Loading...
HomeMy WebLinkAboutREDLINED SPECIAL INSPECTION STATEMENT - 22-00059 - Java EspressAuthor Name Author Email Author Phone No.: Cody Jones Cody.Jones@rexburg.org 208-372-2173 Description : Java Espress Address : 565 N 2nd E Application Type : Document Filename : Special inspection - connection.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 1 Free text Cody Jones : Building Open 1 Need to have special inspector identified. # 22-00059 New Commercial Building Report Date: 03.11.2022 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) Statement of Special Inspections The design engineer (or design architect if no engineer; applicant if no design professional) must complete this form in accordance with IBC Chapter 17 and submit with plans for building permit. Building Permit Number: Project Name: Special Inspection Firm Project Address: Special Inspectors must be certified in the applicable discipline of work needing special inspection. Name: E-mail:Phone: Design Professional in Responsible Charge Acting as the Owner's Agent Name (print): E-mail: Owner Phone: Name (print): E-mail:Phone: Please note: The owner or registered design professional in responsible charge acting as the owner’s agent - not the contractor - shall employ one or more approved agencies to perform special inspections services. I acknowledge that I have read the note above and will employ the special inspector(s). Owner’s Signature Date Structural Engineer Name: E-mail: Phone: Name of Design Professional / Applicant completing the Statement of Special Inspection (Print): Date: Design Engineer (or Design Architect if no engineer) provide Design Professional stamp, signature and date completing the Statement of Special Inspections. 01/2019 www.cityofboise.org/pds City of Boise Planning & Development Services P.O. Box 500 • 150 N. Capitol Blvd • Boise, Idaho 83701-0500 Phone: 208/608-7100 • Fax: 208/377-3529 • TTD/TTY 800/377-3529 Department Application #310 PD S ROBERT FEHRENBACKER, PROJECT MANAGER RobertF@alcarchitecture.com 208 522 0088 JAVA EXPRESS REXBURG, IDAHO Shawn Reeder, PE sreeder@inteframe.com (208) 475-0040 Shawn Reeder, PE 9 7 9 0 S HAWN D REEER P R O F E S S I O NALEN G I N R E EREG I STE D E R S T A TE OF I D A H O02/21/2022 February 21, 2022 Need to have special inspector identified. Statement of Special Inspections ( 2 ) Scope of work to be inspected by Special Inspection firm to meet IBC Section 1704  Yes  No 1705.12.1 Structural Steel AISC 341 If yes complete TABLE 8  Yes  No 1705.2.1 Structural Steel AISC 360 If yes complete TABLE 9  Yes  No 1705.2.2 Cold-formed steel deck-SDI QA/QC If yes, specify:  Yes  No 1705.2.3 Open-web steel joists and joist girders If yes complete TABLE 1  Yes  No 1705.3 Concrete Construction If yes complete TABLE 2  Yes  No 1705.4 Masonry Construction If yes complete TABLE 3 or 4  Yes  No 1705.4.2 Vertical masonry foundations elements If yes complete TABLE 3 or 4  Yes  No 1705.5 Wood Construction  High-load diaphragms  Metal plate connected wood trusses spanning 60 feet or greater  Yes  No 1705.6 Soils If yes complete TABLE 5  Yes  No 1705.7 Driven Deep Foundations If yes complete TABLE 6  Yes  No 1705.8 Cast in Place Deep Foundations If yes complete TABLE 7  Yes  No 1705.9 Helical Pile Foundations If yes, specify:  Yes  No 1705.10 Fabricated Items If yes complete section 1704.2.5  Yes  No 1705.11 Special inspection for wind resistance Structural wood (continuous) Cold formed steel light-frame construction (periodic) Wind resisting components (periodic)  Yes  No 1705.12 Special inspection for seismic resistance Complies with one of the exceptions there- fore sections 1705.12.1 - 1705.12.9 don't apply If special inspection is required complete TABLE 8  Yes  No 1705.13 Testing for seismic resistance If yes complete section 1705.13.1 – 1705.13.4 unless exempted from special inspections by section 1704.2  Yes  No 1705.14 Sprayed Fire-Resistant Materials  Yes  No 1705.15 Mastic & Intumescent Fire -Resistant Coatings  Yes  No 1705.16 Exterior Insulation & Finish Systems (EIFS) x Statement of Special Inspections ( 3 )  Yes  No 1705.17 Fire-Resistant penetrations and joints If yes, specify:  Yes  No 1705.17.1 Penetration firestops If yes, specify:  Yes  No 1705.17.2 Fire-resistant joint systems If yes, specify:  Yes  No 1705.18 Special Inspection for Smoke Control If yes, specify: x Statement of Special Inspections ( 4 ) TABLE 2 1705.3 Concrete Construction Yes No MATERIAL / ACTIVITY Continuous Periodic 1. Inspection of reinforcing steel, including prestressing tendons, and placement. - X 2. Reinforcing bar welding: a. Verify weldability of reinforcing bars other than ASTM A 706; - X b. Inspect single-pass fillet welds, maximum 5/16” X c. Inspect all other welds X 3. Inspect anchors cast in concrete - X 4. Inspect anchors post-installed in hardened concrete members a. Adhesive anchors installed in horizontally or upwardly inclined orientations to resist sustained tension loads. X b. Mechanical anchors and adhesive anchors not defined in 4.a 5. Verify use of required design mix - X 6. Prior to concrete placement, fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete. X - 7. Inspect concrete and shotcrete placement for proper application techniques. X - 8. Verify maintenance of specified curing temperature and techniques. - X 9. Inspection of prestressed concrete for: a. Application of prestressing forces X - b. Grouting of bonded prestressing tendons X - 10. Inspect erection of precast concrete members. - X 11. Verify in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs. - X 12. Inspect formwork for shape, location and dimensions of the concrete member being formed. - X TABLE 1 1705.2.3 Required Special Instructions of Open-Web Steel Joists and Joist Girders Yes No MATERIAL / ACTIVITY Continuous Periodic 1. Installation of open-web steel joists and joist girders a. End connections – welding or bolted. - X b. Bridging – horizontal or diagonal. - 1. Standard bridging. - X 2. Bridging that differs from the SJI specifications listed in Section 2207.1. X X X X X X X