Loading...
HomeMy WebLinkAboutCONCRETE FIELD TEST 3 - 23-00332 - Madison Jr High - AdditionPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 17D54502-C541-4E86-B715-42892B396A2B 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23252C08112023LS Compressive Strength of Concrete Test Specimens Project Number: 23-252 Project Name: Madison JR. High Client: Madison School District Contractor: Richardson Concrete Date: 08/11/2023 Time on Project: 2 hours Start Time: 10:30 AM Supplier: Valley Ready Mic Mix Number: 71FAVALY Concrete Member: Footings Required 28 day Strength (psi): 3,500.0 Admixtures: POLY1025 Entrained Air Spec. (%): 5.5 +- 1.0 Slump Spec. (inches): Max 6 Testing Results Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 30.0 1807 11:15 AM Footings for southeast side of school building 88 34.800 139.8 74 7.0 5.5 +- 1.0 5.5 Max 6 Field Technician Information Date: 08/11/2023 Total Trip Mileage: 20.00 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/ or Remarks.) Tested By: Leland Stiener Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 17D54502-C541-4E86-B715-42892B396A2B 2 Observations and/or Remarks: I arrived to the job site at around 10:30am and did a inspection on the forms and rebar. The reinforcement appeared to be in general conformance to project specifications and I proceeded to set up my equipment to test the concrete. Concrete arrived a little early at around 10:50am and I began testing soon after. I reported my results to the contractor and made strength specimens. Once completed I cleaned my gear and observed the placement. Reviewed By: Luke Hammar Date: 08/14/2023 Signature: Inspection Images: