Loading...
HomeMy WebLinkAboutINFRASTRUCTURE Rev 1 3.23.23 - 22-00669 - 5th West Church Subdivision - University Blvd. & 5th W - Plat-Reviewed-Corrections-Required (2)Author Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Todd Smith Todd.Smith@rexburg.org 208-372-2181 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : 5th West Church Subdivision (BYU 10TH WARD) - University Blvd & S 5th W - Plat Address : RPR6N40E315400 - University Blvd. & S 5th W Application Type : Document Filename : INFRASTRUCTURE Rev 1 3.23.23 - 22-00669 - 5th West Church Subdivision - University Blvd. & 5th W - Plat.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments C122 Callout Joel Gray : PW Open 6 With no rise in elevation here, runoff water will overtop the 2" wall. (Existing valley) C151 Callout Joel Gray : PW Open 7 10 ft seperation required from strom piping C151 Callout Joel Gray : PW Open 7 Class 50 DI Pipe Required. C151 Callout Joel Gray : PW Open 7 Must be Class 50 DI in right of way C151 Callout Joel Gray : PW Open 7 Water line must be Class 50 DI in right of way C151 Callout Joel Gray : PW Open 7 Water valve required after Fire Hydrant. Stub water line to end of asphalt. C151 Free Text Joel Gray : PW Open 7 Sewer line stub to south after manhole required to end of asphalt. C151 Callout Joel Gray : PW Open 7 Fire Hydrant required near end of water line. # 22-00669 Short Plat Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 03.29.2023 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) X X X X X X X X X X X X X X X X X X X X X X XXXXXXXX X XX X XXX X X X X X XX X X X X X X X X X X X MA T C H L I N E C 1 1 1 MATCH LINE C111 MA T C H L I N E C 1 1 2 MATCH LINE C112 G EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD E S D E S D ES D ES D . . X X X X X XX X X XX X X X XX X X X X G G EGEGEG EG EG EG EG EG EG EG EG EG ET ET ET ET ET ET ET ET ESD ESD . . General Notes A.This and any other demolition drawings are not intended to be all-inclusive, nor to define the scope of all demolition work required for this project. Demolition drawings are shown only to aid the contractor in preparing his bid and performing the work. Contractor shall examine all contract documents and visit the site during bidding as required to determine the total extent and scope of the demolition portion of this work. All items that are not required to remain shall be of the demolition work whether shown specifically or not. Contractor shall be responsible for all demolition work required to carry out the work as shown in the contract documents. B.The contractor shall verify all existing site conditions prior to bidding. Coordinate all work affecting adjacent properties with the respective property owners prior to any demolition or construction work. Repair and replace all existing items on adjacent properties damaged or affected during construction to the satisfaction of the property owner. C.Contractor shall enclose the entire area of work with a temporary fence throughout construction - coordinate timing & location with the FM Group. D.There is some existing damaged sidewalk on the church site. Inlcude an additional 250 square feet of city siedwalk replacement in the bid. If the actual area required to be replaced is different than 250 square feet, the difference will be adjusted by change order. E.Since the date of the last survey, there has been yard waste and construction debis dumped onto the the site. The contractor is required to remove and dispose of all waste, debris, and excess dirt and rocks. inspect the site prior to the bid to familiarize yourself with the current site conditions. Existing Item Notes EX.01 Existing street paving to remain. EX.02 Existing curb and gutter to remain. EX.03 Existing catch basin to remain. EX.04 Existing asphalt path to remain. EX.05 Existing street sign to remain. EX.06 Existing utility stub or utility line sign. Modify as necessary for new site work. Coordinate any modifications with the city and / or the utility company with jurisdiction or ownership of the stub, utility line, or sign. EX.07 Existing property line. EX.08 Existing fire hydrant to remain. See Site Survey. EX.09 Existing manhole to remain. Site Notes AR.01 New street light per city standards. See Electrical Site Plan. AR.02 New location of salvaged street light. Install per city standards. See Electrical Site Plan. AR.03 New street paving per city standards as required for utility installation. See Grading and Drainage Plans. AR.04 New street paving per city standards. See Grading and Drainage Plans. AR.05 For work and improvements extending to the north and west, including on adjacent property areas, see Grading and Drainage Plans and Utility Plan. Coordinate all work on adjacent properties with the respective property owners and repair all damaged items and landscaping on adjacent properties as noted in the General Notes. AR.06 New concrete curb and gutter per city standards. See Grading and Drainage Plans. AR.07 New concrete sidewalk per city standards. See Grading and Drainage Plans. AR.08 New concrete drive approach per city standards. See civil details. Remove existing sidewalk, curb, and gutter for new drive approach. AR.09 New concrete sidewalk. See A&H/C501. AR.10 New water meter per city standards. See Utility Plan. AR.11 New fire hydrant per city standards. See Utility Plan. AR.12 New 18'-0" pole light. See D & E/C503 & Electrical Site Plan. AR.13 New asphalt paving - typical. See F/C501. AR.14 New accessible parking sign. See A/C502. AR.15 New accessible access aisle. Paint lines shall be 4" wide, at 45° angle, with 2'-0" spacing. AR.16 New blue & white painted accessible parking symbol - typical. AR.17 New 4" wide painted parking lines - typical. AR.18 New painted access aisle. AR.19 New integral sidewalk, curb, and gutter. See B/C501. See Grading and Drainage Plan for infall / outfall of gutter. AR.20 New concrete curb & gutter - typical. See typical details C501 & infall / outfall notation on the Grading & Drainage Site Plans. AR.21 New concrete control joint. AR.22 New concrete waterway. See civil sheets and detail G/C501 AR.23 New stainless steel bike rack. See M/C501. AR.24 New mechanical enclosure. See A &B/C504 & structural sheets. AR.25 New storage building. See C801. AR.26 New 6'-0" tall masonry dumpster enclosure. See 1 & A/C503. AR.27 New bollard. See B/C502. AR.28 New fire department connection with locking knox plugs - model 3050 or 3043 (verify with fire department). AR.29 New fire alarm control panel location. See A101 and electrical sheets. AR.30 New knox box 3200 series recessed in brick (verify with fire department). AR.31 New 6'-0" tall privacy fence. New 12" wide concrete curb wall under fence. See F/C503. Coordinate top elevation of concrete curb wall with architect. AR.32 End of new fence. AR.33 New gas meter. See plumbing sheets. AR.34 New location of salvaged street sign. See D/C504. Coordinate all reinstallation with city requirements. AR.35 Extend concrete fence apron to back of sidewalk. AR.36 Sloped section of