Loading...
HomeMy WebLinkAboutSOIL DENSITY TESTS - 22-00610 - U-Haul - New Commercial Bldg A & BFile Name: 22247D10312022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 88E02DD2-6C67-425D-9CD1-A24D385FA978 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 18025 Client: Bateman-Hall Date: 10/31/2022 Time End: 11:00 AM Time Start: 08:00 AM Daily Standardization: MS: 528 DS: 1656 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Northeast corner of section North of main building Top of pitrun 12 141.2 132.7 6.3 134.5 Material Type Pit Run 99 2 Northwest corner of section North of main building Top of pitrun 12 143.0 134.3 6.5 134.5 Material Type Pit Run 100 3 Southeast corner of section North of main building Top of pitrun 12 139.9 131.3 6.6 134.5 Material Type Pit Run 98 4 Southwest corner of section North of main building Top of pitrun 12 137.9 129.2 6.8 134.5 Material Type Pit Run 96 Observations/Remarks: Arrived on site and begin observations on the pit run north of the main building. I took tests approximately every 100 linear feet and observed m that the results of the test were within general conformance to project guidelines. I reported my results the contractor and left the jobsite. File Name: 22247D10312022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 88E02DD2-6C67-425D-9CD1-A24D385FA978 2 Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/31/2022 Inspection Images: File Name: 22247D10272022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 669CD2DB-FBFA-4976-B059-3A67CB5252BB 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 3491 Client: Bateman-Hall Date: 10/27/2022 Time End: 04:45 PM Time Start: 01:30 PM Daily Standardization: MS: 710 DS: 2698 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Southwestern corner of southeastern section 1 foot below top of sub base 12 138.4 128.0 7.5 134.5 Material Type Pit Run 95 2 Southeastern corner of southeastern section 1 foot below top of sub base 12 138.6 127.8 7.6 134.5 Material Type Pit Run 95 3 Northwestern corner of southeastern section 1 foot below top of sub base 12 139.1 128.7 8.1 134.5 Material Type Pit Run 96 4 Northeastern corner of southeastern section 1 foot below top of sub base 12 138.9 128.9 7.8 134.5 Material Type Pit Run 96 5 Middle of southeastern section 1 foot below top of sub base 12 139.1 129.3 8.2 134.5 Material Type Pit Run 96 6 Southern side of section between southwestern Finished grade 12 7.6 129.8 139.5 134.5 Material Type Pit Run 97 File Name: 22247D10272022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 669CD2DB-FBFA-4976-B059-3A67CB5252BB 2 Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail pad southeastern section 7 Northern side of section between southwestern pad southeastern section Finished grade 12 140.5 131.0 8.1 134.5 Material Type Pit Run 97 8 Northeastern corner of southwestern pad Finished grade 12 140.5 131.8 6.6 134.5 Material Type Pit Run 98 9 North middle of southwestern pad Finished grade 12 138.9 130.1 6.7 134.5 Material Type Pit Run 97 10 Northwestern corner of southwestern pad Finished grade 12 145.6 137.1 6.2 134.5 Material Type Pit Run 102 11 Southeastern corner of southwestern pad Finished grade 12 141.1 132.5 6.5 134.5 Material Type Pit Run 99 12 South middle corner of southwestern pad Finished grade 12 140.4 131.1 7.0 134.5 Material Type Pit Run 97 13 Southwestern corner of southwestern pad Finished grade 12 140.6 131.1 7.3 134.5 Material Type Pit Run 97 14 Sewer line west of southwestern building pad Finished grade 12 140.2 127.6 9.8 134.5 Material Type Pit Run 95 15 Sewer line west of southwestern building pad Finished grade 12 141.5 128.7 9.9 134.5 Material Type Pit Run 96 Observations/Remarks: File Name: 22247D10272022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 669CD2DB-FBFA-4976-B059-3A67CB5252BB 3 I arrived on site and spoke with the contractor who told me what they wanted me to test. I proceeded to take tests for density, compaction in the south eastern corner, the south western building pad as well as the area between the southeastern corner and Southwestern building pad and the sewer line backfill. I tested approximately every 100 linear feet or as often as requested by the contractor and I observed the results of the test were within general conformance to project guidelines. I reported my results to the contractor. Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/31/2022 Inspection Images: File Name: 22247D10272022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 669CD2DB-FBFA-4976-B059-3A67CB5252BB 4 File Name: 22247D10272022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 669CD2DB-FBFA-4976-B059-3A67CB5252BB 5 File Name: 22247D11282022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1669653883091 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 78653 Client: Bateman-Hall Date: 11/28/2022 Time End: 03:45 PM Time Start: 09:15 AM Daily Standardization: MS: 648 DS: 2540 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Building A line 31 at B Approximate top of sub base material under footings 10 137.8 131.0 5.3 138.5 Material Type Pit Run 95 2 Building A line 31 at D Approximate top of sub base material under footings 10 141.5 132.7 6.6 138.5 Material Type Pit Run 96 3 Building A line A at 29 Approximate top of sub base material under footings 8 139.7 134.5 3.8 138.5 Material Type Pit Run 97 4 Building A line A at 25 Approximate top of sub base material under footings 8 137.4 131.4 4.6 138.5 Material Type Pit Run 95 File Name: 22247D11282022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1669653883091 2 Observations/Remarks: Arrived on site at 9:45 AM. Contractor was just getting started breaking ground on footing trenches. I left and returned at 12:00 PM and began to standardize my gauge but it was not functioning properly so I asked Eric to send out another one. Eric brought me a gauge and contractor's hoe pack was just finishing compacting on line 31 when I finished standardization of my gauge so I did two density test with passing results on line 31 I then headed west down line A. Tested By: Ben E Ball Signature: Reviewed By: E. Vail Signature: Date: 11/29/2022 Inspection Images: File Name: 22247D11282022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1669653883091 3 File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 35B32EF9-09BE-4BE0-953F-D90398BB4EB3 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 78653 Client: Bateman-Hall Date: 12/06/2022 Time End: 12:00 PM Time Start: 10:00 AM Daily Standardization: MS: 632 DS: 2538 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Main building foundation 100 feet east of northwest corner Bottom of foundation 12 133.6 128.6 3.9 134.8 Material Type Pit Run 95 2 Main building foundation northwest corner Bottom of foundation 12 133.8 128.4 7.1 134.8 Material Type Pit Run 95 3 Main building foundation southwest corner Bottom of foundation 12 134.2 129.5 4.3 134.8 Material Type Pit Run 96 Observations/Remarks: I arrived on site and began observations on the foundation of the main building for the north west side and west side. I proceeded to test for density and compaction. I took test approximately every 100 linear feet. I observed that the results of the test were within general conformance to project guidelines. I reported my results to contractor. I observed the contractor manually cover the ground with blankets to keep it thawed. Tested By: C Hammar Reviewed By: E. Vail File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 35B32EF9-09BE-4BE0-953F-D90398BB4EB3 2 Signature:Signature: Date: 12/14/2022 Inspection Images: File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 35B32EF9-09BE-4BE0-953F-D90398BB4EB3 3 File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 35B32EF9-09BE-4BE0-953F-D90398BB4EB3 4 File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 652BA52B-0012-466C-95A0-EB0CFF96204B 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 78653 Client: Bateman-Hall Date: 12/05/2022 Time End: 12:30 PM Time Start: 09:30 AM Daily Standardization: MS: 651 DS: 2533 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Main building foundation 10 feet west of northeast corner Bottom of foundation 12 141.0 134.7 4.7 134.8 Material Type Pit Run 100 2 Main building foundation 60 feet west of northeast corner Bottom of foundation 12 133.8 128.6 4.1 134.8 Material Type Pit Run 95 3 Main building foundation 100 feet west of northeast corner Bottom of foundation 12 140.1 133.5 5.0 134.8 Material Type Pit Run 99 Observations/Remarks: I arrived on site and performed density tests on the foundation heading west from