Loading...
HomeMy WebLinkAboutDENSITY ASPHALT - 22-00269 - Hibbard Elementary SchoolPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED454EB4-E89A-483B-956F-5F92467FFF81 1 4103 E 605 N Suite 1 Rigby, Idaho 83442 208.932.4428 File Name: 22229AD08072023MH In Place Density of Asphalt by Nuclear Methods ASTM D2950 Date: 08/07/2023 Project Number: 22-229 Client: Madison School District Time Start: 07:45 AM Project Name: Hibbard Elementary Contractor: Depatco Ambient Temperature (°F): 55 Current Weather Conditions: Partly Cloudy Wind: Calm Instrument ID 34082 Daily Standardization: MS: 640 DS: 1553 Results Details Test #: Location:Lift: Material:Wet:Marshall #: % Marshall: Pass Fail 1 See attached photo for reference 1 Asphalt Marshall 140.7 151.6 93 2 See attached photo for reference 1 Asphalt Marshall 139.8 151.6 92 3 See attached photo for reference 1 Asphalt Marshall 142.7 151.6 94 4 See attached photo for reference 1 Asphalt Marshall 141.5 151.6 93 5 See attached photo for reference 1 Asphalt Marshall 143.6 151.6 95 6 See attached photo for reference 1 Asphalt Marshall 142.1 151.6 94 7 See attached photo for reference 1 Asphalt Marshall 139.6 151.6 92 8 See attached photo for reference 1 Asphalt Marshall 143.6 151.6 95 9 See attached photo for reference 1 Asphalt Marshall 142.3 151.6 94 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED454EB4-E89A-483B-956F-5F92467FFF81 2 Test #: Location:Lift: Material:Wet:Marshall #: % Marshall: Pass Fail 10 See attached photo for reference 1 Asphalt Marshall 145.3 151.6 96 11 See attached photo for reference 1 Asphalt Marshall 139.7 151.6 92 Field Technician Information Number of Grout Bags Used: Core Drill Used No Total Mileage 33423 Tested By: Michael Hammar Date: 08/07/2023 Total Time on Project 7 hours Signature: Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Items observed are in general conformance with approved project documents and jurisdictional requirements. Observations and/or Remarks: I arrived on site at approximately 8:25 AM and began preparing my equipment for testing. As the material was placed and then compacted, I performed several density tests. The tests I performed were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Reviewed By: E. Vail Date: 08/10/2023 Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED454EB4-E89A-483B-956F-5F92467FFF81 3