sidewalk at 5% maximum slope. See Grading and Drainage Plans. AR.37 Sloped section of sidewalk at 5% maximum slope. See Grading and Drainage Plans. Transition height of curb at gutter along the entire length of the sloped section as shown. AR.38 New concrete mow strip. See K/C501. AR.39 Sloped section of sidewalk at 5% maximum slope. See Grading and Drainage Plans. Transition height of curb along the entire length of the sloped section as shown. AR.40 New Nyloplast yard drain or clean out box. See Grading & Drainage Site Plans and C/C502. AR.41 4" layers of asphalt over 8" aggregate base in dashed area. AR.42 CT cabinet and Main breaker. See electrical sheets. AR.43 Transition height of curb from full height to even with sidewalk and / or gutter in 5'-0". See E/C501. AR.44 New Storm Drain catch basin, curb inlet box, or other storm drain structure. See civil sheets. AR.45 New concrete curb ramp per city standards. See Grading and Drainage Plans. AR.46 New electrical box per city standards to replace removed box. Pull new electrical wiring as necessary. AR.47 New sewer cleanout. AR.48 New sewer manhole per city and sewer district standards. See Utility Plan. AR.49 New concrete sidewalk to replace asphalt path to city requirements. See Grading and Drainage Plans. AR.50 Pavilion. See pavilion sheets. AR.51 Install owner-furnished drinking fountain. AR.52 Electrical transformer and pad. See electrical sheets. AR.53 Hatched area indicates snow storage area. SITE AREAS MAIN BUILDING 31,338 SF 12.73% STORAGE BUILDING 168 SF 0.07% PAVILION 1,800 SF 1.11% ASPHALT 100,117 SF 40.67% CONCRETE 23,868 SF 9.70% LANDSCAPING 90,683 SF 35.73% TOTAL SITE: 246,174 SF 5.65 ACRES TOTAL PARKING PROVIDED:317 Site Data A.Remove all unconsolidated fill and deleterious materials from the entire site prior to construction. B.In all excavation areas, if bedrock is encountered at elevations that prevent the installation of building elements, utilities, etc., remove the bedrock as necessary to properly install building elements and / or utilities with proper fill and bedding as noted. C.In the area of the main building and mechanical enclosures: Overexcavate the entire footprint and 24" beyond the footings at a 1:1 slope down to the top of bedrock. Install 12" minimum imported structural fill above the bedrock beneath footings. Install imported structural fill up to the base course under the building slab. D.In the area of the storage building: Overexcavate the entire footprint and 24" beyond the footings at a 1:1 slope down to the top of bedrock. Install 12" minimum imported structural fill above the bedrock beneath footings. Install imported structural fill up to the base course under the building slab. E.In the area of the pavilion: Overexcavate for footings to allow 12" of structural fill above the bedrock and for the footings to be installed at frost depth. Overexcavate for the slab as necessary to install 12" minimum structural fill below the base course under the pavilion slab. F.Overexcavate and install 12" minimum structural fill below dumpster footings. G.Install 18" crushed rock base beneath sidewalks at building entries, full width of sidewalk and out to the perimeter sidewalk. H.All crushed rock base shall be 3/4" and shall be compacted by procedural compaction. F.Install 6" aggregate base below all site concrete elements unless otherwise noted. G.At asphalt paving: ·See the Site Details for typical asphalt thickness and base material required below typical asphalt paving. ·At the dumpster enclosure, install 6" asphalt paving over 12" minimum aggregate base over 18" subbase in the area 10 feet in front and full width of the dumpster enclosure. For pad and base inside the dumpster enclosure, see Site Details. L.Excavate and backfill at all test pits from geotechnical investigation. Coordinate locations and depths with geotechnical engineer. M.All structural fill shall be imported. N.Install imported structural fill full depth at all utility trenches. O.All topsoil shall be imported. See Landscape Sheets. P.All compacted soils shall be density tested. Q.On-site native soils may be used as fill only in landscape areas. Overexcavation and Fill Notes TOTAL SNOW STORAGE AREA:10,368 sf TOTAL SNOW STORAGE REQ'D:10,012 sf TOTAL CHAPEL SEATING:334 seats TOTAL PARKING REQ'D:84 stalls PARKING COVERED WITH SNOW STORAGE: 64 stalls PARKING AVAILABLE AT FULL SNOW STORAGE: 253 stalls Snow Storage Table Pr i n t e d : 23 M a r 2 0 2 3 10 : 5 9 A M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 22 M a r 2 0 2 3 Si t e P l a n R e - s u b m i t t a l 2 Site Architectural Plan C111Scale:1 Site Architectural Plan - North 1" = 20'-0" 0'10'20'40'80' Scale:2 Keyed Plan Not to Scale C112 2 C112 1 AR.38 C111 1 C111 1 EX.03 AR.35 AR.11 EX.02 EX.01 EX.01 EX.03 AR.04 AR.38 Ex.04AR.35 AR.08 AR.43 AR.43 AR.09 AR.12AR.09AR.12 AR.09 AR.24 AR.12 AR.09 AR.23 AR.13 AR.20 AR.17 AR.20 AR.52 AR.42 AR.12 AR.18 AR.20 AR.19 AR.20 AR.13 AR.20 AR.25 AR.27 AR.27 AR.20 AR.12 AR.19 AR.41 AR.22 AR.12 AR.20 AR.22 AR.13AR.16 AR.51 AR.50 AR.14 AR.14 AR.14 AR.14 AR.12 AR.22 AR.18 AR.43 AR.20AR.26 AR.11 AR.20 AR.20 AR.11 AR.22 AR.12 AR.12 AR.12 AR.12 AR.24 AR.14 AR.14 AR.16 AR.16 AR.15 AR.19 AR.13 AR.17 AR.17 AR.17 AR.17 AR.17 AR.20 AR.20 AR.31 AR.22 AR.24 AR.24 AR.31 AR.31 AR.31 AR.31 AR.12 AR.12 AR.12 AR.24 AR.24 AR.14 AR.14 AR.33 AR.16 AR.16 AR.15 AR.18 AR.21 AR.21 AR.21 AR.21 AR.21 AR.21 AR.40 AR.40 AR.40 AR.40 AR.40 AR.40 AR.40 AR.44 AR.44 AR.44 AR.44 AR.44 AR.44 AR.44 AR.44 Ex.01 EX.05 EX.07 AR.31 AR.43 AR.39 AR.39 AR.37 AR.37 AR.36 AR.37 AR.37 AR.37 AR.37 AR.36 AR.39 AR.43 AR.44 AR.39 AR.43 AR.44 AR.32 AR.32 EX.03 EX.09 AR.01 AR.01 AR.10 AR.48 AR.03 AR.03 AR.48 AR.03 EX.05 AR.49 AR.49 AR.49 AR.44 C503 C1-C3 AR.44 AR.44 AR.44 C502 E AR.44 2 2 AR.53 AR.53 AR.53 AR.53 AR.53 AR.53 AR.53 2 2 2 2 2 2 2 2 STATE OF U T A H Lafe Theodore Harris 6928898-0301 °°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°° LIC E N S E D ARCHIT E C T 22 Mar 2 0 2 3 XX X X X X X XXXXXXXXXXX X X X X X X X X X X X X X X X X X X X MA T C H L I N E C 1 1 1 EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EPEP ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD E S D XXXX X X X X X X X X X X XXXXXXXXXX X X X X X X X X X X XXX X X MATCH LINE C111 XXX X General Notes A.This and any other demolition drawings are not intended to be all-inclusive, nor to define the scope of all demolition work required for this project. Demolition drawings are shown only to aid the contractor in preparing his bid and performing the work. Contractor shall examine all contract documents and visit the site during bidding as required to determine the total extent and scope of the demolition portion of this work. All items that are not required to remain shall be of the demolition work whether shown specifically or not. Contractor shall be responsible for all demolition work required to carry out the work as shown in the contract documents. B.The contractor shall verify all existing site conditions prior to bidding. Coordinate all work affecting adjacent properties with the respective property owners prior to any demolition or construction work. Repair and replace all existing items on adjacent properties damaged or affected during construction to the satisfaction of the property owner. C.Contractor shall enclose the entire area of work with a temporary fence throughout construction - coordinate timing & location with the FM Group. D.There is some existing damaged sidewalk on the church site. Inlcude an additional 250 square feet of city siedwalk replacement in the bid. If the actual area required to be replaced is different than 250 square feet, the difference will be adjusted by change order. E.Since the date of the last survey, there has been yard waste and construction debis dumped onto the the site. The contractor is required to remove and dispose of all waste, debris, and excess dirt and rocks. inspect the site prior to the bid to familiarize yourself with the current site conditions. Existing Item Notes EX.01 Existing street paving to remain. EX.02 Existing curb and gutter to remain. EX.03 Existing catch basin to remain. EX.04 Existing asphalt path to remain. EX.05 Existing street sign to remain. EX.06 Existing utility stub or utility line sign. Modify as necessary for new site work. Coordinate any modifications with the city and / or the utility company with jurisdiction or ownership of the stub, utility line, or sign. EX.07 Existing property line. EX.08 Existing fire hydrant to remain. See Site Survey. EX.09 Existing manhole to remain. Site Notes AR.01 New street light per city standards. See Electrical Site Plan. AR.02 New location of salvaged street light. Install per city standards. See Electrical Site Plan. AR.03 New street paving per city standards as required for utility installation. See Grading and Drainage Plans. AR.04 New street paving per city standards. See Grading and Drainage Plans. AR.05 For work and improvements extending to the north and west, including on adjacent property areas, see Grading and Drainage Plans and Utility Plan. Coordinate all work on adjacent properties with the respective property owners and repair all damaged items and landscaping on adjacent properties as noted in the General Notes. AR.06 New concrete curb and gutter per city standards. See Grading and Drainage Plans. AR.07 New concrete sidewalk per city standards. See Grading and Drainage Plans. AR.08 New concrete drive approach per city standards. See civil details. Remove existing sidewalk, curb, and gutter for new drive approach. AR.09 New concrete sidewalk. See A&H/C501. AR.10 New water meter per city standards. See Utility Plan. AR.11 New fire hydrant per city standards. See Utility Plan. AR.12 New 18'-0" pole light. See D & E/C503 & Electrical Site Plan. AR.13 New asphalt paving - typical. See F/C501. AR.14 New accessible parking sign. See A/C502. AR.15 New accessible access aisle. Paint lines shall be 4" wide, at 45° angle, with 2'-0" spacing. AR.16 New blue & white painted accessible parking symbol - typical. AR.17 New 4" wide painted parking lines - typical. AR.18 New painted access aisle. AR.19 New integral sidewalk, curb, and gutter. See B/C501. See Grading and Drainage Plan for infall / outfall of gutter. AR.20 New concrete curb & gutter - typical. See typical details C501 & infall / outfall notation on the Grading & Drainage Site Plans. AR.21 New concrete control joint. AR.22 New concrete waterway. See civil sheets and detail G/C501 AR.23 New stainless steel bike rack. See M/C501. AR.24 New mechanical enclosure. See A &B/C504 & structural sheets. AR.25 New storage building. See C801. AR.26 New 6'-0" tall masonry dumpster enclosure. See 1 & A/C503. AR.27 New bollard. See B/C502. AR.28 New fire department connection with locking knox plugs - model 3050 or 3043 (verify with fire department). AR.29 New fire alarm control panel location. See A101 and electrical sheets. AR.30 New knox box 3200 series recessed in brick (verify with fire department). AR.31 New 6'-0" tall privacy fence. New 12" wide concrete curb wall under fence. See F/C503. Coordinate top elevation of concrete curb wall with architect. AR.32 End of new fence. AR.33 New gas meter. See plumbing sheets. AR.34 New location of salvaged street sign. See D/C504. Coordinate all reinstallation with city requirements. AR.35 Extend concrete fence apron to back of sidewalk. AR.36 Sloped section of sidewalk at 5% maximum slope. See Grading and Drainage Plans. AR.37 Sloped section of sidewalk at 5% maximum slope. See Grading and Drainage Plans. Transition height of curb at gutter along the entire length of the sloped section as shown. AR.38 New concrete mow strip. See K/C501. AR.39 Sloped section of sidewalk at 5% maximum slope. See Grading and Drainage Plans. Transition height of curb along the entire length of the sloped section as shown. AR.40 New Nyloplast yard drain or clean out box. See Grading & Drainage Site Plans and C/C502. AR.41 4" layers of asphalt over 8" aggregate base in dashed area. AR.42 CT cabinet and Main breaker. See electrical sheets. AR.43 Transition height of curb from full height to even with sidewalk and / or gutter in 5'-0". See E/C501. AR.44 New Storm Drain catch basin, curb inlet box, or other storm drain structure. See civil sheets. AR.45 New concrete curb ramp per city standards. See Grading and Drainage Plans. AR.46 New electrical box per city standards to replace removed box. Pull new electrical wiring as necessary. AR.47 New sewer cleanout. AR.48 New sewer manhole per city and sewer district standards. See Utility Plan. AR.49 New concrete sidewalk to replace asphalt path to city requirements. See Grading and Drainage Plans. AR.50 Pavilion. See pavilion sheets. AR.51 Install owner-furnished drinking fountain. AR.52 Electrical transformer and pad. See electrical sheets. AR.53 Hatched area indicates snow storage area. A.Remove all unconsolidated fill and deleterious materials from the entire site prior to construction. B.In all excavation areas, if bedrock is encountered at elevations that prevent the installation of building elements, utilities, etc., remove the bedrock as necessary to properly install building elements and / or utilities with proper fill and bedding as noted. C.In the area of the main building and mechanical enclosures: Overexcavate the entire footprint and 24" beyond the footings at a 1:1 slope down to the top of bedrock. Install 12" minimum imported structural fill above the bedrock beneath footings. Install imported structural fill up to the base course under the building slab. D.In the area of the storage building: Overexcavate the entire footprint and 24" beyond the footings at a 1:1 slope down to the top of bedrock. Install 12" minimum imported structural fill above the bedrock beneath footings. Install imported structural fill up to the base course under the building slab. E.In the area of the pavilion: Overexcavate for footings to allow 12" of structural fill above the bedrock and for the footings to be installed at frost depth. Overexcavate for the slab as