Loading...
HomeMy WebLinkAboutINFRASTRUCTURE 2.22.23 - 23-00085 - Founders Square Phase 3 - Plat-Reviewed-Corrections-Required (1)Author Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Todd Smith Todd.Smith@rexburg.org 208-372-2181 Description : Founder's Square Phase 3 Address : Sunrise Drive Application Type : Document Filename : INFRASTRUCTURE 2.22.23 - 23-00085 - Founders Square Phase 3 - Plat.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 1 Free Text Todd Smith : Broadband Open 1 As per Resolution 2022-07, adopted April 6, 2022, new development is required to follow standards for the installation of fiber conduit and distribution boxes. Location of conduit and distribution boxes need to be identified and shown on plans. 1 Free Text Joel Gray : PW Open 1 Sunrise Drive buildout must be agreed to with City. 3 Callout Joel Gray : PW Open 3 Street light required. 3 Callout Joel Gray : PW Open 3 Street Light required 4 Free Text Joel Gray : PW Open 4 Sewer Slope must be 0.4% # 23-00085 Plat Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 03.08.2023 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) As per Resolution 2022-07, adopted April 6, 2022, new development is required to follow standards for the installation of fiber conduit and distribution boxes. Location of conduit and distribution boxes need to be identified and shown on plans.S unrise D rive buildout must be ag re e d t o w i t h C i t y . S t r e e t L i g h t r e q u i r e d S t r e e t l i g h t r e q u i r e d . S ewer S lope must be 0.4 %