Loading...
HomeMy WebLinkAboutINFRASTRUCTURE 3.6.23 - 22-00669 - BYUI 10th Ward - University Blvd. & 5th W - Plat-Reviewed-Corrections-Required - Responses (1)Author Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Todd Smith Todd.Smith@rexburg.org 208-372-2181 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : 500 West Church Subdivision (BYU 10TH WARD) - University Blvd & S 5th W - Plat Address : RPR6N40E315400 - University Blvd. & S 5th W Application Type : Document Filename : INFRASTRUCTURE 3.6.23 - 22-00669 - BYUI 10th Ward - University Blvd. & 5th W - Plat.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments C151 Free Text Todd Smith : Broadband Open 10 As per Resolution 2022-07, adopted April 6, 2022, new development is required to follow standards for the installation of fiber conduit and distribution boxes. Location of conduit and distribution boxes need to be identified and shown on plans. C111 Free Text Kyle Baldwin : P&Z Open 4 Please specify parking stall and drive aisle dimensions. Please specify sidewalk widths. Please show snow storage locations with area calculations. C122 Free Text Joel Gray : PW Open 7 How is runoff from field being handled? C171 Callout Joel Gray : PW Open 9 Sewer line alignment C171 Callout Joel Gray : PW Open 9 Water line Alignment with vales to isolate for futre extension. C151 Free Text Joel Gray : PW Open 10 Class 50 ductile iron pipe required in right of way C503 Callout Joel Gray : PW Open 13 Front Bollards must be inside of enclosure # 22-00669 Short Plat Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 03.13.2023 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) . . X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X XXX COCO CO CO EX TOP OF 18" SD CMP PIPE TO REMAIN EX 24" SD PLASTIC PIPE TO REMAIN EX CB TO REMAIN GRATE=4883.00 INV=4878.31 EX SDMH TO REMAIN RIM=4900.31 S INV=4896.13 E INV=4895.97 W INV=4895.87 EX CB TO REMAIN GRATE=4900.59 INV=4897.32 EX SHOULDER TO REMAIN EX CURB & GUTTER TO REMAIN 4 9 0 0 489 2 489 4 4 8 9 6 4 8 9 8 4 9 0 2 4 9 0 4 48 9 4 489 6 EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y EX 10' ASPHALT PATHWAY TO BE REPLACED N80° 43' 00"E 316.81' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" L =1 8 6 .0 6 ,R =1 3 3 5 .0 0 C B =N 8 4 °4 3 '0 2 "E C =1 8 5 .9 1 ∆=0 0 7 °5 9 '0 7 " S0 0 ° 1 6 ' 3 0 " E 30 4 . 5 0 ' 87.48 EXIST 87.72 EXIST 96.25 EXIST 96.73 EXIST 4 . 3 % 3.2%3.6% 1 . 2 % 1. 5 % 1. 