Loading...
HomeMy WebLinkAboutDAILY FIELD REPORTS - 22-00269 - Hibbard Elementary SchoolInspection Date: 10/20/2022 File Name: 22229DFR10202022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1666621674724 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 01:00 PM Client: Madison School District Contractor: ML Masonry End Time: 05:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): NE Wing hallway walls Observations/ Remarks: I arrived on site and began my observations of the masonry reinforcement. After walking the walls to be grouted, I waited for the grout to arrive. At 2:45 PM, the masonry contractor informed me that the grout would not arrive until after 4:00 PM. I left the project and returned at 4:00 PM for the grout. I observed the contractor pump the grout into place and consolidate it with a mechanical vibrator. I notified the contractor of my observations prior to leaving. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 10/20/2022 File Name: 22229DFR10202022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1666621674724 2 Inspector's Signature:Inspector's Name: Jacob Christensen Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 10/25/2022 Inspection Date: 10/18/2022 File Name: 22229DFR10182022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1666621148805 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 01:00 PM Client: Madison School District Contractor: ML Masonry End Time: 03:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): NE wing 4' elevation Observations/ Remarks: I arrived on site and began my observations of the masonry reinforcement of the NE wing hallway walls at the 4' elevation. I observed that the contractor had placed the reinforcement in general conformance with the project documents. I observed the contractor pump the grout into place and consolidate it with a mechanical vibrator. I reported my observations to the contractor prior to leaving. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 10/18/2022 File Name: 22229DFR10182022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1666621148805 2 Inspector's Signature:Inspector's Name: Jacob Christensen Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 10/25/2022 Inspection Date: 10/18/2022 File Name: 22229DFR10182022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1666189159793 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 01:00 PM Client: Madison School District Contractor: ML Masonry End Time: 05:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): NE Wing hallway walls Observations/ Remarks: I arrived on site and began my observations of the masonry reinforcement of the NE wing hallway walls. The east wall was at 8' elevation and the West wing was at 4' elevation. I observed that the reinforcement was placed in general conformance with the project documents. I waited for the grout until 3:00 pm at which time the contractor informed me that it would be there until 4:00 pm. I returned to the project at 4:00 pm and observed the grout placement. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 10/18/2022 File Name: 22229DFR10182022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1666189159793 2 Inspector's Signature:Inspector's Name: Jacob Christensen Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 10/25/2022 Inspection Date: 11/01/2022 File Name: 22229DFR11012022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1667399696928 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 01:00 PM Client: Madison School District Contractor: ML Masonry End Time: 05:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): NW wing - hallway walls 10' elevation Observations/ Remarks: I arrived on site and began my observations of the masonry reinforcement of the walls at the 10' elevation. I then waited for the grout to arrive. At 3:00 PM, the contractor informed me that the grout would arrive at 4:00 PM. I waited on site for the grout to arrive. I observed the contractor pump the grout into place and consolidate it with a mechanical vibrator. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 11/01/2022 File Name: 22229DFR11012022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1667399696928 2 Inspector's Signature:Inspector's Name: Jacob Christensen Reviewer's Signature:Reviewer's Name: Jacob Christensen Reviewed Date: 11/07/2022 Inspection Date: 11/10/2022 File Name: 22229DFR11102022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1668204257239 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 11:00 AM Client: Madison School District Contractor: ML Masonry End Time: 01:00 PM Inspection Type(s): Epoxy Embeds/ Anchors Location(s): Hallway North and East of Media Center Observations/ Remarks: I arrived on site and observed the contractor pump AT-XP Simpson Strongtie epoxy into the predrilled holes. I observed that the holes were +/- 13" deep. I observed the contractor insert each of the dowels a ensure that there was adequate epoxy in the hole and no air bubbles. I notified the contractor of my observations prior to leaving. