Loading...
HomeMy WebLinkAboutDAILY FIELD REPORT - 23-00332 - Madison Jr High - AdditionPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B7A89FCF-C67A-4A4C-BB52-F9095B3AA2BB 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23252DFR09052023LS Daily Field Report Date: 09/05/2023 Project Number: 23-252 Project Name: Madison JR. High Client: Madison School District Start Time: 09:30 AM Contractor: Hill and Sons Excavation Current Weather Conditions: Partly Cloudy Wind: Calm Ambient Temperature (°F): 65 Results Inspection Type(s): Earthwork Inspection Location(s): Subfloor aggregate densities for 3/4 base Observations/ Remarks: I arrived on site at around 9:45am and began setting up my equipment for density testing. After setting up and prepping my equipment, I began testing the compaction of the 3/4 base. I received no passing tests. The contractor was notified, and he said that he’ll have his employees come water and compact the material again to reach required specs for compaction. Inspector Information Truck: THOR Mileage From Lab to Project (One Way) 10 Total Mileage 20.00 Inspector's Name: Leland Steiner Inspector's Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B7A89FCF-C67A-4A4C-BB52-F9095B3AA2BB 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Reviewer's Name: E. Vail Reviewer's Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B7A89FCF-C67A-4A4C-BB52-F9095B3AA2BB 3