0 % 1. 6 % 1. 6 % 99.11 EXIST 96.34 EXIST 4. 6 % 0. 6 % 1. 5 % 1.9% 3.6% 2. 3 % 4. 1 % 3.7%1.5% 1.3%1.6% 4.8%1.7% 4. 6 % 4. 6 % 1. 5 % 1. 5 % 0. 7 % 3.6%4.0% 1.6%3.0% 1.9%2.3% 2. 0 % 2. 0 % 1.9% 2.0% 1.9% 1. 9 % 1. 9 % 1.8% 2.0% 2.0% 2. 9 % 4. 5 % 4.6% 4.8% 1.8% 1.8% 1.8% 3.3% 2.8% 2 . 2 % 2.7%2. 3 % 3.1 % 1. 8 % 1.6% 1. 5 % 2 . 9 % 3.0 % 3.4 % 3.5 % 3.6 % 3.5% 3.8% 3.7% 3.3% 3.9% 3.8% 1.4% 2. 8 % 3 . 2 % 7. 9 % 1.5% 6.4% 5.5% 7.6% 9.1% 14.5% 10.9% 9.3% 8.4% 10.0 % 2 1 . 9 % 15.4 % 3 0 . 6 % 4.3% 94.21 EXIST 1.06 EXIST 2.00 EXIST 3.79 EXIST 2.72 EXIST 2.00 EXIST 0.00 EXIST 2.00 EXIST 4.00 EXIST 4.5% 3. 1 % 94.00 TBC 93.70 TBC 93.70 TBC 93.74 TBC 93.25 TOC 93.41 TOC 93.71 TOC 93.55 TOC 94.05 TBC 94.10 TBC 94.20 TBC 94.50 TBC 2 . 2 % 92.50 TBC 92.20 TBC 92.60 TBC 92.60 TBC 92.10 TBC 92.70 TBC 93.00 TBC 93.73 TOC 92.20 TOC 93.80 TOC 95.35 TOC 97.27 TOC 95.42 TOC 95.50 TOC 95.50 TOC 95.42 TOC 95.00 FG 95.00 FG95.00 FG 93.15 TBC 92.99 TBC 92.75 TBC 92.55 TBC 92.35 TBC 91.75 TBC 91.49 TBC 90.70 TBC 92.83 TBC 92.34 TBC 92.08 TBC 91.30 TBC 93.70 TBC 93.75 TBC 94.10 TOC 94.10 TOC 93.66 TBC 93.58 TBC 93.55 TBC 93.65 TBC 94.22 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.00 FG 95.50 TOC 95.42 TOC 95.50 TOC 95.50 TOC 95.42 TOC 95.50 TOC 95.42 TOC 97.75 TOC 98.00 TOC 97.75 TOC 95.70 TBC 95.75 TBC 0.29 TBC 94.65 TOC 95.20 TOC 95.40 TOC 94.90 TOC 95.08 TBC 94.78 TBC 95.26 TOC 93.82 TOA 94.45 TOA 94.90 TOC 95.40 TOC 94.45 TOA 94.78 TBC 95.28 TOC 95.15 TOC 95.05 TOC 94.60 TOC 94.65 TOC 95.35 TOC 97.05 TOC 94.93 TBC 95.03 TBC 94.53 TOC 94.10 TOA 94.25 TOA 97.05 TOC 97.05 TOC 96.35 TBC 96.35 TBC 96.70 TBC 96.82 TBC 96.94 TBC 96.94 TBC 94.95 TOC 94.83 TBC 98.15 TBC 97.36 TBC 97.14 TBC 96.39 TBC 96.18 TBC 96.00 TBC 96.51 TBC 96.71 TBC 97.30 TBC 97.60 TBC 97.02 TBC 96.83 TBC 96.34 TBC 96.51 TBC 96.73 TBC 97.48 TBC 97.69 TBC 98.50 TBC 0.04 TBC 0.04 TBC 0.39 TBC 98.54 TBC 0.25 TBC 99.65 TBC 99.65 TBC 99.90 TBC 98.35 TBC 98.05 TBC 97.85 TBC 97.24 TBC 99.00 TOC 96.65 TOC 96.90 TBC 97.15 TOC 95.03 TOC 95.15 TOC 95.65 TOC 95.53 TOC 94.80 TOA [ 4 ] [ 2 ] [ 9 9 ] [ 9 8 ] [ 9 9 ] [ 9 7 ] [ 9 7 ] [ 91 ] NEW SD CURB INLET BOX GRATE: 4896.34' IE: 4892.84' SD SD NEW SD CATCH BASIN GRATE: 4893.90' IE: 4890.40' NEW 53 LF 12" HDPE @ 4.60% SLOPESD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD NEW SD CURB INLET BOX GRATE: 4897.19' IE: 4893.69' NEW 99 LF 12" HDPE @ 0.86% SLOPE NEW 141 LF 12" HDPE @ 0.35% SLOPE NEW SD CATCH BASIN