Loading...
HomeMy WebLinkAboutDAILY FIELD REPORT 2 - 23-00332 - Madison Jr High - AdditionPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 01E55D7E-355D-4034-9527-5D0C0676493E 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23252DFR09072023EV Daily Field Report Date: 09/07/2023 Project Number: 23-252 Project Name: Madison JR. High Client: Madison School District Start Time: 12:00 PM Contractor: Richardson Concrete Current Weather Conditions: Sunny/Clear Wind: Calm Ambient Temperature (°F): 79 Results Inspection Type(s): Concrete Reinforcement Location(s): Classroom Addition, interior slab. Observations/ Remarks: I arrived on site and spoke with Richardson Concrete about the job. They were just wrapping up all the rebar placement so I took my time and looked around. I was looking at the rebar and checking for correct size, spacing, and for general conformity. The rebar looked to be within spec and I reported that back to the foreman on site. Inspector Information Truck: Mileage From Lab to Project (One Way) 12 Total Mileage 24.00 Inspector's Name: Eric Vail Inspector's Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 01E55D7E-355D-4034-9527-5D0C0676493E 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Reviewer's Name: E. Vail Reviewer's Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 01E55D7E-355D-4034-9527-5D0C0676493E 3