HomeMy WebLinkAboutFOUNDATION DESIGN - 23-00435 - Precision Precast - New Commercial BldgFOUNDATION DESIGN FOR PRECISION PRECAST BUILDING
REXBURG, IDAHO
For SteelVision Construction
NOTES:
1. Foundation configuration provided by Trevor Haslem of SteelVision Construction.
2. Building dimensions and anchor bolt plan shown on Nucor Drawings AB 1 & A132 dated
6/05/2023.
3. Foundation loads from Nucor Report entitled "General Information for Column Base Plate
Reactions", Precision Precast, Project Number: U23M0364A, dated 06/02/2023.
4. Exact anchor bolt locations shall be as shown on Nucor Drawings.
5. Concrete 28 -day strength shall be 3000 psi minimum. Slump shall be 3-4.5 in.
6. Reinforcement bars shall be ASTM A615 with Fy = 60,000 psi.
7. Concrete construction per ACI -318.
8. Assumed allowable soil bearing pressure = 2000 psf.
9. Rectangular piers shown on drawings may be replaced with circular piers formed by
sonotubes if the reinforcement is the same, the concrete area is equal to that of the
rectangular pier, and there is sufficient cover for the reinforcement as required by ACI -318.
10. The "jab" method of placing anchor bolts or vertical reinforcing bars is acceptable if the
following conditions are met:
a. The anchor bolts and vertical bars are placed when the footing concrete is still fluid
enough for it to fill in around the bolts and bars when they are placed and hand vibrated
into the correct position as shown on the Behlen drawings and the foundation details.
b. The vertical bars are located, relative to the horizontal bars in the footing, as shown on
the foundation details. The details show the horizontal bend on the vertical bars going
below the horizontal bars in the footing.
c. The vertical bars meet the ACI code development length requirements.
INDEX TO ATTACHED DOCUMENTS
Detail Page
Foundation Plan 1
Detail 1 —Foundation for Columns Al & A6 Thru A10 2
Detail 2
—Foundation for Columns A3, A4, C3 & C4 3
Detail 3—Foundation
for Columns B 1& B 10 4
Detail 4
— Foundation for Columns C 1 & C6 Thru C 10 5
Detail 5
— Foundation for Columns D2 & D5 6
Detail 6
— Foundation for Columns E2 & E5 7
Detail 7
— 10 Ft. Pushwall Typical Section 8
CD
m
U
O
O
8
o�
0
z
0
H
Q �
Q U
z
�06
O
L� M
� U
O
w�
cd
W
J � Q
H Q J
I— (4 n
wz
Q � �
W J W
W O >--
C4UI—
oM
w W
o�
LH Jn
n
Q
Q
RJ
z
�n
o}
W I—
DOIa
w r-�
YZ
0 0
w w
z z
a z w
Q ~ ~ Q
z WU z
D O W
D O
W J W
�Q
oLn U oLn
w Q LL_ W
LAW �I— �W
U J ojU
Q�--I P- -J QwJ
a- W Q H (/l W
wz Q3 wz
:L 0i=) _ W (�
wJw wD wJw
L,JO>- (40- WO>
() U I—I-
m
N
0
N
0
O
w
ry
z
IJ
F- o
<1--Iz
Qu
O_
Z
I— o
ryry
z
~
�D
ory
=
o�
LL U
06 Li
ry
W
N U
I,
C
�dSW
U<f
Q J
(%on
_(_)Wz,,n
H Q Q
W
�C'o
WJW
qz-0
w o >-
(/lUl—
0 0
w w
z z
a z w
Q ~ ~ Q
z WU z
D O W
D O
W J W
�Q
oLn U oLn
w Q LL_ W
LAW �I— �W
U J ojU
Q�--I P- -J QwJ
a- W Q H (/l W
wz Q3 wz
:L 0i=) _ W (�
wJw wD wJw
L,JO>- (40- WO>
() U I—I-
m
N
0
N
0
7'-
�18' WIDE FOOTING FOR SIDEWALL
�8°�
I I
I
I I
I
I I
I I
GRADE
�I I
I I
I
8 #6 VERTICAL BARS. EXTEND
INTO FOOTING AS SHOWN
I
#3 TIE, TYP. 8 PLACES
EQUALLY SPACED IN PIER
IN AREA OF ANCHOR BOLTS i
7'-6' SQ.
#4 X -TIE BARS
]LMNS
3. RUN
BARS AROUND ANCHOR BOLTS. PLACE IN SLAB
AND PROVIDE MINIMUM OF 3' CONCRETE BETWEEN
BARS & SOIL.
CONTINUOUS SIDEWALL
-FOUR 1' DIA. ANCHOR BOLTS
IF -1/2•
2 #4 BARS X -TIE BARS FROM SIDE TO SIDE AROUND
COLUMN ANCHOR BOLTS, PROVIDE MIN. OF 3' CONRETE
BETWEEN BARS & SOIL.