GRATE: 4893.25' IE: 4889.75' NEW 176 LF 12" HDPE @ 2.93% SLOPE NEW 72 LF 18" HDPE @ 2.55% SLOPE NEW SD CO BOX GRATE: 4890.00' IE: 4884.48' NEW SD CURB INLET BOX GRATE: 4891.84' IE: 4888.34' NEW 118 LF 12" HDPE @ 3.27% SLOPE 12" AREA DRAIN GRATE: 4894.50' I.E.: 4890.21' SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD 12" AREA DRAIN GRATE: 4894.50' I.E.: 4890.68' 94 L.F. NEW 8" HDPE @ 0.50% 80 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.50' I.E.: 4891.08' 83 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.50' I.E.: 4891.50' 12" AREA DRAIN GRATE: 4893.75' I.E.: 4890.75' 23 L.F. NEW 8" HDPE @ 16.00% 169 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4894.00' I.E.: 4889.90' 92 L.F. NEW 8" HDPE @ 0.50% 12" AREA DRAIN GRATE: 4893.25' I.E.: 4889.44' 96.40 TOA 3.4% 4.7% 3 STEPS 93.92 TOC 95.00 TOC 95.45 TOC 94.50 TOA 2. 5 % 0. 9 % 94.88 TOC 95.33 TBC 1.9% 1. 9 % 1. 1 % 2. 0 % 2.0 % 2.0% 2.0% 93.70 TBC 1. 4 % 1. 6 % 1. 7 % 3.2 % 3.8% 1. 5 % 95.42 TOC 3.6% 95.15 TOC 3 0 . 8 % 1 . 8 % 1. 7 % 1. 6 % 95.05 TOA 94.80 TOA 2.3%0.8%1.1% 1.7 %2.2 % 2. 2 % 2.9% NEW 47 LF 18" HDPE @ 0.35% SLOPE EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL EX ASPHALT TRAIL TO BE REPLACED WITH NEW CONCRETE TRAIL 85.47 EXIST 85.47 TOC 86.57 EXIST 86.57 TOC 88.62 EXIST 88.62 TOC 91.48 EXIST 91.48 TOC 93.54 EXIST 93.54 TOC 95.15 EXIST 95.15 TOC 97.17 EXIST 97.17 TOC 99.21 EXIST 99.21 TOC 5.04 TOC S SCURB AND GUTTER TO BE REPLACED @ NEW DRIVE APPROACH 6.33 EXIST 6.33 TOC END OF NEW CONCRETE TRAIL 23.26' TP 14 EX SURFACE: 4901.50' BEDROCK: 4897.50' TP 15 EX SURFACE: 4898.00' BEDROCK: 4894.50' TP B2 EX SURFACE: 4894.00' BEDROCK: 4888.85' TP 13 EX SURFACE: 4897.50' BEDROCK: 4891.00' TP 12 EX SURFACE: 4901.50' BEDROCK: 4895.35' TP B5 EX SURFACE: 4900.50' BEDROCK: 4896.00' TP B3 EX SURFACE: 4895.50' BEDROCK: 4891.00' TP B4 EX SURFACE: 4897.75' BEDROCK: 4894.25' TP B1 EX SURFACE: 4891.00' BEDROCK: 4886.50' TP 2 EX SURFACE: 4889.50' BEDROCK: 4885.50' TP 4 EX SURFACE: 4892.50' BEDROCK: 4887.75' TP 5 EX SURFACE: 4894.00' BEDROCK: 4889.75' EX SURFACE: 4887.00' BEDROCK: 4882.25' EX SURFACE: 4889.00' BEDROCK: 4887.00' 3.6% 5.4% 96.85 TBC 97.80 TBC 3.1 % 97.54 TBC 7 STEPS 92.00 TOC 88.50 TOC NEW SD CURB INLET BOX NEW 72 LF 18" HDPE @ 1.26% SLOPE 4.4% 94.00 TOA NEW SD CATCH BASIN GRATE: 4887.75' IE (E): 4884.75' IE (S): 4885.75' SD SD SD SD SD SD SD 20 L.F. NEW 8" HDPE @ 6.25% I.E.