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 11/10/2022 File Name: 22229DFR11102022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1668204257239 2 Inspection Date: 11/10/2022 File Name: 22229DFR11102022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1668204257239 3 Inspection Date: 11/10/2022 File Name: 22229DFR11102022JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1668204257239 4 Inspector's Signature:Inspector's Name: Jacob Christensen Reviewer's Signature:Reviewer's Name: Jacob Christensen Reviewed Date: 11/11/2022 Inspection Date: 11/22/2022 File Name: 22229DFR11222022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1E97ACA1-09FC-416B-91D3-02E15431C5B0 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:15 PM Client: Madison School District Contractor: M L Masonry End Time: 02:30 PM Inspection Type(s): Epoxy Embeds/ Anchors Location(s): See included picture. Observations/ Remarks: I arrived on site and began observations on the drilling and cleaning of holes for epoxy and reinforcement. I observed the contractor manually drill and vacuum each hole and I checked each hole for cleanliness. I observed the contractor fill each hole with epoxy, and observed the the epoxy was not expired. I observed the contractor place each piece of reinforcement and saw that there was enough epoxy to coat the entirety of the hole, and that it extruded a little epoxy from the top when filled with the rebar. I saw the contractor manually twist each piece until it was at the bottom. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 11/22/2022 File Name: 22229DFR11222022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1E97ACA1-09FC-416B-91D3-02E15431C5B0 2 Inspection Date: 11/22/2022 File Name: 22229DFR11222022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1E97ACA1-09FC-416B-91D3-02E15431C5B0 3 Inspection Date: 11/22/2022 File Name: 22229DFR11222022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1E97ACA1-09FC-416B-91D3-02E15431C5B0 4 Inspection Date: 11/22/2022 File Name: 22229DFR11222022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1E97ACA1-09FC-416B-91D3-02E15431C5B0 5 Inspector's Signature:Inspector's Name: C Hammar Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 11/30/2022 Inspection Date: 11/22/2022 File Name: 22229DFR11222022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1E97ACA1-09FC-416B-91D3-02E15431C5B0 6 Inspection Date: 11/16/2022 File Name: 22229DFR11162022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1668623248336 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 11:00 AM Client: Madison School District Contractor: Headwaters Construction End Time: 01:00 PM Inspection Type(s): Epoxy Embeds/ Anchors Location(s): Media Center 194 Observations/ Remarks: Arrived on site at 11:30 AM. Ambient temperature was 22 degrees with overcast conditions. I met with contractor's agent to embed 5/8" all thread rod in the Media Center foundations 194. I observed him fill the holes with Hilti HIT-HY 200-A V3 which had an expiration date of 5/31 2023. He filled the holes then inserted the rod with a screwing motion until it was embedded 9" or it bottomed out. There were three holes the all thread was not embedded into the concrete the full 9", two on the east side and one in the west. Contractor explained that they hit rebar with the drill but the engineer was aware of the problem. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 11/16/2022 File Name: 22229DFR11162022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1668623248336 2 Inspection Date: 11/16/2022 File Name: 22229DFR11162022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1668623248336 3 Inspector's Signature:Inspector's Name: Ben E Ball Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 11/30/2022 Inspection Date: 12/08/2022 File Name: 22229DFR12082022MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AB88B2D5-BC80-4818-83EF-B7E68B8DB4FA 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 10:00 AM Client: Madison School District Contractor: Headwaters Contruction End Time: 12:00 PM Inspection Type(s): Welding Location(s): Media Center roof Observations/ Remarks: I arrived at the job at 10:45 am and began my welding inspection. I inspected the welds and saw that the majority of the job was up to spec. As shown in the photos attached I found some area where the welds burnt through. The other welds appeared to be correct. I concluded my inspection at 11:15 am I returned to my vehicle to begin my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 12/08/2022 File Name: 22229DFR12082022MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AB88B2D5-BC80-4818-83EF-B7E68B8DB4FA 2 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 12/14/2022 Inspection Date: 12/16/2022 File Name: 22229DFR12162022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671205332319 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 08:00 AM Client: Madison School District Contractor: ML Masonary End Time: 12:00 PM Inspection Type(s): Masonry Grout Placement Location(s): Corridor 138 east wall Observations/ Remarks: Arrived on site at 8:30 AM ambient temperature was 9 degrees with overcast skies. I was sent out to observe a grout pour this morning but they ended up not pouring grout today and didn’t tell us. Contractor's agent told me that they are starting a new wall and would be ready for epoxy inspection in approximately one hour. At 11:00 AM they began to epoxy rebar into 14" holes they had drilled. I observed them insert the rebar with a twisting motion until it bottomed out in the holes and epoxy was extruded from the holes. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 12/16/2022 File Name: 22229DFR12162022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671205332319 2 Inspection Date: 12/16/2022 File Name: 22229DFR12162022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671205332319 3 Inspector's Signature:Inspector's Name: Ben E Ball Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 12/21/2022 Inspection Date: 12/15/2022 File Name: 22229DFR12152022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671119506543 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 08:00 AM Client: Madison School District Contractor: ML Masonry End Time: 11:00 AM Inspection Type(s): Masonry Grout Placement Location(s): Corridors 136 &128, west wall. Top of grout was 10.5' off finished floor. Observations/ Remarks: Arrived on site at 8:45 AM ambient temp was 10 degrees with a light fog. I observed that rebar was in place and had proper overlap. Contractor was vibrating every cell that had vertical rebar in it. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 12/15/2022 File Name: 22229DFR12152022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671119506543 2 Inspection Date: 12/15/2022 File Name: 22229DFR12152022BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1671119506543 3 Inspector's Signature:Inspector's Name: Ben E Ball Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 12/21/2022 Inspection Date: 01/10/2023 File Name: 22229DFR01102023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AB75BD92-3BA8-474B-B4C2-E149841B6020 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 11:30 AM Client: Madison School District Contractor: Headwaters Construction End Time: 01:30 PM Inspection Type(s): Masonry Grout Placement Location(s): See photo Observations/ Remarks: I arrived at the job site around 11:45 am and the truck had already arrived. I did what I could to inspect the rebar. What I saw looked good and up to spec. I was able to observe the remainder of the pour in which I saw the crew taking advantage of a vibrator as well as lifting and shaking the rebar to help the grout consolidate. Once the pour was completed I returned to my vehicle to begin filling out my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 01/10/2023 File Name: 22229DFR01102023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AB75BD92-3BA8-474B-B4C2-E149841B6020 2 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 01/12/2023 Inspection Date: 01/10/2023 File Name: 22229DFR01102023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AB75BD92-3BA8-474B-B4C2-E149841B6020 3 Inspection Date: 01/12/2023 File Name: 22229DFR01122023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 80108844-69BE-427D-8C2F-8EAAE384F9B3 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 09:30 AM Client: Madison School District Contractor: ML Masonry End Time: 12:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See picture. Refer to page S2.0 on plans. Masonry wall, 3rd lift. Observations/ Remarks: I arrived on site around 9:50 am for the 10:00 am pour and checked in with ML Masonry to see where the grout pour would be taking place. After they showed me I was able to check out the rebar and walls in preparation for the pour. I checked for size, lap length, and spacing for the rebar. All of which appeared to be according to spec. The grout rolled in around 10:45 am and upon initial distribution, it was very thick. The crew tried to roll with it as best they could but eventually more water needed to be added to the mix. The rest of the pour went smoothly and I observed as mechanical vibration was used on the cells that required vertical rebar. I left location around 12:00 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 01/12/2023 File Name: 22229DFR01122023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 80108844-69BE-427D-8C2F-8EAAE384F9B3 2 Inspection Date: 01/12/2023 File Name: 22229DFR01122023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 80108844-69BE-427D-8C2F-8EAAE384F9B3 3 Inspector's Signature:Inspector's Name:Reviewer's Signature:Reviewer's Name:Reviewed Date: Inspection Date: 01/12/2023 File Name: 22229DFR01122023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 80108844-69BE-427D-8C2F-8EAAE384F9B3 4 E. Vail E. Vail 01/12/2023 Inspection Date: 01/18/2023 File Name: 22229DFR01182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8E953CA7-5DCA-46C3-AD6E-EA65C0E73569 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 11:15 AM Client: Madison School District Contractor: Headwaters Construction/ML Masonry End Time: 01:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo Observations/ Remarks: I arrived at the job site around 11:15 am and spoke with the crew. I looked over the rebar and found it to be up to spec. We waited for the truck to show and it did so around 12:30 pm. The driver set up and began the pour. I observed they were continuing to use vibration for consolidation. The pour went smoothly. I returned to my vehicle once it was concluded and filled out my report. I left the job site around 1:30 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 01/18/2023 File Name: 22229DFR01182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8E953CA7-5DCA-46C3-AD6E-EA65C0E73569 2 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 01/18/2023 Inspection Date: 01/16/2023 File Name: 22229DFR01162023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 25651E6D-A291-4ABF-B4ED-DC59C6651D46 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 10:30 AM Client: Madison School District Contractor: Headwaters Construction/ML Masonry End Time: 12:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo Observations/ Remarks: I arrived at the job site around 11:15 am and the truck was already there. I was able to observe the second half of the pour. The pour wrapped up around 11:45 am. I returned to my vehicle to fill out my report. I left the job site around 12:00 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 01/16/2023 File Name: 22229DFR01162023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 25651E6D-A291-4ABF-B4ED-DC59C6651D46 2 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 01/18/2023 Inspection Date: 01/17/2023 File Name: 22229DFR01172023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6C757D4A-3CFC-418C-8BD8-21C330A8D54D 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 10:45 AM Client: Madison School District Contractor: Headwaters Construction/ML Masonry End Time: 01:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo Observations/ Remarks: I arrived at the job site just before 11:00 am and looked over the rebar, which was up to spec. We then waited for the first truck to arrive. The first truck arrived around 11:15 am and began its setup. While observing the pour I saw the crew using vibration to help consolidate the grout. The pour went smoothly and ended around 12:45 pm. At that time I returned to my vehicle and began my report. I left the job site around 1:00 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 01/17/2023 File Name: 22229DFR01172023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6C757D4A-3CFC-418C-8BD8-21C330A8D54D 2 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 01/18/2023 Inspection Date: 01/20/2023 File Name: 22229DFR01202023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6E1D478C-CEC8-4D5D-8DF4-C64B9985CEDE 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 11:30 AM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 01:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans. Masonry wall, 8th lift. Observations/ Remarks: I arrived on site and checked in with ML Masonry to see where the grout pour would be taking place. I then looked over the rebar and CMU’s. I checked for size, spacing, and lap length. All appeared to be within spec. The grout showed up a short time later and the pour began. It went smoothly with no hiccups. I left location around 1:15 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 01/20/2023 File Name: 22229DFR01202023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6E1D478C-CEC8-4D5D-8DF4-C64B9985CEDE 2 Inspection Date: 01/20/2023 File Name: 22229DFR01202023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6E1D478C-CEC8-4D5D-8DF4-C64B9985CEDE 3 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 01/23/2023 Inspection Date: 01/25/2023 File Name: 22229DFR01252023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 77CE00C9-B50D-4012-ABCD-FB6174535220 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 09:00 AM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 11:00 AM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing structural drawings. Masonry wall, top lift. Observations/ Remarks: I arrived on site just as the grout was showing up at 9:20 am and so I quickly climbed the scaffolding to look at the rebar. I checked for spacing, size, and lap length. All appeared to be in accordance with the given specs. The pour went smoothly and I stayed for the duration of it. I wrote this report and left location at 10:45 am. