Loading...
HomeMy WebLinkAboutCONCRETE FIELD TEST 4 - 23-00332 - Madison Jr High - AdditionPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8BC0B0FC-09D1-4D5D-82A2-019A95E72502 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23252C08182023LS Compressive Strength of Concrete Test Specimens Date: 08/18/2023 Project Number: 23-252 Project Name: Madison JR. High Client: Madison School District Time on Project: 3 hours Start Time: 09:30 AM Contractor: Richardson Concrete Supplier: Valley Ready Mix Mix Number: MIX96AF Concrete Member: Foundation Walls Required 28 day Strength (psi): 4,500.0 Admixtures: POLY1025, 322-N, MICROAIR Entrained Air Spec. (%): 5.5 +- 1.0 Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 9.5 2022 10:00 AM Foundation walls on north east corner 82 34.220 137.4 71 6.5 5 1/2 Field Technician Information Truck: THOR Total Trip Mileage: 0.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8BC0B0FC-09D1-4D5D-82A2-019A95E72502 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at around 9:30am and began my inspection of the forms for the foundation walls. I then set up my gear and prepared for concrete to arrive. Concrete arrived on time at around 10:00am. After a yard was let off the truck, I grabbed a sample and began testing. The first field test failed so I stopped the pour, grabbed a new airpot and tested the same sample again, in which the concrete passed in my field testing. After the field tests were passed, the concrete pour was resumed. I then cleaned my gear and waited in case I needed to test again. Reviewed By: E. Vail Signature: Inspection Images: Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8BC0B0FC-09D1-4D5D-82A2-019A95E72502 3 Ticket Image: