Loading...
HomeMy WebLinkAboutINFRASTRUCTURE Rev 3 4.6.23 - 22-00669 - BYUI 10th Ward - University Blvd. & 5th W - Plat-Reviewed-Corrections-Required (3) (1)GENERAL NOTES 1.1 COMPLIANCE 1.ALL WORK TO CONFORM TO GOVERNING MUNICIPALITY'S STANDARDS, SPECIFICATIONS AND REQUIREMENTS. 2.ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS AND THE MOST RECENT, ADOPTED EDITIONS OF THE FOLLOWING: INTERNATIONAL BUILDING CODE (IBC), THE INTERNATIONAL PLUMBING CODE, STATE DRINKING WATER REGULATIONS, APWA MANUAL OF STANDARD PLANS AND SPECIFICATIONS, ADA ACCESSIBILITY GUIDELINES. 3.ALL CONSTRUCTION SHALL BE AS SHOWN ON THESE PLANS. ANY REVISIONS MUST HAVE PRIOR WRITTEN APPROVAL. 1.2 PERMITTING AND INSPECTIONS 1.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING SURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED THOROUGHLY REVIEWED PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES. 2.CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND NOTIFYING ARCHITECT/ENGINEER OR INSPECTING AUTHORITY 48 HOURS IN ADVANCE OF COVERING UP ANY PHASE OF CONSTRUCTION REQUIRING OBSERVATION. 3.ANY WORK IN THE PUBLIC RIGHT-OF-WAY WILL REQUIRE PERMITS FROM THE APPROPRIATE, CITY, COUNTY OR STATE AGENCY CONTROLLING THE ROAD AND WITH APPROPRIATE INSPECTIONS. 1.3 COORDINATION & VERIFICATION 1.ALL DIMENSIONS, GRADES & UTILITY DESIGNS SHOWN ON THE PLANS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR WORK HAVING TO BE REDONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS, IF NOT VERIFIED AND NOTIFICATION OF CONFLICTS HAVE NOT BEEN BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER. 2.CONTRACTOR MUST VERIFY ALL EXISTING CONDITIONS BEFORE BIDDING AND BRING UP ANY QUESTIONS BEFOREHAND. NO ALLOWANCE WILL BE MADE FOR DISCREPANCIES OR OMISSIONS THAT CAN BE EASILY OBSERVED. 3.CONTRACTOR TO COORDINATE WITH ALL OTHER DISCIPLINES, INCLUDING BUT NOT LIMITED TO: LANDSCAPE PLANS, SITE ELECTRICAL SITE LIGHTING PLANS AND ELECTRICAL SERVICE TO THE BUILDING(S), MECHANICAL PLANS FOR LOCATION OF SERVICES TO THE BUILDING(S), INCLUDING FIRE PROTECTION, ARCHITECTURAL SITE PLAN FOR DIMENSIONS, ACCESSIBLE ROUTES, ETC., NOT SHOWN ON CIVIL PLANS. 4.CONTRACTOR IS TO COORDINATE LOCATION OF NEW TELEPHONE SERVICE, GAS SERVICE, CABLE, ETC. TO BUILDING WITH THE APPROPRIATE UTILITY COMPANY. FOR TELEPHONE, CONTRACTOR TO FURNISH CONDUIT, PLYWOOD BACKBOARD, AND GROUND WIRE, AS REQUIRED. 1.4 SAFETY AND PROTECTION 1.CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION, 2.CONTRACTOR IS RESPONSIBLE FOR THE SAFETY OF THE PROJECT AND SHALL MEET ALL OSHA REQUIREMENTS. 3.CONTRACTOR IS RESPONSIBLE FOR CONFORMING TO LOCAL AND FEDERAL CODES GOVERNING SHORING AND BRACING OF EXCAVATIONS AND TRENCHES, AND FOR THE PROTECTION OR WORKERS AND PUBLIC. 4.CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PROTECT ALL EXISTING PUBLIC AND PRIVATE PROPERTY, ROADWAYS, AND UTILITY IMPROVEMENTS. DAMAGE TO EXISTING IMPROVEMENTS CAUSED BY THE CONTRACTOR MUST BE REPAIRED BY THE CONTRACTOR AT HIS/HER EXPENSE TO THE SATISFACTION OF THE OWNER OF SAID IMPROVEMENTS. 5.CONTRACTOR IS REQUIRED TO KEEP ALL CONSTRUCTION ACTIVITIES WITHIN THE APPROVED PROJECT LIMITS. THIS INCLUDES, BUT IS NOT LIMITED TO, VEHICLE AND EQUIPMENT STAGING, MATERIAL STORAGE AND LIMITS OF TRENCH EXCAVATION. 6.IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN PERMISSION AND/OR EASEMENTS FROM THE APPROPRIATE GOVERNMENT AGENCY AND/OR INDIVIDUAL PROPERTY OWNER(S) FOR WORK OR STAGING OUTSIDE OF THE PROJECT LIMITS. 7.CONTRACTOR SHALL PROVIDE BARRICADES, SIGNS, FLASHERS, OTHER EQUIPMENT AND FLAG PERSONS NECESSARY TO INSURE THE SAFETY OF WORKERS AND VISITORS. ALL CONSTRUCTION SIGNING, BARRICADING, AND TRAFFIC DELINEATION SHALL CONFORM TO THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES", LATEST EDITION. 8.CONTRACTOR SHALL COMPLY WITH LOCAL NOISE ORDINANCE STANDARDS. 9.CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL ACCORDING TO GOVERNING AGENCY STANDARDS. 10.CONTRACTOR SHALL TAKE ALL NECESSARY AND PROPER PRECAUTIONS TO PROTECT ADJACENT PROPERTIES FROM ANY AND ALL DAMAGE THAT MAY OCCUR FROM STORM WATER RUNOFF AND/OR DEPOSITION OF DEBRIS RESULTING FROM ANY AND ALL WORK IN CONNECTION WITH CONSTRUCTION. SUBMIT A STORM WATER POLLUTION PREVENTION PLAN, IF REQUIRED. 11.WORK IN PUBLIC STREETS, ONCE BEGUN, SHALL BE PROSECUTED TO COMPLETION WITHOUT DELAY AS TO PROVIDE MINIMUM INCONVENIENCE TO ADJACENT PROPERTY OWNERS AND TO THE TRAVELING PUBLIC. 12.CONTRACTOR SHALL PROVIDE ALL NECESSARY HORIZONTAL AND VERTICAL TRANSITIONS BETWEEN NEW CONSTRUCTION AND EXISTING SURFACES TO PROVIDE FOR PROPER DRAINAGE AND FOR INGRESS AND EGRESS TO NEW CONSTRUCTION. 13.NATURAL VEGETATION AND SOIL COVER SHALL NOT BE DISTURBED PRIOR TO ACTUAL CONSTRUCTION OF A REQUIRED FACILITY OR IMPROVEMENT. MASS CLEARING OF THE SITE IN ANTICIPATION OF CONSTRUCTION SHALL BE AVOIDED. CONSTRUCTION TRAFFIC SHALL BE LIMITED TO ONE APPROACH TO THE SITE. THE APPROACH SHALL BE DESIGNATED BY THE OWNER OR GOVERNING AGENCY. 14.THE CONTRACTOR SHALL TAKE REASONABLE MEASURE TO PROTECT EXISTING IMPROVEMENTS FROM DAMAGE AND ALL SUCH IMPROVEMENTS DAMAGED BY THE CONTRACTOR'S OPERATION SHALL BE REPAIRED OR RECONSTRUCTED TO THE ENGINEER/OWNER'S SATISFACTION AT THE EXPENSE OF THE CONTRACTOR. 1.5 MATERIALS 1.SITE CONCRETE SHALL BE A MINIMUM 6.5 BAG MIX, 4000 P.S.I. @ 28 DAYS, 4" MAXIMUM SLUMP WITH 5 + OR - 1% AIR ENTRAINMENT, UNLESS SPECIFIED OTHERWISE. -SEE SPECIFICATION A.SLABS-ON-GRADE WILL BE TYPICALLY SCORED (1/4 THE DEPTH) AT INTERVALS NOT TO EXCEED THEIR WIDTH OR 12 TIMES THEIR DEPTH, WHICHEVER IS LESS. SCORING WILL BE PLACED TO PREVENT RANDOM CRACKING. FULL DEPTH EXPANSION JOINTS WILL BE PLACED AGAINST ANY OBJECT DEEMED TO BE FIXED, CHANGES IN DIRECTION AND AT EQUAL INTERVALS NOT TO EXCEED 50 FEET. B.CONCRETE WATERWAYS, CURBWALLS, MOWSTRIPS, CURB AND GUTTER, ETC. WILL TYPICALLY BE SCORED (1/4 THE DEPTH AT INTERVALS NOT TO EXCEED 10 FEET AND HAVE FULL DEPTH EXPANSION JOINTS AT EQUAL SPACING NOT TO EXCEED 50 FEET. C.UNLESS OTHERWISE NOTED, ALL SLABS-0N-GRADE WILL HAVE A MINIMUM 8" TURNED-DOWN EDGE TO HELP CONTROL FROST HEAVE. D.UNLESS OTHERWISE NOTED, ALL ON-GRADE CONCRETE WILL BE PLACED ON A MINIMUM 4" GRAVEL BASE OVER A WELL COMPACTED (90%) SUBGRADE. E.ALL EXPOSED SURFACES WILL HAVE A TEXTURED FINISH, RUBBED OR BROOMED. ANY "PLASTERING" OF NEW CONCRETE WILL BE DONE WHILE IT IS STILL "GREEN". F.ALL JOINTS (CONTROL, CONSTRUCTION OR EXPANSION JOINTS, ETC.) WILL BE SEALED WITH A ONE PART POLYURETHANE SEALANT (SEE SPECIFICATION). 2.ASPHALTIC CONCRETE PAVEMENT SHALL BE A MINIMUM 3" OVER 6" OF COMPACTED (95%) ROAD BASE OVER PROPERLY PREPARED AND COMPACTED (90%) SUBGRADE, UNLESS NOTED OTHERWISE. -SEE SPECIFICATIONS, AND DETAIL 'D1' SHEET C5.01 A.ASPHALT COMPACTION SHALL BE A MINIMUM 96% (MARSHALL DESIGN). B.SURFACE COARSE SHALL BE ½ " MINUS. MIX DESIGN TO BE SUBMITTED FOR APPROVAL AT LEAST TWO WEEKS PRIOR TO ANTICIPATED PAVING SCHEDULE. C.AC PAVEMENT TO BE A ¼" ABOVE LIP OF ALL GUTTER AFTER COMPACTION. D.THICKNESSES OVER 3" WILL BE LAID IN TWO LIFTS WITH THE FIRST LIFT BEING AN APPROVED 3/4" MINUS DESIGN. 1.6 GRADING / SOILS 1.SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT, WHICH BY REFERENCE ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND IN CASE OF CONFLICT SHALL TAKE PRECEDENCE, UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS, OR IN THE SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY BETWEEN THE SOILS REPORT AND THESE PLANS AND SPECIFICATIONS. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. 3.ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557, EXCEPT UNDER BUILDING FOUNDATIONS WHERE IT SHALL BE 98% MIN. OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2% ABOVE NOR 3% BELOW OPTIMUM. 4.CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITH THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT. 5.SITE CLEARING SHALL INCLUDE THE LOCATING AND REMOVAL OF ALL UNDERGROUND TANKS, PIPES, VALVES, ETC. 6.ALL EXISTING VALVES, MANHOLES, ETC. SHALL BE RAISED OR LOWERED TO GRADE AS REQUIRED. GENERAL NOTES: CONTINUED 1.7 UTILITIES 1.THE LOCATIONS OF UNDERGROUND FACILITIES SHOWN ON THESE PLANS ARE BASED ON FIELD SURVEYS AND LOCAL UTILITY COMPANY RECORDS. IT SHALL BE THE CONTRACTOR'S FULL RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES EITHER DIRECT OR THROUGH BLUE STAKE TO LOCATE THEIR FACILITIES PRIOR TO STARTING CONSTRUCTION. 