HomeMy WebLinkAboutSOIL DENSITY TEST 2 - 22-00269 - Hibbard Elementary SchoolFile Name:
22229D07112023BB
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
66E0C003-AB2A-484A-940D-174354F8539C 1
4103 E. 605 N. Suite 1
Rigby ID, 83442
208.932.4428
In Place Density of Soils ASTM D2922 & D3017
Project Number:
22-229
Project Name:
Hibbard Elementary
Contractor:
Hill & Son Excavation
Client:
Madison School District
Date:
07/11/2023
Time Start:
08:00 AM
Total Time on Project:
2
Instrument ID
00443
Daily Standardization:
MS:
989
DS:
1494
Current Weather Conditions:
Sunny/Clear
Ambient Temperature (°F):
69
Wind:
5-15 mph
Details
Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail
1 East parking
area curb line
from the
northwest
corner 15’
Approximately
top of
sub base
8 130.6 128.5 1.7 132.0
Material Type
Pit Run
97
2 East parking
area curb line
from the
northwest
corner 75’
Approximately
top of
sub base
8 127.5 125.4 1.7 132.0
Material Type
Pit Run
95
3 East parking
area curb line
from the
northeast
entrance 25’
west
Approximately
top of
sub base
8 127.4 125.7 1.8 132.0
Material Type
Pit Run
95
Observations/Remarks:
File Name:
22229D07112023BB
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
66E0C003-AB2A-484A-940D-174354F8539C 2
Arrived on site at 8:20 AM. Talked to dozer operator and told him that I was there to perform densities tests. He
was not expecting me and told the roller to roll the one curb line. He did and I tested with minimal passing
results (see report). We agreed that he needed more time to water and roll the area. Left site at 9:30 AM
Tested By:
Ben Ball
Signature:
Reviewed By:
E. Vail
Signature:
Date:
07/12/2023
Inspection Images:
File Name:
22229D07112023BB
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
66E0C003-AB2A-484A-940D-174354F8539C 3