Loading...
HomeMy WebLinkAboutMANUAL J - 23-00481 - 55 Autumn Winds - New SFR MechanicalCalculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 1 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Load Short Form 07/16/2023Date:Entire House Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Information InfiltrationClgHtg SimplifiedMethod90-7Outside db (°F) Semi-tightConstruction quality7570Inside db (°F) 0Fireplaces1577Design TD (°F) H-Daily range 5030Inside humidity (%) -2935Moisture difference (gr/lb) HEATING EQUIPMENT COOLING EQUIPMENT Make Day & Night Make Day & Night Trade DAY & NIGHT Trade 17 SEER N SERIES R410A AC Model N9MSE1402420A Cond N4A760GKA1 AHRI ref 0 Coil END4X60L24A1++TDR AHRI ref 0 Efficiency 96 AFUE Efficiency 11.7 EER, 14 SEER Heating input Btuh140000 Sensible cooling Btuh52490 Heating output Btuh109000 Latent cooling Btuh0 Temperature rise °F51 Total cooling Btuh52490 Actual air flow cfm2322 Actual air flow cfm2322 Air flow factor cfm/Btuh0.030 Air flow factor cfm/Btuh0.045 Static pressure in H2O1.00 Static pressure in H2O1.00 Space thermostat Load sensible heat ratio 1.00 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft²)(Btuh)(Btuh)(cfm)(cfm) 2nd Floor Zone 1315 32459 22605 981 1027 Main Floor Zone 5409 44352 32929 1341 1497 Entire House 6724 76810 50500 2322 2322 Other equip loads 11841 2254 Equip. @ 0.95 RSM 49905 Latent cooling 0 TOTALS 6724 88651 49905 2322 2322 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 2 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Load Short Form 07/16/2023Date:2nd Floor Zone Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Information InfiltrationClgHtg SimplifiedMethod90-7Outside db (°F) Semi-tightConstruction quality7570Inside db (°F) 0Fireplaces1577Design TD (°F) H-Daily range 5030Inside humidity (%) -2935Moisture difference (gr/lb) HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling Btuh0 Heating output Btuh0 Latent cooling Btuh0 Temperature rise °F0 Total cooling Btuh0 Actual air flow cfm0 Actual air flow cfm0 Air flow factor cfm/Btuh0 Air flow factor cfm/Btuh0 Static pressure in H2O0 Static pressure in H2O0 Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft²)(Btuh)(Btuh)(cfm)(cfm) Loft 398 4689 1224 142 56 Billiards 345 11297 12718 342 578 Bath 2 82 2049 1601 62 73 Bedroom 3 255 8343 3335 252 152 Bedroom 2 167 4238 3482 128 158 Mech/Storage 69 1843 245 56 11 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 3 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E 2nd Floor Zone 1315 32459 22605 981 1027 Other equip loads 0 0 Equip. @ 0.95 RSM 21384 Latent cooling 0 TOTALS 1315 32459 21384 981 1027 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 4 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Load Short Form 07/16/2023Date:Main Floor Zone Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Information InfiltrationClgHtg SimplifiedMethod90-7Outside db (°F) Semi-tightConstruction quality7570Inside db (°F) 0Fireplaces1577Design TD (°F) H-Daily range 5030Inside humidity (%) -2935Moisture difference (gr/lb) HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling Btuh0 Heating output Btuh0 Latent cooling Btuh0 Temperature rise °F0 Total cooling Btuh0 Actual air flow cfm0 Actual air flow cfm0 Air flow factor cfm/Btuh0 Air flow factor cfm/Btuh0 Static pressure in H2O0 Static pressure in H2O0 Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft²)(Btuh)(Btuh)(cfm)(cfm) Crawl Space 2681 8191 0 248 0 Master 239 3557 3887 108 177 M WIC 171 3268 1426 99 65 M Bath 237 2897 1718 88 78 Den 157 1808 2347 55 107 Laundry 170 4365 4409 132 200 Pwdr 32 0 0 0 0 Guest 226 2626 2190 79 100 Gurest Bath 78 1812 234 55 11 Craft Rm 110 1329 1586 40 72 Kit/Din/Great Rm 1278 14498 15132 438 688 Mech 31 0 0 0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 5 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Main Floor Zone 5409 44352 32929 1341 1497 Other equip loads 0 0 Equip. @ 0.95 RSM 31151 Latent cooling 109 TOTALS 5409 44352 31260 1341 1497 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 1 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Building Analysis 07/16/2023Date:Entire House Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Conditions Location:CoolingHeatingIndoor: 7570Indoor temp era ture (°F)Idaho Falls Rgnl, ID, US 1577Design TD (°F)ft4744Elevation: 5030Relative humidity (%)°N44Latitude:Outdoor:-29.435.3Moisture difference (gr/lb)CoolingHeating Infiltration:90-7Dry bul b (°F) SimplifiedMethod)H(35-Da ily ra nge (°F) Semi-tightConstruction quality61-We t bu lb (°F) 0Fireplaces7.515.0Wind speed (mph) Heating Walls Glazing Doors CeilingsFloors Infiltration Ducts Ventilation % of loadBtuhBtuh/ft²Component 29.3260084.7Walls 16.01419623.0Glazing 3.7326129.9Doors 6.154051.5Ceilings 7.667011.91.9Floors 10.289991.7Infiltration 13.812241Ducts 00Piping 00Humidification 13.411841Ventilation0Adjustments 100.088651Total Cooling Walls Glazing OtherCeilings Ducts Internal Gains Ventilation % of loadBtuhBtuh/ft²Component 4.121550.4Walls 48.22540141.2Glazing 1.57917.3Doors 5.629670.8Ceilings 0.1560.0Floors 1.79020.2Infiltration 16.08448Ducts 4.32254Ventilation 18.59780Internal gains 00Blower 0Adjustments 100.052753Total Latent Cooling Load = 0 Btuh Overall U-va lue = 0.0 54 Btuh/ft²-°F, Windo w / Floor Area = 9.2 % Data entries checked. 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 2 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Building Analysis 07/16/2023Date:2nd Floor Zone Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Conditions Location:CoolingHeatingIndoor: 7570Indoor temp era ture (°F)Idaho Falls Rgnl, ID, US 1577Design TD (°F)ft4744Elevation: 5030Relative humidity (%)°N44Latitude:Outdoor:-29.435.3Moisture difference (gr/lb)CoolingHeating Infiltration:90-7Dry bul b (°F) SimplifiedMethod)H(35-Da ily ra nge (°F) Semi-tightConstruction quality61-We t bu lb (°F) 0Fireplaces7.515.0Wind speed (mph) Heating Walls Glazing Ceilings Floors Infiltration Ducts % of loadBtuhBtuh/ft²Component 28.392025.0Walls 10.6345223.0Glazing 000Doors 6.220181.5Ceilings 6.520972.62.6Floors 10.634491.7Infiltration 37.712241Ducts 00Piping 00Humidification 00Ventilation0Adjustments 100.032459Total Cooling Walls Glazing Ceilings Other Ducts Internal Gains % of loadBtuhBtuh/ft²Component 3.98880.5Walls 26.4597839.9Glazing 000Doors 4.911080.8Ceilings 0.2560.1Floors 1.53460.2Infiltration 38.88770Ducts 00Ventilation 24.25460Internal gains 00Blower 0Adjustments 100.022605Total Latent Cooling Load = 0 Btuh Overall U-va lue = 0.0 53 Btuh/ft²-°F, Windo w / Floor Area = 11 .4 % Data entries checked. 