2.CONTRACTOR TO VERIFY BY POTHOLING BOTH THE VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UTILITIES PRIOR TO INSTALLING ANY NEW LINES. NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR DAMAGE AND REPAIR TO THESE FACILITIES CAUSED BY HIS WORK FORCE. 3.CONTRACTOR MUST START AT LOW END OF ALL NEW GRAVITY UTILITY LINES. MECHANICAL SUB-CONTRACTOR MUST BE PROVIDED CIVIL SITE DRAWINGS FOR COORDINATION AND TO CHECK THE FLOW FROM THE LOWEST POINT IN BUILDING TO THE FIELD VERIFIED CONNECTION AT THE EXISTING MAIN. NO EXTRA COMPENSATION IS TO BE PAID TO THE CONTRACTOR FOR WORK HAVING TO BE REDONE DUE TO FAILURE TO COMPLY WITH THESE REQUIREMENTS. 4.CONTRACTOR IS TO VERIFY LOCATION, DEPTH, SIZE, TYPE, AND OUTSIDE DIAMETERS OF UTILITIES IN THE FIELD BY POTHOLING A MINIMUM OF 300 FEET AHEAD, PIPELINE CONSTRUCTION TO AVOID CONFLICTS WITH DESIGNED PIPELINE GRADE AND ALIGNMENT. EXISTING UTILITY INFORMATION SHOWN ON PLANS OR OBTAINED FROM UTILITY COMPANIES OR BLUE STAKED MUST BE ASSUMED AS APPROXIMATE, REQUIRING FIELD VERIFICATION. 5.CULINARY WATER AND FIRE SERVICE LINES TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS AND SPECIFICATIONS. 6.SANITARY SEWER MAINS AND LATERALS TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY SEWER DISTRICT STANDARDS AND SPECIFICATIONS. 7.STORM SEWER TO BE CONSTRUCTED IN ACCORDANCE WITH THE GOVERNING MUNICIPALITY STANDARDS AND SPECIFICATIONS. 8.ALL STORM DRAIN AND IRRIGATION CONDUITS SHALL BE INSTALLED WITH WATER TIGHT JOINTS AND CONNECTIONS. 9.ALL STORM DRAIN PIPE PENETRATIONS INTO BOXES SHALL BE CONSTRUCTED WITH WATER TIGHT SEALS ON THE OUTSIDE AND GROUTED SMOOTH WITH A NON-SHRINK GROUT ON THE INSIDE. CONDUITS SHALL BE CUT OFF FLUSH WITH THE INSIDE OF THE BOX. 10.NO CHANGE IN THE DESIGN OF UTILITIES AS SHOWN WILL BE MADE BY THE CONTRACTOR WITHOUT THE WRITTEN APPROVAL OF THE GOVERNING MUNICIPALITY, OR OTHER AUTHORITY HAVING JURISDICTION OVER THAT UTILITY. 11.ALL STORM DRAIN CONDUITS AND BOXES SHALL BE CLEAN AND FREE OF ROCKS, DIRT, AND CONSTRUCTION DEBRIS PRIOR TO FINAL INSPECTION. 1.8 SURVEY CONTROL 1.CONTRACTOR MUST PROVIDE A REGISTERED LAND SURVEYOR OR PERSONS UNDER THE SUPERVISION OF A REGISTERED LAND SURVEYOR TO SET STAKES FOR THE ALIGNMENT AND GRADE OF EACH MAIN AND/OR FACILITY AS SHOWN ON THE PLANS. THE STAKES SHALL BE MARKED WITH THE HORIZONTAL LOCATION (STATION) AND VERTICAL LOCATION (GRADE) WITH CUTS AND/OR FILLS TO THE APPROVED GRADE OF THE MAIN AND OR FACILITY AS SHOWN ON THE PLANS. 2.THE CONTRACTOR SHALL PROTECT ALL STAKES AND MARKERS FOR VERIFICATION PURPOSES. 3.CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING, MAINTAINING, OR RESTORING ALL MONUMENTS AND REFERENCE MARKS WITHIN THE PROJECT SITE. 1.9 AMERICAN DISABILITIES ACT 1.PEDESTRIAN / ADA ROUTES SHALL MEET THE FOLLOWING SPECIFICATIONS: *ROUTES SHALL HAVE A 2.00% (1:50) MAXIMUM CROSS SLOPE. *ROUTES SHALL HAVE A 5.00% (1:20) MAXIMUM RUNNING SLOPE. *RAMPS SHALL HAVE A 8.33% (1:12) MAXIMUM RUNNING SLOPE. 2.ADA PARKING STALLS AND ADJACENT ROUTES SHALL HAVE A 2.00% MAXIMUM SURFACE SLOPE IN ANY DIRECTION. 3.THE CONTRACTOR SHALL ADHERE TO THE ABOVE SPECIFICATIONS. IN THE EVENT OF A DISCREPANCY IN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO ANY CONSTRUCTION. MONUMENT LINE CENTER LINE SUBJECT PROPERTY LINE ADJACENT PROPERTY LINE EASEMENT LINE DITCH FLOWLINE FENCE LINE ATMS CABLE CABLE TV LINE COMMUNICATIONS LINE FIBER-OPTIC CABLE FIRE LINE IRRIGATION LINE NATURAL GAS LINE OVERHEAD COMMUNICATIONS OVERHEAD POWER LINE OVERHEAD TELEPHONE LINE OVERHEAD TELEVISION LINE POWER LINE POWER/COMMUNICATIONS LINE POWER/TELEPHONE LINE POWER/TELE/COMM LINE ROOF DRAIN LINE SECONDARY WATER LINE SANITARY SEWER LINE STEAM LINE STORM DRAIN LINE TELEPHONE LINE TELEPHONE/COMM LINE UNDERDRAIN UNDERGROUND COMMUNICATIONS UNDERGROUND POWER LINE UNDERGROUND TELEPHONE LINE UNDERGROUND TELEVISION WATER LINE CONTOUR LINE CURB & GUTTER (STD) CURB & GUTTER (OUTFALL) CONCRETE PAVEMENT STD. DUTY ASPHALT HEAVY DUTY ASPHALT SECTION CORNER (FOUND) SECTION CORNER (NOT FOUND) STREET MONUMENT BRASS CAP MONUMENT POWER POLE UTILITY POLE GUY ANCHOR POWER TRANSFORMER TRAFFIC SIGNAL CABINET LIGHT POLE TELEPHONE RISER TELEPHONE MANHOLE TRAFFIC SIGNAL BOX WATER MANHOLE WATER VALVE WATER METER FIRE HYDRANT SANITARY SEWER MANHOLE SANITARY SEWER CLEANOUT STORM DRAIN MANHOLE STORM DRAIN CURB INLET STORM DRAIN CATCH BASIN STORM DRAIN CLEANOUT STORM DRAIN COMBO BOX MAILBOX SIGN FLOW DIRECTION SPOT ELEVATION CONIFEROUS TREE DECIDUOUS TREE EXISTINGNEW EXISTINGNEW ATMS X X atms LEGEND TV tv C c FO fo F f G g IRR irr OHP ohp P p P/C p/c P/T p/t P/T/C p/t/c RD rd SW sw S s ST st SD sd T t T/C t/c UGP ugp W w GUY GUY TRANS TRANS TR TR T T W W WM WM S S SSCO SSCO SD SD SD SD MB MB 4572 44.00 EX TOC 44.00 TOC OHC ohc OHT oht OHTV ohtv UGC ugc UGTV ugtv UGT ugt 72 UD ud ABBREVIATIONS AC ACRE ADA AMERICANS WITH DISABILITIES ACT ATMS ADVANCED TRAFFIC MGMT. SYSTEM B&C BAR & CAP BC BUILDING CORNER BLUE BLUE STAKED ELECTRIC BLUFO BLUE STAKED FIBER OPTIC BLUG BLUE STAKED NATURAL GAS BLUIRR BLUE STAKED IRRIGATION BLUSD BLUE STAKED STORM DRAIN BLUSS BLUE STAKED SANITARY SEWER BLUT BLUE STAKED TELEPHONE BLUW BLUE STAKED WATER BM BENCHMARK BOB BOTTOM OF BOX BOL BOLLARD BOV BLOW-OFF VALVE BOW BACK OF WALK BW BOTTOM OF WALL ℄CENTERLINE CATV CABLE TELEVISION CBR CONCRETE BARRIER CC CURB CUT COL COLUMN COMM COMMUNICATIONS CONC CONCRETE CONST CONSTRUCTION CMP CORRUGATED METAL PIPE CP CONTROL POINT CTREE CONIFEROUS TREE CUFT CUBIC FOOT CUYD CUBIC YARD DEL DELINEATOR DIA or Ø DIAMETER DIP DUCTILE IRON PIPE DTREE DECIDUOUS TREE DYL DOUBLE YELLOW LINE E EAST EB ELECTRIC BOX EGL ENERGY GRADE LINE ELEV ELEVATION EM ELECTRIC METER EMH ELECTRIC MANHOLE EOA EDGE OF ASPHALT EOC EDGE OF CONCRETE EOG EDGE OF GRAVEL EOL EDGE OF LAWN EX or EXIST EXISTING F FIRE FC FOUNDATION CORNER FD FOUND FDC FIRE DEPT. CONNECTION FDMN FOUND MONUMENT FDSC FOUND SECTION CORNER FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FH FIRE HYDRANT FL FLOW LINE FNC FENCE FNCCL CHAIN LINK FENCE FNCIRN IRON FENCE FNCVYL VINYL FENCE FNCWD WOOD FENCE FNCWR WIRE FENCE FO FIBER OPTIC FOW FRONT OF WALK FT FEET G NATURAL GAS GAR GARAGE GB GRADE BREAK GL GROUND LIGHT GM GAS METER GMH GAS MANHOLE GUY GUY WIRE GV GAS VALVE HDPE HIGH DENSITY POLYETHYLENE HG HEADGATE HGL HYDRAULIC GRADE LINE HP HIGH POINT HW HEADWALL or HIGH WATER HWY HIGHWAY ICO IRRIGATION CLEANOUT ICV IRRIGATION CONTROL VALVE IE INVERT ELEVATION IRR IRRIGATION LF LINEAR FEET LIP LIP OF GUTTER LP LOW POINT or LIGHT POLE MAX MAXIMUM MIN MINIMUM MON MONUMENT MP METAL PIPE MW MONITORING WELL N NORTH NG NATURAL GROUND NGRET NG AT RETAINING WALL NR NAIL & RIBBON NW NAIL & WASHER NTS NOT TO SCALE OG ORIGINAL GROUND OH OVERHANG OHC OVERHEAD COMMUNICATIONS OHP OVERHEAD POWER OHT OVERHEAD TELEPHONE OHTV OVERHEAD TELEVISION ⅊PROPERTY LINE PB POWER BOX PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVE PI POINT OF INTERSECTION PM PARKING METER PP POWER POLE PRC POINT OF REVERSE CURVE PRK PARKING STRIPE POC POINT OF CONNECTION PT POINT OF TANGENCY PWR POWER PVC POLYVINYL CHLORIDE PIPE R RANGE RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN REV REVISION ROW RIGHT-OF-WAY RR RAILROAD S SOUTH SAD SEE ARCHITECTURAL DRAWINGS SD STORM DRAIN SDCB STORM DRAIN CATCH BASIN SDCO STORM DRAIN CLEOUNOUT BOX SDMH STORM DRAIN MANHOLE SEC SECTION SPECS SPECIFICATIONS SLB&M SALT LAKE BASE & MERIDIAN SQ SQUARE SQFT SQUARE FEET SQYD SQUARE YARD SS SANITARY SEWER SSCO SANITARY SEWER CLEANOUT SSMH SANITARY SEWER MANHOLE ST STEAM STA STATION STD STANDARD STM STORM SYL SOLID YELLOW LINE SWL SOLID WHITE LINE T TOWNSHIP TBC TOP BACK OF CURB TELE TELEPHONE TFC TOP FACE OF CURB TL TREE LINE TMH TELEPHONE MANHOLE TOA TOP OF ASPHALT TOC TOP OF CONCRETE TOE TOE OF SLOPE TOP TOP OF SLOPE or TOP OF PIPE TOW TOP OF WALK TR TELEPHONE RISER TV TELEVISION TW TOP OF WALL TRANS TRANSFORMER TSP TRAFFIC SIGNAL POLE TSB TRAFFIC SIGNAL BOX UD UNDERDRAIN UGC UNDERGROUND COMMUNICATIONS UGP UNDERGROUND POWER UGT UNDERGROUND TELEPHONE UGTV UNDERGROUND TELEVISION U.N.O.UNLESS NOTED OTHERWISE UP UTILITY POLE VCP VITRIFIED CLAY PIPE VP VERTICAL PIPE W WEST or WATER WM WATER METER WMH WATER MANHOLE WS WATER SURFACE WTR WATER WV WATER VALVE WW WATERWAY Pr i n t e d : 31 M a r 2 0 2 3 2: 5 5 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 Preliminary - Not for Construction - Pl a n r e - s u b m i t t a l 2 Civil Notes C601 . X X X X X X X X X X X X XXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X CO CO EX TOP OF 12" PIPE TO REMAIN EX TOP OF 18" SD CMP PIPE TO REMAIN EX 24" SD PLASTIC PIPE TO REMAIN EX CB TO REMAIN GRATE=4883.00 INV=4878.31 EX CB TO REMAIN GRATE=4880.92 INV=4878.42 EX SDMH TO REMAIN RIM=4882.26 E INV=4878.60 N INV=4878.47 S INV=4878.42 EX 36" SD PLASTIC PIPE TO REMAIN EX INV:4876.96 EX SDMH TO REMAIN RIM=4873.74 E INV=4869.99 W INV=4869.91 EX INV:4875.25 EX 24" SD CMP PIPE TO REMAIN EX SHOULDER TO REMAIN EX CURB & GUTTER TO REMAIN 48 9 0 48 8 8 489 2 489 4 490 0 48 9 4 489 6 489 8 48 8 0 4880 4880 4876 4 8 7 8 4878 4878 48 8 2 48 8 4 48 8 6 EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y S89° 40' 10"E 165.11' S89° 39' 20"E 86.98' N80° 43' 00"E 316.81' N0 0 ° 1 6 ' 3 0 " W 24 2 . 