FLOOR SLAB
24'
iin
8 #6 BARS EACH DIRECTION
EVENLY SPACED AS SHOWN
PRECISI❑N PRECAST BUILDING
DETAIL I
F❑UNDATI❑N F❑R COLUMNS Al & A6 THRU A10
06/19/2023
7' -
/-18' WIDE FOOTING FOR SIDEWALL
PLAN VIEW
8' -}--- 21'
I I
I
I
i I
1 I
I I
GRADE I I
I I
8 #6 VERTICAL BARS. EXTEND
INTO FOOTING AS SHOWN
I
#3 TIE, TYP, 8 PLACES
EQUALLY SPACED IN PIER
IN AREA OF ANCHOR BOLTS I
SECTION
#4 X -TIE BARS
1LUMNS A3 & Al,
BOLTS. PLACE IN
SLAB AND PROVIDE MINIMUM OF 3" CONCRETE BETWEEN
BARS & SOIL.
CONTINUOUS SIDEWALL
-FOUR 1' DIA. ANCHOR BOLTS
2 #4 BARS X -TIE BARS FROM SIDE TO SIDE AROUND
COLUMN ANCHOR BOLTS. PROVIDE MIN. OF 3' CONRETE
BETWEEN BARS & SOIL.
FLOOR SLAB
24'
24'
8 #6 BARS EACH DIRECTION
EVENLY SPACED AS SHOWN
PRECISION PRECAST BUILDING
DETAIL 2
FOUNDATION FOR COLUMNS A3, A4, C3 & C4
06/19/2023
PLAN VIEW
12"
4'-0"
'IN BAR. EXTEND
5' INT❑ SLAB.
3/4' DIA. ANCHOR BOLTS
--j 1/2"
19.5' --�
7 #3 TIES; 4 IN AREA
OF ANCHOR BOLTS, THEN
AT 10' O.C. BELOW.
#5 HAIRPIN INTO SLAB; PROVIDE MIN,
OF 3' CONCRETE COVER BETWEEN
BAR & S❑IL.
TYP. SIDEWALL & ENDWALL REINFORCEMENT
5 #4 HORIZONTAL BARS EVENLY
SPACED. #4 VERTICAL BARS @ 18' O.C.
4 #4 VERT. BARS IN CORNERS
OF ENLARGED WALL
10"
3 #4 LONGITUDINAL BARS
IN WALL FOOTING
4 TRANSVERSE BARS @ 18" O.C.
24'
SECTI❑N
PRECISION PRECAST BUILDING
DETAIL 3
FOUNDATION FOR COLUMNS B1 & B10
06/17/2023
7'-
/1-18' WIDE FOOTING FOR SIDEWALL
PLAN VIEW
#4 X -TIE BARS
ILMNS
10. RUN
BARS AROUND ANCHOR BOLTS. PLACE IN SLAB AND
PROVIDE MINIMUM OF 3' CONCRETE BETWEEN
BARS & SOIL.
CONTINUOUS SIDEWALL
r e 21' FOUR I' DIA, ANCHOR BOLTS
� I
i
� I
I I
i I
GRADE---\
8 #6 VERTICAL BARS, EXTEND�j
INTO FOOTING AS SHOWN 1
I
#3 TIE, TYP. 8 PLACES
EQUALLY SPACED IN PIER
IN AREA OF ANCHOR BOLTS i
i
7'-6' SQ.
2 #4 BARS X -TIE BARS FROM SIDE TO SIDE AROUND
COLUMN ANCHOR BOLTS. PROVIDE MIN. OF 3' CONRETE
BETWEEN BARS & SOIL.
LOOR SLAB
24'
18'
8 #6 BARS EACH DIRECTION
EVENLY SPACED AS SHOWN
PRECISI❑N PRECAST BUILDING
DETAIL 4
FOUNDATI❑N FOR COLUMNS Cl & C6 THRU C10
06/19/2023
PLAN
.si 4+ 1J1H, ANCH❑R B❑LTS
12"
—19,5" —I
10'-0"
GRADE FL
24'
16"
t
ISM
W"llam
/2"
■M
PRECISION PRECAST BUILDING
DETAIL 5
FOUNDATION FOR COLUMNS D2 & D5
06/17/2023
❑R 10 FT,
CAL SECTI❑N.
10'-0"
GRADE
7 FOR 10 FT.
YPICAL SECTI❑N,
3/4° DIA, ANCHOR BOLTS
22"
-19,5" -I
4 #4 VERT. BARS IN
ENLARGED WALL, EXTEND
INT❑ FOOTING AS SHOWN,
#3 TIE BARS. FOUR IN AREA
❑F ANCHOR BOLTS; THEN @
10" ❑,C. BELOW FOR FULL
HEIGHT OF WALL,
FLOOR SLAB
16"
Ams
SECTION
PRECISION PRECAST BUILDING
DETAIL 6
F-OUNBATI❑N FOR COLUMNS E2 & E5
06/17/2023
10'-0"
L—SHAPED #4 D
FOOTING @ 12"
INT❑ WALL AND
INT❑ FO❑TING,
LONGITUDINAL
EVELY SPACE
SECTI❑N
SIDE OF WALL WHERE GRAVEL
WILL BE PLACED & PUSHED.
PRECISI❑N PRECAST BUILDING
DETAIL 7
10 FT, PUSHWALL TYPICAL SECTI❑N
06/17/2023
S SPACED
TARS SPACED
aCH FACE OF
DOWELS INT❑
❑.C- 40" LEG
ID 36" LEG
i TRANSVERSE BARS
'ACED @ 9.5' ❑.C.