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 3 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Building Analysis 07/16/2023Date:Main Floor Zone Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Conditions Location:CoolingHeatingIndoor: 7570Indoor temp era ture (°F)Idaho Falls Rgnl, ID, US 1577Design TD (°F)ft4744Elevation: 5030Relative humidity (%)°N44Latitude:Outdoor:-29.435.3Moisture difference (gr/lb)CoolingHeating Infiltration:90-7Dry bul b (°F) SimplifiedMethod)H(35-Da ily ra nge (°F) Semi-tightConstruction quality61-We t bu lb (°F) 0Fireplaces7.515.0Wind speed (mph) Heating Walls Glazing Doors Ceilings Floors Infiltration % of loadBtuhBtuh/ft²Component 37.9168064.5Walls 24.21074523.0Glazing 7.4326129.9Doors 7.633871.5Ceilings 10.446041.71.7Floors 12.555501.7Infiltration 00Ducts 00Piping 00Humidification 00Ventilation0Adjustments 100.044352Total Cooling Walls Glazing Doors Ceilings Other Internal Gains % of loadBtuhBtuh/ft²Component 3.812680.3Walls 73.32413651.7Glazing 2.47917.3Doors 5.618590.8Ceilings 000Floors 1.75560.2Infiltration 00Ducts 00Ventilation 13.14320Internal gains 00Blower 0Adjustments 100.032929Total Latent Cooling Load = 109 Btuh Overall U-va lue = 0.0 55 Btuh/ft²-°F, Windo w / Floor Area = 8.6 % Data entries checked. 2023-Jul-16 12:06:01 Right-Suite® Universal 2022 22.0.07 RSU28163 Page 1 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Component Constructions 07/16/2023Date:Entire House Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Conditions Location:CoolingHeatingIndoor: 7570Indoor temperature (°F)Idaho Falls Rgnl, ID, US 1577Design TD (°F)ft4744Elevation: 5030Relative humidity (%)°N44Latitude: Outdoor:-29.435.3Moisture difference (gr/lb)CoolingHeating Infiltration:90-7Dry bulb (°F) SimplifiedMethod)H(35-Daily range (°F) Semi-tightConstruction quality61-Wet bulb (°F) 0Fireplaces7.515.0Wind speed (mph) GainLossClg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² 007293.3019.00.043221n 0011053.3019.00.043335e 007293.3019.00.043221s 0011053.3019.00.043335w 0036673.3019.00.0431112all 5430.4856314.9922.00.0651130n 5300.4854984.9922.00.0651103e 5610.4858174.9922.00.0651167s 5200.4853944.9922.00.0651082w 21550.48223404.9922.00.0654481all 44111.092023.000.30040n 38611.080523.000.30035n 353547.1172623.000.30075e 528747.1258123.000.300112e 171730.1131223.000.30057s 235747.1115123.000.30050w 1167947.1570223.000.300248w 2540141.21419623.000.300617all 1407.2557629.900.39019n 6517.25268529.900.39090e 7917.25326129.900.390109all Construction descriptions Walls 15B19-0wc-6: Bg wall, light dry soil, 2"x4" wood int frm, concrete wall, r-19 cav ins, 8" thk, 1/2" gypsum board int fnsh Frm wall, vnl ext, 3/8" wood shth, r-22 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr low-e outr, argon gas, vnl frm mat, clr innr, 1/4" gap, 1/8" thk: 2 glazing, clr low-e outr, argon gas, vnl frm mat, clr innr, 1/4" gap, 1/8" thk; NFRC rated (SHGC=0.35); foreground = new concrete (0.32); 6.67 ft head ht Doors 11D0: Door, wd sc type Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 29670.8454051.5350.00.0203524 Floors 2023-Jul-16 12:06:01 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 2 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E 20P-30v: Flr floor, frm flr, 12" thkns, vinyl flr fnsh, r-30 cav ins, gar ovr 560.0720332.6830.00.035757 21A-28v: Bg floor, light dry soil, 6.5' depth, vinyl flr fnsh 00.0222681 0045231.69 00801.6900.02248 00641.6900.02238 0046681.6900.0222766all 2023-Jul-16 12:06:01 Right-Suite® Universal 2022 22.0.07 RSU28163 Page 3 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Component Constructions 07/16/2023Date:2nd Floor Zone Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Conditions Location:CoolingHeatingIndoor: 7570Indoor temperature (°F)Idaho Falls Rgnl, ID, US 1577Design TD (°F)ft4744Elevation: 5030Relative humidity (%)°N44Latitude: Outdoor:-29.435.3Moisture difference (gr/lb)CoolingHeating Infiltration:90-7Dry bulb (°F) SimplifiedMethod)H(35-Daily range (°F) Semi-tightConstruction quality61-Wet bulb (°F) 0Fireplaces7.515.0Wind speed (mph) GainLossClg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² 2830.4829304.9922.00.065588n 1890.4819564.9922.00.065392e 2370.4824574.9922.00.065493s 1790.4818604.9922.00.065373w 8880.4892024.9922.00.0651846all 44111.092023.000.30040n 282847.1138123.000.30060e 235747.1115123.000.30050w 562537.5345223.000.300150all 11080.8420181.5350.00.0201315 560.0720332.6830.00.035757 Construction descriptions Walls Frm wall, vnl ext, 3/8" wood shth, r-22 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr low-e outr, argon gas, vnl frm mat, clr innr, 1/4" gap, 1/8" thk: 2 glazing, clr low-e outr, argon gas, vnl frm mat, clr innr, 1/4" gap, 1/8" thk; NFRC rated (SHGC=0.35); foreground = new concrete (0.32); 6.67 ft head ht Doors (none) Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh Floors 20P-30v: Flr floor, frm flr, 12" thkns, vinyl flr fnsh, r-30 cav ins, gar ovr 21A-28v: Bg floor, light dry soil, 6.5' depth, vinyl flr fnsh 00.02238 00641.69 2023-Jul-16 12:06:01 Right-Suite® Universal 2022 22.0.07 RSU28163 Page 4 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Component Constructions 07/16/2023Date:Main Floor Zone Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: Design Conditions Location:CoolingHeatingIndoor: 7570Indoor temperature (°F)Idaho Falls Rgnl, ID, US 1577Design TD (°F)ft4744Elevation: 5030Relative humidity (%)°N44Latitude: Outdoor:-29.435.3Moisture difference (gr/lb)CoolingHeating Infiltration:90-7Dry bulb (°F) SimplifiedMethod)H(35-Daily range (°F) Semi-tightConstruction quality61-Wet bulb (°F) 0Fireplaces7.515.0Wind speed (mph) GainLossClg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² 007293.3019.00.043221n 0011053.3019.00.043335e 007293.3019.00.043221s 0011053.3019.00.043335w 0036673.3019.00.0431112all 2610.4827014.9922.00.065542n 3420.4835434.9922.00.065711e 3240.4833604.9922.00.065674s 3410.4835354.9922.00.065709w 