HomeMy WebLinkAboutROOF-ATIC MEASURMENTS - 23-00518 - 75 Oak Ave - Solar Panel* f. +
ROOFING MATERIAL (ASPHALTSHFNGLE,ALUMINUMSHINGLES,METAL,ETC.). Asphalt shingle
METAL PLATES@ ALL CONN ECTIONS
R"SLOPE; 4112
EXISTING BEARING WALL OR BEAM
IF BEAM!
BEAM SIZE (Widchx HeWInumbeeor
plies [oxnmp1m: 4x8 os i 2x 16])=
BEAM LENGTH (BETWEEN POSTS):
—FEET—INCHES
NOTE: IF METAL PLATEVGUSSETS ARE LOCATED AT ALL CONNECT]ONS, IT IS MOST LIKELY A PREIEKGINEERED TRUSS BY A
TRUSS MANUFACTURER AND WE KNOW THAT THE TRUSSMANUFACTIIRER SHOULD HAVE DESIGNED] IT FOR THE CORRECT
SNOW LOADS, IF IT HAS PLYWOOD (OR OTHER WOOD) GUSSETS CONNECTING THE MEMBERS TOGETHER, SEE NUMBER 4
� METAL -PLATED WDOD T'U
ROOFING MATERIAL (ASPHALT SHfNGLE, ALUMINUM SHINGLES, METAL, ETC
RAFTER SLOPE -
RAFTER SIZE (2x4, 2x6, 2n9, 2x IU, stc);
KAFTERSPACING iIr,16".W,ctc)
INCHES ON CENTER
EXISTING BEARING WALL OR BEAM
IF BEAM:
BEAM SIZE{ Wift x Hciglu I i r6a of pi in
[examples: 4x8 of 3-2a I OJl:
BEAM LENGTH (BETWEEN POMP:
—FEET—INCHES
DFSTANCE BETWEEN BEAW.W WALLS+BEAMS: FEET WCHES
2 LOW PITCH RAFTERS