Loading...
HomeMy WebLinkAboutFounders Square Ph 3 - updated infrastructure plans (1)From:Winston Dyer To:Katie Saurey Cc:Keith Davidson; Joel Gray Subject:Founders Square Ph 3 - updated infrastructure plans Date:Monday, July 17, 2023 2:01:03 PM Attachments:Founders Square Phase 3 - Project Plans - 17 July 2023.pdf Attached is the updated plan set for the infrastructure in Founders Square Phase 3. We have changed the grade in the sewer line between Manholes 6A and 4A to be 0.40%. We left the portion downstream of Manhole 6A at the originally designed 0.32% to be consistent with the segment of sewer line to which it will be connected, which is already constructed at that grade. As far as changes to the plans, Sheet 1 is changed to show my engineering stamp with a date of 17 July 23…so anyone picking up a set of plans from here forward will know this is the "latest, greatest". Then Sheets 4 and 5 have been changed to show the adjusted sewer line grade in the profile, and also have the engineering stamp with today's date. All other sheets in the drawing packet remain unchanged and the same as previously submitted, since there were not any other required changes. Hope this helps, please call with questions…Dick Winston R. Dyer, PE The Dyer Group, LLC 208.390.9700 c wdyer@thedyergroup.com