0 7 ' S89° 43' 30"W 330.00' N0 0 ° 1 6 ' 5 0 " W 18 5 . 7 0 ' N89° 39' 50"W 2649.26' 87.48 EXIST 87.72 EXIST 2 . 3 % 4.2% 3. 1 % 1. 6 % 83.92 EXIST 83.92 EXIST 83.53 EXIST 83.10 EXIST 82.84 EXIST 82.23 EXIST 81.52 EXIST 78.94 EXIST 80.09 EXIST 2.0% 2.4% 2.7% 2.5% 3.0% 83.81 TBC 83.56 TBC 83.31 TBC 82.59 TBC 81.93 TBC 81.34 TBC 78.90 TBC 77.98 EXIST 2. 7 % 0. 6 % 1. 5 % 1.9% 3.7%1.5% 1.3%1.6% 4.8%1.7% 4. 6 % 4. 6 % 1. 5 % 1. 5 % 3.6% 2. 0 % 2.0% 2.0% 1.9% 1. 9 % 4.8% 3.5 % 4.2% 4.8% 4.0 % 3.9 % 0.5% 1. 8 % 1.8% 1.8% 1.8% 3.3% 3.5% 2. 7 % 2.8% 2 . 2 % 1. 8 % 1.6% 2 . 9 % 1.5% 1.5% 6.4% 4.6% 2.9% 0. 5 % 1. 0 % 2. 2 % 1. 7 % 84.00 EXIST 86.00 EXIST 88.00 EXIST 90.00 EXIST 92.29 EXIST 94.21 EXIST 84.28 EXIST 86.00 EXIST 88.20 EXIST 86.00 EXIST 84.00 EXIST 82.65 TOA 82.29 TOA 3.7%1.1%1. 9 % 1.6% 4.5% 82.46 TBC 82.40 TBC 82.34 TOC 82.46 TOC 82.03 TOC 83.91 TOC 83.66 TOC 83.41 TOC 81.90 TOC 78.50 TOC 78.04 TOC 78.00 EXIST 83.10 TBC 91.00 TBC 90.75 TBC 90.50 TBC 91.58 TBC 92.65 TBC 92.75 TBC 92.85 TBC 93.00 TBC 94.00 TBC 93.70 TBC 93.70 TBC 93.74 TBC 93.25 TOC 93.41 TOC 93.71 TOC 93.55 TOC 94.05 TBC 94.10 TBC 94.20 TBC 94.50 TBC 2 . 2 % 92.50 TBC 92.20 TBC 92.60 TBC 92.60 TBC 85.76 TOC 90.18 TOC 90.45 TBC 90.60 TBC 90.50 TBC 90.48 TBC 90.34 TBC 90.15 TBC 89.75 TBC 88.85 TBC 88.25 TBC 88.75 TBC 88.75 TBC 88.25 TBC 92.10 TBC 92.70 TBC 93.10 TBC 93.90 TOC 93.00 TOC 95.10 TOC 95.42 TOC 95.50 TOC 95.00 FG 93.15 TBC 92.99 TBC 92.75 TBC 92.55 TBC 92.35 TBC 91.75 TBC 91.49 TBC 90.70 TBC 92.83 TBC 92.34 TBC 92.08 TBC 91.30 TBC 93.70 TBC 93.75 TBC 94.10 TOC 94.10 TOC 93.66 TBC 93.58 TBC 93.55 TBC 93.65 TBC 94.22 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.00 FG 95.00 FG 95.00 FG 95.50 TOC 95.42 TOC 97.75 TOC 98.00 TOC 95.70 TBC 94.65 TOC 95.20 TOC 95.40 TOC 94.90 TOC 95.08 TBC 94.78 TBC 95.26 TOC 93.82 TOA 94.45 TOA 94.90 TOC 95.40 TOC 94.45 TOA 94.78 TBC 95.28 TOC 95.15 TOC 95.05 TOC 94.60 TOC 94.93 TBC 94.10 TOA [ 86 ] [ 8 4 ] [ 8 3 ] SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD NEW SD CATCH BASIN GRATE: 4893.25' IE: 4889.75' NEW SD CURB INLET BOX GRATE: 4890.00' IE: 4887.00' NEW 72 LF 18" HDPE @ 2.55% SLOPE NEW SD CO BOX GRATE: 4890.00' IE: 4884.48' NEW 46 LF 12" HDPE @ 5.82% SLOPE NEW SD CURB INLET BOX GRATE: 4891.84' IE: 4888.34' NEW 118 LF 12" HDPE @ 3.27% SLOPE NEW SD CURB INLET BOX GRATE: 4887.75' IE: 4884.30' NEW 28 LF 12" HDPE @ 0.35% SLOPE NEW SD CURB INLET BOX GRATE: 4887.75' IE: 4884.40' NEW 223 LF 12" HDPE @ 1.16% SLOPE NEW SD CURB INLET BOX GRATE: 4881.84' IE: 4878.84' NEW SD CO BOX SOLID LID: 4888.33' 18" (N): 4882.50' ISOLATER (S): 4880.50' MANIFOLD (E): 4881.50' SD SD SD SD SD SD SD SD SD SD 12" AREA DRAIN GRATE: 4893.75' I.E.: 4890.75' 23 L.F. NEW 8" HDPE @ 16.00% 169 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.00' I.E.: 4889.90' 92 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4893.00' I.E.: 4889.44' 0.6% 4.7% 95.42 TOC 1. 7 % 94.80 TOA 0.8%1.1% 1.7 %2.2 % 2. 2 % 2.9% 4. 1 % SECTION LINE SECTION LINE NEW RIGHT-OF-WAY LINE20.00' 20.00' 20.00' SECTION LINE NEW RIGHT-OF-WAY LINE NEW 47 LF 18" HDPE @ 0.35% SLOPE NEW 26 LF 18" HDPE @ 6.90% SLOPE NEW 175 LF 18" PERFORATED HDPE @ 0.50% SLOPE 77.84 EXIST 77.45 EXIST 1.8% 77.87 EXIST 2.5% 2.7% 3. 0 % 1.8 % SD NEW SD CURB DOUBLE INLET BOX GRATE: 4877.00' IE: 4873.50' 78.32 TBC 77.50 TBC REPLACE EXISTING TYPE 8 INLET WITH NEW SD CO BOX SOLID LID: 4877.55' EX IE (W): MATCH EX / APPROX 4872.80' EX IE (E): MATCH EX / APPROX 4872.50' NEW IE (N): MATCH EX IE (W) / 4872.80' 84.20 EXIST 83.60 EXIST 83.30 EXIST 82.90 EXIST 82.30 EXIST 81.30 EXIST 80.50 EXIST 79.60 EXIST 79.20 EXIST 77.80 EXIST NEW 12 LF 18" RCP @ 5.83% SLOPE 1. 9 % ROAD TO BE WIDENED AS SHOWN ROAD TO BE WIDENED AS SHOWN 81.73 TOC 81.39 TOC 79.95 TOC NEW ADA RAMP PER CITY CITY STANDARDS 78.00 TBC 77.85 TBC 79.36 EXIST 79.71 EXIST EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL 79.71 TOC 79.36 TOC 80.32 EXIST 80.32 TOC 81.83 EXIST 81.83 TOC 83.07 EXIST 83.07 TOC 84.34 EXIST 84.34 TOC 85.47 EXIST 85.47 TOC 86.57 EXIST 86.57 TOC 88.62 EXIST 88.62 TOC 91.48 EXIST 91.48 TOC S S S S 167.50' TP B4 EX SURFACE: 4897.75' BEDROCK: 4894.25' TP B1 EX SURFACE: 4891.00' BEDROCK: 4886.50' TP 2 EX SURFACE: 4889.50' BEDROCK: 4885.50' TP 4 EX SURFACE: 4892.50' BEDROCK: 4887.75' TP 5 EX SURFACE: 4894.00' BEDROCK: 4889.75' TP 1 EX SURFACE: 4887.00' BEDROCK: 4882.25' TP 3 EX SURFACE: 4889.00' BEDROCK: 4887.00' TP 7 EX SURFACE: 4893.00' BEDROCK: 4888.25' TP 6 EX SURFACE: 4886.00' BEDROCK: 4881.75' 5 STEPS 92.90 TOC 90.65 TOC 93.10 TOC 93.10 TOC 93.10 TOC NEW SD CURB INLET BOX GRATE: 4891.84' IE: 4888.84' NEW 72 LF 18" HDPE @ 1.26% SLOPE 3.9 % 4.5% NEW SD CATCH BASIN GRATE: 4887.75' IE (E): 4884.75' IE (S): 4885.75' SD SD SD TP 9 EX SURFACE: 4899.50' BEDROCK: 4896.50' SD SD SDNEW 76 LF 12" HDPE @ 0.35% SLOPE 92.34 TBC SD SD SD SD SD SD SD SD SD NEW 12 LF 12" HDPE @ 0.75% SLOPE I.E. = 4878.75' 81.25 FG 78.75 FG 81.25 FG 79.75 FG I.E. = 4879.75' NEW 12 LF 12" HDPE @ 0.75% SLOPE POND BERM / HIGHWATER = 4881.25' POND 100 YR OVERFLOW I.E. = 4879.75' 96.95 TOC 96.85 TOC 96.50 TOC 95.70 TOC 96.60 TOC 4.8% 4.8% 5. 0 % RD 4 STEPS 90.75 TOC 88.00 TOC 2. 7 % GENERAL NOTES: SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT (IF AVAILABLE). THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557 EXCEPT UNDER BUILDING FOUNDATION WHERE IT SHALL BE 98% MIN. OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2% ABOVE NOR 3% BELOW OPTIMUM. CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS & SPECS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT. THE CONTRACTOR IS TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. SPECIFIC DETAILS SHOWN ON SHEET C2.10 SHALL BE USED IN COMBINATION WITH OTHER ACCEPTED LOCAL PRACTICES. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THOSE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. ALL ELEVATIONS SHOWN AT TOP AND BOTTOM OF WALL(S), IF ANY, ARE ELEVATIONS AT FINISH GRADE, UNLESS OTHERWISE NOTED. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: GRADE SITE TO ELEVATIONS AND CONTOURS SHOWN ON PLAN. STORM DRAIN CURB INLET WITH HEAVY DUTY BICYCLE SAFE GRATE, PER STANDARD CHURCH DETAIL, SEE DETAIL 'M', SHEET C521. 12" SQUARE SECURABLE NYLOPLAST YARD DRAIN, PER STANDARD CHURCH DETAIL, SEE DETAIL 'L", SHEET C521. STORM DRAIN PIPE. SEE PLAN FOR LENGTH, SIZE, TYPE AND SLOPE. SEE ISPWC DRAWING SD-301, FOR TRENCHING DETAIL. ROOF DRAIN DOWNSPOUT LOCATION. DOWNSPOUT TO BE PER STANDARD CHURCH DETAIL. TAPER LAST 3' OF CURB TO MATCH SIDEWALK HEIGHT, PER STANDARD CHURCH DETAIL. STORMTECH MC-7200 CHAMBERS OR EQUIVALENT SYSTEM APPROVED PRIOR TO BIDDING. SYSTEM AS SHOWN ON PLANS ALL PROVIDED BY THE CONTRACTOR. STORMTECH CHAMBER HAS RETENTION OF 35,950 C.F. REQUIRED RETENTION = 35,016 C.F. SEE DETAIL ON SHEET C571. SHOP DRAWINGS PROVIDED BY MANUFACTURER PRIOR TO BIDDING AND CONSTRUCTION. LANDING AREAS TO HAVE 2% MAXIMUM SLOPE AWAY FROM BUILDING ADA PARKING STALL, TOA (TOP OF ASPHALT) SPOT GRADES ARE TO BE STAKED TO ENSURE SLOPE WITHIN ADA PARKING STALL REMAINS UNDER 2.0% MAX. SLOPE. STORM DRAIN CLEANOUT BOX WITH HEAVY DUTY PEDESTRIAN SAFE LID. 6" HDPE PIPE FROM ROOF DRAIN. STORM DRAIN CATCH BASIN WITH HEAVY DUTY BICYCLE SAFE GRATE. 