12680.48131384.9922.00.0652635all 38611.080523.000.30035n 70747.134523.000.30015e 528747.1258123.000.300112e 171730.1131223.000.30057s 1167947.1570223.000.300248w 1977542.31074523.000.300467all 1407.2557629.900.39019n 6517.25268529.900.39090e 7917.25326129.900.390109all Construction descriptions Walls 15B19-0wc-6: Bg wall, light dry soil, 2"x4" wood int frm, concrete wall, r-19 cav ins, 8" thk, 1/2" gypsum board int fnsh Frm wall, vnl ext, 3/8" wood shth, r-22 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr low-e outr, argon gas, vnl frm mat, clr innr, 1/4" gap, 1/8" thk: 2 glazing, clr low-e outr, argon gas, vnl frm mat, clr innr, 1/4" gap, 1/8" thk; NFRC rated (SHGC=0.35); foreground = new concrete (0.32); 6.67 ft head ht Doors 11D0: Door, wd sc type Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh 18590.8433871.5350.00.0202208 Floors 2023-Jul-16 12:06:01 Right-Suite® Universal 2022 22.0.07 RSU28163 Page 5 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E 21A-28v: Bg floor, light dry soil, 6.5' depth, vinyl flr fnsh 00.0222681 0045231.69 00801.6900.02248 0046041.6900.0222728all Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01 Right-Suite® Universal 2022 22.0.07 RSU28163 Page 1 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Project Summary 07/16/2023Date:Entire House Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information For:Nick McIntire INFORMATION CONTAINED WITHIN THE REPORT IS PER THE RESCHECK COMPLIANCE CERTIFICATE. IF ANY OF THESE VALUES SHOULD CHANGE, THIS REPORT WILL BE NULL AND VOID. OVERSIZED EQUIPMENT IS AT THE OWNERS REQUEST. Notes: Design Information Idaho Falls Rgnl, ID, USWeather: Winter Design Conditions Summer Design Conditions Outside db °F-7 Outside db °F90Inside db °F70 Inside db °F75 Design TD °F77 Design TD °F15Daily range H Relative humidity %50Moisture difference gr/lb-29 Heating Summary Sensible Cooling Equipment Load Sizing Structure Btuh64570 Structure Btuh42051 Ducts Btuh12241 Ducts Btuh8448Central vent (167 cfm)11841 Btuh Central vent (167 cfm)Btuh2254 Outside air Outside airHumidificationBtuh0Blower Btuh0 Piping Btuh0Equipment load Btuh88651 Use manufacturer's data n Rate/swing multiplier 0.95InfiltrationEquipment sensible load Btuh49905 Method Latent Cooling Equipment Load SizingSimplified Construction quality Semi-tight0Fireplaces Structure Btuh79 Ducts Btuh-161Central vent (167 cfm)Btuh-2802 CoolingHeating Outside air67246724Area (ft²)Equipment latent load Btuh0 4009540095Volume (ft³)Air changes/hour 0.100.19 Equipment Total Load (Sen+Lat)Btuh49905 Equiv. AVF (cfm)67127 Req. total capacity at 1.00 SHR ton4.2 Heating Equipment Summary Cooling Equipment Summary Make Day & Night Make Day & NightTradeDAY & NIGHT Trade 17 SEER N SERIES R410A AC Model N9MSE1402420A Cond N4A760GKA1AHRI ref 0 Coil END4X60L24A1++TDR AHRI ref 0Efficiency96 AFUE Efficiency 11.7 EER, 14 SEER Heating input Btuh140000 Sensible cooling Btuh52490Heating output Btuh109000 Latent cooling Btuh0 Temperature rise °F51 Total cooling Btuh52490Actual air flow cfm2322 Actual air flow cfm2322 Air flow factor cfm/Btuh0.030 Air flow factor cfm/Btuh0.045Static pressure in H2O1.00 Static pressure in H2O1.00 Space thermostat Load sensible heat ratio 1.00 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01 Right-Suite® Universal 2022 22.0.07 RSU28163 Page 2 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Project Summary 07/16/2023Date:2nd Floor Zone Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information For:Nick McIntire INFORMATION CONTAINED WITHIN THE REPORT IS PER THE RESCHECK COMPLIANCE CERTIFICATE. IF ANY OF THESE VALUES SHOULD CHANGE, THIS REPORT WILL BE NULL AND VOID. OVERSIZED EQUIPMENT IS AT THE OWNERS REQUEST. Notes: Design Information Idaho Falls Rgnl, ID, USWeather: Winter Design Conditions Summer Design Conditions Outside db °F-7 Outside db °F90Inside db °F70 Inside db °F75 Design TD °F77 Design TD °F15Daily range H Relative humidity %50Moisture difference gr/lb-29 Heating Summary Sensible Cooling Equipment Load Sizing Structure Btuh20218 Structure Btuh13835 Ducts Btuh12241 Ducts Btuh8770Central vent (33 cfm)0 Btuh Central vent (33 cfm)Btuh0 Humidification Btuh0 Blower Btuh0 Piping Btuh0Equipment load Btuh32459 Use manufacturer's data n Rate/swing multiplier 0.95InfiltrationEquipment sensible load Btuh21384 Method Latent Cooling Equipment Load SizingSimplified Construction quality Semi-tight0Fireplaces Structure Btuh-30 Ducts Btuh-161Central vent (33 cfm)Btuh0 CoolingHeating13151315Area (ft²)Equipment latent load Btuh0 1183811838Volume (ft³)Air changes/hour 0.130.25 Equipment Total Load (Sen+Lat)Btuh21384 Equiv. AVF (cfm)2649 Req. total capacity at 0.70 SHR ton2.5 Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/aTraden/a Trade n/a Model n/a Cond n/aAHRI ref n/a Coil n/a AHRI ref n/aEfficiencyn/a Efficiency n/a Heating input Sensible cooling Btuh0Heating output Btuh0 Latent cooling Btuh0 Temperature rise °F0 Total cooling Btuh0Actual air flow cfm0 Actual air flow cfm0 Air flow factor cfm/Btuh0 Air flow factor cfm/Btuh0Static pressure in H2O0 Static pressure in H2O0 Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01 Right-Suite® Universal 2022 22.0.07 RSU28163 Page 3 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Project Summary 07/16/2023Date:Main Floor Zone Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information For:Nick McIntire INFORMATION CONTAINED WITHIN THE REPORT IS PER THE RESCHECK COMPLIANCE CERTIFICATE. IF ANY OF THESE VALUES SHOULD CHANGE, THIS REPORT WILL BE NULL AND VOID. OVERSIZED EQUIPMENT IS AT THE OWNERS REQUEST. Notes: Design Information Idaho Falls Rgnl, ID, USWeather: Winter Design Conditions Summer Design Conditions Outside db °F-7 Outside db °F90Inside db °F70 Inside db °F75 Design TD °F77 Design TD °F15Daily range H Relative humidity %50Moisture difference gr/lb-29 Heating Summary Sensible Cooling Equipment Load Sizing Structure Btuh44352 Structure Btuh32929 Ducts Btuh0 Ducts Btuh0Central vent (134 cfm)0 Btuh Central vent (134 cfm)Btuh0 Humidification Btuh0 Blower Btuh0 Piping Btuh0Equipment load Btuh44352 Use manufacturer's data n Rate/swing multiplier 0.95InfiltrationEquipment sensible load Btuh31151 Method Latent Cooling Equipment Load SizingSimplified Construction quality Semi-tight0Fireplaces Structure Btuh109 Ducts Btuh0Central vent (134 cfm)Btuh0 CoolingHeating54095409Area (ft²)Equipment latent load Btuh109 2825728257Volume (ft³)Air changes/hour 0.090.17 Equipment Total Load (Sen+Lat)Btuh31260 Equiv. AVF (cfm)4178 Req. total capacity at 0.70 SHR ton3.7 Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/aTraden/a Trade n/a Model n/a Cond n/aAHRI ref n/a Coil n/a AHRI ref n/aEfficiencyn/a Efficiency n/a Heating input Sensible cooling Btuh0Heating output Btuh0 Latent cooling Btuh0 Temperature rise °F0 Total cooling Btuh0Actual air flow cfm0 Actual air flow cfm0 Air flow factor cfm/Btuh0 Air flow factor cfm/Btuh0Static pressure in H2O0 Static pressure in H2O0 Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 1...