= 4888.96' SD SD SDNEW 76 LF 12" HDPE @ 0.35% SLOPE 92.34 TBC 97.65 TOC96.95 TOC 96.85 TOC 96.50 TOC 95.70 TOC 95.80 TOC96.60 TOC 4.8% 4.8% 5. 0 % 4.5% 0 . 9 % 98.50 TBC NEW SD CATCH BASIN GRATE: 4896.30' IE: 4889.90' NEW SD CURB INLET BOX GRATE: 4896.65' IE: 4893.00' S D S DNEW 57 LF 12" HDPE @ 5.44% SLOPE 0 . 7 % GENERAL NOTES: SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT (IF AVAILABLE). THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557 EXCEPT UNDER BUILDING FOUNDATION WHERE IT SHALL BE 98% MIN. OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2% ABOVE NOR 3% BELOW OPTIMUM. CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS & SPECS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT. THE CONTRACTOR IS TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. SPECIFIC DETAILS SHOWN ON SHEET C2.10 SHALL BE USED IN COMBINATION WITH OTHER ACCEPTED LOCAL PRACTICES. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THOSE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. ALL ELEVATIONS SHOWN AT TOP AND BOTTOM OF WALL(S), IF ANY, ARE ELEVATIONS AT FINISH GRADE, UNLESS OTHERWISE NOTED. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: GRADE SITE TO ELEVATIONS AND CONTOURS SHOWN ON PLAN. STORM DRAIN CURB INLET WITH HEAVY DUTY BICYCLE SAFE GRATE, PER STANDARD CHURCH DETAIL, SEE DETAIL 'M', SHEET C521. 12" SQUARE SECURABLE NYLOPLAST YARD DRAIN, PER STANDARD CHURCH DETAIL, SEE DETAIL 'L", SHEET C521. STORM DRAIN PIPE. SEE PLAN FOR LENGTH, SIZE, TYPE AND SLOPE. SEE ISPWC DRAWING SD-301, FOR TRENCHING DETAIL. ROOF DRAIN DOWNSPOUT LOCATION. DOWNSPOUT TO BE PER STANDARD CHURCH DETAIL. TAPER LAST 3' OF CURB TO MATCH SIDEWALK HEIGHT, PER STANDARD CHURCH DETAIL. STORMTECH MC-7200 CHAMBERS OR EQUIVALENT SYSTEM APPROVED PRIOR TO BIDDING. SYSTEM AS SHOWN ON PLANS ALL PROVIDED BY THE CONTRACTOR. STORMTECH CHAMBER HAS RETENTION OF 38,892 C.F. REQUIRED RETENTION = 37,896 C.F. SEE DETAIL ON SHEET C571. SHOP DRAWINGS PROVIDED BY MANUFACTURER PRIOR TO BIDDING AND CONSTRUCTION. TO INCLUDE INSPECTION PORT. LANDING AREAS TO HAVE 2% MAXIMUM SLOPE AWAY FROM BUILDING ADA PARKING STALL, TOA (TOP OF ASPHALT) SPOT GRADES ARE TO BE STAKED TO ENSURE SLOPE WITHIN ADA PARKING STALL REMAINS UNDER 2.0% MAX. SLOPE. STORM DRAIN CLEANOUT BOX WITH HEAVY DUTY PEDESTRIAN SAFE LID. 6" HDPE PIPE FROM ROOF DRAIN. STORM DRAIN CATCH BASIN WITH HEAVY DUTY BICYCLE SAFE GRATE. 