1 3 5 6 SCALE: 1" = NORTH 20' 0 10'20'40'60' 4 8 9 10 11 2 7 COMMON GRADING ABBREVIATIONS: SEE SHEET C0.01 FOR ADDITIONAL ABBREVIATIONS -BFE BASEMENT FLOOR ELEVATION -BW FINISH GRADE AT BOTTOM OF WALL -EX or EXIST EXISTING -EOA EDGE OF ASPHALT -EOC EDGE OF CONCRETE -FFE FINISH FLOOR ELEVATION -FG FINISH GRADE -FL FLOW LINE -GB GRADE BREAK -HP HIGH POINT -LP LOW POINT -NG NATURAL GROUND -SDCB STORM DRAIN CATCH BASIN -SDCO STORM DRAIN CLEANOUT BOX -SDDB STORM DRAIN DRAIN BASIN -SDMH STORM DRAIN MANHOLE -TBC TOP BACK OF CURB -TOA TOP OF ASPHALT -TOC TOP OF CONCRETE -TOG TOP OF GRATE -TOW TOP OF WALL -TW FINISH GRADE AT TOP OF WALL -WW WATERWAY Pr i n t e d : 31 M a r 2 0 2 3 2: 5 6 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 Preliminary - Not for Construction - Pl a n r e - s u b m i t t a l 2 10 9 9 9 8 8 8 8 8 7 7 6 4 4 4 4 4 4 4 4 2 4 3 3 3 12 2 2 2 2 4 12 10 Grading and Drainage Plan C121 4 4 4 4 4 5 11 511 11 5 5 11 11 5 11 5 11 5 5 5 11 11 . . X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X XXX COCO CO CO EX TOP OF 18" SD CMP PIPE TO REMAIN EX 24" SD PLASTIC PIPE TO REMAIN EX CB TO REMAIN GRATE=4883.00 INV=4878.31 EX SDMH TO REMAIN RIM=4900.31 S INV=4896.13 E INV=4895.97 W INV=4895.87 EX CB TO REMAIN GRATE=4900.59 INV=4897.32 EX SHOULDER TO REMAIN EX CURB & GUTTER TO REMAIN 4 9 0 0 489 2 489 4 4 8 9 6 4 8 9 8 4 9 0 2 4 9 0 4 48 9 4 489 6 EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y EX 10' ASPHALT PATHWAY TO BE REPLACED N80° 43' 00"E 316.81' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" L =1 8 6 .0 6 ,R =1 3 3 5 .0 0 C B =N 8 4 °4 3 '0 2 "E C =1 8 5 .9 1 ∆=0 0 7 °5 9 '0 7 " S0 0 ° 1 6 ' 3 0 " E 30 4 . 5 0 ' 87.48 EXIST 87.72 EXIST 96.25 EXIST 96.73 EXIST 2 . 3 % 4.2%3.6% 1 . 2 % 3. 1 % 1. 0 % 1. 6 % 1. 6 % 99.11 EXIST 96.34 EXIST 2. 7 % 0. 6 % 1. 5 % 1.9% 3.6% 2. 3 % 4. 1 % 3.7%1.5% 1.3%1.6% 4.8%1.7% 4. 6 % 4. 6 % 1. 5 % 1. 5 % 0. 7 % 3.6%4.0% 1.6%3.0% 1.9%2.3% 2. 0 % 2. 0 % 2.0% 2.0% 1.9% 1. 9 % 1. 9 % 1.8% 2.0% 2.0% 2. 9 % 4. 5 % 4.8% 4.8% 1.8% 1.8% 1.8% 3.3% 2.8% 2 . 2 % 2.7%2. 3 % 3.1 % 1. 8 % 1.6% 1. 5 % 2 . 9 % 3.0 % 3.4 % 3.5 % 3.6 % 3.5% 3.8% 3.7% 3.3% 3.9% 3.8% 1.4% 2. 8 % 3 . 2 % 7. 9 % 1.5% 6.4% 5.4% 7.6% 9.1% 14.5% 10.9% 11.7% 8.4% 10.0 % 2 1 . 9 % 15.4 % 3 0 . 6 % 4.6% 94.21 EXIST 1.06 EXIST 2.00 EXIST 3.79 EXIST 2.72 EXIST 2.00 EXIST 0.50 EXIST 2.00 EXIST 4.00 EXIST 4.5% 3. 1 % 94.00 TBC 93.70 TBC 93.70 TBC 93.74 TBC 93.25 TOC 93.41 TOC 93.71 TOC 93.55 TOC 94.05 TBC 94.10 TBC 94.20 TBC 94.50 TBC 2 . 2 % 92.50 TBC 92.20 TBC 92.60 TBC 92.60 TBC 92.10 TBC 92.70 TBC 93.10 TBC 93.90 TOC 93.00 TOC 95.10 TOC 95.35 TOC 97.27 TOC 95.42 TOC 95.50 TOC 95.50 TOC 95.42 TOC 95.00 FG 95.00 FG95.00 FG 93.15 TBC 92.99 TBC 92.75 TBC 92.55 TBC 92.35 TBC 91.75 TBC 91.49 TBC 90.70 TBC 92.83 TBC 92.34 TBC 92.08 TBC 91.30 TBC 93.70 TBC 93.75 TBC 94.10 TOC 94.10 TOC 93.66 TBC 93.58 TBC 93.55 TBC 93.65 TBC 94.22 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.50 TOC 95.42 TOC 95.50 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 97.75 TOC 98.00 TOC 97.75 TOC 95.70 TBC 95.75 TBC 0.29 TBC 94.65 TOC 95.20 TOC 95.40 TOC 94.90 TOC 95.08 TBC 94.78 TBC 95.26 TOC 93.82 TOA 94.45 TOA 94.90 TOC 95.40 TOC 94.45 TOA 94.78 TBC 95.28 TOC 95.15 TOC 95.05 TOC 94.60 TOC 94.65 TOC 95.35 TOC 97.05 TOC 94.93 TBC 95.03 TBC 94.53 TOC 94.10 TOA 94.25 TOA 97.05 TOC 97.05 TOC 96.35 TBC 96.35 TBC 96.70 TBC 96.82 TBC 96.94 TBC 96.94 TBC 94.95 TOC 94.83 TBC 98.15 TBC 97.36 TBC 97.14 TBC 96.39 TBC 96.18 TBC 96.00 TBC 96.51 TBC 96.71 TBC 97.30 TBC 97.60 TBC 97.02 TBC 96.83 TBC 96.34 TBC 96.51 TBC 96.73 TBC 97.48 TBC 97.69 TBC 98.50 TBC 0.04 TBC 0.04 TBC 0.39 TBC 98.54 TBC 0.25 TBC 99.65 TBC 99.65 TBC 99.90 TBC 98.35 TBC 98.05 TBC 97.85 TBC 97.24 TBC 99.00 TOC 96.65 TOC 96.90 TBC 97.15 TOC 95.03 TOC 95.15 TOC 95.65 TOC 95.53 TOC 94.80 TOA [ 4 ] [ 2 ] [ 9 9 ] [ 9 8 ] [ 9 9 ] [ 9 7 ] [ 9 7 ] NEW SD CURB INLET BOX GRATE: 4896.34' IE: 4892.84' SD SD NEW SD CATCH BASIN GRATE: 4893.90' IE: 4890.40' NEW 53 LF 12" HDPE @ 4.60% SLOPESD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD NEW SD CURB INLET BOX GRATE: 4897.19' IE: 4893.69' NEW 99 LF 12" HDPE @ 0.86% SLOPE NEW 141 LF 12" HDPE @ 0.35% SLOPE NEW SD CATCH BASIN GRATE: 4893.25' IE: 4889.75' NEW 176 LF 12" HDPE @ 2.93% SLOPE NEW 72 LF 18" HDPE @ 2.55% SLOPE NEW SD CO BOX GRATE: 4890.00' IE: 4884.48' NEW SD CURB INLET BOX GRATE: 4891.84' IE: 4888.34' NEW 118 LF 12" HDPE @ 3.27% SLOPE 12" AREA DRAIN GRATE: 4894.50' I.E.: 4890.21' SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD 12" AREA DRAIN GRATE: 4894.50' I.E.: 4890.68' 94 L.F. NEW 8" HDPE @ 0.50% 80 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.50' I.E.: 4891.08' 83 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.50' I.E.: 4891.50' 12" AREA DRAIN GRATE: 4893.75' I.E.: 4890.75' 23 L.F. NEW 8" HDPE @ 16.00% 169 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.00' I.E.: 4889.90' 92 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4893.00' I.E.: 4889.44' 96.40 TOA 0.6% 4.7% 95.42 TOC 95.00 TOC 95.45 TOC 94.50 TOA 2. 5 % 0. 9 % 94.88 TOC 95.33 TBC 1.9% 1. 9 % 1. 1 % 2. 0 % 2.0 % 2.0% 2.0% 93.70 TBC 1. 4 % 1. 6 % 1. 7 % 3.2 % 3.8% 1. 5 % 95.42 TOC 3.6% 95.15 TOC 3 0 . 8 % 1 . 8 % 1. 7 % 1. 6 % 95.05 TOA 94.80 TOA 2.3%0.8%1.1% 1.7 %2.2 % 2. 2 % 2.9% NEW 47 LF 18" HDPE @ 0.35% SLOPE EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL 85.47 EXIST 85.47 TOC 86.57 EXIST 86.57 TOC 88.62 EXIST 88.62 TOC 91.48 EXIST 91.48 TOC 93.54 EXIST 93.54 TOC 95.15 EXIST 95.15 TOC 97.17 EXIST 97.17 TOC 99.21 EXIST 99.21 TOC 5.04 TOC S S CURB AND GUTTER TO BE REPLACED @ NEW DRIVE APPROACH 6.33 EXIST 6.33 TOC END OF NEW CONCRETE TRAIL 23.26' TP 14 EX SURFACE: 4901.50' BEDROCK: 4897.50' TP 15 EX SURFACE: 4898.00' BEDROCK: 4894.50' TP B2 EX SURFACE: 4894.00' BEDROCK: 4888.85' TP 13 EX SURFACE: 4897.50' BEDROCK: 4891.00' TP 12 EX SURFACE: 4901.50' BEDROCK: 4895.35' TP B5 EX SURFACE: 4900.50' BEDROCK: 4896.00' TP B3 EX SURFACE: 4895.50' BEDROCK: 4891.00' TP B4 EX SURFACE: 4897.75' BEDROCK: 4894.25' TP B1 EX SURFACE: 4891.00' BEDROCK: 4886.50' TP 2 EX SURFACE: 4889.50' BEDROCK: 4885.50' TP 4 EX SURFACE: 4892.50' BEDROCK: 4887.75' TP 5 EX SURFACE: 4894.00' BEDROCK: 4889.75' EX SURFACE: 4887.00' BEDROCK: 4882.25' EX SURFACE: 4889.00' BEDROCK: 4887.00' 3.6% 5.4% 96.85 TBC 97.80 TBC 3.1 % 97.54 TBC 5 STEPS 92.90 TOC 90.65 TOC NEW SD CURB INLET BOX NEW 72 LF 18" HDPE @ 1.26% SLOPE 4.5% 94.00 TOA NEW SD CATCH BASIN GRATE: 4887.75' IE (E): 4884.75' IE (S): 4885.75' SD SD SD SD SD SD SD 20 L.F. NEW 8" HDPE @ 6.25% I.E.= 4888.96' SD SD SDNEW 76 LF 12" HDPE @ 0.35% SLOPE 92.34 TBC 97.65 TOC96.95 TOC 96.85 TOC 96.50 TOC 95.70 TOC 95.80 TOC96.60 TOC 4.8% 4.8% 5. 0 % 4.5% 0 . 9 % 98.50 TBC NEW SD CATCH BASIN GRATE: 4896.30' IE: 4889.90' NEW SD CURB INLET BOX GRATE: 4896.65' IE: 4893.00' S D S DNEW 57 LF 12" HDPE @ 5.44% SLOPE 0 . 7 % RD RD 4 STEPS 90.75 TOC 88.00 TOC 2. 7 % CB 0.50 EXIST 1.00 EXIST 99.64 EXIST 0.50 FG 0.50 FG 0.50 FG GENERAL NOTES: SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT (IF AVAILABLE). THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557 EXCEPT UNDER BUILDING FOUNDATION WHERE IT SHALL BE 98% MIN. OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2% ABOVE NOR 3% BELOW OPTIMUM. CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS & SPECS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT. THE CONTRACTOR IS TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. SPECIFIC DETAILS SHOWN ON SHEET C2.10 SHALL BE USED IN COMBINATION WITH OTHER ACCEPTED LOCAL PRACTICES. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THOSE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. ALL ELEVATIONS SHOWN AT TOP AND BOTTOM OF WALL(S), IF ANY, ARE ELEVATIONS AT FINISH GRADE, UNLESS OTHERWISE NOTED. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: GRADE SITE TO ELEVATIONS AND CONTOURS SHOWN ON PLAN. STORM DRAIN CURB INLET WITH HEAVY DUTY BICYCLE SAFE GRATE, PER STANDARD CHURCH DETAIL, SEE DETAIL 'M', SHEET C521. 