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Entire House Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Entire House 2nd Floor Zone 2 Exposed wall 783.8 ft 221.8 ft 3 Room height 7.6 ft 9.0 ft 4 Room dimensions 5 Room area 6724.2 f t²1315.4 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 3.303.30 0.000.00 221 221 729 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 1224 1130 5631 543 628 588 2930 283 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 40 0 920 441 40 0 920 441 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 35 0 805 386 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 29.9129.91 7.257.25 19 19 576 140 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 3.303.30 0.000.00 335 335 1105 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 1380 1103 5498 530 452 392 1956 189 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 75 0 1726 3535 60 0 1381 2828 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 112 0 2581 5287 0 0 0 0 DD 11D011D0 0.3900.390 ee 29.9129.91 7.257.25 90 90 2685 651 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 3.303.30 0.000.00 221 221 729 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 1224 1167 5817 561 493 493 2457 237 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 23.0123.01 30.1330.13 57 0 1312 1717 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 3.303.30 0.000.00 335 335 1105 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 1380 1082 5394 520 423 373 1860 179 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 50 0 1151 2357 50 0 1151 2357 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 248 0 5702 11679 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 3524 3524 5405 2967 1315 1315 2018 1108 FF 20P-30v20P-30v 0.0350.035 --2.682.68 0.070.07 757 757 2033 56 757 757 2033 56 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 2681 2681 4523 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 48 48 80 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 38 38 64 0 38 38 64 0 6 c) AED excursion 0 353 Envelope loss/gain 55571 31370 16769 8029 12 a)Infiltration 8999 902 3449 346 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 6 1380 2 460 Appliances/other 8400 5000 Subtotal (lines 6 to 13)64570 42051 20218 13835 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 64570 42051 20218 13835 15 Duct loads 19%20%12241 8448 61%63%12241 8770 Total room load 76810 50500 32459 22605 Air required (cfm)Air required (cfm)2322 2322 981 1027 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 2...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Entire House Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Main Floor Zone 2 Exposed wall 562.0 ft 3 Room height 7.2 ft 4 Room dimensions 5 Room area 5408.8 f t² Ty Construction U-value Or HTM Area (f t²)Load Area Load number (Bt uh/f t²-°F)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 15B19-0wc-6 0.069 n 3.30 0.00 221 221 729 0 .W Frm wall, vnl ext, 3 0.065 n 4.99 0.48 596 542 2701 261 .G 2 glazing, clr low-e 0.300 n 23.01 11.03 0 0 0 0 .G 2 glazing, clr low-e 0.300 n 23.01 11.03 35 0 805 386 1 1 D 11D0 0.390 n 29.91 7.25 19 19 576 140 W 15B19-0wc-6 0.069 e 3.30 0.00 335 335 1105 0 W Frm wall, vnl ext, 3 0.065 e 4.99 0.48 928 711 3543 342 G 2 glazing, clr low-e 0.300 e 23.01 47.13 15 0 345 707 G 2 glazing, clr low-e 0.300 e 23.01 47.13 112 0 2581 5287 D 11D0 0.390 e 29.91 7.25 90 90 2685 651 W 15B19-0wc-6 0.069 s 3.30 0.00 221 221 729 0 W Frm wall, vnl ext, 3 0.065 s 4.99 0.48 731 674 3360 324 G 2 glazing, clr low-e 0.300 s 23.01 30.13 57 0 1312 1717 W 15B19-0wc-6 0.069 w 3.30 0.00 335 335 1105 0 W Frm wall, vnl ext, 3 0.065 w 4.99 0.48 957 709 3535 341 G 2 glazing, clr low-e 0.300 w 23.01 47.13 0 0 0 0 G 2 glazing, clr low-e 0.300 w 23.01 47.13 248 0 5702 11679 C 16B-50ad 0.020 -1.53 0.84 2208 2208 3387 1859 F 20P-30v 0.035 -2.68 0.07 0 0 0 0 F 21A-28v 0.022 -1.69 0.00 2681 2681 4523 0 F 21A-28v 0.022 -1.69 0.00 48 48 80 0 F 21A-28v 0.022 -1.69 0.00 0 0 0 0 6 c) AED excursion 4360 Envelope loss/gain 38802 28053 12 a)Infiltration 5550 556 b)Room ventilation 0 0 13 Internal gains:Occupants @ 230 4 920 Appliances/other 3400 Subtotal (lines 6 to 13)44352 32929 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 44352 32929 15 Duct loads 0%0%0 0 Total room load 44352 32929 Air required (cfm)1341 1497 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 3...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:2nd Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name 2nd Floor Zone Loft 2 Exposed wall 221.8 ft 24.8 ft 3 Room height 9.0 ft 9.0 heat/coolft 4 Room dimensions ft397.6x1.0 5 Room area 1315.4 f t²397.6 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 628 588 2930 283 115 95 472 46 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 40 0 920 441 20 0 460 221 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 452 392 1956 189 52 52 258 25 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 60 0 1381 2828 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 DD 11D011D0 0.3900.390 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 493 493 2457 237 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 423 373 1860 179 56 56 280 27 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 50 0 1151 2357 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 1315 1315 2018 1108 398 398 610 335 FF 20P-30v20P-30v 0.0350.035 --2.682.68 0.070.07 757 757 2033 56 169 169 455 12 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 38 38 64 0 0 0 0 0 6 c) AED excursion 353 45 Envelope loss/gain 16769 8029 2536 710 12 a)Infiltration 3449 346 385 39 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 2 460 0 0 Appliances/other 5000 0 Subtotal (lines 6 to 13)20218 13835 2921 749 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 20218 13835 2921 749 15 Duct loads 61%63%12241 8770 61%63%1768 475 Total room load 32459 22605 4689 1224 Air required (cfm)Air required (cfm)981 1027 142 56 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 4...