Loading...
HomeMy WebLinkAboutCONCRETE FIELD TEST 2 - 23-00332 - Madison Jr High - AdditionFile Name 23252C07212023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1B72FF88-B3EE-4A43-B6FE-054BFC954EDB 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Compressive Strength of Concrete Test Specimens Project Number: 23-252 Cumulative Test Load Amount: 10.0 Ticket #: 1200 Project Name: Madison JR. High Test Location: East side of slab, northwest side of building Concrete Member: Int. Slab on Grade Client: Madison School District Admixtures: 322-N, POLY1025 Required 28 day Strength (psi): 3,500.0 Contractor Richardson’s Concrete Supplier: Valley Ready Mix Mix Number: 71FVALLY Date: 07/21/2023 Start Time 05:15 AM Time on Project 3 hours 30 minutes Tested By: Michael Hammar Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 10.0 1200 06:00 AM East side of slab, northwest side of building 61 36.260 145.6 73 1.3 N/A 6 Max 6 2 60.0 1200 07:45 AM West side of slab, northwest side of building 61 36.180 145.3 69 1.9 N/A 6 Max 6 Observations/Remarks: File Name 23252C07212023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1B72FF88-B3EE-4A43-B6FE-054BFC954EDB 2 I arrived on site at approximately 5:35 AM and began preparing my equipment for testing. The first truck I would test arrived at approximately 5:50 AM and immediately began preparing to place material. Once a sufficient amount of material had been placed, I collected a sample and performed tests. The second truck I would test arrived at approximately 7:40 AM and immediately prepared to place material. Once a sufficient amount of material had been placed, I collected a sample and performed tests. The tests I performed for both samples were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Signature:Reviewed By: Luke Hammar Signature: Date: 07/21/2023 Inspection Images File Name 23252C07212023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1B72FF88-B3EE-4A43-B6FE-054BFC954EDB 3