12" SQUARE SECURABLE NYLOPLAST YARD DRAIN, PER STANDARD CHURCH DETAIL, SEE DETAIL 'L", SHEET C521. STORM DRAIN PIPE. SEE PLAN FOR LENGTH, SIZE, TYPE AND SLOPE. SEE ISPWC DRAWING SD-301, FOR TRENCHING DETAIL. ROOF DRAIN DOWNSPOUT LOCATION. DOWNSPOUT TO BE PER STANDARD CHURCH DETAIL. TAPER LAST 3' OF CURB TO MATCH SIDEWALK HEIGHT, PER STANDARD CHURCH DETAIL. STORMTECH MC-7200 CHAMBERS OR EQUIVALENT SYSTEM APPROVED PRIOR TO BIDDING. SYSTEM AS SHOWN ON PLANS ALL PROVIDED BY THE CONTRACTOR. STORMTECH CHAMBER HAS RETENTION OF 38,892 C.F. REQUIRED RETENTION = 37,896 C.F. SEE DETAIL ON SHEET C571. SHOP DRAWINGS PROVIDED BY MANUFACTURER PRIOR TO BIDDING AND CONSTRUCTION. TO INCLUDE INSPECTION PORT. LANDING AREAS TO HAVE 2% MAXIMUM SLOPE AWAY FROM BUILDING ADA PARKING STALL, TOA (TOP OF ASPHALT) SPOT GRADES ARE TO BE STAKED TO ENSURE SLOPE WITHIN ADA PARKING STALL REMAINS UNDER 2.0% MAX. SLOPE. STORM DRAIN CLEANOUT BOX WITH HEAVY DUTY PEDESTRIAN SAFE LID. 6" HDPE PIPE FROM ROOF DRAIN. STORM DRAIN CATCH BASIN WITH HEAVY DUTY BICYCLE SAFE GRATE. 1 3 5 6 4 8 9 10 11 2 7 COMMON GRADING ABBREVIATIONS: SEE SHEET C0.01 FOR ADDITIONAL ABBREVIATIONS -BFE BASEMENT FLOOR ELEVATION -BW FINISH GRADE AT BOTTOM OF WALL -EX or EXIST EXISTING -EOA EDGE OF ASPHALT -EOC EDGE OF CONCRETE -FFE FINISH FLOOR ELEVATION -FG FINISH GRADE -FL FLOW LINE -GB GRADE BREAK -HP HIGH POINT -LP LOW POINT -NG NATURAL GROUND -SDCB STORM DRAIN CATCH BASIN -SDCO STORM DRAIN CLEANOUT BOX -SDDB STORM DRAIN DRAIN BASIN -SDMH STORM DRAIN MANHOLE -TBC TOP BACK OF CURB -TOA TOP OF ASPHALT -TOC TOP OF CONCRETE -TOG TOP OF GRATE -TOW TOP OF WALL -TW FINISH GRADE AT TOP OF WALL -WW WATERWAY Pr i n t e d : 31 M a r 2 0 2 3 2: 5 6 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 Preliminary - Not for Construction - Pl a n r e - s u b m i t t a l 2 8 9 9 9 9 9 9 9 8 8 8 8 8 8 8 6 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 2 12 12 2 2 12 Grading and Drainage Plan C122 SCALE: 1" = NORTH 20' 0 10'20'40'60' 4 12 4 2 5 11 511 11 5 5 11 11 5 11 5 11 5 5 5 11 11 5 5 5 5 5 5 5 5 5 11 11 11 11 11 11 1111 X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX CO CO 48 9 0 48 8 8 489 2 490 0 48 9 4 489 6 489 8 490 2 4904 4906 490 8 S0 0 ° 1 6 ' 3 0 " E 26 1 8 . 1 1 ' N0 0 ° 1 6 ' 3 0 " W 24 2 . 0 7 ' S89° 43' 30"W 330.00' N0 0 ° 1 6 ' 3 0 " W 13 2 . 0 0 ' S89° 43' 30"W 330.00' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" 84.71 EXIST 83.92 EXIST 83.92 EXIST 83.53 EXIST 83.10 EXIST 82.84 EXIST 82.23 EXIST 2.0% 2.4% 2.7% 3.0% 83.81 TBC 83.56 TBC 83.31 TBC 82.59 TBC 81.93 TBC 1. 5 % 1.9% 3.6% 2. 3 % 4. 6 % 1. 5 % 1. 5 % 0. 7 % 3.6%4.0% 1.9% 1. 9 % 1. 9 % 1.8%4.0 % 3.9 % 0.5% 1. 8 % 1.8% 3.3% 3.5% 2. 7 % 2.8% 2 . 2 % 2. 7 % 2. 3 % 3.1 % 1. 8 % 1.6% 1. 5 % 2 . 9 % 3.0 % 3.4 % 7. 9 % 1.5% 1.5% 1.5% 1.5% 8 . 1 % 1 2 . 5 % 20.6% 3. 0 % 10.0 % 2 1 . 9 % 15.4 % 3 0 . 6 % 15.7% 2.9% 0. 5 % 1. 0 % 1. 7 % 84.00 EXIST 86.00 EXIST 88.00 EXIST 90.00 EXIST 92.29 EXIST 94.21 EXIST 96.00 EXIST 98.00 EXIST 98.76 EXIST 2.00 EXIST 4.00 EXIST 6.00 EXIST 7.07 EXIST 6.00 EXIST 4.00 EXIST 2.00 EXIST 1.06 EXIST 2.00 EXIST 3.79 EXIST 82.65 TOA 82.29 TOA 3.7%1.1%1. 9 % 1.6% 4.5% 3. 1 % 82.46 TBC 82.40 TBC 82.34 TOC 82.03 TOC 83.91 TOC 83.66 TOC 83.41 TOC 83.10 TBC 91.00 TBC 90.75 TBC 90.50 TBC 91.58 TBC 92.65 TBC 92.75 TBC 92.85 TBC 93.00 TBC 94.00 TBC 93.70 TBC 93.70 TBC 93.74 TBC 93.25 TOC 93.41 TOC 93.71 TOC 93.55 TOC 94.05 TBC 94.10 TBC 94.20 TBC 94.50 TBC 2 . 2 % 92.50 TBC 92.20 TBC 92.60 TBC 92.60 TBC 85.76 TOC 90.18 TOC 90.45 TBC 90.60 TBC 90.50 TBC 90.48 TBC TBC 93.15 TBC 92.99 TBC 92.75 TBC 92.55 TBC 93.70 TBC 93.75 TBC 94.10 TOC 94.10 TOC 93.66 TBC 93.58 TBC 93.55 TBC 93.65 TBC 94.22 TOC 95.00 FG 95.00 FG 95.00 FG 95.50 TOC 95.42 TOC 95.50 TOC 97.75 TOC 98.00 TOC 97.75 TOC 97.75 TOC 98.00 TOC 97.75 TOC 95.70 TBC 95.75 TBC 0.29 TBC 94.90 TOC 95.40 TOC 94.45 TOA 95.28 TOC 95.15 TOC 95.05 TOC 94.60 TOC 94.65 TOC 95.35 TOC 97.05 TOC 94.93 TBC 95.03 TBC 94.53 TOC 94.10 TOA 94.25 TOA 97.05 TOC 97.05 TOC 96.35 TBC 96.35 TBC 96.70 TBC 96.82 TBC 96.94 TBC 96.94 TBC 98.15 TBC 97.36 TBC 97.14 TBC 97.48 TBC 97.69 TBC 98.50 TBC 0.04 TBC 0.04 TBC 0.39 TBC [ 9 9 ] [ 9 7 ] [ 8 4 ] [ 8 3 ] [ 9 7 ] [ 98 ] [ 9 8 ] [ 0 ] [ 5 ] [ 5 ] [ 1 ] [ 0 ] SD SD SD SD SD SD SD SD SD SD NEW SD CURB INLET BOX GRATE: 4897.19' IE: 4893.69' NEW 99 LF 12" HDPE @ 0.86% SLOPE NEW SD CATCH BASIN GRATE: 4893.25' IE: 4889.75' NEW SD CURB INLET BOX GRATE: 4890.00' IE: 4887.00' NEW 72 LF 18" HDPE @ 2.55% SLOPE NEW 46 LF 12" HDPE @ 5.82% SLOPE SD SD SD SD SD SD 83 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.50' I.E.: 4891.50' 12" AREA DRAIN GRATE: 4893.75' I.E.: 4890.75' 169 L.F. NEW 8" HDPE @ 0.50% 2.0% 2.0% 1. 7 % 3.2 % 1. 5 % 95.42 TOC 3.6% 95.15 TOC 3 0 . 8 % 1 . 8 % 1. 7 % 1. 6 % 95.05 TOA 94.80 TOA 2.3%0.8%1.1% 1.7 %2.2 % 2. 2 % 2.9% 4. 1 % SECTION LINE NEW RIGHT-OF-WAY LINE20.00' 20.00' SECTION LINE NEW RIGHT-OF-WAY LINE NEW 175 LF 18" PERFORATED HDPE @ 0.50% SLOPE 2.5% 1. 9 % S NEW 430 L.F. 8" WATER LINE TAPER NEW ASPHALT BACK TO EXISTING ASPHALT END OF NEW SIDEWALK END OF NEW CURB & GUTTER 167.50' TP 13 EX SURFACE: 4897.50' BEDROCK: 4891.00' TP 12 EX SURFACE: 4901.50' BEDROCK: 4895.35' TP B5 EX SURFACE: 4900.50' BEDROCK: 4896.00' TP B3 EX SURFACE: 4895.50' BEDROCK: 4891.00' TP B4 EX SURFACE: 4897.75' BEDROCK: 4894.25' TP 4 EX SURFACE: 4892.50' BEDROCK: 4887.75' TP 5 EX SURFACE: 4894.00' BEDROCK: 4889.75' TP 3 EX SURFACE: 4889.00' BEDROCK: 4887.00' TP 7 EX SURFACE: 4893.00' BEDROCK: 4888.25' TP 6 EX SURFACE: 4886.00' BEDROCK: 4881.75' 3.1 % 97.54 TBC93.10 TOC 93.10 TOC 93.10 TOC NEW SD CURB INLET BOX GRATE: 4891.84' IE: 4888.84' NEW 72 LF 18" HDPE @ 1.26% SLOPE TP 11 EX SURFACE: 4907.25' BEDROCK: 4904.00' TP 10 EX SURFACE: 4904.00' BEDROCK: 4899.50' TP 8 EX SURFACE: 4901.00' BEDROCK: 4897.50' TP 9 EX SURFACE: 4899.50' BEDROCK: 4896.50' 92.34 TBC SD SD SD SD SD SD SD NEW 12 LF 12" HDPE @ 0.75% SLOPE I.E. = 4878.75' 81.25 FG 78.75 FG 81.25 FG FG NEW 12 LF 12" HDPE @ 0.75% SLOPE I.E. = 4879.75' 97.65 TOC96.95 TOC 96.85 TOC 96.50 TOC 95.70 TOC 95.80 TOC96.60 TOC 4.8% 4.8% 5. 0 % RD RD CB NEW 55 L.F. 8" WATER PLUG END FOR FUTURE CONNECTION GENERAL NOTES: SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT (IF AVAILABLE). THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557 EXCEPT UNDER BUILDING FOUNDATION WHERE IT SHALL BE 98% MIN. OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2% ABOVE NOR 3% BELOW OPTIMUM. CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS & SPECS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT. THE CONTRACTOR IS TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. SPECIFIC DETAILS SHOWN ON SHEET C2.10 SHALL BE USED IN COMBINATION WITH OTHER ACCEPTED LOCAL PRACTICES. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THOSE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. ALL ELEVATIONS SHOWN AT TOP AND BOTTOM OF WALL(S), IF ANY, ARE ELEVATIONS AT FINISH GRADE, UNLESS OTHERWISE NOTED. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. COMMON GRADING ABBREVIATIONS: SEE SHEET C0.01 FOR ADDITIONAL ABBREVIATIONS -BFE BASEMENT FLOOR ELEVATION -BW FINISH GRADE AT BOTTOM OF WALL -EX or EXIST EXISTING -EOA EDGE OF ASPHALT -EOC EDGE OF CONCRETE -FFE FINISH FLOOR ELEVATION -FG FINISH GRADE -FL FLOW LINE -GB GRADE BREAK -HP HIGH POINT -LP LOW POINT -NG NATURAL GROUND -SDCB STORM DRAIN CATCH BASIN -SDCO STORM DRAIN CLEANOUT BOX -SDDB STORM DRAIN DRAIN BASIN -SDMH STORM DRAIN MANHOLE -TBC TOP BACK OF CURB -TOA TOP OF ASPHALT -TOC TOP OF CONCRETE -TOG TOP OF GRATE -TOW TOP OF WALL -TW FINISH GRADE AT TOP OF WALL -WW WATERWAY Pr i n t e d : 31 M a r 2 0 2 3 3: 0 1 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 Preliminary - Not for Construction - Pl a n r e - s u b m i t t a l 2 8 10 9 9 8 4 4 4 4 4 4 3 3 2 12 2 Grading and Drainage Plan C123 SCALE: 1" = NORTH 20' 0 10'20'40'60' KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: GRADE SITE TO ELEVATIONS AND CONTOURS SHOWN ON PLAN. STORM DRAIN CURB INLET WITH HEAVY DUTY BICYCLE SAFE GRATE, PER STANDARD CHURCH DETAIL, SEE DETAIL 'M', SHEET C521. 