the north east corner. I took three tests and observed the results of the tests were within general conformance to project guidelines. I observed the contractor preparing the rest of the foundation heading towards the north west corner. I observed that the ground was heated and covered overnight in preparation for excavation and compaction today. I reported my results to the contractor and left the job site. Tested By: C Hammar Reviewed By: E. Vail File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 652BA52B-0012-466C-95A0-EB0CFF96204B 2 Signature:Signature: Date: 12/14/2022 Inspection Images: File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 652BA52B-0012-466C-95A0-EB0CFF96204B 3 File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 652BA52B-0012-466C-95A0-EB0CFF96204B 4 File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 652BA52B-0012-466C-95A0-EB0CFF96204B 5 File Name: 22247D12052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 652BA52B-0012-466C-95A0-EB0CFF96204B 6 File Name: 22247D12142022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E4353B9-B7AB-4E75-893A-5C0489BCA2EA 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 78653 Client: Bateman-Hall Date: 12/14/2022 Time End: 04:00 PM Time Start: 01:15 PM Daily Standardization: MS: 648 DS: 2540 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Interior spot footing northeast most footing Bottom of footing 12 141.1 130.6 8.4 134.8 Material Type Pit Run (Edstrom's) 97 2 Interior spot footing north middle Bottom of footing 12 141.0 129.9 8.6 134.8 Material Type Pit Run (Edstrom's) 96 3 Interior spot footing north west Bottom of footing 12 137.8 127.6 8.0 134.8 Material Type Pit Run (Edstrom's) 95 Observations/Remarks: I arrived on site and began observations on the interior spot footings. I observed that the contractor had already placed reinforcement in several footings prior to density testing. They removed the reinforcement and I tested every other footing. I observed that the results for the test were within general conformance to project guidelines. I reported my results to the contractor and left the job site. Tested By: C Hammar Reviewed By: E. Vail File Name: 22247D12142022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E4353B9-B7AB-4E75-893A-5C0489BCA2EA 2 Signature:Signature: Date: 12/21/2022 Inspection Images: File Name: 22247D12142022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E4353B9-B7AB-4E75-893A-5C0489BCA2EA 3 File Name: 22247D12142022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E4353B9-B7AB-4E75-893A-5C0489BCA2EA 4 File Name: 22247D121922BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671482980660 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 18025 Client: Bateman-Hall Date: 12/19/2022 Time End: 03:00 PM Time Start: 01:00 PM Daily Standardization: MS: 518 DS: 1640 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Grid line A.5, 10 Top of sub base under concrete footings 6 140.3 130.8 7.3 134.8 Material Type Pit Run (Edstrom's) 97 2 Approximately grid line A.5, 8 spot footing Top of sub base under concrete footings 6 140.1 131.2 6.8 134.8 Material Type Pit Run (Edstrom's) 97 3 Approximately grid line B, 7 spot footing Top of sub base under concrete footings 6 137.9 129.7 6.3 134.8 Material Type Pit Run (Edstrom's) 96 4 Approximately grid line B, 3 spot footing Top of sub base under concrete footings 6 140.7 132.0 6.6 134.8 Material Type Pit Run (Edstrom's) 98 Observations/Remarks: File Name: 22247D121922BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671482980660 2 Arrived on site at 1:30 PM ambient temperature was 15 degree partly cloudy skies. Contractor was just finishing compacting 4th spot foot in this pour. I checked densities on sub grade under concrete with passing results. See density report. Tested By: Ben E Ball Signature: Reviewed By: E. Vail Signature: Date: 12/21/2022 Inspection Images: File Name: 22247D121922BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671482980660 3 File Name: 22247D12152022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671132331303 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 18025 Client: Bateman-Hall Date: 12/15/2022 Time End: 02:30 PM Time Start: 12:00 PM Daily Standardization: MS: 521 DS: 1646 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Grid line C, 1 through 9 Top of sub base under concrete footings 6 139.5 130.6 6.9 134.8 Material Type Pit Run (Edstrom's) 97 2 Grid line C, 1 through 9 Top of sub base under concrete footings 6 139.0 129.8 7.1 134.8 Material Type Pit Run (Edstrom's) 96 Observations/Remarks: Arrived on site at 12:20 PM ambient temperature was 21 degrees with overcast skies. I tested density on footing trench on line C between 1 & 9 where I failed to get a passing test. I asked contractor to re-compact the area. I tested again with passing results. See density report. Tested By: Ben E Ball Signature: Reviewed By: E. Vail Signature: File Name: 22247D12152022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671132331303 2 Date: 12/21/2022 Inspection Images: File Name: 22247D12152022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671132331303 3 File Name: 22247D01032023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1672780388523 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 78653 Client: Bateman-Hall Date: 01/03/2023 Time End: 03:30 PM Time Start: 01:30 PM Daily Standardization: MS: 612 DS: 2491 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Grid line E , approximately at 18 Top of sub base under concrete footings 10 135.1 127.9 5.7 134.8 Material Type Pit Run (Edstrom's) 95 2 Grid line E, approximately at 24 Top of sub base under concrete footings 10 142.4 131.7 8.1 134.8 Material Type Pit Run (Edstrom's) 98 3 Grid line E, approximately at 30 Top of sub base under concrete footings 10 140.2 131.1 6.9 134.8 Material Type Pit Run (Edstrom's) 97 Observations/Remarks: Arrived on site at 2:15 PM ambient temperature was 28 degrees with overcast skies and light snow. Contractor had compacted footing for line E 10 through 31. Tested By: Ben E Ball Reviewed By: E. Vail File Name: 22247D01032023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1672780388523 2 Signature:Signature: Date: 01/12/2023 Inspection Images: File Name: 22247D01032023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1672780388523 3 File Name: 22247D01102023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D0B18E69-0FEA-4FAB-BE73-9D45B8A0106B 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 78653 Client: Bateman-Hall Date: 01/10/2023 Time End: 11:30 AM Time Start: 09:30 AM Daily Standardization: MS: 646 DS: 2563 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Northeast corner of job North side of the footings Sub base 8 136.3 127.9 6.2 134.8 Material Type Pit Run (Edstrom's) 95 2 Northeast corner South end of footings Sub base 8 138.3 131.3 7.3 134.8 Material Type Pit Run (Edstrom's) 97 Observations/Remarks: I arrived at the job and prepped my gauge. I spoke with the foreman and discussed where the testing needed to take place. After being pointed in the right direction I took two shots and both passed compaction. I returned to the foreman and reported the results. I returned to my vehicle and put my gauge away and began filling out my report. I left the job site around 11:30 am. Tested By: M.Mansfield Signature: Reviewed By: E. Vail Signature: File Name: 22247D01102023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D0B18E69-0FEA-4FAB-BE73-9D45B8A0106B 2 Date: 01/12/2023 Inspection Images: File Name: 22247D01232023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1B560382-FB89-45E7-866F-136ED82F49EE 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Bateman-Hall, Jerome Bowen Instrument ID 18025 Client: Bateman-Hall Date: 01/23/2023 Time End: 02:30 PM Time Start: 12:30 PM Daily Standardization: MS: 514 DS: 1666 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 See photo Sub grade BS 133.2 129.7 6.0 134.8 Material Type Pit Run (Edstrom's) 96 2 See photo Sub grade BS 134.7 130.1 5.9 134.8 Material Type Pit Run (Edstrom's) 97 Observations/Remarks: I arrived at the job and spoke with the foreman about the job. I reported to the area and the crew was still compacting the section. After they were done I took a few shots, the first few were low but I had them work the soil a bit more. After a little while I tested again and the areas passed. I reported to the foreman and returned to my vehicle to begin my report. Tested By: M.Mansfield Signature: Reviewed By: E. Vail Signature: File Name: 