necessary to install 12" minimum structural fill below the base course under the pavilion slab. F.Overexcavate and install 12" minimum structural fill below dumpster footings. G.Install 18" crushed rock base beneath sidewalks at building entries, full width of sidewalk and out to the perimeter sidewalk. H.All crushed rock base shall be 3/4" and shall be compacted by procedural compaction. F.Install 6" aggregate base below all site concrete elements unless otherwise noted. G.At asphalt paving: ·See the Site Details for typical asphalt thickness and base material required below typical asphalt paving. ·At the dumpster enclosure, install 6" asphalt paving over 12" minimum aggregate base over 18" subbase in the area 10 feet in front and full width of the dumpster enclosure. For pad and base inside the dumpster enclosure, see Site Details. L.Excavate and backfill at all test pits from geotechnical investigation. Coordinate locations and depths with geotechnical engineer. M.All structural fill shall be imported. N.Install imported structural fill full depth at all utility trenches. O.All topsoil shall be imported. See Landscape Sheets. P.All compacted soils shall be density tested. Q.On-site native soils may be used as fill only in landscape areas. Overexcavation and Fill Notes Pr i n t e d : 23 M a r 2 0 2 3 11 : 0 0 A M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 22 M a r 2 0 2 3 Si t e P l a n R e - s u b m i t t a l 2 Site Architectural Plan C112 Scale:1 Site Architectural Plan - West 1" = 20'-0" Scale:2 Site Architectural Plan - South 1" = 20'-0" 0'10'20'40'80' 0'10'20'40'80' AR.13 AR.20 AR.13 AR.17 AR.17 AR.17 AR.17 AR.18 AR.25 AR.42 AR.52 AR.25 AR.27 AR.27 AR.41 AR.26 AR.16 AR.51 AR.14 AR.14 AR.18 AR.43 AR.21 AR.21 AR.08 AR.12 AR.12 AR.12 AR.31 AR.31 Ex.01 Ex.02 EX.05 AR.02 EX.03 AR.21 AR.38 AR.31 AR.31 AR.31 AR.50 EX.06 AR.35 AR.32 AR.44 AR.44 AR.44 AR.44 AR.44 AR.44 AR.32 AR.04 AR.04 AR.04 AR.48 EX.06 AR.20 AR.19AR.09 EX.06 AR.06 AR.06 AR.06 AR.07 AR.07 AR.07 AR.07 AR.45 AR.46 AR.49 AR.49 AR.49 EX.03 EX.03 AR.05 AR.05 AR.20 AR.48 AR.44 AR.04 AR.32 EX.06 AR.38 AR.35 AR.35 AR.01 EX.06 AR.38 AR.53 AR.53 AR.53 2 2 2 2 2 2 STATE OF U T A H Lafe Theodore Harris 6928898-0301 °°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°° LIC E N S E D ARCHIT E C T 22 Mar 2 0 2 3 Typ. X X X X X X X X X X X X X X X X X X X X X X XXXXXXXX X XX X XXX X X X X X XX X X X X X X X X X X X G 14'-9 3/4" 6" 18'-0"26'-0"18'-0"11'-0"18'-0"26'-0"18'-0"6'-6"19'-2 1/2"19'-2 1/2" 6'-6" 18'-0"26'-0"18'-0"18'-0"26'-0"18'-0" 6" 14'-11" 13 ' - 6 " 6" 26 ' - 0 " 18 ' - 0 " 6" 13 ' - 3 " 18 ' - 0 " 28 ' - 6 3 / 4 " 2' - 5 1 / 2 " 53 ' - 1 1 1 / 4 " 2' - 5 1 / 2 " 26 ' - 5 1 / 4 " 2' - 5 1 / 2 " 27 ' - 0 " 5' - 0 " 60 ' - 6 " 5' - 0 " 51 ' - 6 " 9' - 0 " 2' - 5 1 / 2 " Ty p . 9' - 0 " Ty p . 9'-0" Typ. 10 ' - 0 " 6" 26 ' - 0 " 18 ' - 0 " 6' - 6 " 10 ' - 8 " 15 ' - 0 " 6" 18 ' - 0 " 27 ' - 1 0 1 / 2 " 26 ' - 0 " 2' - 5 1 / 2 " 69 ' - 6 " 5' - 0 " 66 ' - 4 " 5' - 0 " 2' - 5 1 / 2 " 27 ' - 1 0 1 / 2 " 18 ' - 0 " 6" 41 ' - 1 1 1 / 4 " 11 ' - 5 " 9' - 0 " 9' - 0 " 15 ' - 6 " 9' - 0 " 9' - 0 " Ty p . Ty p . R6'-0 " R 6 ' - 0 " R5 ' - 0 " T y p . R 6 ' - 0 " R5'- 0 " R 5 ' - 0 " R6'- 0 " R 5 ' - 0 " 67 ' - 0 " 5' - 0 " 60 ' - 6 " 11 ' - 6 1 / 4 " 11 ' - 1 1 3 / 4 " 9' - 0 " 9' - 0 " 15 ' - 6 " 9' - 0 " 9' - 0 " Ty p . 9'-7 1/4" 9'-0"8'-0" 5'-0" 8'-0"9'-0" 9'-7 1/4" Typ. 18 ' - 0 " 6" 24 ' - 0 " 18'-0" 5'-0" 18'-0"9'-0" 12'-7 1/2"9'-0"9'-0" 6" 21'-7" 20 ' - 5 1 / 4 " 22'-11" 20 ' - 1 0 1 / 4 " 5' - 0 " 16 ' - 1 0 " 14 ' - 6 " 14 ' - 9 1 / 2 " 8' - 1 0 1 / 2 " 10 ' - 4 " 5' - 0 " 6' - 1 1 1 / 4 " 18 ' - 7 1 / 2 " 15 ' - 6 " 18 ' - 7 1 / 2 " 2'-1 1/4" Typ. 18 ' - 0 " 6' - 6 " 19 ' - 2 3 / 4 " 2'-1 1/4" 47'-4 1/4" 9'-3 3/4" 22'-2 1/2"21'-6 1/2" 9'-3 1/4" 47'-4 3/4" 2'-1 1/4" 2' - 1 1 / 4 " 59 ' - 3 " 59 ' - 3 " 31 ' - 2 3 / 4 " 5' - 0 " 23 ' - 0 1 / 4 " 18 ' - 7 1 / 2 " 15 ' - 6 " 18 ' - 7 1 / 2 " 51 ' - 4 3 / 4 " 5' - 0 " 1' - 8 " 13 ' - 2 3 / 4 " 6' - 8 " 1'-8" 1'-8" 5' - 0 " 9'-4"9'-4" 9' - 0 " Ty p . 9'-0" Typ. 9' - 0 " Ty p . 9' - 0 " Ty p . 20 ' - 1 1 1 / 2 " 21'-1 3/4" 9' - 0 " 7'-2 1/4" R6 ' - 0 " R6' - 2 1 / 2 " R4'-3 " R4'-3 " R 1 2 ' - 0 " R4'- 3 " 12'-4 1/4" 6"18'-0" 9' - 0 " Ty p . 9'-0" Typ. Typ.Typ. Typ. R 3 ' - 0 " Ty p . R2 ' - 0 " T y p . Ty p . R 2 ' - 0 " R3 ' - 0 " 1' - 1 0 1 / 4 " 1'-10 1/4" Typ. Ty p . 7'-2 1/2" 64 ' - 5 1 / 2 " R 6 ' - 0 " 7' - 7 1 / 2 " R 6 1 ' - 1 1 / 4 " 6'-6"18'-2" 6" 26'-0" 6" 6'-6" 24'-0" 22 ' - 7 " 18'-0" X X X X X X X X X X X X X X X X X X X X X X X X X XXXX EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD E S D E S D E S D E S D . . 1 0 ' - 0 " X X X X X XX X X XX X X X XX X X X X G G X X X X X X XXXXXX EGEGEG EG EG EG EG EG EG EG EG EG ET ET ET ET ET ET ET ET ESD ESD . . Pr i n t e d : 23 M a r 2 0 2 3 11 : 4 0 A M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 22 M a r 2 0 2 3 Si t e P l a n R e - s u b m i t t a l 2 Site Dimension Plan - North C113Scale:1 Site Dimension Plan - North 1" = 20'-0" 0'10'20'40'80' Scale:2 Keyed Plan Not to Scale C114 2 C114 1 00 MATCH LINE C113 MATCH LINE C114 MA T C H L I N E C 1 1 3 MA T C H L I N E C 1 1 4 C503 1 C503 1 STATE OF U T A H Lafe Theodore Harris 6928898-0301 °°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°° LIC E N S E D ARCHIT E C T 22 Mar 2 0 2 3 XX X X X X X XXXXXXXXXXX X X X X X X X X X X X X X X X X X X X G 14'-9 3/4" 6" 18'-0"26'-0" 13 ' - 6 " 26 ' - 0 " 18 ' - 0 " 6" 13 ' - 3 " 18 ' - 0 " 28 ' - 6 3 / 4 " 2' - 5 1 / 2 " 53 ' - 1 1 1 / 4 " 2' - 5 1 / 2 " 26 ' - 5 1 / 4 " 2' - 5 1 / 2 " 27 ' - 0 " 5' - 0 " 60 ' - 6 " 5' - 0 " 51 ' - 6 " 9' - 0 " 2' - 5 1 / 2 " Ty p . 9' - 0 " Ty p . 10 ' - 0 " 6" 26 ' - 0 " 18 ' - 0 " 6' - 6 " 10 ' - 8 " R 6 ' - 0 " 6" 21'-7" 20 ' - 5 1 / 4 " 20 ' - 1 1 1 / 2 " 21'-1 3/4" 9' - 0 " 7'-2 1/4" R6 ' - 0 " R6' - 2 1 / 2 " R4'-3 " R4'-3 " R 1 2 ' - 0 " R4'- 3 " 12'-4 1/4" 6"18'-0" 9' - 0 " Ty p . 9'-0" Typ. 39'-5 1/2" 20'-0" 20'-0" 42'-11 1/2"89'-1 3/4" X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ESD ESD ESD ESD ESD ESD ESD ESD ESD ESD E S D 1 0 ' - 0 " 5'-0" Typ. XXXX X X X X X X X X X X XXXXXXXXXX X X X X X X X X X X XXX X X 13 ' - 6 " 6" 18 ' - 0 " 28 ' - 6 3 / 4 " 26 ' - 0 " 9'-7 1/4" 9'-0"8'-0" 5'-0" 8'-0"9'-0" 9'-7 1/4" Typ. 18 ' - 0 " 6" 24 ' - 0 " 18'-0" 5'-0" 18'-0"9'-0" 9'-0"9'-0" 20 ' - 1 1 1 / 2 " 21'-1 3/4" 9' - 0 " 7'-2 1/4" R6 ' - 0 " Typ.Typ. Typ. XXX X Pr i n t e d : 23 M a r 2 0 2 3 11 : 4 2 A M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 22 M a r 2 0 2 3 Si t e P l a n R e - s u b m i t t a l 2 Site Dimension Plan - West, South C114 Scale:1 Site Dimension Plan - West 1" = 20'-0" Scale:2 Site Dimension Plan - South 1" = 20'-0" 0'10'20'40'80' 0'10'20'40'80' MA T C H L I N E C 1 1 3 MATCH LINE C113 C503 1 STATE OF U T A H Lafe Theodore Harris 6928898-0301 °°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°° LIC E N S E D ARCHIT E C T 22 Mar 2 0 2 3 . X X X X X X X X X X X X XXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X CO CO EX TOP OF 12" PIPE TO REMAIN EX TOP OF 18" SD CMP PIPE TO REMAIN EX 24" SD PLASTIC PIPE TO REMAIN EX CB TO REMAIN GRATE=4883.00 INV=4878.31 EX CB TO REMAIN GRATE=4880.92 INV=4878.42 EX SDMH TO REMAIN RIM=4882.26 E INV=4878.60 N INV=4878.47 S INV=4878.42 EX 36" SD PLASTIC PIPE TO REMAIN EX INV:4876.96 EX SDMH TO REMAIN RIM=4873.74 E INV=4869.99 W INV=4869.91 EX INV:4875.25 EX 24" SD CMP PIPE TO REMAIN EX SHOULDER TO REMAIN EX CURB & GUTTER TO REMAIN 48 9 0 48 8 8 489 2 489 4 490 0 48 9 4 489 6 489 8 48 8 0 4880 4880 4876 4 8 7 8 4878 4878 48 8 2 48 8 4 48 8 6 EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y S89° 40' 10"E 165.11' S89° 39' 20"E 86.98' N80° 43' 00"E 316.81' N0 0 ° 1 6 ' 3 0 " W 24 2 . 