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:2nd Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Billiards Bath 2 2 Exposed wall 78.0 ft 13.5 ft 3 Room height 9.0 heat/coolft 9.0 heat/coolft 4 Room dimensions ft345.0x1.0 ft10.3x8.0 5 Room area 345.0 f t²82.0 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 236 236 1178 114 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 146 121 604 58 90 75 374 36 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 25 0 575 1178 15 0 345 707 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 DD 11D011D0 0.3900.390 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 173 173 864 83 20 20 101 10 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 146 121 604 58 11 11 56 5 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 25 0 575 1178 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 345 345 529 290 82 82 126 69 FF 20P-30v20P-30v 0.0350.035 --2.682.68 0.070.07 333 333 893 24 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 38 38 64 0 6 c) AED excursion -323 132 Envelope loss/gain 5823 2662 1066 959 12 a)Infiltration 1213 122 210 21 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 5000 0 Subtotal (lines 6 to 13)7036 7784 1276 980 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 7036 7784 1276 980 15 Duct loads 61%63%4260 4934 61%63%773 621 Total room load 11297 12718 2049 1601 Air required (cfm)Air required (cfm)342 578 62 73 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 5...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:2nd Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Bedroom 3 Bedroom 2 2 Exposed wall 56.3 ft 32.0 ft 3 Room height 9.0 heat/coolft 9.0 heat/coolft 4 Room dimensions ft255.3x1.0 ft11.5x14.5 5 Room area 255.3 f t²166.8 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 146 126 629 61 131 131 651 63 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 20 0 460 221 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 164 144 719 69 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 20 0 460 943 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 DD 11D011D0 0.3900.390 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 146 146 729 70 54 54 269 26 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 50 50 247 24 104 79 391 38 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 0 0 0 0 25 0 575 1178 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 255 255 392 215 167 167 256 140 FF 20P-30v20P-30v 0.0350.035 --2.682.68 0.070.07 255 255 685 19 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 6 c) AED excursion 102 406 Envelope loss/gain 4322 1724 2142 1851 12 a)Infiltration 875 88 498 50 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 1 230 1 230 Appliances/other 0 0 Subtotal (lines 6 to 13)5197 2041 2640 2131 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 5197 2041 2640 2131 15 Duct loads 61%63%3146 1294 61%63%1598 1351 Total room load 8343 3335 4238 3482 Air required (cfm)Air required (cfm)252 152 128 158 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 6...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:2nd Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Mech/Storage 2 Exposed wall 17.3 ft 3 Room height 9.0 heat/coolft 4 Room dimensions ft6.3x11.0 5 Room area 68.8 f t² Ty Construction U-value Or HTM Area (f t²)Load Area Load number (Bt uh/f t²-°F)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 15B19-0wc-6 0.069 n 0.00 0.00 0 0 0 0 .W Frm wall, vnl ext, 3 0.065 n 4.99 0.48 0 0 0 0 .G 2 glazing, clr low-e 0.300 n 23.01 11.03 0 0 0 0 .G 2 glazing, clr low-e 0.300 n 0.00 0.00 0 0 0 0 1 1 D 11D0 0.390 n 0.00 0.00 0 0 0 0 W 15B19-0wc-6 0.069 e 0.00 0.00 0 0 0 0 W Frm wall, vnl ext, 3 0.065 e 4.99 0.48 0 0 0 0 G 2 glazing, clr low-e 0.300 e 23.01 47.13 0 0 0 0 G 2 glazing, clr low-e 0.300 e 0.00 0.00 0 0 0 0 D 11D0 0.390 e 0.00 0.00 0 0 0 0 W 15B19-0wc-6 0.069 s 0.00 0.00 0 0 0 0 W Frm wall, vnl ext, 3 0.065 s 4.99 0.48 99 99 494 48 G 2 glazing, clr low-e 0.300 s 0.00 0.00 0 0 0 0 W 15B19-0wc-6 0.069 w 0.00 0.00 0 0 0 0 W Frm wall, vnl ext, 3 0.065 w 4.99 0.48 56 56 280 27 G 2 glazing, clr low-e 0.300 w 23.01 47.13 0 0 0 0 G 2 glazing, clr low-e 0.300 w 0.00 0.00 0 0 0 0 C 16B-50ad 0.020 -1.53 0.84 69 69 105 58 F 20P-30v 0.035 -2.68 0.07 0 0 0 0 F 21A-28v 0.022 -0.00 0.00 0 0 0 0 F 21A-28v 0.022 -0.00 0.00 0 0 0 0 F 21A-28v 0.022 -1.69 0.00 0 0 0 0 6 c) AED excursion -10 Envelope loss/gain 879 123 12 a)Infiltration 268 27 b)Room ventilation 0 0 13 Internal gains:Occupants @ 230 0 0 Appliances/other 0 Subtotal (lines 6 to 13)1148 150 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 1148 150 15 Duct loads 61%63%695 95 Total room load 1843 245 Air required (cfm)56 11 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 7...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Main Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Main Floor Zone Crawl Space 2 Exposed wall 562.0 ft 278.0 ft 3 Room height 7.2 ft 4.0 heat/coolft 4 Room dimensions ft2680.6x1.0 5 Room area 5408.8 f t²2680.6 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 3.303.30 0.000.00 221 221 729 0 221 221 729 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 596 542 2701 261 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 35 0 805 386 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 29.9129.91 7.257.25 19 19 576 140 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 3.303.30 0.000.00 335 335 1105 0 335 335 1105 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 928 711 3543 342 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 15 0 345 707 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 112 0 2581 5287 0 0 0 0 DD 11D011D0 0.3900.390 ee 29.9129.91 7.257.25 90 90 2685 651 