12" SQUARE SECURABLE NYLOPLAST YARD DRAIN, PER STANDARD CHURCH DETAIL, SEE DETAIL 'L", SHEET C521. STORM DRAIN PIPE. SEE PLAN FOR LENGTH, SIZE, TYPE AND SLOPE. SEE ISPWC DRAWING SD-301, FOR TRENCHING DETAIL. ROOF DRAIN DOWNSPOUT LOCATION. DOWNSPOUT TO BE PER STANDARD CHURCH DETAIL. TAPER LAST 3' OF CURB TO MATCH SIDEWALK HEIGHT, PER STANDARD CHURCH DETAIL. STORMTECH MC-7200 CHAMBERS OR EQUIVALENT SYSTEM APPROVED PRIOR TO BIDDING. SYSTEM AS SHOWN ON PLANS ALL PROVIDED BY THE CONTRACTOR. STORMTECH CHAMBER HAS RETENTION OF 38,892 C.F. REQUIRED RETENTION = 37,896 C.F. SEE DETAIL ON SHEET C571. SHOP DRAWINGS PROVIDED BY MANUFACTURER PRIOR TO BIDDING AND CONSTRUCTION. TO INCLUDE INSPECTION PORT. LANDING AREAS TO HAVE 2% MAXIMUM SLOPE AWAY FROM BUILDING ADA PARKING STALL, TOA (TOP OF ASPHALT) SPOT GRADES ARE TO BE STAKED TO ENSURE SLOPE WITHIN ADA PARKING STALL REMAINS UNDER 2.0% MAX. SLOPE. STORM DRAIN CLEANOUT BOX WITH HEAVY DUTY PEDESTRIAN SAFE LID. 6" HDPE PIPE FROM ROOF DRAIN. STORM DRAIN CATCH BASIN WITH HEAVY DUTY BICYCLE SAFE GRATE. 1 3 5 6 4 8 9 10 11 2 7 12 . . X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X S S S S S S S S COCO CO CO S S S S S S W W W W W W F W W W W W W W WWWWWWWWWW W W W W W W W W W W W W W W W W W W W W EX SHOULDER TO REMAINEX SHOULDER TO REMAIN 48 9 0 4 9 0 0 48 8 8 489 2 489 4 4 8 9 6 4 8 9 8 4 9 0 2 4 9 0 4 4 9 0 6 490 0 4910 48 9 4 489 6 489 8 490 2 4904 4906 490 8 48 8 0 4880 4880 4876 4 8 7 8 4878 4878 48 8 2 48 8 4 48 8 6 EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y EX 10' ASPHALT PATHWAY TO BE REPLACED S89° 40' 10"E 165.11' S89° 39' 20"E 86.98' N80° 43' 00"E 316.81' N0 0 ° 1 6 ' 3 0 " W 24 2 . 0 7 ' S89° 43' 30"W 330.00' N0 0 ° 1 6 ' 3 0 " W 13 2 . 0 0 ' S89° 43' 30"W 330.00' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" L =1 8 6 .0 6 ,R =1 3 3 5 .0 0 C B =N 8 4 °4 3 '0 2 "E C =1 8 5 .9 1 ∆=0 0 7 °5 9 '0 7 " N0 0 ° 1 6 ' 5 0 " W 18 5 . 7 0 ' S0 0 °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r i n t e d : 31 M a r 2 0 2 3 2: 5 6 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 Preliminary - Not for Construction - Pl a n r e - s u b m i t t a l 2 1 1 11 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 22 2 3 2 2 2 22 2 2 Erosion Control Plan C171 2 2 2 2 2 2 2 . . X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X GM G G G S S S S S S S S COCO CO CO WM S S S S S S W W W W W W F W W W W W W W WWWWWWWWWW W W W W W W W W W W W W W W W W W W W W EX SHOULDER TO REMAINEX SHOULDER TO REMAIN EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y EX 10' ASPHALT PATHWAY TO BE REPLACED S89° 40' 10"E 165.11' S89° 39' 20"E 86.98' N80° 43' 00"E 316.81' N0 0 ° 1 6 ' 3 0 " W 24 2 . 0 7 ' S89° 43' 30"W 330.00' N0 0 ° 1 6 ' 3 0 " W 13 2 . 0 0 ' S89° 43' 30"W 330.00' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" L =1 8 6 .0 6 ,R =1 3 3 5 .0 0 C B =N 8 4 °4 3 '0 2 "E C =1 8 5 .9 1 ∆=0 0 7 °5 9 '0 7 " N0 0 ° 1 6 ' 5 0 " W 18 5 . 7 0 ' S0 0 ° 1 6 ' 3 0 " E 30 4 . 5 0 ' SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S S S S S S S S S S S SD EX SSMH 13 4.0' Ø RIM = 4874.67' IE (E) = 4862.87' EX SSMH 12 EX 12" PVC EX 12" PVC 120' @ 1.04% EX PLUGGED END IE = 4864.12' S 8.00' S S S S S S S S S S S S S S S S S NEW SSMH 5' Ø RIM = 4876.14' IE (S) = 4863.98' IE (W) = MATCH EX / 4863.78' NEW SSMH 4' Ø RIM = 4877.38' IE (N) = 4864.58' IE (S) = 4864.78' IE (E) = 4864.78' NEW 8" PVC SEWER MAIN 79' @ 0.75% NEW SSMH 4' Ø RIM = 4883.55' IE (N) = 4872.55' IE (S) = 4872.75' NEW 8" PVC SEWER MAIN 400' @ 1.94% NEW SSMH 4' Ø RIM = 4887.85' IE (W) = 4876.35' IE (E) = 4876.55' NEW 10" PVC SEWER MAIN 400' @ 2.89% NEW SSMH 4' Ø RIM = 4903.25' IE (W) = 4892.25' NEW 10" PVC SEWER MAIN 306' @ 5.13% NEW 6" WYE TIE-IN EX PLUGGED END EX 12" WATER LINE EX 12" WATER LINE EX 12" WATER LINE STUB FOR TIE ON W W W W W W W W W W W W W W W 45° BEND 45° BEND TIE ON TO EX STUBBED END NEW 38 L.F. 12" WATER LINE NEW 38 L.F. 12" WATER LINE 12" x 8" REDUCER NEW 430 L.F. 8" WATER LINE S TIE ON TO EX STUBBED END NEW 732 L.F. 12" WATER LINE CAP END FOR FUTURE CONNECTION SD SD SD SD SD SD SD SD SD SD SD S D CB CB CB CB 16.11' 10.87' NEW 8" PVC SEWER MAIN 25' @ 1.50% STUBBED TO END OF PAVEMENT AS REQUIRED BY CITY PLUG END FOR FUTURE CONNECTION IE = 4873.13' NEW 55 L.F. 8" WATER LINE STUBBED TO END OF PAVEMENT AS REQUIRED BY CITY PLUG END FOR FUTURE CONNECTION NEW 30 L.F. 8" CLASS 50 DI PIPE WATER LINE IN THE RIGHT-OF-WAY AS REQUIRED BY CITY NEW 83 L.F. 8" CLASS 50 DI PIPE WATER LINE IN THE RIGHT-OF-WAY AS REQUIRED BY CITY SCALE: 1" = NORTH 30' 0 15'30'60'90' 1 2 7 9 11 12 14 GENERAL NOTES: CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL DRAWINGS. ALL NEW WATER CONSTRUCTION TO BE DONE IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS & SPECIFICATIONS. ALL NEW SANITARY SEWER CONSTRUCTION TO BE DONE IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS & SPECIFICATIONS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND INVERT ELEVATIONS OF EXISTING MANHOLES AND OTHER UTILITIES BEFORE STAKING OR CONSTRUCTING ANY SEWER LINES. MAINTAIN A MINIMUM OF 5 FEET OF COVER ON ALL WATER LINES. CONTRACTOR IS TO COORDINATE LOCATIONS OF NEW TELEPHONE SERVICE TO BUILDING WITH CENTURY LINK. A PVC CONDUIT, PLYWOOD BACKBOARD, AND GROUND WIRE IS REQUIRED FOR SERVICE THROUGH PROPERTY, COORDINATE SIZES AND LOCATION WITH CENTURY LINK. CONTRACTOR IS TO SUBMIT SITE PLAN TO DOMINION ENERGY FOR DESIGN OF GAS LINE SERVICE TO BUILDING. CONTRACTOR TO COORDINATE WITH DOMINION ENERGY FOR CONTRACTOR LIMITS OF WORK VERSUS DOMINION ENERGY LIMITS. LOCATION OF ALL UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE LOCATIONS. CONTRACTOR IS TO VERIFY CONNECTION POINTS WITH EXISTING UTILITIES. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO EXISTING UTILITIES AND UTILITY STRUCTURE THAT ARE TO REMAIN. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: ASPHALT T-PATCH / REPAIR PER CITY STANDARD DETAIL. INSTALL NEW FIRE HYDRANT PER ANSI/AWWA STANDARD DETAIL. CONNECT NEW 2" POLY PIPE WATER SERVICE LINE TO NEW 12" MAIN LINE AND INSTALL NEW 2" CULINARY METER, PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 6" PVC SDR-35 SANITARY SEWER LATERAL @ 1.00% MINIMUM SLOPE, INCLUDING NEW CLEANOUTS PER EAGLE MOUNTAIN STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING 6" SEWER LATERAL STUB. LATERAL PER ANSI/AWW STANDARD. APPROXIMATE LOCATION OF NEW NATURAL GAS LINE. CONTRACTOR TO COORDINATE SIZE, DESIGN AND INSTALLATION BY INTERMOUNTAIN GAS WITH OTHER CONSTRUCTION. APPROXIMATE LOCATION OF NEW NATURAL GAS METER(S). CONTRACTOR TO COORDINATE SIZE, DESIGN AND INSTALLATION WITH INTERMOUNTAIN GAS AND WITH MECHANICAL PLANS. UNDERGROUND CABLE AND POWER LINES. CONTRACTOR TO COORDINATE WITH COMCAST AND ROCKY MOUNTAIN POWER. SEE ELECTRICAL SITE PLAN FOR POWER CONNECTIONS. TELEPHONE LINE. CONTRACTOR TO PROVIDE TRENCHING 30" DEEP X 24" WIDE THEN BACKFILL AS REQUIRED. SEE ELECTRICAL SITE PLAN FOR COMMUNICATIONS CONNECTIONS. INSTALL 2" STOP AND WASTE FOR IRRIGATION, CONNECT TO NEW 2" WATER LATERAL PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. SEE LANDSCAPE PLANS SHEET L521 DETAIL "K". NEW 6" FIRE SERVICE WATER LINE TO BUILDING PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 3/4" POLY PIPE WATER LINE FROM PROPOSED BUILDING TO THE PAVILION DRINKING FOUNTAIN. SEE PLUMBING PLANS FOR COORDINATION AND FOR DETAILS. SEWER CLEANOUT AND 6" PVC SEWER LINE FOR USE IN CLEARING SEWER LINES WITHIN THE BUILDING FROM OUTSIDE (TYPICAL CHURCH DESIGN) SEE STANDARD CHURCH DETAIL 'C' SHEET C5.01. 2" POLY PIPE WATER SERVICE LINE, PER ANSI/AWWA STANDARD, DETAIL '541'. NEW 8" PVC C-900 FIRE SERVICE WATER MAIN LOOP PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 8" CLASS 50 DI PIPE WATER MAIN LINE, INCLUDING ALL FITTINGS AND THRUST BLOCKING. 12" CLASS 50 DI PIPE WATER MAIN LINE, INCLUDING ALL FITTINGS AND THRUST BLOCKING. CONNECT NEW 12" PVC C-900 WATER LINE TO EXISTING 12" WATER MAIN, PER GOVERNING BODY STANDARDS AND SPECIFICATIONS. STUB ON NEW 1" WATER SERVICE LINE, PER CITY OF REXBURG STANDARDS. 4' DIAMETER SANITARY SEWER MANHOLE, PER CITY OF REXBURG STANDARDS. 5' DIAMETER SANITARY SEWER MANHOLE, PER CITY OF REXBURG STANDARDS. 8" PVC SDR-35 SANITARY SEWER LINE, INCLUDING ALL FITTINGS, CITY OF REXBURG STANDARDS. 10" PVC SDR-35 SANITARY SEWER LINE, INCLUDING ALL FITTINGS, CITY OF REXBURG STANDARDS. STUB ON NEW 4" PVC SDR-35 SANITARY SEWER LATERAL, INCLUDING ALL FITTINGS, PER CITY OF REXBURG STANDARDS. LOCATION OF NEW FIBER CONDUIT AND DISTRIBUTION BOXES, TO BE INSTALLED PER CITY STANDARD AND SPECIFICATIONS. 