Loading...
HomeMy WebLinkAboutSOIL DENSITY TEST 5 - 23-00332 - Madison Jr High - AdditionPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9D99F9DB-5501-410B-BB02-DAE5E6E19305 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23252D09062023EV In Place Density of Soils ASTM D2922 & D3017 Date: 09/06/2023 Project Number: 23-252 Project Name: Madison JR. High Client: Madison School District Total Time on Project: 3 Time Start: 09:00 AM Contractor: Hill and Sons Excavation Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76560 MS: 615 Ambient Temperature (°F): 61 DS: 2408 Results Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Southern classroom addition. Interior slab. 15’ south of northern wall, 25’ east of western wall. Top of base BS 131.5 125.3 5.5 131.6 3/4" Base 95 2 Southern classroom addition. Interior slab. 12’ south of northern wall, 75’ east of western wall. Top of base BS 131.9 125.9 5.0 131.6 3/4" Base 96 3 Southern Top of BS 132.1 126.1 5.1 131.6 96 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9D99F9DB-5501-410B-BB02-DAE5E6E19305 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail classroom addition. Interior slab. 18’ south of northern wall, 125’ east of western wall. base 3/4" Base 4 Southern classroom addition. Interior slab. 18’ south of northern wall, 15’ west of eastern wall. Top of base BS 132.0 126.4 5.3 131.6 3/4" Base 96 Field Technician Information Truck DEADPOOL Mileage from Lab to Project (One Way) 12 Total Mileage 12.00 Tested By: Eric Vail Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site and checked in with Hill and Sons excavation. They weren’t quite ready yet so I standardized my gauge in the mean time. They had just started watering and compacting the 3/4” base, so progress was a little slow. But I was able to work along with them and take several passing shots and report those results as I went. When I was done I cleaned and packed up my gear and wrote this report. Reviewed By: E. Vail Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9D99F9DB-5501-410B-BB02-DAE5E6E19305 3 Inspection Images: