Loading...
HomeMy WebLinkAboutCONCRETE FIELD TEST12 - 22-00269 - Hibbard Elementary SchoolFile Name 22229C07182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. FC400D33-8D04-45E7-AD52-A062E62BCC72 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Compressive Strength of Concrete Test Specimens Project Number: 22-229 Cumulative Test Load Amount: 11.0 Ticket #: 06529 Project Name: Hibbard Elementary Test Location: Slabs southeast of building Concrete Member: Curb & Gutter Client: Madison School District Admixtures: MP 322, MA AE 90 Required 28 day Strength (psi): 4,000.0 Contractor Headwaters Supplier: Walter Ready Mix Mix Number: 500F HES Date: 07/18/2023 Start Time 11:15 AM Time on Project 2 hours Tested By: Mark Mansfield Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 11.0 06529 12:00 PM Slabs southeast of building 83 34.350 138.0 78 6.5 5.5 +- 1.5 6 1/2 5 +- 1 Observations/Remarks: I arrived at the job site and spoke with the foreman about the pour. We discussed locations and the amount of mud had been ordered. I parked my vehicle and began setting up my equipment. I looked over the forms and waited for the first truck to arrive. The first truck arrived around 11:45 AM and I was able to grab the batch ticket. I waited for the driver to offload about a yard of material and once he reached that point, I was able to grab a File Name 22229C07182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. FC400D33-8D04-45E7-AD52-A062E62BCC72 2 sample and begin testing. I tested both air content and slump. The result for air was within general conformance to project specifications. Once I finished pouring and placing my cylinders I observed the remainder of the pour and began filling out my report. Signature:Reviewed By: Luke Hammar Signature: Date: 07/18/2023 Inspection Images File Name 22229C07182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. FC400D33-8D04-45E7-AD52-A062E62BCC72 3