0 7 ' S89° 43' 30"W 330.00' N0 0 ° 1 6 ' 5 0 " W 18 5 . 7 0 ' N89° 39' 50"W 2649.26' 87.48 EXIST 87.72 EXIST 2 . 3 % 4.2% 3. 1 % 1. 6 % 83.92 EXIST 83.92 EXIST 83.53 EXIST 83.10 EXIST 82.84 EXIST 82.23 EXIST 81.52 EXIST 78.94 EXIST 80.09 EXIST 2.0% 2.4% 2.7% 2.5% 3.0% 83.81 TBC 83.56 TBC 83.31 TBC 82.59 TBC 81.93 TBC 81.34 TBC 78.90 TBC 77.98 EXIST 2. 7 % 0. 6 % 1. 5 % 1.9% 3.7%1.5% 1.3%1.6% 4.8%1.7% 4. 6 % 4. 6 % 1. 5 % 1. 5 % 3.6% 2. 0 % 2.0% 2.0% 1.9% 1. 9 % 4.8% 3.5 % 4.2% 4.8% 4.0 % 3.9 % 0.5% 1. 8 % 1.8% 1.8% 1.8% 3.3% 3.5% 2. 7 % 2.8% 2 . 2 % 1. 8 % 1.6% 2 . 9 % 1.5% 1.5% 6.4% 4.6% 2.9% 0. 5 % 1. 0 % 2. 2 % 1. 7 % 84.00 EXIST 86.00 EXIST 88.00 EXIST 90.00 EXIST 92.29 EXIST 94.21 EXIST 84.28 EXIST 86.00 EXIST 88.20 EXIST 86.00 EXIST 84.00 EXIST 82.65 TOA 82.29 TOA 3.7%1.1%1. 9 % 1.6% 4.5% 82.46 TBC 82.40 TBC 82.34 TOC 82.46 TOC 82.03 TOC 83.91 TOC 83.66 TOC 83.41 TOC 81.90 TOC 78.50 TOC 78.04 TOC 78.00 EXIST 83.10 TBC 91.00 TBC 90.75 TBC 90.50 TBC 91.58 TBC 92.65 TBC 92.75 TBC 92.85 TBC 93.00 TBC 94.00 TBC 93.70 TBC 93.70 TBC 93.74 TBC 93.25 TOC 93.41 TOC 93.71 TOC 93.55 TOC 94.05 TBC 94.10 TBC 94.20 TBC 94.50 TBC 2 . 2 % 92.50 TBC 92.20 TBC 92.60 TBC 92.60 TBC 85.76 TOC 90.18 TOC 90.45 TBC 90.60 TBC 90.50 TBC 90.48 TBC 90.34 TBC 90.15 TBC 89.75 TBC 88.85 TBC 88.25 TBC 88.75 TBC 88.75 TBC 88.25 TBC 92.10 TBC 92.70 TBC 93.10 TBC 93.90 TOC 93.00 TOC 95.10 TOC 95.42 TOC 95.50 TOC 95.00 FG 93.15 TBC 92.99 TBC 92.75 TBC 92.55 TBC 92.35 TBC 91.75 TBC 91.49 TBC 90.70 TBC 92.83 TBC 92.34 TBC 92.08 TBC 91.30 TBC 93.70 TBC 93.75 TBC 94.10 TOC 94.10 TOC 93.66 TBC 93.58 TBC 93.55 TBC 93.65 TBC 94.22 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.00 FG 95.00 FG 95.00 FG 95.50 TOC 95.42 TOC 97.75 TOC 98.00 TOC 95.70 TBC 94.65 TOC 95.20 TOC 95.40 TOC 94.90 TOC 95.08 TBC 94.78 TBC 95.26 TOC 93.82 TOA 94.45 TOA 94.90 TOC 95.40 TOC 94.45 TOA 94.78 TBC 95.28 TOC 95.15 TOC 95.05 TOC 94.60 TOC 94.93 TBC 94.10 TOA [ 86 ] [ 8 4 ] [ 8 3 ] SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD NEW SD CATCH BASIN GRATE: 4893.25' IE: 4889.75' NEW SD CURB INLET BOX GRATE: 4890.00' IE: 4887.00' NEW 72 LF 18" HDPE @ 2.55% SLOPE NEW SD CO BOX GRATE: 4890.00' IE: 4884.48' NEW 46 LF 12" HDPE @ 5.82% SLOPE NEW SD CURB INLET BOX GRATE: 4891.84' IE: 4888.34' NEW 118 LF 12" HDPE @ 3.27% SLOPE NEW SD CURB INLET BOX GRATE: 4887.75' IE: 4884.30' NEW 28 LF 12" HDPE @ 0.35% SLOPE NEW SD CURB INLET BOX GRATE: 4887.75' IE: 4884.40' NEW 223 LF 12" HDPE @ 1.16% SLOPE NEW SD CURB INLET BOX GRATE: 4881.84' IE: 4878.84' NEW SD CO BOX SOLID LID: 4888.33' 18" (N): 4882.50' ISOLATER (S): 4880.50' MANIFOLD (E): 4881.50' SD SD SD SD SD SD SD SD SD SD 12" AREA DRAIN GRATE: 4893.75' I.E.: 4890.75' 23 L.F. NEW 8" HDPE @ 16.00% 169 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.00' I.E.: 4889.90' 92 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4893.00' I.E.: 4889.44' 0.6% 4.7% 95.42 TOC 1. 7 % 94.80 TOA 0.8%1.1% 1.7 %2.2 % 2. 2 % 2.9% 4. 1 % SECTION LINE SECTION LINE NEW RIGHT-OF-WAY LINE20.00' 20.00' 20.00' SECTION LINE NEW RIGHT-OF-WAY LINE NEW 47 LF 18" HDPE @ 0.35% SLOPE NEW 26 LF 18" HDPE @ 6.90% SLOPE NEW 175 LF 18" PERFORATED HDPE @ 0.50% SLOPE 77.84 EXIST 77.45 EXIST 1.8% 77.87 EXIST 2.5% 2.7% 3. 0 % 1.8 % SD NEW SD CURB DOUBLE INLET BOX GRATE: 4877.00' IE: 4873.50' 78.32 TBC 77.50 TBC REPLACE EXISTING TYPE 8 INLET WITH NEW SD CO BOX SOLID LID: 4877.55' EX IE (W): MATCH EX / APPROX 4872.80' EX IE (E): MATCH EX / APPROX 4872.50' NEW IE (N): MATCH EX IE (W) / 4872.80' 84.20 EXIST 83.60 EXIST 83.30 EXIST 82.90 EXIST 82.30 EXIST 81.30 EXIST 80.50 EXIST 79.60 EXIST 79.20 EXIST 77.80 EXIST NEW 12 LF 18" RCP @ 5.83% SLOPE 1. 9 % ROAD TO BE WIDENED AS SHOWN ROAD TO BE WIDENED AS SHOWN 81.73 TOC 81.39 TOC 79.95 TOC NEW ADA RAMP PER CITY CITY STANDARDS 78.00 TBC 77.85 TBC 79.36 EXIST 79.71 EXIST EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL 79.71 TOC 79.36 TOC 80.32 EXIST 80.32 TOC 81.83 EXIST 81.83 TOC 83.07 EXIST 83.07 TOC 84.34 EXIST 84.34 TOC 85.47 EXIST 85.47 TOC 86.57 EXIST 86.57 TOC 88.62 EXIST 88.62 TOC 91.48 EXIST 91.48 TOC S S S S 167.50' TP B4 EX SURFACE: 4897.75' BEDROCK: 4894.25' TP B1 EX SURFACE: 4891.00' BEDROCK: 4886.50' TP 2 EX SURFACE: 4889.50' BEDROCK: 4885.50' TP 4 EX SURFACE: 4892.50' BEDROCK: 4887.75' TP 5 EX SURFACE: 4894.00' BEDROCK: 4889.75' TP 1 EX SURFACE: 4887.00' BEDROCK: 4882.25' TP 3 EX SURFACE: 4889.00' BEDROCK: 4887.00' TP 7 EX SURFACE: 4893.00' BEDROCK: 4888.25' TP 6 EX SURFACE: 4886.00' BEDROCK: 4881.75' 5 STEPS 92.90 TOC 90.65 TOC 93.10 TOC 93.10 TOC 93.10 TOC NEW SD CURB INLET BOX GRATE: 4891.84' IE: 4888.84' NEW 72 LF 18" HDPE @ 1.26% SLOPE 3.9 % 4.5% NEW SD CATCH BASIN GRATE: 4887.75' IE (E): 4884.75' IE (S): 4885.75' SD SD SD TP 9 EX SURFACE: 4899.50' BEDROCK: 4896.50' SD SD SDNEW 76 LF 12" HDPE @ 0.35% SLOPE 92.34 TBC SD SD SD SD SD SD SD SD SD NEW 12 LF 12" HDPE @ 0.75% SLOPE I.E. = 4878.75' 81.25 FG 78.75 FG 81.25 FG 79.75 FG I.E. = 4879.75' NEW 12 LF 12" HDPE @ 0.75% SLOPE POND BERM / HIGHWATER = 4881.25' POND 100 YR OVERFLOW I.E. = 4879.75' 96.95 TOC 96.85 TOC 96.50 TOC 95.70 TOC 96.60 TOC 4.8% 4.8% 5. 0 % RD 4 STEPS 90.75 TOC 88.00 TOC 2. 7 % GENERAL NOTES: SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT (IF AVAILABLE). THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557 EXCEPT UNDER BUILDING FOUNDATION WHERE IT SHALL BE 98% MIN. OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2% ABOVE NOR 3% BELOW OPTIMUM. CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS & SPECS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT. THE CONTRACTOR IS TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. SPECIFIC DETAILS SHOWN ON SHEET C2.10 SHALL BE USED IN COMBINATION WITH OTHER ACCEPTED LOCAL PRACTICES. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THOSE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. ALL ELEVATIONS SHOWN AT TOP AND BOTTOM OF WALL(S), IF ANY, ARE ELEVATIONS AT FINISH GRADE, UNLESS OTHERWISE NOTED. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: GRADE SITE TO ELEVATIONS AND CONTOURS SHOWN ON PLAN. STORM DRAIN CURB INLET WITH HEAVY DUTY BICYCLE SAFE GRATE, PER STANDARD CHURCH DETAIL, SEE DETAIL 'M', SHEET C521. 