Loading...
HomeMy WebLinkAboutROOF-ATIC MEASURMENTS - 23-00518 - 75 Oak Ave - Solar Panel* f. + ROOFING MATERIAL (ASPHALTSHFNGLE,ALUMINUMSHINGLES,METAL,ETC.). Asphalt shingle METAL PLATES@ ALL CONN ECTIONS R"SLOPE; 4112 EXISTING BEARING WALL OR BEAM IF BEAM! BEAM SIZE (Widchx HeWInumbeeor plies [oxnmp1m: 4x8 os i 2x 16])= BEAM LENGTH (BETWEEN POSTS): —FEET—INCHES NOTE: IF METAL PLATEVGUSSETS ARE LOCATED AT ALL CONNECT]ONS, IT IS MOST LIKELY A PREIEKGINEERED TRUSS BY A TRUSS MANUFACTURER AND WE KNOW THAT THE TRUSSMANUFACTIIRER SHOULD HAVE DESIGNED] IT FOR THE CORRECT SNOW LOADS, IF IT HAS PLYWOOD (OR OTHER WOOD) GUSSETS CONNECTING THE MEMBERS TOGETHER, SEE NUMBER 4 � METAL -PLATED WDOD T'U ROOFING MATERIAL (ASPHALT SHfNGLE, ALUMINUM SHINGLES, METAL, ETC RAFTER SLOPE - RAFTER SIZE (2x4, 2x6, 2n9, 2x IU, stc); KAFTERSPACING iIr,16".W,ctc) INCHES ON CENTER EXISTING BEARING WALL OR BEAM IF BEAM: BEAM SIZE{ Wift x Hciglu I i r6a of pi in [examples: 4x8 of 3-2a I OJl: BEAM LENGTH (BETWEEN POMP: —FEET—INCHES DFSTANCE BETWEEN BEAW.W WALLS+BEAMS: FEET WCHES 2 LOW PITCH RAFTERS