1 3 5 6 4 8 9 10 11 2 7 COMMON GRADING ABBREVIATIONS: SEE SHEET C0.01 FOR ADDITIONAL ABBREVIATIONS -BFE BASEMENT FLOOR ELEVATION -BW FINISH GRADE AT BOTTOM OF WALL -EX or EXIST EXISTING -EOA EDGE OF ASPHALT -EOC EDGE OF CONCRETE -FFE FINISH FLOOR ELEVATION -FG FINISH GRADE -FL FLOW LINE -GB GRADE BREAK -HP HIGH POINT -LP LOW POINT -NG NATURAL GROUND -SDCB STORM DRAIN CATCH BASIN -SDCO STORM DRAIN CLEANOUT BOX -SDDB STORM DRAIN DRAIN BASIN -SDMH STORM DRAIN MANHOLE -TBC TOP BACK OF CURB -TOA TOP OF ASPHALT -TOC TOP OF CONCRETE -TOG TOP OF GRATE -TOW TOP OF WALL -TW FINISH GRADE AT TOP OF WALL -WW WATERWAY Pr i n t e d : 24 F e b 2 0 2 3 5: 0 4 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 10 W a r d S t a k e C e n t e r Re x b u r g I D M a r r i e d S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 BH D # : 21 0 9 Da t e : 1 N o v 2 0 2 2 Ow n e r # : 50 1 - 3 5 6 0 Pl a n S e r i e s : 10 W a r d S C PR O J E C T N O : 2 2 3 5 4 8 9 9 9 9 9 9 9 8 8 8 8 8 8 8 6 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 2 12 12 2 2 12 Grading and Drainage Plan C122 SCALE: 1" = NORTH 20' 0 10'20'40'60' 4 12 4 2  cOÑ[gÑfiEcXXÑXfc`ÑX[W_VÑT W[EYÑZSEV_WV— . . X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X S S S S S S S S S S S COCO CO CO S S S S S S S W W W W W F F F F F W W W W W W W WWWWWWWWWW W W W W W W W W W W W W W W W W W W W EX SHOULDER TO REMAINEX SHOULDER TO REMAIN 48 9 0 4 9 0 0 48 8 8 489 2 489 4 4 8 9 6 4 8 9 8 4 9 0 2 4 9 0 4 4 9 0 6 490 0 4910 48 9 4 489 6 489 8 490 2 4904 4906 490 8 48 8 0 4880 4880 4876 4 8 7 8 4878 4878 48 8 2 48 8 4 48 8 6 EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y EX 10' ASPHALT PATHWAY TO BE REPLACED S89° 40' 10"E 165.11' S89° 39' 20"E 86.98' N80° 43' 00"E 316.81' N0 0 ° 1 6 ' 3 0 " W 24 2 . 0 7 ' S89° 43' 30"W 330.00' N0 0 ° 1 6 ' 3 0 " W 13 2 . 0 0 ' S89° 43' 30"W 330.00' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" L =1 8 6 .0 6 ,R =1 3 3 5 .0 0 C B =N 8 4 °4 3 '0 2 "E C =1 8 5 .9 1 ∆=0 0 7 °5 9 '0 7 " N0 0 ° 1 6 ' 5 0 " W 18 5 . 7 0 ' S0 0 °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r i n t e d : 27 F e b 2 0 2 3 5: 0 4 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 10 W a r d S t a k e C e n t e r Re x b u r g I D M a r r i e d S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 BH D # : 21 0 9 Da t e : 1 N o v 2 0 2 2 Ow n e r # : 50 1 - 3 5 6 0 Pl a n S e r i e s : 10 W a r d S C PR O J E C T N O : 2 2 3 5 4 1 1 11 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 22 2 3 2 2 2 22 2 2 Erosion