22247D01232023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1B560382-FB89-45E7-866F-136ED82F49EE 2 Date: 01/30/2023 Inspection Images: File Name: 22247D01232023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1B560382-FB89-45E7-866F-136ED82F49EE 3 File Name: 22247D01232023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1B560382-FB89-45E7-866F-136ED82F49EE 4 File Name: 22247D02212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 08CC6232-4C11-499A-932C-89CE5F8E6011 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Bateman-Hall Instrument ID 76561 Client: Bateman-Hall Date: 02/21/2023 Time End: 01:00 PM Time Start: 11:00 AM Daily Standardization: MS: 765 DS: 2759 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Interior of Building B Footing for loading dock Base 8 132.8 127.6 8.0 134.8 Material Type Pit Run (Edstrom's) 95 Observations/Remarks: I arrived at the job site and spoke with the foreman. He directed me where to go and I began testing. I got passing results and reported them back. Tested By: M.Mansfield Signature: Reviewed By: E. Vail Signature: Date: 03/10/2023 Inspection Images: File Name: 22247D02212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 08CC6232-4C11-499A-932C-89CE5F8E6011 2 File Name: 22247D02212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E0C98BF2-7F98-44F9-9F05-80CC5516E998 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Bateman-Hall Instrument ID 76562 Client: Bateman-Hall Date: 02/21/2023 Time End: 12:30 PM Time Start: 10:00 AM Daily Standardization: MS: 765 DS: 1124 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Loading dock area Sub base 10 126.5 132.6 5.7 134.8 Material Type Pit Run (Edstrom's) 98 Observations/Remarks: I arrived at the job site and setup my concrete gear before meeting with the foreman. Once I met with the foreman, he directed me to the area that needed testing. I was able to test and receive passing results. I reported to the foreman and returned to my vehicle to prep for my concrete pour. Tested By: M.Mansfield Signature: Reviewed By: E. Vail Signature: Date: File Name: 22247D02212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E0C98BF2-7F98-44F9-9F05-80CC5516E998 2 03/24/2023 Inspection Images: File Name: 22247D04132023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 12AF9328-F6BF-4D44-A9F9-C01D765CCA73 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Bateman-Hall Client: Bateman-Hall Date: 04/13/2023 Time Start: 08:00 AM Time End: 04:00 PM Instrument ID 867 Daily Standardization: MS: 1190 DS: 4895 Current Weather Conditions: Snow Ambient Temperature (°F): 30 Wind: 5-15 mph Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Building A 15 ft south of northern wall 20 ft west of eastern wall. Sub base 8 133.7 129.8 4.8 134.8 Material Type Pit Run (Edstrom's) 96 2 Building A 15 ft north of southern wall 15 ft west of eastern wall. Sub base 8 132.4 128.5 4.0 134.8 Material Type Pit Run (Edstrom's) 95 3 Building A 15 ft north of southern wall 20 ft east of southwestern wall Sub base 8 134.7 129.2 5.2 134.8 Material Type Pit Run (Edstrom's) 96 4 Building A 15ft south or northern wall 40 ft east of western wall Sub base 8 135.1 130.2 6.2 134.8 Material Type Pit Run (Edstrom's) 97 5 Building A Sub base 8 135.6 129.9 5.1 134.8 96 File Name: 22247D04132023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 12AF9328-F6BF-4D44-A9F9-C01D765CCA73 2 Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail Center point of western pad Material Type Pit Run (Edstrom's) 6 Building A 20ft south of northern wall 20 ft west of eastern wall Base BS 133.1 126.2 5.2 130.8 Material Type Native Material 96 7 Building A 20 ft north of southern wall 15 ft west of eastern wall Base BS 134.7 126.7 6.0 130.8 Material Type Native Material 97 8 Building A 20 ft North of southern wall 15 ft east of southwestern wall Base BS 132.6 129.4 4.7 130.8 Material Type Native Material 99 9 Building A 15 ft south of northern wall 40 ft east of western wall Base BS 135.1 128.7 5.0 130.8 Material Type Native Material 98 Observations/Remarks: I arrived at the job site and spoke with the foreman about the testing. He informed me that some of the pit run had already been compacted and was ready for testing. I returned to my vehicle and prepped my gauge, I input the necessary data and standardized. While I tested the