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 3.303.30 0.000.00 221 221 729 0 221 221 729 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 731 674 3360 324 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 23.0123.01 30.1330.13 57 0 1312 1717 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 3.303.30 0.000.00 335 335 1105 0 335 335 1105 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 957 709 3535 341 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 248 0 5702 11679 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 2208 2208 3387 1859 0 0 0 0 FF 20P-30v20P-30v 0.0350.035 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 2681 2681 4523 0 2681 2681 4523 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 48 48 80 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 6 c) AED excursion 4360 0 Envelope loss/gain 38802 28053 8191 0 12 a)Infiltration 5550 556 0 0 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 4 920 0 0 Appliances/other 3400 0 Subtotal (lines 6 to 13)44352 32929 8191 0 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 44352 32929 8191 0 15 Duct loads 0%0%0 0 -0%0%0 0 Total room load 44352 32929 8191 0 Air required (cfm)Air required (cfm)1341 1497 248 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 8...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Main Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Master M WIC 2 Exposed wall 33.5 ft 39.3 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft239.0x1.0 ft170.8x1.0 5 Room area 239.0 f t²170.8 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 3.303.30 0.000.00 0 0 0 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 18 18 87 8 123 123 611 59 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 0 0 0 0 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 29.9129.91 7.257.25 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 0 0 0 0 118 98 486 47 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 0 0 0 0 20 0 460 943 DD 11D011D0 0.3900.390 ee 29.9129.91 7.257.25 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 150 150 748 72 153 153 760 73 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 23.0123.01 30.1330.13 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 168 117 583 56 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 51 0 1165 2386 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 239 239 367 201 171 171 262 144 FF 20P-30v20P-30v 0.0350.035 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 17 17 29 0 6 6 11 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 6 c) AED excursion 645 92 Envelope loss/gain 2978 3369 2590 1358 12 a)Infiltration 579 58 678 68 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 2 460 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13)3557 3887 3268 1426 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 3557 3887 3268 1426 15 Duct loads -0%0%0 0 -0%0%0 0 Total room load 3557 3887 3268 1426 Air required (cfm)Air required (cfm)108 177 99 65 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 9...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Main Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name M Bath Den 2 Exposed wall 30.5 ft 12.5 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft236.6x1.0 ft157.3x1.0 5 Room area 236.6 f t²157.3 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 3.303.30 0.000.00 0 0 0 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 0 0 0 0 15 15 75 7 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 0 0 0 0 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 29.9129.91 7.257.25 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 73 73 361 35 110 70 347 33 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 0 0 0 0 40 0 929 1903 DD 11D011D0 0.3900.390 ee 29.9129.91 7.257.25 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 160 133 663 64 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 23.0123.01 30.1330.13 27 0 621 813 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 73 73 361 35 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 0 0 0 0 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 237 237 363 199 157 157 241 132 FF 20P-30v20P-30v 0.0350.035 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 6 c) AED excursion 519 249 Envelope loss/gain 2370 1665 1592 2325 12 a)Infiltration 527 53 216 22 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13)2897 1718 1808 2347 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 2897 1718 1808 2347 15 Duct loads -0%0%0 0 -0%0%0 0 Total room load 2897 1718 1808 2347 Air required (cfm)Air required (cfm)88 78 55 107 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 10...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Main Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Laundry Pwdr 2 Exposed wall 16.8 ft 0 ft 3 Room height 13.4 heat/coolft 10.0 heat/coolft 4 Room dimensions ft169.8x1.0 ft5.8x5.5 5 Room area 169.8 f t²31.6 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 3.303.30 0.000.00 0 0 0 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 14 14 67 6 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 0 0 0 0 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 29.9129.91 7.257.25 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 258 191 951 92 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 15 0 345 707 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 52 0 1192 2441 0 0 0 0 DD 11D011D0 0.3900.390 ee 29.9129.91 7.257.25 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 65 65 325 31 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 23.0123.01 30.1330.13 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 90 90 449 43 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 0 0 0 0 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 180 180 276 151 30 30 46 25 FF 20P-30v20P-30v 0.0350.035 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 6 c) AED excursion 352 -3 Envelope loss/gain 3605 3824 46 23 12 a)Infiltration 737 74 0 0 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 500 0 Subtotal (lines 6 to 13)4341 4398 46 23 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 23 11 -46 -23 14 Subtotal 4365 4409 0 0 15 Duct loads -0%0%0 0 -0%0%0 0 Total room load 4365 4409 0 0 Air required (cfm)Air required (cfm)132 200 0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 11...