Control Plan C171 2 2 2 2 2 2 2 - 6O:IÑBLN:Ñ BL<NC:NOÑOLO=ÑM6B:J OFÑLJFB6O:Ñ;FIÑ;LOI:Ñ:P O:NJLFN• ) :O:IÑBLN:Ñ6BL<NC:NO . . X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X GM G G G S S S S S S S S S S S COCO CO CO WM S S S S S S S W W W W W F F F F F W W W W W W W WWWWWWWWWW W W W W W W W W W W W W W W W W W W W EX SHOULDER TO REMAINEX SHOULDER TO REMAIN EX CURB & GUTTER TO REMAIN EX G R A V E L D R I V E W A Y EX G R A V E L D R I V E W A Y EX 10' ASPHALT PATHWAY TO BE REPLACED S89° 40' 10"E 165.11' S89° 39' 20"E 86.98' N80° 43' 00"E 316.81' N0 0 ° 1 6 ' 3 0 " W 24 2 . 0 7 ' S89° 43' 30"W 330.00' N0 0 ° 1 6 ' 3 0 " W 13 2 . 0 0 ' S89° 43' 30"W 330.00' L=332.08, R=1141.52 CB=S15° 32' 02"W C=330.915 ∆=016°40'05" L =1 8 6 .0 6 ,R =1 3 3 5 .0 0 C B =N 8 4 °4 3 '0 2 "E C =1 8 5 .9 1 ∆=0 0 7 °5 9 '0 7 " N0 0 ° 1 6 ' 5 0 " W 18 5 . 7 0 ' S0 0 ° 1 6 ' 3 0 " E 30 4 . 5 0 ' SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S S S S S S S S S S S SD EX SSMH 13 4.0' Ø RIM = 4874.67' IE (E) = 4862.87' EX SSMH 12 EX 12" PVC EX 12" PVC 120' @ 1.04% EX PLUGGED END IE = 4864.12' S 22.00' S S S S S SSSSSSSSS S S NEW SSMH 5' Ø RIM = 4876.14' IE (W) = MATCH EX / 4864.12' IE (S) = 4864.32' IE (E) = 4864.32' NEW SSMH 4' Ø RIM = 4877.38' IE (N) = 4865.12' IE (S) = 4865.32' NEW 8" PVC SEWER MAIN 108' @ 0.75% NEW SSMH 4' Ø RIM = 4883.85' IE (N) = 4872.00' NEW 8" PVC SEWER MAIN 400' @ 1.67% NEW SSMH 4' Ø RIM = 4885.94' IE (W) = 4873.80' IE (E) = 4874.00' NEW 10" PVC SEWER MAIN 330' @ 2.87% NEW SSMH 4' Ø RIM = 4905.23' IE (W) = 4893.50' NEW 10" PVC SEWER MAIN 400' @ 4.87% NEW 6" WYE TIE-INEX PLUGGED END EX 12" WATER LINE EX 12" WATER LINE EX 12" WATER LINE STUB FOR TIE ON W W W W W W W W W W W W W 45° BEND 45° BEND TIE ON TO EX STUBBED END NEW 38 L.F. 12" WATER LINE NEW 52 L.F. 12" WATER LINE 12" x 8" REDUCER NEW 422 L.F. 8" WATER LINE S TIE ON TO EX STUBBED END 45° BEND 45° BEND NEW 47 L.F. 12" WATER LINE 11.25° BEND NEW 133 L.F. 12" WATER LINE 11.25° BEND NEW 472 L.F. 12" WATER LINE NEW 100 L.F. 12" WATER LINE CAP END FOR FUTURE CONNECTION SD SD SD SD SD SD SD SD SD SD SD S D SCALE: 1" = NORTH 30' 0 15'30'60'90' 1 2 7 9 11 12 14 GENERAL NOTES: CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL DRAWINGS. ALL NEW WATER CONSTRUCTION TO BE DONE IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS & SPECIFICATIONS. ALL NEW SANITARY SEWER CONSTRUCTION TO BE DONE IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS & SPECIFICATIONS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND INVERT ELEVATIONS OF EXISTING MANHOLES AND OTHER UTILITIES BEFORE STAKING OR CONSTRUCTING ANY SEWER LINES. MAINTAIN A MINIMUM OF 5 FEET OF COVER ON ALL WATER LINES. CONTRACTOR IS TO COORDINATE LOCATIONS OF NEW TELEPHONE SERVICE TO BUILDING WITH CENTURY LINK. A PVC CONDUIT, PLYWOOD BACKBOARD, AND GROUND WIRE IS REQUIRED FOR SERVICE THROUGH PROPERTY, COORDINATE SIZES AND LOCATION WITH CENTURY LINK. CONTRACTOR IS TO SUBMIT SITE PLAN TO DOMINION ENERGY FOR DESIGN OF GAS LINE SERVICE TO BUILDING. CONTRACTOR TO COORDINATE WITH DOMINION ENERGY FOR CONTRACTOR LIMITS OF WORK VERSUS DOMINION ENERGY LIMITS. LOCATION OF ALL UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE LOCATIONS. CONTRACTOR IS TO VERIFY CONNECTION POINTS WITH EXISTING UTILITIES. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO EXISTING UTILITIES AND UTILITY STRUCTURE THAT ARE TO REMAIN. TEST PIT SURFACE AND BEDROCK ELEVATION INFORMATION ADDED TO THE PLANS BASED ON THE GEOTECHNICAL REPORT FROM ASPEN ENGINEERING, AND PROPOSED ELEVATIONS HAVE BEEN DESIGNED USING THAT ELEVATION INFORMATION. ACTUAL BEDROCK ELEVATION INFORMATION SHOULD BE FIELD VERIFIED TO ENSURE ACCURACY. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: ASPHALT T-PATCH / REPAIR PER CITY STANDARD DETAIL. INSTALL NEW FIRE HYDRANT PER ANSI/AWWA STANDARD DETAIL. CONNECT NEW 2" POLY PIPE WATER SERVICE LINE TO EXISTING CULINARY METER AND STUBBED LATERAL, PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 6" PVC SDR-35 SANITARY SEWER LATERAL @ 1.00% MINIMUM SLOPE, INCLUDING NEW CLEANOUTS PER EAGLE MOUNTAIN STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING 6" SEWER LATERAL STUB. LATERAL PER ANSI/AWW STANDARD. APPROXIMATE LOCATION OF NEW NATURAL GAS LINE. CONTRACTOR TO COORDINATE SIZE, DESIGN AND INSTALLATION BY INTERMOUNTAIN GAS WITH OTHER CONSTRUCTION. APPROXIMATE LOCATION OF NEW NATURAL GAS METER(S). CONTRACTOR TO COORDINATE SIZE, DESIGN AND INSTALLATION WITH INTERMOUNTAIN GAS AND WITH MECHANICAL PLANS. UNDERGROUND CABLE AND POWER LINES. CONTRACTOR TO COORDINATE WITH COMCAST AND ROCKY MOUNTAIN POWER. SEE ELECTRICAL SITE PLAN FOR POWER CONNECTIONS. TELEPHONE LINE. CONTRACTOR TO PROVIDE TRENCHING 30" DEEP X 24" WIDE THEN BACKFILL AS REQUIRED. SEE ELECTRICAL SITE PLAN FOR COMMUNICATIONS CONNECTIONS. INSTALL 2" STOP AND WASTE FOR IRRIGATION, CONNECT TO NEW 2" WATER LATERAL PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. SEE LANDSCAPE PLANS FOR DETAILS. NEW 6" FIRE SERVICE WATER LINE TO BUILDING PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 3/4" POLY PIPE WATER LINE FROM PROPOSED BUILDING TO THE PAVILION DRINKING FOUNTAIN. SEE PLUMBING PLANS FOR COORDINATION AND FOR DETAILS. SEWER CLEANOUT AND 6" PVC SEWER LINE FOR USE IN CLEARING SEWER LINES WITHIN THE BUILDING FROM OUTSIDE (TYPICAL CHURCH DESIGN) SEE STANDARD CHURCH DETAIL 'C' SHEET C5.01. 2" POLY PIPE WATER SERVICE LINE, PER ANSI/AWWA STANDARD, DETAIL '541'. NEW 8" PVC C-900 FIRE SERVICE WATER MAIN LOOP PER ANSI/AWWA STANDARDS AND SPECIFICATIONS. 8" PVC C-900 WATER MAIN LINE, INCLUDING ALL FITTINGS AND THRUST BLOCKING. 12" PVC C-900 WATER MAIN LINE, INCLUDING ALL FITTINGS AND THRUST BLOCKING. CONNECT NEW 12" PVC C-900 WATER LINE TO EXISTING 12" WATER MAIN, PER GOVERNING BODY STANDARDS AND SPECIFICATIONS. STUB ON NEW 1" WATER SERVICE LINE, PER CITY OF REXBURG STANDARDS. 4' DIAMETER SANITARY SEWER MANHOLE, PER CITY OF REXBURG STANDARDS. 5' DIAMETER SANITARY SEWER MANHOLE, PER CITY OF REXBURG STANDARDS. 8" PVC SDR-35 SANITARY SEWER LINE, INCLUDING ALL FITTINGS, CITY OF REXBURG STANDARDS. 10" PVC SDR-35 SANITARY SEWER LINE, INCLUDING ALL FITTINGS, CITY OF REXBURG STANDARDS. STUB ON NEW 4" PVC SDR-35 SANITARY SEWER LATERAL, INCLUDING ALL FITTINGS, PER CITY OF REXBURG STANDARDS. 6 5 4 3 10 8 13 2 2 2 3 13 4 4 5 5 6 7 8 10 10 11 11 11 12 12 12 12 14 14 14 14 13 Pr i n t e d : 24 F e b 2 0 2 3 5: 0 4 P M Dr a w i n g I s s u e a n d R e v i s i o n S c h e d u l e # Da t e De s c r i p t i o n 10 W a r d S t a k e C e n t e r Re x b u r g I D M a r r i e d S e c o n d S t a k e 5t h W e s t a n d U n i v e r s i t y B o u l e v a r d , R e x b u r g , I d a h o 43 . 8 0 3 3 0 3 , - 1 1 1 . 7 9 6 6 1 2 Co u n t y P a r c e l : RP R 6 N 4 0 E 3 1 5 4 0 0 BH D # : 21 0 9 Da t e : 1 N o v 2 0 2 2 Ow n e r # : 50 1 - 3 5 6 0 Pl a n S e r i e s : 10 W a r d S C PR O J E C T N O : 2 2 3 5 4 Site Utility Plan C151 2 15 16 17 18 19 20 21 22 23 23 18 22 22 21 21 20 19 19 19 17 17 16 16 16 16 16 16 15 1 1 1 1 1 1 1 1 1 1 1 2 gÑdWfÑE Wgc_ih[cEѽ Ž ½ ½ #Ž Á 8ÑSVcdhWVÑ2 df[_Ñ 8ѽ Ž ½ ½ 8ÑEWOÑ VWMW_cd`WEhÑ[gÑfWH i[fWVÑhcÑXc__cOÑghSEVSfVgÑXcfÑhZWÑ [EghS__Sh[cEÑcXÑX[T WfÑUcEVi[hÑSEVÑV[ghf[T ih[cEÑT cm Wg•ÑÑ" cUSh[cE cXÑUcEVi[hÑSEVÑV[ghf[T ih[cEÑT cm WgÑEWWVÑhcÑT WÑ[VWEh[X[WVÑSEVÑ gZcOEÑcEÑd_SEg• 4 _SggÑ( Ž ÑViUh[_WÑ[fcEÑd[dWÑfWH i[fWVÑ[EÑf[YZhÑcXÑ OSQ