first few spots to the east of Building A the crew finished rolling the remaining areas of pit run. Once I finished testing the sub base, I observed as they imported their 3/4 base. I spoke with the foreman about the 3/4 base to make sure it was a material we had on file. I reached out to Shantel and confirmed the proctor and optimum moisture. They were able to begin rolling, but ran into an issue with their machine. The just halted as they went grab a replacement to finish placing the material. We were shutdown for about an hour. After the replacement had arrived, we were able to continue laying down materials and rolling. I was able to test the east side of the building and move to the west as material was layered and compacted. The material was achieving compaction as I tested, after recording results I continued reporting to the crew. File Name: 22247D04132023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 12AF9328-F6BF-4D44-A9F9-C01D765CCA73 3 As they concluded for the day I returned to my vehicle to put my gear away and begin filling out my report. Tested By: M.Mansfield Signature: Reviewed By: E. Vail Signature: Date: 04/17/2023 Inspection Images: File Name: 22247D04132023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 12AF9328-F6BF-4D44-A9F9-C01D765CCA73 4 File Name: 22247D04132023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 12AF9328-F6BF-4D44-A9F9-C01D765CCA73 5 File Name: 22247D04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 92BCE8A2-4B2C-440D-88FF-D7650770B9EF 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen/Bateman-Hall Client: Bateman-Hall Date: 04/18/2023 Time Start: 08:00 AM Time End: 11:00 AM Instrument ID 867 Daily Standardization: MS: 1193 DS: 4892 Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 38 Wind: 5-15 mph Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 10ft away from north wall 20ft east of west wall Base BS 135.1 130.2 3.0 130.3 Material Type 3/4" Base 100 2 10ft north of southeast corner 15ft east of west wall Base BS 134.6 132.0 2.0 130.3 Material Type 3/4" Base 101 3 25ft north of south wall 40ft east of west wall Base BS 132.1 133.1 2.0 130.3 Material Type 3/4" Base 102 4 20ft south of north wall 15ft east of office pad Base BS 136.5 128.0 6.7 130.3 Material Type 3/4" Base 98 Observations/Remarks: We arrived at the job site around 9:15 am and setup our equipment and spoke with the foreman about the areas that needed testing. We were able to do some testing on the office pad. We were able to take 3 passing tests. File Name: 22247D04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 92BCE8A2-4B2C-440D-88FF-D7650770B9EF 2 While we were testing that area the crew was laying the material in the other section. One of the crew members needed to fill the water truck, so we were delayed about 30 minutes. Once the truck was filled, they were able to water the material and begin rolling. They worked the material for another 15-20 minutes. When completed we were able to take another test which also passed. Once our testing was completed we spoke with the foreman about future portions of the job. We returned to the vehicle and began filling out our report. Tested By: M.Mansfield Signature: Reviewed By: E. Vail Signature: Date: 04/19/2023 Inspection Images: File Name: 22247D04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 92BCE8A2-4B2C-440D-88FF-D7650770B9EF 3 File Name: 22247D04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 92BCE8A2-4B2C-440D-88FF-D7650770B9EF 4 File Name: 22247D04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 92BCE8A2-4B2C-440D-88FF-D7650770B9EF 5 File Name: 22247D04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 92BCE8A2-4B2C-440D-88FF-D7650770B9EF 6 File Name: 22247D05042023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 476E3C10-7832-454D-952F-628E650325A6 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Client: Bateman-Hall Date: 05/04/2023 Time Start: 12:30 PM Time End: 02:00 PM Instrument ID 78653 Daily Standardization: MS: 651 DS: 2491 Current Weather Conditions: Overcast Ambient Temperature (°F): 66 Wind: 5-15 mph Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Building B Gridline: J-5 Top of subbase BS 138.1 131.6 5.0 134.8 Material Type Pit Run (Edstrom's) 98 2 Building B Gridline: E-5 Top of subbase BS 137.9 