Loading...
HomeMy WebLinkAboutSTRUCTURAL SUPPLEMENTAL INFORMATION 8/16/2023 - 22-00502 - Mountain West Rental and SalesFROST Structural Engineering 1020 Lincoln Road Phone: 208.227.8404 Idaho Falls, ID 83401 Fax: 208.227.8405 www.frost-structural.com SSI No. : Re : Project : Date:SEAL: To : From : Project No. : Reference:Instruction: FSE Hairpins may be post-installed through the concrete pier, see the attached detail. S2.0 Colt Grimmett David Porter IF22-235 August 16, 2023 STRUCTURAL SUPPLEMENTAL INFORMATION 3 Hairpins Mountain West - Rexburg August 16, 2023 KEYNOTES: 1.PRE-ENGINEERED COLUMN, SEE PLAN 2.SIDEWALK, PAVEMENT, OR FINISH GRADE PER ARCH 3.CONCRETE STEM WALL BEYOND, CONT REINFORCEMENT TROUGH PIER (NOT SHOWN FOR CLARITY) 4.MINIMUM FOOTING DEPTH, SEE GSN 5.COMPACTED SUB-GRADE BELOW FOOTING, SEE PLAN 6.CONCRETE FOOTING, SEE PLAN 7.14"x17" CONCRETE PIER W/ (8) #5 HOOKED DOWELS AND (3) #3 TIES IN TOP 5" AND AT 8" O.C. REMAINDER 8.ANCHOR BOLTS W/ NUT AT BOTTOM 9.HAIRPIN AS OCCURS, SEE PLAN 10.CONCRETE SLAB ON GRADE, SEE PLAN 110 PRE-ENGINEERED COLUMN AT CONCRETE FOOTING NO SCALE 5 3 10 9 7 4 1 8 6 2 3" CLR 3" CL R A PLANA 1'-5" 1' - 2 " AT THE CONTRACTORS OPTION, THE HAIRPIN MAY BE INSTALLED IN THE PIER THROUGH A DRILLED HOLE AND EPOXIED ONCE THE HAIRPIN IS IN PLACE FROST Structural Engineering FSE