HomeMy WebLinkAboutCONCRETE FIELD TEST 2 - 23-00332 - Madison Jr High - AdditionFile Name
23252C07212023MH
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1B72FF88-B3EE-4A43-B6FE-054BFC954EDB 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Compressive Strength of Concrete Test Specimens
Project Number:
23-252
Cumulative Test Load Amount:
10.0
Ticket #:
1200
Project Name:
Madison JR. High
Test Location:
East side of slab, northwest
side of building
Concrete Member:
Int. Slab on Grade
Client:
Madison School District
Admixtures:
322-N, POLY1025
Required 28 day Strength
(psi):
3,500.0
Contractor
Richardson’s Concrete
Supplier:
Valley Ready Mix
Mix Number:
71FVALLY
Date:
07/21/2023
Start Time
05:15 AM
Time on Project
3 hours 30 minutes
Tested By:
Michael Hammar
Testing:
Set #:Cumulative
Test
Load
Amount:
Ticket
Image:
Ticket
#:
Time
Tested:
Test
Location:
Ambient
Temp.
(°F):
Weight
of
Concrete
(lbs):
Unit
Weight
(PCF):
Concrete
Temp.
(°F):
Entrained
Air
(%):
Entrained
Air
Spec.
(%):
Slump
(in):
Slump
Spec.
(in):
1 10.0 1200 06:00
AM
East
side of
slab,
northwest
side of
building
61 36.260 145.6 73 1.3 N/A 6 Max 6
2 60.0 1200 07:45
AM
West
side of
slab,
northwest
side of
building
61 36.180 145.3 69 1.9 N/A 6 Max 6
Observations/Remarks:
File Name
23252C07212023MH
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1B72FF88-B3EE-4A43-B6FE-054BFC954EDB 2
I arrived on site at approximately 5:35 AM and began preparing my equipment for testing. The first truck I would
test arrived at approximately 5:50 AM and immediately began preparing to place material.
Once a sufficient amount of material had been placed, I collected a sample and performed tests.
The second truck I would test arrived at approximately 7:40 AM and immediately prepared to place material.
Once a sufficient amount of material had been placed, I collected a sample and performed tests.
The tests I performed for both samples were in general conformance of project specifications and the results
were reported to the contractor.
I then cleaned my equipment and entered my vehicle to begin this report.
Signature:Reviewed By:
Luke Hammar
Signature:
Date:
07/21/2023
Inspection Images
File Name
23252C07212023MH
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1B72FF88-B3EE-4A43-B6FE-054BFC954EDB 3