Loading...
HomeMy WebLinkAboutCONCRETE FIELD TEST - 23-00332 - Madison Jr High - AdditionFile Name 23252C06282023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D76B3862-8BC3-4DD4-B4E8-42BD4043518A 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Compressive Strength of Concrete Test Specimens Project Number: 23-252 Cumulative Test Load Amount: 9.5 Ticket #: 0446 Test Location: Foundation walls- commons in reference to AI.03 Concrete Member: Foundation Walls Client: Madison School District Admixtures: MICROAIR, 322-N, POLY1025 Required 28 day Strength (psi): 4,500.0 Contractor Richardson Concrete Supplier: Valley Ready Mix Mix Number: MIX96AF Date: 06/28/2023 Start Time 12:00 PM Time on Project 3 Hours Tested By: Mark Mansfield Testing: Set #:Cumulative Test Load Amount: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 9.5 01:45 PM Foundation walls- commons in reference to AI.03 72 34.620 139.0 75 5.5 +- 1.0 6 1/2 Max 6 Observations/Remarks: I arrived at the job site around 12:45 PM and looked over the forms and rebar. I noted that the concrete reinforcement appeared to be in general conformance to project specifications. I then returned to my vehicle to begin setting up my equipment. As I was setting up, the trucks arrived. I was able to grab a batch ticket from the first truck and record the information I needed for my report. After the driver had offloaded about a yard of material, I was able to grab a sample and begin my testing.I File Name 23252C06282023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D76B3862-8BC3-4DD4-B4E8-42BD4043518A 2 tested both air and slump. The results were within general conformance and I was able to report said results to the foreman. After my testing was completed, I cast strength specimens and observed the remainder of the pour. Once the pour had concluded, I returned to my vehicle and filled out my report. Signature:Reviewed By: Luke Hammar Signature: Date: 06/29/2023 Inspection Images File Name 23252C06282023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D76B3862-8BC3-4DD4-B4E8-42BD4043518A 3