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Main Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Guest Gurest Bath 2 Exposed wall 30.3 ft 12.8 ft 3 Room height 10.0 heat/coolft 10.0 heat/coolft 4 Room dimensions ft13.5x16.8 ft13.5x5.8 5 Room area 226.1 f t²77.6 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 3.303.30 0.000.00 0 0 0 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 168 168 835 81 58 58 287 28 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 0 0 0 0 0 0 0 0 1 1 DD 11D011D0 0.3900.390 nn 29.9129.91 7.257.25 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 0 0 0 0 70 70 349 34 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 0 0 0 0 0 0 0 0 DD 11D011D0 0.3900.390 ee 29.9129.91 7.257.25 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 23.0123.01 30.1330.13 0 0 0 0 0 0 0 0 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 135 110 548 53 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 25 0 575 1178 0 0 0 0 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 94 94 145 79 1 1 1 1 FF 20P-30v20P-30v 0.0350.035 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 6 c) AED excursion 286 -9 Envelope loss/gain 2103 1678 637 53 12 a)Infiltration 523 52 220 22 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 2 460 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13)2626 2190 857 75 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 955 159 14 Subtotal 2626 2190 1812 234 15 Duct loads -0%0%0 0 -0%0%0 0 Total room load 2626 2190 1812 234 Air required (cfm)Air required (cfm)79 100 55 11 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 12...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Main Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Craft Rm Kit/Din/Great Rm 2 Exposed wall 12.3 ft 84.3 ft 3 Room height 10.0 heat/coolft 10.3 heat/coolft 4 Room dimensions ft12.3x9.0 ft1278.4x1.0 5 Room area 110.3 f t²1278.4 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW 15B19-0wc-615B19-0wc-6 0.0690.069 nn 3.303.30 0.000.00 0 0 0 0 0 0 0 0 .WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 nn 4.994.99 0.480.48 0 0 0 0 165 111 552 53 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 0.000.00 0.000.00 0 0 0 0 0 0 0 0 .GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 nn 23.0123.01 11.0311.03 0 0 0 0 35 0 805 386 1 1 DD 11D011D0 0.3900.390 nn 29.9129.91 7.257.25 0 0 0 0 19 19 576 140 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ee 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ee 4.994.99 0.480.48 0 0 0 0 218 165 820 79 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ee 23.0123.01 47.1347.13 0 0 0 0 0 0 0 0 DD 11D011D0 0.3900.390 ee 29.9129.91 7.257.25 0 0 0 0 53 53 1585 384 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ss 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ss 4.994.99 0.480.48 0 0 0 0 203 173 864 83 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ss 23.0123.01 30.1330.13 0 0 0 0 30 0 690 904 WW 15B19-0wc-615B19-0wc-6 0.0690.069 ww 3.303.30 0.000.00 0 0 0 0 0 0 0 0 WW Frm wall, vnl ext, 3 0.065Frm wall, vnl ext, 3 0.065 ww 4.994.99 0.480.48 123 98 490 47 369 221 1103 106 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0 GG 2 glazing, clr low-e 0.3002 glazing, clr low-e 0.300 ww 23.0123.01 47.1347.13 24 0 556 1139 148 0 3405 6975 CC 16B-50ad16B-50ad 0.0200.020 --1.531.53 0.840.84 47 47 71 39 1053 1053 1615 887 FF 20P-30v20P-30v 0.0350.035 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --1.691.69 0.000.00 0 0 0 0 0 0 0 0 FF 21A-28v21A-28v 0.0220.022 --0.000.00 0.000.00 0 0 0 0 0 0 0 0 6 c) AED excursion 340 1923 Envelope loss/gain 1118 1565 12017 11921 12 a)Infiltration 212 21 1650 165 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 0 2900 Subtotal (lines 6 to 13)1329 1586 13667 14986 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 831 146 14 Subtotal 1329 1586 14498 15132 15 Duct loads -0%0%0 0 -0%0%0 0 Total room load 1329 1586 14498 15132 Air required (cfm)Air required (cfm)40 72 438 688 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jul-16 12:06:01Right-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 13...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Right-J® W or ksheet 07/16/2023Date:Main Floor Zone Gene MillerBy:Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com 1 Room name Mech 2 Exposed wall 12.0 ft 3 Room height 10.0 heat/coolft 4 Room dimensions ft8.3x3.8 5 Room area 30.9 f t² Ty Construction U-value Or HTM Area (f t²)Load Area Load number (Bt uh/f t²-°F)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 15B19-0wc-6 0.069 n 3.30 0.00 0 0 0 0 .W Frm wall, vnl ext, 3 0.065 n 4.99 0.48 38 38 187 18 .G 2 glazing, clr low-e 0.300 n 0.00 0.00 0 0 0 0 .G 2 glazing, clr low-e 0.300 n 23.01 11.03 0 0 0 0 1 1 D 11D0 0.390 n 29.91 7.25 0 0 0 0 W 15B19-0wc-6 0.069 e 3.30 0.00 0 0 0 0 W Frm wall, vnl ext, 3 0.065 e 4.99 0.48 83 46 228 22 G 2 glazing, clr low-e 0.300 e 23.01 47.13 0 0 0 0 G 2 glazing, clr low-e 0.300 e 23.01 47.13 0 0 0 0 D 11D0 0.390 e 29.91 7.25 37 37 1099 267 W 15B19-0wc-6 0.069 s 3.30 0.00 0 0 0 0 W Frm wall, vnl ext, 3 0.065 s 4.99 0.48 0 0 0 0 G 2 glazing, clr low-e 0.300 s 23.01 30.13 0 0 0 0 W 15B19-0wc-6 0.069 w 3.30 0.00 0 0 0 0 W Frm wall, vnl ext, 3 0.065 w 4.99 0.48 0 0 0 0 G 2 glazing, clr low-e 0.300 w 0.00 0.00 0 0 0 0 G 2 glazing, clr low-e 0.300 w 23.01 47.13 0 0 0 0 C 16B-50ad 0.020 -1.53 0.84 0 0 0 0 F 20P-30v 0.035 -0.00 0.00 0 0 0 0 F 21A-28v 0.022 -1.69 0.00 0 0 0 0 F 21A-28v 0.022 -1.69 0.00 24 24 41 0 F 21A-28v 0.022 -0.00 0.00 0 0 0 0 6 c) AED excursion -35 Envelope loss/gain 1555 272 12 a)Infiltration 207 21 b)Room ventilation 0 0 13 Internal gains:Occupants @ 230 0 0 Appliances/other 0 Subtotal (lines 6 to 13)1763 293 Less external load 0 0 Less transfer 0 0 Redistribution -1763 -293 14 Subtotal 0 0 15 Duct loads -0%0%0 0 Total room load 0 0 Air required (cfm)0 0 Job #: Chandler - Gome Performed by Gene Miller for: Nick McIntire Mechanical Compliance Solutions 4181 Aschli lane Idaho Falls, ID 83406 Phone: 208-881-3243 gene.mechcompliancesolutions@gmail.com Scale: 1 : 130 Page 1 Ri g ht-Sui te® Un i versal 2022 22.0.07 RSU28163 2023-Jul-16 12:06:17 ...