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 01/25/2023 File Name: 22229DFR01252023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 77CE00C9-B50D-4012-ABCD-FB6174535220 2 Inspection Date: 01/25/2023 File Name: 22229DFR01252023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 77CE00C9-B50D-4012-ABCD-FB6174535220 3 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 01/26/2023 Inspection Date: 02/06/2023 File Name: 22229DFR02062023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 87EFE679-40D7-4A0C-AE1E-404D71AB142C 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 01:30 PM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 04:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Southern wall Observations/ Remarks: I arrived at the job site around 1:30 pm and conducted a rebar inspection. The placement of said rebar appeared to be correct as well as the spacing between cells. The crew was finishing their final prep and waiting for the truck to show up. The truck arrived just after 1:45 pm and began pouring around 2:00 pm. They had an issue at first with the pump, but we’re able to fix the problem quickly. As the pour concluded I returned to my vehicle to write my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 02/06/2023 File Name: 22229DFR02062023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 87EFE679-40D7-4A0C-AE1E-404D71AB142C 2 Inspection Date: 02/06/2023 File Name: 22229DFR02062023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 87EFE679-40D7-4A0C-AE1E-404D71AB142C 3 Inspection Date: 02/06/2023 File Name: 22229DFR02062023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 87EFE679-40D7-4A0C-AE1E-404D71AB142C 4 Inspection Date: 02/06/2023 File Name: 22229DFR02062023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 87EFE679-40D7-4A0C-AE1E-404D71AB142C 5 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 02/10/2023 Inspection Date: 02/09/2023 File Name: 22229DFR02092023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 300EFB4D-F2FC-435E-A02E-32D7B532AF4F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 11:30 AM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 01:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing S2.0 in the plans. Masonry wall, 3rd lift. Observations/ Remarks: I arrived on site around 11:45 am and checked in with ML Masonry. I looked over the rebar for and checked for spacing, lap length, and size. All appeared to be in accordance with the plans and specs. Shortly after, the grout arrived and the pour began. The pour went smoothly with no issues to speak of. I left location around 1:00 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 02/09/2023 File Name: 22229DFR02092023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 300EFB4D-F2FC-435E-A02E-32D7B532AF4F 2 Inspection Date: 02/09/2023 File Name: 22229DFR02092023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 300EFB4D-F2FC-435E-A02E-32D7B532AF4F 3 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 02/10/2023 Inspection Date: 02/13/2023 File Name: 22229DFR02132023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B82466C2-3576-447D-B5E9-3C0FEDD2ACC0 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 11:30 AM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 03:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing page S2.0 of Structural Plans. 4th lift of masonry wall. Observations/ Remarks: I arrived on site at 11:45 am and checked in with ML Masonry. They informed me that the grout would be about an hour late, as they had problems at the Burns Concrete plant. That gave me more than enough time to look over the rebar. I checked for spacing, size, and lap length. All appeared to be in accordance with the plans and specs. The grout finally rolled in around 1:15 pm and the pour began. It went smoothly with no issues to speak of. I observed the crew fill each cell with grout. Some rebar pieces on the corner were temporarily removed to allow for flow of grout, but then were put back after said cell was filled. I left location at 2:30 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 02/13/2023 File Name: 22229DFR02132023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B82466C2-3576-447D-B5E9-3C0FEDD2ACC0 2 Inspection Date: 02/13/2023 File Name: 22229DFR02132023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B82466C2-3576-447D-B5E9-3C0FEDD2ACC0 3 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 02/14/2023 Inspection Date: 02/17/2023 File Name: 22229DFR02172023LH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D3DD2116-5DBF-4D6E-A87C-1DC95B7B4651 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 10:30 AM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 12:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Reference attached picture of plans. Observations/ Remarks: I arrived on site and located where the grout placement was. I ascended the scaffolding and observed the masonry reinforcement that was placed. I then observed the grout placement. I observed that the contractor used a mechanical vibrator to consolidate the grout where needed. Upon completion of placement I returned to my vehicle and wrote this report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 02/17/2023 File Name: 22229DFR02172023LH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D3DD2116-5DBF-4D6E-A87C-1DC95B7B4651 2 Inspection Date: 02/17/2023 File Name: 22229DFR02172023LH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D3DD2116-5DBF-4D6E-A87C-1DC95B7B4651 3 Inspection Date: 02/17/2023 File Name: 22229DFR02172023LH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D3DD2116-5DBF-4D6E-A87C-1DC95B7B4651 4 Inspection Date: 02/17/2023 File