12" SQUARE SECURABLE NYLOPLAST YARD DRAIN, PER STANDARD CHURCH DETAIL, SEE DETAIL 'L", SHEET C521. STORM DRAIN PIPE. SEE PLAN FOR LENGTH, SIZE, TYPE AND SLOPE. SEE ISPWC DRAWING SD-301, FOR TRENCHING DETAIL. ROOF DRAIN DOWNSPOUT LOCATION. DOWNSPOUT TO BE PER STANDARD CHURCH DETAIL. TAPER LAST 3' OF CURB TO MATCH SIDEWALK HEIGHT, PER STANDARD CHURCH DETAIL. STORMTECH MC-7200 CHAMBERS OR EQUIVALENT SYSTEM APPROVED PRIOR TO BIDDING. SYSTEM AS SHOWN ON PLANS ALL PROVIDED BY THE CONTRACTOR. STORMTECH CHAMBER HAS RETENTION OF 35,950 C.F. REQUIRED RETENTION = 35,016 C.F. SEE DETAIL ON SHEET C571. SHOP DRAWINGS PROVIDED BY MANUFACTURER PRIOR TO BIDDING AND CONSTRUCTION. LANDING AREAS TO HAVE 2% MAXIMUM SLOPE AWAY FROM BUILDING ADA PARKING STALL, TOA (TOP OF ASPHALT) SPOT GRADES ARE TO BE STAKED TO ENSURE SLOPE WITHIN ADA PARKING STALL REMAINS UNDER 2.0% MAX. SLOPE. STORM DRAIN CLEANOUT BOX WITH HEAVY DUTY PEDESTRIAN SAFE LID. 6" HDPE PIPE FROM ROOF DRAIN. STORM DRAIN CATCH BASIN WITH HEAVY DUTY BICYCLE SAFE GRATE. 1 3 5 6 SCALE: 1" = NORTH 20' 0 10'20'40'60' 4 8 9 10 11 2 7 COMMON GRADING ABBREVIATIONS: SEE SHEET C0.01 FOR ADDITIONAL ABBREVIATIONS -BFE BASEMENT FLOOR ELEVATION -BW FINISH GRADE AT BOTTOM OF WALL -EX or EXIST EXISTING -EOA EDGE OF ASPHALT -EOC EDGE OF CONCRETE -FFE FINISH FLOOR ELEVATION -FG FINISH GRADE -FL FLOW LINE -GB GRADE BREAK -HP HIGH POINT -LP LOW POINT -NG NATURAL GROUND -SDCB STORM DRAIN CATCH BASIN -SDCO STORM DRAIN CLEANOUT BOX -SDDB STORM DRAIN DRAIN BASIN -SDMH STORM DRAIN MANHOLE -TBC TOP BACK OF CURB -TOA TOP OF ASPHALT -TOC TOP OF CONCRETE -TOG TOP OF GRATE -TOW TOP OF WALL -TW FINISH GRADE AT TOP OF WALL -WW WATERWAY Pr i n t e d : 22 M a r 2 0 2 3 3: 4 1 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 - Pl a n r e - s u b m i t t a l 2 10 9 9 9 8 8 8 8 8 7 7 6 4 4 4 4 4 4 4 4 2 4 3 3 3 12 2 2 2 2 4 12 10 Grading and Drainage Plan C121 4 4 4 4 4 5 11 511 11 5 5 11 11 5 11 5 11 5 5 5 11 11 . . X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X XXX COCO CO CO EX TOP OF 18" SD CMP PIPE TO REMAIN EX 24" SD PLASTIC PIPE TO REMAIN EX CB TO REMAIN GRATE=4883.00 INV=4878.31 EX SDMH TO REMAIN RIM=4900.31 S INV=4896.13 E INV=4895.97 W INV=4895.87 EX CB TO REMAIN GRATE=4900.59 INV=4897.32 EX SHOULDER TO REMAIN EX CURB & GUTTER TO REMAIN 4 9 0 0 489 2 489 4 4 8 9 6 4 8 9 8 4 9 0 2 4 9 0 4 48 9 4 489 6 EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y EX 10' ASPHALT PATHWAY TO BE REPLACED N80° 43' 00"E 316.81' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" L =1 8 6 .0 6 ,R =1 3 3 5 .0 0 C B =N 8 4 °4 3 '0 2 "E C =1 8 5 .9 1 ∆=0 0 7 °5 9 '0 7 " S0 0 ° 1 6 ' 3 0 " E 30 4 . 5 0 ' 87.48 EXIST 87.72 EXIST 96.25 EXIST 96.73 EXIST 2 . 3 % 4.2%3.6% 1 . 2 % 3. 1 % 1. 0 % 1. 6 % 1. 6 % 99.11 EXIST 96.34 EXIST 2. 7 % 0. 6 % 1. 5 % 1.9% 3.6% 2. 3 % 4. 1 % 3.7%1.5% 1.3%1.6% 4.8%1.7% 4. 6 % 4. 6 % 1. 5 % 1. 5 % 0. 7 % 3.6%4.0% 1.6%3.0% 1.9%2.3% 2. 0 % 2. 0 % 2.0% 2.0% 1.9% 1. 9 % 1. 9 % 1.8% 2.0% 2.0% 2. 9 % 4. 5 % 4.8% 4.8% 1.8% 1.8% 1.8% 3.3% 2.8% 2 . 2 % 2.7%2. 3 % 3.1 % 1. 8 % 1.6% 1. 5 % 2 . 9 % 3.0 % 3.4 % 3.5 % 3.6 % 3.5% 3.8% 3.7% 3.3% 3.9% 3.8% 1.4% 2. 8 % 3 . 2 % 7. 9 % 1.5% 6.4% 5.4% 7.6% 9.1% 14.5% 10.9% 9.3% 8.4% 10.0 % 2 1 . 9 % 15.4 % 3 0 . 6 % 4.6% 94.21 EXIST 1.06 EXIST 2.00 EXIST 3.79 EXIST 2.72 EXIST 2.00 EXIST 0.00 EXIST 2.00 EXIST 4.00 EXIST 4.5% 3. 1 % 94.00 TBC 93.70 TBC 93.70 TBC 93.74 TBC 93.25 TOC 93.41 TOC 93.71 TOC 93.55 TOC 94.05 TBC 94.10 TBC 94.20 TBC 94.50 TBC 2 . 2 % 92.50 TBC 92.20 TBC 92.60 TBC 92.60 TBC 92.10 TBC 92.70 TBC 93.10 TBC 93.90 TOC 93.00 TOC 95.10 TOC 95.35 TOC 97.27 TOC 95.42 TOC 95.50 TOC 95.50 TOC 95.42 TOC 95.00 FG 95.00 FG95.00 FG 93.15 TBC 92.99 TBC 92.75 TBC 92.55 TBC 92.35 TBC 91.75 TBC 91.49 TBC 90.70 TBC 92.83 TBC 92.34 TBC 92.08 TBC 91.30 TBC 93.70 TBC 93.75 TBC 94.10 TOC 94.10 TOC 93.66 TBC 93.58 TBC 93.55 TBC 93.65 TBC 94.22 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.50 TOC 95.42 TOC 95.50 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 97.75 TOC 98.00 TOC 97.75 TOC 95.70 TBC 95.75 TBC 0.29 TBC 94.65 TOC 95.20 TOC 95.40 TOC 94.90 TOC 95.08 TBC 94.78 TBC 95.26 TOC 93.82 TOA 94.45 TOA 94.90 TOC 95.40 TOC 94.45 TOA 94.78 TBC 95.28 TOC 95.15 TOC 95.05 TOC 94.60 TOC 94.65 TOC 95.35 TOC 97.05 TOC 94.93 TBC 95.03 TBC 94.53 TOC 94.10 TOA 94.25 TOA 97.05 TOC 97.05 TOC 96.35 TBC 96.35 TBC 96.70 TBC 96.82 TBC 96.94 TBC 96.94 TBC 94.95 TOC 94.83 TBC 98.15 TBC 97.36 TBC 97.14 TBC 96.39 TBC 96.18 TBC 96.00 TBC 96.51 TBC 96.71 TBC 97.30 TBC 97.60 TBC 97.02 TBC 96.83 TBC 96.34 TBC 96.51 TBC 96.73 TBC 97.48 TBC 97.69 TBC 98.50 TBC 0.04 TBC 0.04 TBC 0.39 TBC 98.54 TBC 0.25 TBC 99.65 TBC 99.65 TBC 99.90 TBC 98.35 TBC 98.05 TBC 97.85 TBC 97.24 TBC 99.00 TOC 96.65 TOC 96.90 TBC 97.15 TOC 95.03 TOC 95.15 TOC 95.65 TOC 95.53 TOC 94.80 TOA [ 4 ] [ 2 ] [ 9 9 ] [ 9 8 ] [ 9 9 ] [ 9 7 ] [ 9 7 ] NEW SD CURB INLET BOX GRATE: 4896.34' IE: 4892.84' SD SD NEW SD CATCH BASIN GRATE: 4893.90' IE: 4890.40' NEW 53 LF 12" HDPE @ 4.60% SLOPESD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD NEW SD CURB INLET BOX GRATE: 4897.19' IE: 4893.69' NEW 99 LF 12" HDPE @ 0.86% SLOPE NEW 141 LF 12" HDPE @ 0.35% SLOPE NEW SD CATCH BASIN GRATE: 4893.25' IE: 4889.75' NEW 176 LF 12" HDPE @ 2.93% SLOPE NEW 72 LF 18" HDPE @ 2.55% SLOPE NEW SD CO BOX GRATE: 4890.00' IE: 4884.48' NEW SD CURB INLET BOX GRATE: 4891.84' IE: 4888.34' NEW 118 LF 12" HDPE @ 3.27% SLOPE 12" AREA DRAIN GRATE: 4894.50' I.E.: 4890.21' SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD 12" AREA DRAIN GRATE: 4894.50' I.E.: 4890.68' 94 L.F. NEW 8" HDPE @ 0.50% 80 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.50' I.E.: 4891.08' 83 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.50' I.E.: 4891.50' 12" AREA DRAIN GRATE: 4893.75' I.E.: 4890.75' 23 L.F. NEW 8" HDPE @ 16.00% 169 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.00' I.E.: 4889.90' 92 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4893.00' I.E.: 4889.44' 96.40 TOA 0.6% 4.7% 95.42 TOC 95.00 TOC 95.45 TOC 94.50 TOA 2. 5 % 0. 9 % 94.88 TOC 95.33 TBC 1.9% 1. 9 % 1. 1 % 2. 0 % 2.0 % 2.0% 2.0% 93.70 TBC 1. 4 % 1. 6 % 1. 7 % 3.2 % 3.8% 1. 5 % 95.42 TOC 3.6% 95.15 TOC 3 0 . 8 % 1 . 8 % 1. 7 % 1. 6 % 95.05 TOA 94.80 TOA 2.3%0.8%1.1% 1.7 %2.2 % 2. 2 % 2.9% NEW 47 LF 18" HDPE @ 0.35% SLOPE EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL 85.47 EXIST 85.47 TOC 86.57 EXIST 86.57 TOC 88.62 EXIST 88.62 TOC 91.48 EXIST 91.48 TOC 93.54 EXIST 93.54 TOC 95.15 EXIST 95.15 TOC 97.17 EXIST 97.17 TOC 99.21 EXIST 99.21 TOC 5.04 TOC S S CURB AND GUTTER TO BE REPLACED @ NEW DRIVE APPROACH 6.33 EXIST 6.33 TOC END OF NEW CONCRETE TRAIL 23.26' TP 14 EX SURFACE: 4901.50' BEDROCK: 4897.50' TP 15 EX SURFACE: 4898.00' BEDROCK: 4894.50' TP B2 EX SURFACE: 4894.00' BEDROCK: 4888.85' TP 13 EX SURFACE: 4897.50' BEDROCK: 4891.00' TP 12 EX SURFACE: 4901.50' BEDROCK: 4895.35' TP B5 EX SURFACE: 4900.50' BEDROCK: 4896.00' TP B3 EX SURFACE: 4895.50' BEDROCK: 4891.00' TP B4 EX SURFACE: 4897.75' BEDROCK: 4894.25' TP B1 EX SURFACE: 4891.00' BEDROCK: 4886.50' TP 2 EX SURFACE: 4889.50' BEDROCK: 4885.50' TP 4 EX SURFACE: 4892.50' BEDROCK: 4887.75' TP 5 EX SURFACE: 4894.00' BEDROCK: 4889.75' EX SURFACE: 4887.00' BEDROCK: 4882.25' EX SURFACE: 4889.00' BEDROCK: 4887.00' 3.6% 5.4% 96.85 TBC 97.80 TBC 3.1 % 97.54 TBC 5 STEPS 92.90 TOC 90.65 TOC NEW SD CURB INLET BOX NEW 72 LF 18" HDPE @ 1.26% SLOPE 4.5% 94.00 TOA NEW SD CATCH BASIN GRATE: 4887.75' IE (E): 4884.75' IE (S): 4885.75' SD SD SD SD SD SD SD 20 L.F. NEW 8" HDPE @ 6.25% I.E.