\Chandler Gome\Chandler-Gome.rup N Crawl Crawl Space 124 cfm Sup Riser 20 x 10 Ret Riser 22 x 10 124 cfm 6 " 6 " 6 " 6 " 6 " 3-14x3.25 6 " 6 " 8 " 14x3.25 14x3.25 6 " 14x3.25 6 " 6 " 6 " 6 " 6 " 6 " 22 x 10 6 " 3-14x3.25 6 " 3-14x3.25 20 x 10 6 " 8-14x3.25 30 x 10 10 x 8 22 x 8 12 x 8 8 " FRESH AIR WILL BE SUPPLIED WITH A PIPE AND DAMPER 22 x 8 16 x 8 6 " 12 x 8 10 x 8 28 x 8 10 x 8 8 x 8 Job #: Chandler - Gome Performed by Gene Miller for: Nick McIntire Mechanical Compliance Solutions 4181 Aschli lane Idaho Falls, ID 83406 Phone: 208-881-3243 gene.mechcompliancesolutions@gmail.com Scale: 1 : 130 Page 2 Ri g ht-Sui te® Un i versal 2022 22.0.07 RSU28163 2023-Jul-16 12:06:17 ...\Chandler Gome\Chandler-Gome.rup N Main Floor Master M WIC M Bath Den Laundry Pwdr GuestGurest Bath Craft Rm Kit/Din/Great Rm Mech 55 cfm 88 cfm 88 cfm 99 cfm 88 cfm 107 cfm 50 cfm 50 cfm 72 cfm 86 cfm 86 cfm 86 cfm 86 cfm 86 cfm 100 cfm 100 cfm 86 cfm 86 cfm 86 cfm 544 cfm Sup Riser 20 x 10 Ret Riser 22 x 10 134 cfm 320 cfm 430 cfm 72 cfm 107 cfm Job #: Chandler - Gome Performed by Gene Miller for: Nick McIntire Mechanical Compliance Solutions 4181 Aschli lane Idaho Falls, ID 83406 Phone: 208-881-3243 gene.mechcompliancesolutions@gmail.com Scale: 1 : 130 Page 3 Ri g ht-Sui te® Un i versal 2022 22.0.07 RSU28163 2023-Jul-16 12:06:18 ...\Chandler Gome\Chandler-Gome.rup N 2nd Floor Mech/Storage Bedroom 2 Bedroom 3 Bath 2 Open to Laundry Loft Open to below Billiards 56 cfm 79 cfm 79 cfm 126 cfm 126 cfm 71 cfm Sup Riser 20 x 10 Ret Riser 22 x 10 602 cfm 116 cfm 116 cfm 116 cfm 116 cfm 274 cfm 116 cfm 73 cfm 252 cfm 71 cfm 10 " 10 " 6 " 22 x 10 8 " 8 " 8 " 8 " 8 "8 " 8 " 8 " 8 " 20 x 10 8 " 6 " 8 " 14 " 18 x 8 12 x 8 10 x 8 2023-Jul-16 12:06:03 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 1 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Chandler - GomeJob:Duct System Summary 07/16/2023Date:Entire House Gene MillerBy: Paul SarpePlan:Mechanical Compliance Solutions 4181 Aschli lane, Idaho Falls, ID 83406 Phone: 208-881-3243 Email: gene.mechcompliancesolutions@gmail.com Project Information Nick McIntireFor: CoolingHeating External static pressure in H2O1.00in H2O1.00 Pressure losses in H2O0.41in H2O0.41 Available static pressure in H2O0.59in H2O0.59 Supply / return available pressure 0.292 / 0.298 in H2O in H2O0.292 / 0.298 Lowest friction rate in/100ft0.076in/100ft0.076 Actual air flow cfm2322cfm2322 Total effective length (TEL)ft778 2023-Jul-16 12:06:03 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 2 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Supply Branch Detail Table Design Htg Clg Design Diam H x W Duct Actual Ftg.Eqv Name (Btuh)(cfm)(cfm)FR (in)(in)Matl Ln (ft)Ln (ft)Trunk st4A265.085.3VlFx0x08.00.08373621601cBath 2 st4A295.086.6VlFx0x08.00.07679641741cBedroom 2 st4245.080.6VlFx0x08.00.09079641741cBedroom 2-A st4A285.0100.0VlFx0x08.00.076761264172hBedroom 3 st4265.082.6VlFx0x08.00.084761264172hBedroom 3-A st5265.063.5ShMt0x08.00.089116682544cBilliards st5245.065.6VlFx0x08.00.094116682544cBilliards-A st5255.071.3VlFx0x08.00.089116682544cBilliards-B st5275.074.3VlFx0x08.00.084116682544cBilliards-C st4280.066.5VlFx0x08.00.084116682544cBilliards-D st2140.016.0ShMt0x06.00.18772401586cCraft Rm st1D230.052.5ShMt0x08.00.10301244095hCrawl Space st2A215.021.8ShMt0x08.00.12301244095hCrawl Space-A st1C200.059.0ShMt0x06.00.113107552347cDen st2130.024.3ShMt0x06.00.18950401095cGuest st2A225.029.8ShMt0x06.00.11550401095cGuest-A st2A180.022.3ShMt0x86.00.14411551812hGurest Bath st1A150.038.3ShMt0x06.00.15586551891cKit/Din/Great Rm st1B170.048.0ShMt0x06.00.13486551891cKit/Din/Great Rm-A st1A170.037.0ShMt0x06.00.14186551891cKit/Din/Great Rm-B st1150.027.8ShMt0x06.00.16486551891cKit/Din/Great Rm-C st1B190.046.8ShMt0x06.00.12386551891cKit/Din/Great Rm-D st1160.023.5ShMt0x06.00.15986551891cKit/Din/Great Rm-E st1130.037.0ShMt0x06.00.17586551891cKit/Din/Great Rm-F st1B180.043.8ShMt0x06.00.13086551891cKit/Din/Great Rm-G st1A160.040.8ShMt0x06.00.145100662205cLaundry st1140.033.8ShMt0x06.00.168100662205cLaundry-A st4275.067.5VlFx0x08.00.08528712345hLoft st4255.063.0VlFx0x06.00.09228712345hLoft-A st1D210.055.0ShMt0x06.00.11078882897hM Bath st1D220.082.5ShMt0x06.00.09665993268hM WIC st1D240.060.8ShMt0x06.00.09788541943cMaster st1C190.055.3ShMt0x06.00.11988541943cMaster-A st4A275.085.3VlFx0x06.00.08111561843hMech/Storage Supply Trunk Detail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm)(cfm)FR (fpm)(in)(in)Material Trunk st1 Peak AVF 1043 1314 0.096 845 15.4 28x8 ShtMetl st2A Peak AVF 218 60 0.115 491 7.7 8x8 ShtMetl st2 st1D Peak AVF 364 231 0.096 655 9.5 10x8 ShtMetl st1C st1C Peak AVF 472 426 0.096 709 10.5 12x8 ShtMetl st1B st1B Peak AVF 637 684 0.096 770 12.0 16x8 ShtMetl st1A st1A Peak AVF 812 956 0.096 782 13.6 22x8 ShtMetl st1 st2 Peak AVF 298 182 0.115 537 7.7 10x8 ShtMetl st4 Peak AVF 708 565 0.076 708 12.8 18x8 ShtMetl st3 st4A Peak AVF 308 239 0.076 554 9.4 10x8 ShtMetl st4 st5 Peak AVF 273 462 0.084 694 10.7 12x8 ShtMetl st3 st3 Peak AVF 981 1027 0.076 740 14.7 20x10 ShtMetl 2023-Jul-16 12:06:03 Rig ht-Su ite® U niv er sal 20 22 22 .0.07 RSU2 8163 Page 3 ...cholas McIntier\Chandler Gome\Chandler-Gome.rup Calc = MJ8 Front Door faces: E Return Branch Detail Table Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size (in)(cfm)(cfm)(ft)FR (fpm)(in)(in)Opening (in)Matl Trunk rb7 0x 1340 110 244.3 0.122 425 6.2 3.25x14 10x9 SJSp rt4 rb2 0x 5440 458 185.5 0.161 574 10.0 3-3.25x14 3-10x27 SJSp rt3 rb1 0x 2940 320 369.3 0.081 337 9.4 3-3.25x14 3-10x27 SJSp rt3B rb6 0x 2740 430 283.0 0.105 453 9.9 3-3.25x14 3-10x27 SJSp rt3A rb8 0x 400 72 199.3 0.150 228 4.8 3.25x14 10x9 SJSp rt3 rb9 0x 550 107 393.3 0.076 338 6.3 3.25x14 10x9 SJSp rt3B rb4 0x 2520 152 174.1 0.171 462 10.0 x0 0 VlFx rt1 rb3 0x 5330 602 162.5 0.183 563 14.0 x0 0 VlFx rt1 rb5 0x 1960 274 247.3 0.121 502 10.0 x0 0 VlFx rt1 Return Trunk Detail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm)(cfm)FR (fpm)(in)(in)Material Trunk rt3A Peak AVF 623 856 0.076 700 13.7 22x8 ShtMetl rt3 rt3B Peak AVF 349 426 0.076 639 10.6 12x8 ShtMetl rt3A rt3 Peak AVF 1207 1386 0.076 666 16.4 30x10 ShtMetl rt2 rt1 Peak AVF 981 1027 0.121 672 13.4 22x10 ShtMetl rt4 Peak AVF 134 110 0.122 242 6.1 10x8 ShtMetl rt2 rt2 Peak AVF 1341 1497 0.076 592 16.9 8-3.25x14 SdJstSp