129.4 6.6 134.8 Material Type Pit Run (Edstrom's) 96 3 Building B Gridline: H-4 Top of subbase BS 137.5 129.3 6.3 134.8 Material Type Pit Run (Edstrom's) 96 6 Building B Gridline: F-2 Top of subbase BS 135.7 131.1 3.6 134.8 Material Type Pit Run (Edstrom's) 97 7 Building B Gridline: C-2 Top of subbase BS 134.8 128.1 5.3 134.8 Material Type Pit Run 95 File Name: 22247D05042023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 476E3C10-7832-454D-952F-628E650325A6 2 Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail (Edstrom's) Observations/Remarks: I arrived on site around 12:55 pm. I got out of my vehicle, and began to standardize my gauge. Once it passed the standardization I input the correct proctor number for the material. I observed the contractor use a large CAT tire roller for compaction. They were also using a small handheld plate compactor for the corners and everywhere the roller couldn’t hit. Tested By: B. Choffin Signature: Reviewed By: E. Vail Signature: Date: 05/09/2023 Inspection Images: File Name: 22247D05042023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 476E3C10-7832-454D-952F-628E650325A6 3 File Name: 22247D05042023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 476E3C10-7832-454D-952F-628E650325A6 4 File Name: 22247D05042023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 476E3C10-7832-454D-952F-628E650325A6 5 File Name: 22247D05042023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 476E3C10-7832-454D-952F-628E650325A6 6 File Name: 22247D05092023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 251F2D20-7DB0-4B06-898E-08A3FA9D253A 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Client: Bateman-Hall Date: 05/09/2023 Time Start: 08:15 AM Time End: 10:15 AM Instrument ID 78653 Daily Standardization: MS: 653 DS: 2491 Current Weather Conditions: Drizzle Ambient Temperature (°F): 39 Wind: 5-15 mph Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Building B Gridline: J-5 Top of base BS 133.7 129.3 3.4 130.8 Material Type 3/4" Base (Edstrom Thorton Pit) 99 2 Building B Gridline: F-5 Top of base BS 129.7 123.9 4.7 130.8 Material Type 3/4" Base (Edstrom Thorton Pit) 95 3 Building B Gridline: B-5 Top of base BS 138.0 129.8 6.3 130.8 Material Type 3/4" Base (Edstrom Thorton Pit) 99 4 Building B Gridline: B-4 Top of base BS 132.9 124.9 6.4 130.8 Material Type 3/4" Base (Edstrom 95 File Name: 22247D05092023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 251F2D20-7DB0-4B06-898E-08A3FA9D253A 2 Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail Thorton Pit) 5 Building B Gridline: F-4 Top of base BS 134.5 127.0 5.9 130.8 Material Type 3/4" Base (Edstrom Thorton Pit) 97 6 Building B Gridline: J-4 Top of base BS 130.7 125.2 4.4 130.8 Material Type 3/4" Base (Edstrom Thorton Pit) 96 7 Building B Gridline: J-2 Top of base BS 131.7 126.9 3.8 130.8 Material Type 3/4" Base (Edstrom Thorton Pit) 97 8 Building B Gridline: F-2 Top of base BS 133.7 126.6 5.6 130.8 Material Type 3/4" Base (Edstrom Thorton Pit) 97 9 Building B Gridline: B-2 Top of base BS 130.6 124.2 5.1 130.8 Material Type 3/4" Base (Edstrom Thorton Pit) 95 Observations/Remarks: I arrived on site around 8:30 am. I immediately got my gauge out of the case to let it warm up. I walked inside of the building and observed that they only had a skid loader inside leveling the far west side (Gridlines J-1/2 through B-1/2) of the building. After my gauge warmed up, I standardized my gauge on the material to be tested today. I spoke with the employee who was running the skid loader and he let me know that he was going to be rolling the area they were working on again. After the area was rolled, I was able to obtain passing shots and I reported those results back to Jerome Bowen. Tested By: B. Choffin Signature: Reviewed By: E. Vail Signature: File Name: 22247D05092023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 251F2D20-7DB0-4B06-898E-08A3FA9D253A 3 Date: 05/11/2023 Inspection Images: File Name: 22247D05092023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 251F2D20-7DB0-4B06-898E-08A3FA9D253A 4 File Name: 22247D05092023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 251F2D20-7DB0-4B06-898E-08A3FA9D253A 5 File Name: 22247D05092023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 251F2D20-7DB0-4B06-898E-08A3FA9D253A 6