= 4888.96' SD SD SDNEW 76 LF 12" HDPE @ 0.35% SLOPE 92.34 TBC 97.65 TOC96.95 TOC 96.85 TOC 96.50 TOC 95.70 TOC 95.80 TOC96.60 TOC 4.8% 4.8% 5. 0 % 4.5% 0 . 9 % 98.50 TBC NEW SD CATCH BASIN GRATE: 4896.30' IE: 4889.90' NEW SD CURB INLET BOX GRATE: 4896.65' IE: 4893.00' S D S DNEW 57 LF 12" HDPE @ 5.44% SLOPE 0 . 7 % RD RD 4 STEPS 90.75 TOC 88.00 TOC 2. 7 % CB GENERAL NOTES: SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT (IF AVAILABLE). THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557 EXCEPT UNDER BUILDING FOUNDATION WHERE IT SHALL BE 98% MIN. OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2% ABOVE NOR 3% BELOW OPTIMUM. CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS & SPECS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT. THE CONTRACTOR IS TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. SPECIFIC DETAILS SHOWN ON SHEET C2.10 SHALL BE USED IN COMBINATION WITH OTHER ACCEPTED LOCAL PRACTICES. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THOSE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. ALL ELEVATIONS SHOWN AT TOP AND BOTTOM OF WALL(S), IF ANY, ARE ELEVATIONS AT FINISH GRADE, UNLESS OTHERWISE NOTED. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: GRADE SITE TO ELEVATIONS AND CONTOURS SHOWN ON PLAN. STORM DRAIN CURB INLET WITH HEAVY DUTY BICYCLE SAFE GRATE, PER STANDARD CHURCH DETAIL, SEE DETAIL 'M', SHEET C521. 12" SQUARE SECURABLE NYLOPLAST YARD DRAIN, PER STANDARD CHURCH DETAIL, SEE DETAIL 'L", SHEET C521. STORM DRAIN PIPE. SEE PLAN FOR LENGTH, SIZE, TYPE AND SLOPE. SEE ISPWC DRAWING SD-301, FOR TRENCHING DETAIL. ROOF DRAIN DOWNSPOUT LOCATION. DOWNSPOUT TO BE PER STANDARD CHURCH DETAIL. TAPER LAST 3' OF CURB TO MATCH SIDEWALK HEIGHT, PER STANDARD CHURCH DETAIL. STORMTECH MC-7200 CHAMBERS OR EQUIVALENT SYSTEM APPROVED PRIOR TO BIDDING. SYSTEM AS SHOWN ON PLANS ALL PROVIDED BY THE CONTRACTOR. STORMTECH CHAMBER HAS RETENTION OF 38,892 C.F. REQUIRED RETENTION = 37,896 C.F. SEE DETAIL ON SHEET C571. SHOP DRAWINGS PROVIDED BY MANUFACTURER PRIOR TO BIDDING AND CONSTRUCTION. TO INCLUDE INSPECTION PORT. LANDING AREAS TO HAVE 2% MAXIMUM SLOPE AWAY FROM BUILDING ADA PARKING STALL, TOA (TOP OF ASPHALT) SPOT GRADES ARE TO BE STAKED TO ENSURE SLOPE WITHIN ADA PARKING STALL REMAINS UNDER 2.0% MAX. SLOPE. STORM DRAIN CLEANOUT BOX WITH HEAVY DUTY PEDESTRIAN SAFE LID. 6" HDPE PIPE FROM ROOF DRAIN. STORM DRAIN CATCH BASIN WITH HEAVY DUTY BICYCLE SAFE GRATE. 1 3 5 6 4 8 9 10 11 2 7 COMMON GRADING ABBREVIATIONS: SEE SHEET C0.01 FOR ADDITIONAL ABBREVIATIONS -BFE BASEMENT FLOOR ELEVATION -BW FINISH GRADE AT BOTTOM OF WALL -EX or EXIST EXISTING -EOA EDGE OF ASPHALT -EOC EDGE OF CONCRETE -FFE FINISH FLOOR ELEVATION -FG FINISH GRADE -FL FLOW LINE -GB GRADE BREAK -HP HIGH POINT -LP LOW POINT -NG NATURAL GROUND -SDCB STORM DRAIN CATCH BASIN -SDCO STORM DRAIN CLEANOUT BOX -SDDB STORM DRAIN DRAIN BASIN -SDMH STORM DRAIN MANHOLE -TBC TOP BACK OF CURB -TOA TOP OF ASPHALT -TOC TOP OF CONCRETE -TOG TOP OF GRATE -TOW TOP OF WALL -TW FINISH GRADE AT TOP OF WALL -WW WATERWAY Pr i n t e d : 22 M a r 2 0 2 3 3: 4 1 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 - Pl a n r e - s u b m i t t a l 2 8 9 9 9 9 9 9 9 8 8 8 8 8 8 8 6 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 2 12 12 2 2 12 Grading and Drainage Plan C122 SCALE: 1" = NORTH 20' 0 10'20'40'60' 4 12 4 2 5 11 511 11 5 5 11 11 5 11 5 11 5 5 5 11 11 5 5 5 5 5 5 5 5 5 11 11 11 11 11 11 1111 With no rise in elevation here, runoff water will overtop the 2" wall. (Existing valley) . . X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X GM G G G S S S S S S S S COCO CO CO WM S S S S S S W W W W W W F W W W W W W W WWWWWWWWWW W W W W W W W W W W W W W W W W W W W EX SHOULDER TO REMAINEX SHOULDER TO REMAIN EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y EX 10' ASPHALT PATHWAY TO BE REPLACED S89° 40' 10"E 165.11' S89° 39' 20"E 86.98' N80° 43' 00"E 316.81' N0 0 ° 1 6 ' 3 0 " W 24 2 . 0 7 ' S89° 43' 30"W 330.00' N0 0 ° 1 6 ' 3 0 " W 13 2 . 0 0 ' S89° 43' 30"W 330.00' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" L =1 8 6 .0 6 ,R =1 3 3 5 .0 0 C B =N 8 4 °4 3 '0 2 "E C =1 8 5 .9 1 ∆=0 0 7 °5 9 '0 7 " N0 0 ° 1 6 ' 5 0 " W 18 5 . 7 0 ' S0 0 ° 1 6 ' 3 0 " E 30 4 . 5 0 ' SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S S S S S S S S S S S SD EX SSMH 13 4.0' Ø RIM = 4874.67' IE (E) = 4862.87' EX SSMH 12 EX 12" PVC EX 12" PVC 120' @ 1.04% EX PLUGGED END IE = 4864.12' S 8.00' S S S S S S S S S S S S S S S S S NEW SSMH 5' Ø RIM = 4876.14' IE (S) = 4863.98' IE (W) = MATCH EX / 4863.78' NEW SSMH 4' Ø RIM = 4877.38' IE (N) = 4864.58' IE (S) = 4864.78' IE (E) = 4864.78' NEW 8" PVC SEWER MAIN 79' @ 0.75% NEW SSMH 4' Ø RIM = 4883.55' IE (N) = 4872.55' NEW 8" PVC SEWER MAIN 400' @ 1.94% NEW SSMH 4' Ø RIM = 4887.85' IE (W) = 4876.35' IE (E) = 4876.55' NEW 10" PVC SEWER MAIN 400' @ 2.89% NEW SSMH 4' Ø RIM = 4903.25' IE (W) = 4892.25' NEW 10" PVC SEWER MAIN 306' @ 5.13% NEW 6" WYE TIE-IN EX PLUGGED END EX 12" WATER LINE EX 12" WATER LINE EX 12" WATER LINE STUB FOR TIE ON W W W W W W W W W W W W W W 45° BEND 45° BEND TIE ON TO EX STUBBED END NEW 38 L.F. 12" WATER LINE NEW 38 L.F. 12" WATER LINE 12" x 8" REDUCER NEW 437 L.F. 8" WATER LINE S TIE ON TO EX STUBBED END NEW 732 L.F. 12" WATER LINE CAP END FOR FUTURE CONNECTION SD SD SD SD SD SD SD SD SD SD SD S D CB CB CB CB SCALE: 1" = NORTH 30' 0 15'30'60'90' 1 2 7 9 11 12 14 GENERAL NOTES: CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL DRAWINGS. ALL NEW WATER CONSTRUCTION TO BE DONE IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS & SPECIFICATIONS. ALL NEW SANITARY SEWER CONSTRUCTION TO BE DONE IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS & SPECIFICATIONS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND INVERT ELEVATIONS OF EXISTING MANHOLES AND OTHER UTILITIES BEFORE STAKING OR CONSTRUCTING ANY SEWER LINES. MAINTAIN A MINIMUM OF 5 FEET OF COVER ON ALL WATER LINES. CONTRACTOR IS TO COORDINATE LOCATIONS OF NEW TELEPHONE SERVICE TO BUILDING WITH CENTURY LINK. A PVC CONDUIT, PLYWOOD BACKBOARD, AND GROUND WIRE IS REQUIRED FOR SERVICE THROUGH PROPERTY, COORDINATE SIZES AND LOCATION WITH CENTURY LINK. CONTRACTOR IS TO SUBMIT SITE PLAN TO DOMINION ENERGY FOR DESIGN OF GAS LINE SERVICE TO BUILDING. CONTRACTOR TO COORDINATE WITH DOMINION ENERGY FOR CONTRACTOR LIMITS OF WORK VERSUS DOMINION ENERGY LIMITS. LOCATION OF ALL UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE LOCATIONS. CONTRACTOR IS TO VERIFY CONNECTION POINTS WITH EXISTING UTILITIES. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO EXISTING UTILITIES AND UTILITY STRUCTURE THAT ARE TO REMAIN. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: ASPHALT T-PATCH / REPAIR PER CITY STANDARD DETAIL. INSTALL NEW FIRE HYDRANT PER ANSI/AWWA STANDARD DETAIL. CONNECT NEW 2" POLY PIPE WATER SERVICE LINE TO NEW 12" MAIN LINE AND INSTALL NEW 2" CULINARY METER, PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 6" PVC SDR-35 SANITARY SEWER LATERAL @ 1.00% MINIMUM SLOPE, INCLUDING NEW CLEANOUTS PER EAGLE MOUNTAIN STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING 6" SEWER LATERAL STUB. LATERAL PER ANSI/AWW STANDARD. APPROXIMATE LOCATION OF NEW NATURAL GAS LINE. CONTRACTOR TO COORDINATE SIZE, DESIGN AND INSTALLATION BY INTERMOUNTAIN GAS WITH OTHER CONSTRUCTION. APPROXIMATE LOCATION OF NEW NATURAL GAS METER(S). CONTRACTOR TO COORDINATE SIZE, DESIGN AND INSTALLATION WITH INTERMOUNTAIN GAS AND WITH MECHANICAL PLANS. UNDERGROUND CABLE AND POWER LINES. CONTRACTOR TO COORDINATE WITH COMCAST AND ROCKY MOUNTAIN POWER. SEE ELECTRICAL SITE PLAN FOR POWER CONNECTIONS. TELEPHONE LINE. CONTRACTOR TO PROVIDE TRENCHING 30" DEEP X 24" WIDE THEN BACKFILL AS REQUIRED. SEE ELECTRICAL SITE PLAN FOR COMMUNICATIONS CONNECTIONS. INSTALL 2" STOP AND WASTE FOR IRRIGATION, CONNECT TO NEW 2" WATER LATERAL PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. SEE LANDSCAPE PLANS SHEET L521 DETAIL "K". NEW 6" FIRE SERVICE WATER LINE TO BUILDING PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 3/4" POLY PIPE WATER LINE FROM PROPOSED BUILDING TO THE PAVILION DRINKING FOUNTAIN. SEE PLUMBING PLANS FOR COORDINATION AND FOR DETAILS. SEWER CLEANOUT AND 6" PVC SEWER LINE FOR USE IN CLEARING SEWER LINES WITHIN THE BUILDING FROM OUTSIDE (TYPICAL CHURCH DESIGN) SEE STANDARD CHURCH DETAIL 'C' SHEET C5.01. 2" POLY PIPE WATER SERVICE LINE, PER ANSI/AWWA STANDARD, DETAIL '541'. NEW 8" PVC C-900 FIRE SERVICE WATER MAIN LOOP PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 8" PVC C-900 WATER MAIN LINE, INCLUDING ALL FITTINGS AND THRUST BLOCKING. 12" PVC C-900 WATER MAIN LINE, INCLUDING ALL FITTINGS AND THRUST BLOCKING. CONNECT NEW 12" PVC C-900 WATER LINE TO EXISTING 12" WATER MAIN, PER GOVERNING BODY STANDARDS AND SPECIFICATIONS. STUB ON NEW 1" WATER SERVICE LINE, PER CITY OF REXBURG STANDARDS. 4' DIAMETER SANITARY SEWER MANHOLE, PER CITY OF REXBURG STANDARDS. 5' DIAMETER SANITARY SEWER MANHOLE, PER CITY OF REXBURG STANDARDS. 8" PVC SDR-35 SANITARY SEWER LINE, INCLUDING ALL FITTINGS, CITY OF REXBURG STANDARDS. 10" PVC SDR-35 SANITARY SEWER LINE, INCLUDING ALL FITTINGS, CITY OF REXBURG STANDARDS. STUB ON NEW 4" PVC SDR-35 SANITARY SEWER LATERAL, INCLUDING ALL FITTINGS, PER CITY OF REXBURG STANDARDS. LOCATION OF NEW FIBER CONDUIT AND DISTRIBUTION BOXES, TO BE INSTALLED PER CITY STANDARD AND SPECIFICATIONS. 6 5 4 3 10 8 13 2 2 2 3 13 4 4 5 5 6 7 8 10 11 11 11 12 12 12 12 14 14 14 14 13 Pr i n t e d : 22 M a r 2 0 2 3 3: 4 2 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 - Pl a n r e - s u b m i t t a l 2 Site Utility Plan C151 2 15 16 17 18 19 20 21 22 23 23 18 22 22 21 21 20 19 19 19 17 17 16 16 16 15 1 1 1 1 1 9 24 24 24 24 24 24 24 24 24 Water valve req uired after F ire H yd rant. S tub water line to end of asphalt. M ust b e C lass 5 0 D I in right of way 1 0 ft seperation req uired from strom piping F WOWfÑ_[EWÑghiT ÑhcÑgcihZÑSXhWfÑ` SEZc_WÑfWH i[fWV ÑhcÑWEV ÑcXÑSgdZS_h• Water line m ust b e C lass 5 0 D I in right of way F ire H yd rant req uired near C lass 5 0 D I P ipe R eq uired . Scale:1 DUMPSTER ENCLOSURE PLAN 1/4" = 1'-0" 7" CONCRETE SLAB OVER 12" AGGREGATE BASE 28'-0" 7' - 4 " 1' - 0 " 1' - 0 " 1' - 0 " DUMPSTER CONTAINER (NIC) DUMPSTER CONTAINER (NIC) DUMPSTER CONTAINER (NIC) C503B C C503 CONCRETE FILLED BOLLARD SEE B/C502. TYPICAL. CONCRETE FILLED BOLLARD SEE B/C502. 8" FOUNDATION WALL. 6'-2"7'-10"7'-10"6'-2" CONCRETE FILLED BOLLARD SEE B/C502. 8" FOUNDATION WALL. CONCRETE FOUNDATION ROCK MULCH - SEE LANDSCAPE SHEETS Scale:F FENCE AND MOWSTRIP DETAIL 1" = 1'-0" 2" FINISH GRADE - SEE SITE GRADING PLAN 3/4" RADIUS - TYPICAL PROPERTY LINE FENCE CHURCH PROPERTY ADJACENT PROPERTY SLOPE 1/2" PER FOOT FINISH GRADE 12" WIDE x 12" DEEP CONCRETE MOW STRIP FENCE POST CENTERED IN MOWSTRIP INSTALL CONCRETE CONTROL JOINT IN THE MOWSTRIP, CENTERED ON EACH POST. INSTALL EXPANSION JOINTS PER SPECIFICATIONS . LOCATE AT CENTERLINE OF POSTS. PLAN CONTROL JOINT AT EACH POST. INSTALL EXPANSION JOINTS PER SPECIFICATIONS. LOCATE AT CENTERLINE OF POSTS #4 X 6" THRU POST PRECAST CONCRETE WALL CAP WITH SEALANT AT JOINTS STONE VENEER ON 8" CMU CONCRETE SLAB AND FOOTING CONCRETE RAMP 6' - 0 " NOTE: STONE VENEER DETAILS AND COLOR SHALL MATCH MAIN BUILDING. Scale:B DUMPSTER ENCLOSURE ELEVATION 1/4" = 1'-0" C C503 4' - 0 " #3 REINFORCING TIES AT 12" O.C. NON-SHRINK GROUT 1'-6" DIAMETER x 4'-0" LONG CONCRETE BASE (4) #5'S REINFORCING STEEL 3/4" CONDUIT 24" BELOW GRADE UNDISTURBED BASE OR COMPACTED EARTH 2" C L E A R H C502 Scale:D POLE LIGHT BASE IN LANDSCAPING AREAS 3/4" = 1'-0" 4" POLE, COVER AND 3/4" DIAMETER ANCHOR BOLTS METAL ROD AND ADHESIVE MORTAR PRECAST CONCRETE WALL CAPS. 3/4" SLOPED CONCRETE CAP MANUFACTURED STONE VENEER #5 BARS AT 16" O.C. (30" OVERLAP) (2) #5 BARS CONTINUOUS FOUNDATION AS REQUIRED (MIN. SHOWN) 8" SOLID GROUTED CONCRETE MASONRY CAVITY WALL REINFORCED WITH #5 VERT. BARS AT 16" O.C. AND #5 HORIZ. BARS AT 48" O.C. EXPANSION JOINT WITH SEALANT SLOPED CONCRETE SLAB ON AGGREGATE BASE 6' - 0 " 7" 12 " 8"8"8" 2'-0" 1' - 0 " STAINLESS STEEL METAL FLASHING #5 HORIZ. CONTINUOUS 1/4" x 1/4" CAST DRIP EDGE. HOLD DRIP EDGE BACK 1" FROM EXPOSED ENDS.1" Scale:C DUMPSTER ENCLOSURE WALL SECTION 3/4" = 1'-0" 6" AGGREGATE BASE 4' - 0 " 1' - 8 " 2" C L E A R POLE, COVER AND 3/4" DIAMETER ANCHOR BOLTS COORDINATE CLEARANCE BETWEEN GROUT AND BASE WITH MANUFACTURER. NON-SHRINK GROUT 1'-6" DIAMETER x 5'-8" LONG CONCRETE BASE (4) #5 BARS 3/4" PVC CONDUIT 24" BELOW GRADE MINIMUM UNDISTURBED OR COMPACTED EARTH #3 TIES AT 12" O.C. Scale:E POLE LIGHT BASE IN PARKING AREAS 3/4" = 1'-0" 1/2" RADIUS 1'-0"12" typ.2'-0" 1' - 0 " 1' - 0 " 1' - 0 " 8" 8" VA R I E S - S E E S I T E GR A D I N G P L A N 1' - 0 " 1' - 0 " 2 2 2 12 1 11 9 14 11 3 3 6 7 7 5 4 8 10 9 2 3 14 2 12 13 3' - 0 " 9 9 13 13 C2 C504 Scale:C1 STAIR AND HANDRAIL DETAIL 1" = 1'-0"Scale:C2 STAIR AND HANDRAIL DETAIL 1" = 1'-0" 8" 8" 8" 8" 3' - 0 " 2" 12" typ. 1" OVERHANG - TYPICAL C2 C504 15 1' - 0 " 1' - 0 " 1'-0"1'-0" C2 C504 C2 C504 C2 C504 C1 C504 C1 C504 2 12 2 11 8 11 3 1 1 13 Scale:C3 TYPICAL STAIR AND HANDRAIL PLAN 1" = 1'-0" 1'-0"1'-0" 8" VA R I E S - S E E S I T E P L A N 8" 4" 11 4" 11 16 16 1911 19 C2 C504 Pr i n t e d : 23 M a r 2 0 2 3 11 : 0 2 A M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 1 1 M a r 2 0 2 3 Si t e P l a n S u b m i t t a l Re x b u r g I D C u s t o m 1 0 W a r d Me e t i n g h o u s e Ma r r i e d S t u d e n t S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 Ch u r c h P r o p e r t y : 50 1 - 3 5 6 0 Is s u e D a t e : 11 A p r 2 0 2 3 BH D P r o j e c t : 21 0 9 22 M a r 2 0 2 3 Si t e P l a n R e - s u b m i t t a l 2 Site Details C503 2 STATE OF U T A H Lafe Theodore Harris 6928898-0301 °°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° ° ° ° ° ° ° ° ° ° ° ° ° ° ° °°°°°°°°°°°°°°°°°°°°° LIC E N S E D ARCHIT E C T 22 Mar 2 0 2 3