of way as stipulated in the development agreement. 2 Callout Keith Davidson : PW Open 2 There needs to be a 15' utility easement on Stonebridge and 7th North 2 Callout Keith Davidson : PW Open 2 water and sewer easements need to be shown on the plat. 3 Callout Keith Davidson : PW Open 3 The Irrigation Certificate needs to say; Irrigation Certificate All statutory requirements of Idaho Code have been met, including 31-3805. The lots on this plat will not receive any irrigation water rights or shares in an irrigation company, other than have been agreed to in writing between developer and Irrigation District. # 23-00264 Plat Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 06.06.2023 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments The irrigation company has no issues with this development. ____________________________ Irrigation Company President Signature ____________________________ Irrigation Company Report Date: 06.06.2023 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) There needs to be a 15' utility easement on Stonebridge and 7th North w ater and sew er easements need to be The dev elop ment needs to dedic ate 6 5' of right of w ay as stip ulated in the dev elop ment agreement. The Irrigation C ertific ate needs to say; Irrigation Certificate A ll statutory req uirements of Idaho C ode hav e been met, inc luding 3 1-3 8 0 5. The lots on this p lat w ill not rec eiv e any irrigation w ater rights or shares in an irrigation c omp any, other than hav e been agreed to in w riting betw een dev elop er and Irrigation D istric t. The irrigation c omp any has no issues w ith this dev elop ment. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Irrigation C omp any P resident Signature _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Irrigation C omp any