6 5 4 3 10 8 13 2 2 2 3 13 4 4 5 5 6 7 8 10 11 11 11 12 12 12 12 14 14 14 14 13 Pr i n t e d : 31 M a r 2 0 2 3 2: 5 6 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 Preliminary - Not for Construction - Pl a n r e - s u b m i t t a l 2 Site Utility Plan C151 2 15 16 17 18 19 20 21 22 23 23 18 22 22 21 21 20 19 19 19 17 17 16 16 16 15 1 1 1 1 1 9 24 24 24 24 24 24 24 24 24 21 2 15 15 15 Pr i n t e d : 31 M a r 2 0 2 3 2: 5 6 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 Preliminary - Not for Construction - Pl a n r e - s u b m i t t a l 2 CITY APPROVED STEEL COVER & FRAME 4" CONCRETE SEWER CLEAN-OUT P.V.C. PIPE 12" X 12" Ø P.V.C. PIPE SCALE: SEWER CLEAN-OUT N.T.S.C SCALE: N.T.S. STORMTECH CHAMBER SECTION DETAIL PLAN SECTION A-A NOTES: 1.MATERIALS, CONSTRUCTION, AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH CURRENT EDITION OF "STATE STD. SPEC'S FOR ROAD AND BRIDGE CONST.", ADDENDUMS AND SPECIAL PROVISIONS THERETO. 2. ALL STEEL SHALL HAVE A MINIMUM OF 2" CONCRETE COVER. 3. GREY IRON CASTING: ASTM A48 CLASS 30 MINIMUM. 4. 2"x4" SHEAR KEY REQUIRED BOTH WAYS. SECTION B-B 3'-11 3/4"6"6" FLOWFLOW A A B B 2'-0" 1'-0"6"6" 8" VA R I E S SE E S C H E D U L E 6" 3" 12" 18 " 18" 18 " 2' - 0 " 4'-1 1/2" OUT TO OUT OF FRAME CONTROL JOINT BICYCLE SAFE GRATING. TOP OF GRATING 2" BELOW FLOW-LINE. 45 DEGREE SLOPE TO GRATING TYPICAL MAXIMUM OUTFLOW PIPE SIZE 24" CONTROL JOINT TOP OF CURB NATURAL FLOW-LINE OF STREEET AND GUTTER #5 AT 8" O.C. HORIZONTAL #5 AT 12" O.C. VERTICAL 2" 9" MI N . SCALE: SINGLE GUTTER INLET BOX N.T.S.M 4" AGGREGATE BASE OUTFLOW PIPE SCALE: 12" AREA NYLOPLAST DRAIN BOX N.T.S.L PROVIDE STANDARD GRATE. GRATE TO HAVE NO SLOTS WIDER THAN 1/2". PROVIDE SCREEN AT ROCK MULCH AREAS. SEE G/C505 BACKFILL MATERIAL SHALL BE CRUSHED STONE OR GRAVEL MATERIAL MEETING CLASS 1 OR 2 AS SPECIFIED IN ASTM D2321. BACKFILL MATERIAL SHALL BE PLACED UNIFORMLY IN 12" LIFTS AND COMPACTED 26 " T O 2 9 " SOD 12 " M I N . NOTE : (DIAMETER OF BASIN DETERMINED BY NUMBER OF PIPES IN AND OUT) NOTE: PROVIDE NECESSARY ADAPTORS FOR CONCRETE PIPE TO PVC BASINS PROVIDE OIL/WATER SEPARATOR WHERE REQUIRED _ Civil Details C521 Civil Details C571 DESCRIPTION: A STABILIZED PAD OF CRUSHED STONE LOCATED WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES THE SITE FROM OR TO PAVED SURFACE. APPLICATIONS: AT ANY POINT OF INGRESS OR EGRESS AT A CONSTRUCTION SITE WHERE ADJACENT TRAVELED WAY IS PAVED. GENERALLY APPLIES TO SITES OVER 2 ACRES UNLESS SPECIAL CONDITIONS EXIST. INSTALLATION/APPLICATION CRITERIA: ·CLEAR GRUB AREA AND GRAD TO PROVIDE MAXIMUM SLOPE OF 2%. ·COMPACT SUB GRADE AND PLACE FILTER FABRIC IF DESIRED (RECOMMENDED FOR ENTRANCES TO REMAIN FOR MORE THAN 3 MONTHS. ·PLACE COARSE AGGREGATE, 1 TO 2-1/2 INCHES IN SIZE, TO A MINIMUM DEPTH OF 8 INCHES. LIMITATIONS: ·REQUIRES PERIODIC TOP DRESSING WITH ADDITIONAL STONES. ·SHOULD BE USED IN CONJUNCTION WITH STREET SWEEPING ON ADJACENT PUBLIC RIGHT-OF-WAY. MAINTENANCE: ·INSPECT DAILY FOR LOSS OF GRAVEL OR SEDIMENT BUILDUP. ·INSPECT ADJACENT ROADWAY FOR SEDIMENT DEPOSIT AND CLEAN BY SWEEPING OR SHOVELING. ·REPAIR ENTRANCE AND REPLACE GRAVEL AS REQUIRED TO MAINTAIN CONTROL IN GOOD WORKING CONDITION. ·EXPAND STABILIZED AREA AS REQUIRED TO ACCOMMODATE TRAFFIC AND PREVENT EROSION AT DRIVEWAYS. OBJECTIVES □HOUSEKEEPING PRACTICES □CONTAIN WASTE □MINIMIZE DISTURBED AREA □STABILIZE DISTURBED AREA □PROTECT SLOPES/CHANNELS □CONTROL SITE PERIMETER □CONTROL INTERNAL EROSION TARGETED POLLUTANTS □SEDIMENT □NUTRIENTS □TOXIC MATERIALS □OIL & GREASE □FLOATABLE MATERIALS □OTHER WASTE _______________________________________________ □HIGH IMPACT □MEDIUM IMPACT □LOW OR UNKNOWN IMPACT _______________________________________________ IMPLEMENTATION REQUIREMENTS □CAPITAL COSTS □O & M COSTS □MAINTENANCE □TRAINING □HIGH □MEDIUM □LOW SEDIMENT FABRIC UNDER GRAVEL 3" TO 4" SIZE COARSE AGGREGATE 8" MIN. PAV E D R O A D 50' MIN. 20 ' M I N . SCALE: N.T.S. STABILIZED CONSTRUCTION ENTRANCE C1 DESCRIPTION: A TEMPORARY SEDIMENT BARRIER CONSISTING OF ENTRENCHED FILTER FABRIC STRETCHED ACROSS AND SECURED TO SUPPORTING POSTS. APPLICATIONS: ·PERIMETER CONTROL: PLACER BARRIER AT DOWNGRADE LIMITS OF DISTURBANCE. ·SEDIMENT BARRIER: PLACE BARRIER AT TOE OF SLOPE OR SOIL STOCKPILE. ·PROTECTION OF EXISTING WATERWAYS: PLACE BARRIER AT TOP OF STREAM BANK ·INLET PROTECTION: PLACE FENCE SURROUNDING CATCH BASINS INSTALLATION/APPLICATION CRITERIA: ·PLACE POSTS 6 FEET APART ON CENTER ALONG CONTOUR (OR USE PRE-ASSEMBLED UNIT) AND DRIVE 2 FEET MINIMUM INTO GROUND. EXCAVATE AN ANCHOR TRENCH IMMEDIATELY UPGRADIENT OF POSTS ·SECURE WIRE MESH (14 GAGE MIN. WITH 6 INCH OPENINGS) TO UPSLOPE SIDE OF POSTS. ATTACH WITH HEAVY DUTY 1 INCH LONG WIRE STAPLES, TIE WIRES OR HOG RINGS. ·CUT FABRIC TO REQUIRED WIDTH, UNROLL ALONG LENGTH OF BARRIER AND DRAPE OVER BARRIER. SECURE FABRIC TO MESH WITH TWINE, STAPLES, OR SIMILAR, WITH TRAILING EDGE EXTENDING INTO ANCHOR TRENCH. ·BACKFILL OVER FILTER FABRIC TO ANCHOR. LIMITATIONS: ·RECOMMENDED MAXIMUM DRAINAGE AREA OF 0.5 ACRE PER 100 FEET OF FENCE. ·RECOMMENDED MAXIMUM UPGRADIENT SLOPE LENGTH OF 150 FEET. ·RECOMMENDED MAXIMUM UPHILL GRADE OF 2:1 (50%). ·RECOMMENDED MAXIMUM FLOW RATE OF 0.5 CFS. ·PONDING SHOULD NOT BE ALLOWED BEHIND FENCE. MAINTENANCE: ·INSPECT IMMEDIATELY AFTER ANY RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ·LOOK FOR RUNOFF BYPASSING ENDS OF BARRIERS OR UNDERCUTTING BARRIERS. ·REPAIR OR REPLACE DAMAGED AREAS OF THE BARRIER AND REMOVE ACCUMULATED SEDIMENT. ·REANCHOR FENCE AS NECESSARY TO PREVENT SHORTCUTTING. ·REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/2 THE HEIGHT OF THE FENCE. 1. PLACE POSTS 6' ON CENTER (2X4 WOOD POSTS OR STEEL FENCE POSTS) 2.3. SECURE MESH TO POSTS WITH WIRE STAPLES 1" LONG OR TIE WIRES OR HOG RINGS 4. SECURE FABRIC TO MESH WITH TWINE, STAPLES, OR SIMILAR 5.6.TOE DETAIL FABRIC BACK FILL WITH ROCKS OR DIRT WIRE MESH OBJECTIVES □HOUSEKEEPING PRACTICES □CONTAIN WASTE □MINIMIZE DISTURBED AREA □STABILIZE DISTURBED AREA □PROTECT SLOPES/CHANNELS □CONTROL SITE PERIMETER □CONTROL INTERNAL EROSION TARGETED POLLUTANTS □SEDIMENT □NUTRIENTS □TOXIC MATERIALS □OIL & GREASE □FLOATABLE MATERIALS □OTHER WASTE _______________________________________________ □HIGH IMPACT □MEDIUM IMPACT □LOW OR UNKNOWN IMPACT _______________________________________________ IMPLEMENTATION REQUIREMENTS □CAPITAL COSTS □O & M COSTS □MAINTENANCE □TRAINING □HIGH □MEDIUM □LOW FLOW FLOW DISTURBED A R E A EXISTING VE G I T A T I O N 3' 2' 2' 2' SCALE: N.T.S. SILT FENCE C3 DESCRIPTION: TEMPORARY ON-SITE SANITARY FACILITIES FOR CONSTRUCTION PERSONNEL. APPLICATIONS: ·ALL SITES WITH NO PERMANENT SANITARY FACILITIES OR WHERE PERMANENT FACILITY IS TO FAR FROM ACTIVITIES. INSTALLATION/APPLICATION CRITERIA: ·LOCATE PORTABLE TOILETS IN CONVENIENT LOCATIONS THROUGHOUT THE SITE. ·PREPARE LEVEL, GRAVEL SURFACE AND PROVIDE CLEAR ACCESS TO THE TOILETS FOR SERVICING AND FOR ON-SITE PERSONNEL. ·CONSTRUCT EARTH BERM PERIMETER (SEE EARTH BERM BARRIER INFORMATION SHEET), CONTROL FOR SPILL/PROTECTION LEAK. LIMITATIONS: ·NO LIMITATIONS MAINTENANCE: ·PORTABLE TOILETS SHOULD BE MAINTAINED IN GOOD WORKING ORDER BY LICENSED SERVICE WITH DAILY OBSERVATION FOR LEAK DETECTION. ·REGULAR WASTE COLLECTION SHOULD BE ARRANGED WITH LICENSED SERVICE. ·ALL WASTE SHOULD BE DEPOSITED IN SANITARY SEWER SYSTEM FOR TREATMENT WITH APPROPRIATE AGENCY APPROVAL. CONTAINMENT EARTH BERM GRAVEL PAD1' x 1' OBJECTIVES □HOUSEKEEPING PRACTICES □CONTAIN WASTE □MINIMIZE DISTURBED AREA □STABILIZE DISTURBED AREA □PROTECT SLOPES/CHANNELS □CONTROL SITE PERIMETER □CONTROL INTERNAL EROSION TARGETED POLLUTANTS □SEDIMENT □NUTRIENTS □TOXIC MATERIALS □OIL & GREASE □FLOATABLE MATERIALS □OTHER WASTE _______________________________________________ □HIGH IMPACT □MEDIUM IMPACT □LOW OR UNKNOWN IMPACT _______________________________________________ IMPLEMENTATION REQUIREMENTS □CAPITAL COSTS □O & M COSTS □MAINTENANCE □TRAINING □HIGH □MEDIUM □LOW SCALE: N.T.S. PORTABLE TOILETS C5 DESCRIPTION: PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM CONCRETE WASTE BY CONDUCTING WASHOUT OFF-SITE, PERFORMING ON-SITE WASHOUT IN A DESIGNATED AREA, AND TRAINING EMPLOYEES AND SUBCONTRACTORS. APPLICATIONS: ·THIS TECHNIQUE IS APPLICABLE TO ALL TYPES OF SITES. INSTALLATION/APPLICATION CRITERIA: ·STORE DRY AND WET MATERIALS UNDER COVER, AWAY FROM DRAINAGE AREAS. ·AVOID MIXING EXCESS AMOUNTS OF FRESH CONCRETE OR CEMENT ON-SITE. ·PERFORM WASHOUT OF CONCRETE TRUCKS OFF-SITE OR IN DESIGNATED AREAS ONLY. ·DO NOT WASH OUT CONCRETE TRUCKS INTO STORM DRAINS, OPEN DITCHES, STREETS, OR STREAMS. ·DO NOT ALLOW EXCESS CONCRETE TO BE DUMPED ON-SITE, EXCEPT IN DESIGNATED AREAS. ·WHEN WASHING CONCRETE TO REMOVE FINE PARTICLES AND EXPOSE THE AGGREGATE, AVOID CREATING RUNOFF BY DRAINING THE WATER WITHIN A BERMED OR LEVEL AREA (SEE EARTH BERM BARRIER INFORMATION SHEET.) ·TRAIN EMPLOYEES AND SUBCONTRACTORS IN PROPER CONCRETE WASTE MANAGEMENT. LIMITATIONS: ·OFF-SITE WASHOUT OF CONCRETE WASTES MAY NOT ALWAYS BE POSSIBLE. MAINTENANCE: ·INSPECT SUBCONTRACTORS T ENSURE THAT CONCRETE WASTES ARE BEING PROPERLY MANAGED. ·IF USING A TEMPORARY PIT, DISPOSE HARDENED CONCRETE ON A REGULAR BASIS. CONTAINMENT EARCH BERM ALL AROUND WASHDOWN AREA PONDING STORAGE LOCATE 50' FROM NEAREST DRAINAGE AREA OBJECTIVES □HOUSEKEEPING PRACTICES □CONTAIN WASTE □MINIMIZE DISTURBED AREA □STABILIZE DISTURBED AREA □PROTECT SLOPES/CHANNELS □CONTROL SITE PERIMETER □CONTROL INTERNAL EROSION TARGETED POLLUTANTS □SEDIMENT □NUTRIENTS □TOXIC MATERIALS □OIL & GREASE □FLOATABLE MATERIALS □OTHER WASTE _______________________________________________ □HIGH IMPACT □MEDIUM IMPACT □LOW OR UNKNOWN IMPACT _______________________________________________ IMPLEMENTATION REQUIREMENTS □CAPITAL COSTS □O & M COSTS □MAINTENANCE □TRAINING □HIGH □MEDIUM □LOW SCALE: N.T.S. CONCRETE WASTE MANAGEMENT A5 FILTERSOCK SPECIFICATION: FILTREXX FILTERSOCK INSTALLATION AND MAINTENANCE 1.0 DESCRIPTION: THIS WORK SHALL CONSIST OF FURNISHING, INSTALLING, MAINTAINING AND DISPERSING (IF NEEDED) A WATER PERMEABLE COMPOST FILTER SOCK (FILTREXX FILTERSOCK) TO CONTAIN SOIL EROSION AND SEDIMENT BY REMOVING SOIL PARTICLES FROM WATER MOVING OFF SITE INTO ADJACENT WATERWAYS OR STORM WATER DRAINAGE SYSTEMS. FILTERSOCKS WILL BE USED AS A FORM OF INLET PROTECTION FOR OPERATIONAL STORM DRAINAGE SYSTEMS. 2.0 COMPOST PRODUCTS USED TO FILL FILTREXX FILTERSOCKS 1.COMPOST: COMPOST USED FOR FILTREXX FILTERSOCKS SHALL BE WEED FREE AND DERIVED FROM A WELL-DECOMPOSED SOURCE OF ORGANIC MATTER. THE COMPOST SHALL BE PRODUCED USING AN AEROBIC COMPOSTING PROCESS MEETING CFR 503 REGULATIONS, INCLUDING TIME AND TEMPERATURE DATA INDICATING EFFECTIVE WEED SEED, PATHOGEN AND INSECT LARVAE KILL. THE COMPOST SHALL BE FREE OF ANY REFUSE, CONTAMINANTS OR OTHER MATERIALS TOXIC TO PLANT GROWTH. NON-COMPOSTED PRODUCTS WILL NOT BE ACCEPTED. TEST METHODS FOR THE ITEMS BELOW SHOULD FOLLOW USCC TMECC GUIDELINES FOR LABORATORY PROCEDURES: A.PH - 5.0-8.0 IN ACCORDANCE WITH TMECC 04.11-A, "ELECTROMETRIC PH DETERMINATIONS FOR COMPOST" B.PARTICLE SIZE - 99% PASSING A 1" SIEVE, 90% PASSING A _" SIEVE AND A MINIMUM OF 70% GREATER THAN THE 3/8" SIEVE. A TOTAL OF 98 % SHALL NOT EXCEED 3 INCHES IN LENGTH, IN ACCORDANCE WITH TMECC 02.02-B, "SAMPLE SIEVING FOR AGGREGATE SIZE CLASSIFICATION" C.MOISTURE CONTENT OF LESS THAN 60% IN ACCORDANCE WITH STANDARDIZED TEST METHODS FOR MOISTURE DETERMINATION. D.MATERIAL SHALL BE RELATIVELY FREE (<1% BY DRY WEIGHT) OF INERT OR FOREIGN MAN MADE MATERIALS. E. A SAMPLE SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO BEING USED AND MUST COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. 3.0 CONSTRUCTION AND INSTALLATION OF FILTREXX FILTERSOCKS: 1.FILTREXX FILTERSOCKS WILL BE USED AS A FORM OF INLET PROTECTION ON CONSTRUCTION SITES WHICH REQUIRE PROTECTION AGAINST SEDIMENT LADEN WATER AFTER STORM DRAINS BECOME OPERATIONAL. 2.FILTREXX FILTERSOCKS WILL BE PLACED AT LOCATIONS INDICATED ON PLANS AS DIRECTED BY THE ENGINEER. FILTERSOCKS SHOULD BE INSTALLED IN A PATTERN THAT ALLOWS COMPLETE PROTECTION OF THE INLET AREA 3.INSTALLATION OF FILTREXX FILTERSOCKS WILL ENSURE A MINIMAL OVERLAP OF AT LEAST ONE FOOT ON EITHER SIDE OF THE OPENING BEING PROTECTED. THE FILTERSOCKS WILL BE ANCHORED TO THE SOIL BEHIND THE CURB USING STAPLES, STAKES OR OTHER DEVICES CAPABLE OF HOLDING THE FILTERSOCK IN PLACE. 4.STANDARD SIZES OF FILTERSOCKS FOR INLET PROTECTION WILL BE 8" DIAMETER PRODUCTS. IN SEVERE FLOW SITUATIONS, LARGER FILTERSOCKS MAY BE RECOMMENDED BY THE ENGINEER. 5.FILTERSOCKS SHALL BE CONSTRUCTED OF A WOVEN MATERIAL AND FILLED WITH A COMPOST PRODUCT THAT PASSES THE CRITERIA LISTED IN SECTION 2. 6.IF THE FILTERSOCKS BECOME CLOGGED WITH DEBRIS AND SEDIMENT, THEY SHALL BE MAINTAINED SO AS TO ASSURE A PROPER DRAINAGE AND WATER FLOW INTO THE STORM DRAIN. IN SEVERE STORM EVENTS, OVERFLOW OF THE FILTERSOCK MAY BE ACCEPTABLE IN ORDER TO KEEP THE AREA FROM FLOODING. 7.THE FILTERSOCKS SHALL BE POSITIONED SO AS TO PROVIDE COMPLETE PHYSICAL BARRIER TO THE DRAIN ITSELF, ALLOWING SEDIMENT TO COLLECT ON THE OUTSIDE OF THE FILTERSOCKS. SEE ATTACHED SCHEMATIC FOR FILTREXX FILTERSOCK INSTALLATION. 8.FOR AREAS WHERE FILTERSOCKS ARE TO BE LEFT AS A PERMANENT PART OF THE LANDSCAPE, FILTERSOCKS MAY BE SEEDED DURING TIME OF MANUFACTURE TO CREATE A LIVING SOCK. FOR SEEDING OPTIONS, THE ENGINEER MAY SIMPLY REPLACE ALL LANGUAGE ABOVE WITH "LIVING FILTREXX FILTERSOCKS" 4.0 MAINTENANCE: 1.THE CONTRACTOR SHALL MAINTAIN FILTREXX FILTERSOCKS IN A FUNCTIONAL CONDITION AT ALL TIMES AND IT SHALL BE ROUTINELY INSPECTED. 2.WHERE THE FILTERSOCK REQUIRES REPAIR, IT WILL BE ROUTINELY REPAIRED. 3.THE CONTRACTOR SHALL REMOVE SEDIMENTS COLLECTED AT THE BASE OF THE FILTERSOCK WHEN THEY REACH 1/3 OF THE EXPOSED HEIGHT OF THE FILTERSOCK, OR AS DIRECTED BY THE ENGINEER. 4.THE FILTREXX FILTERSOCK WILL BE DISPERSED ON SITE WHEN NO LONGER REQUIRED, AS DETERMINED BY THE ENGINEER. THE NETTING MATERIAL WILL BE DISPOSED OF IN NORMAL TRASH CONTAINERS OR REMOVED BY THE CONTRACTOR. 5.REGULAR MAINTENANCE INCLUDES LIFTING THE FILTREXX FILTERSOCKS AND CLEANING UNDER THEM AS SEDIMENT COLLECTS. 5.0 METHOD OF MEASUREMENT: BID ITEMS SHALL SHOW MEASUREMENT AS `FILTREXX FILTERSOCK' PER LINEAR FOOT, INSTALLED OR PER INLET, AS SPECIFIED BY THE ENGINEER. 6.0 PERFORMANCE: 1.CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A WORKING EROSION CONTROL SYSTEM AND MAY, WITH APPROVAL OF THE ENGINEER, WORK OUTSIDE THE MINIMUM CONSTRUCTION REQUIREMENTS AS NEEDED. 2.WHERE THE FILTERSOCK DETERIORATES OR FAILS, IT WILL BE REPAIRED OR REPLACED WITH A MORE EFFECTIVE ALTERNATIVE. 3.CONTRACTOR IS REQUIRED TO BE A CERTIFIED FILTREXX INSTALLER AS DETERMINED BY FILTREXX INTERNATIONAL, LLC (440-926-8041 OR VISIT WEBSITE AT FILTREXX.COM). CERTIFICATION SHALL BE CONSIDERED CURRENT IF APPROPRIATE IDENTIFICATION IS SHOWN DURING TIME OF BID OR AT TIME OF APPLICATION. 7.0 APPLICATION GUIDELINES: 1.FILTREXX FILTERSOCKS SHALL EITHER BE MADE ON SITE OR DELIVERED TO THE JOBSITE USING A 3 MIL TUBULAR HDPE KNITTED MESH NETTING MATERIAL, FILLED WITH COMPOST PASSING THE ABOVE SPECIFICATIONS FOR COMPOST PRODUCTS AS OUTLINED IN 2.0. 2.FILTREXX FILTERSOCKS NETTING MATERIALS ARE AVAILABLE ONLY FROM FILTREXX INTERNATIONAL, LLC AND ARE THE ONLY CERTIFIED MESH MATERIALS ACCEPTED IN CREATING FILTREXX PRODUCTS ON SITE OR AS DELIVERED TO THE JOB SITE. STANDARD FILTREXX COLOR CODING SYSTEMS INCLUDE YELLOW AND BLACK STRIPED MESH NETTING WITH 3/8" MESH OPENINGS FOR INLET PROTECTION. OTHER COLORS ARE ONLY ACCEPTABLE AS APPROVED BY BOTH THE ENGINEER AND FILTREXX INTERNATIONAL, LLC. 3.CONTRACTOR IS REQUIRED TO BE A CERTIFIED FILTREXX INSTALLER AS DETERMINED BY FILTREXX INTERNATIONAL, LLC (440-926-8041 OR VISIT WEBSITE AT FILTREXX.COM). CERTIFICATION SHALL BE CONSIDERED CURRENT IF APPROPRIATE IDENTIFICATION IS SHOWN DURING TIME OF BID OR AT TIME OF APPLICATION. 8.0 AVAILABLE VENDORS FILTREXX FILTERSOCKS MAY BE PURCHASED FROM THE FOLLOWING CERTIFIED FILTREXX INSTALLERS: WINDSWEPT ORGANIX INC. WORK: 480-963-4638 FAX: 408-940-4261 850 SOUTH BOGLE AVE, SUITE 2 CHANDLER, AZ 85225 C REPLENISH AREA INLET FILTER FABRIC REQUIRED OVER GRATE 8" FILTER FILTER SOCK FILTER FABRIC REQUIRED OVER GRATE CURB INLET 8" FILTER FILTER SOCK EMP T Y F I L T E R F I L T E R S O C K TIED O F F T O S T A K E S W A T E R F L O W W A T E R F L O W WATE R F L O W W A T E R F L O W WATE R F L O W SCALE: N.T.S. SEDIMENT BARRIER / FILTER SOCK PROTECTION A1 Pr i n t e d : 31 M a r 2 0 2 3 2: 5 6 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 Preliminary - Not for Construction - Pl a n r e - s u b m i t t a l 2