Name: 22229DFR02172023LH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D3DD2116-5DBF-4D6E-A87C-1DC95B7B4651 5 Inspection Date: 02/17/2023 File Name: 22229DFR02172023LH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D3DD2116-5DBF-4D6E-A87C-1DC95B7B4651 6 Inspector's Signature:Inspector's Name: Luke Hammar Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 02/27/2023 Inspection Date: 02/15/2023 File Name: 22229DFR02152023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BBD87C7B-9B5D-4520-9804-E30C68D889DD 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 08:30 AM Client: Madison School District Contractor: Headwaters Construction/ML Masonry End Time: 11:15 AM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Southern wall Observations/ Remarks: I arrived at the job site around 9:00 and began my rebar inspection. I found the bar to be correct with the right spacing and placement. Once completed we waited for the truck to arrive. The truck arrived just after 9:30 and began pouring. I observed the pour. The truck finished and left around 10:45. I returned to my vehicle and began my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 02/15/2023 File Name: 22229DFR02152023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BBD87C7B-9B5D-4520-9804-E30C68D889DD 2 Inspection Date: 02/15/2023 File Name: 22229DFR02152023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BBD87C7B-9B5D-4520-9804-E30C68D889DD 3 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 02/27/2023 Inspection Date: 02/20/2023 File Name: 22229DFR0202023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 56C40738-BA96-4439-822B-C5DC97BFD47F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:00 PM Client: Madison School District Contractor: Headwaters Construction/ML Masonry End Time: 03:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Southern most section of the building. Observations/ Remarks: I arrived at the job site around 12:30 pm and conducted an inspection. I spoke with the crew after I was finished and they told me the material would be late. We then waited for the truck to arrive. The truck arrived just after 2:00 pm and began pumping. The pour went smoothly, there were quite a few crew members to assist. After the pour concluded I returned to my vehicle to begin writing my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 02/20/2023 File Name: 22229DFR0202023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 56C40738-BA96-4439-822B-C5DC97BFD47F 2 Inspection Date: 02/20/2023 File Name: 22229DFR0202023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 56C40738-BA96-4439-822B-C5DC97BFD47F 3 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 02/28/2023 Inspection Date: 03/09/2023 File Name: 22229DFR03092023KD PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8EE65BC3-EAF4-4D74-A32A-37B67CCC97CE 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:30 PM Client: Madison School District Contractor: ML Masonry End Time: 02:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): South of gym 15’ high Observations/ Remarks: I arrived on site around 12:50 PM and was met by Tom with ML Masonry. He informed me the grout pour that was scheduled for 1:00 PM arrived an hour and a half early. He had already cleaned and had the grout pump on his trailer when I arrived. He apologized for us missing the pour and then asked if we would be at the pour at 4:00 PM at the Idaho Falls police station today. I told him I would check with Eric and make sure someone was there to cover it. I then filled out this DFR and headed back to the lab. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspector's Signature:Inspector's Name: K. Drake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/10/2023 Inspection Date: 03/08/2023 File Name: 22229DFR03082023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 553F0B01-596D-4F31-AF5E-EC96F84E9B65 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:30 PM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 02:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See picture referencing Structural Plans page S2.0. 2nd lift. Observations/ Remarks: I arrived on site and checked in with ML Masonry. The grout showed up earlier than expected but I was still able to look over the majority of the rebar prior to the pour. I checked for correct spacing, lap length, and size. All appeared to be in accordance to project documents. I observed the remainder of the pour and saw that everything went smoothly. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 03/08/2023 File Name: 22229DFR03082023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 553F0B01-596D-4F31-AF5E-EC96F84E9B65 2 Inspection Date: 03/08/2023 File Name: 22229DFR03082023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 553F0B01-596D-4F31-AF5E-EC96F84E9B65 3 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/10/2023 Inspection Date: 03/06/2023 File Name: 22229DFR03062023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1678120646216 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 09:00 AM Client: Madison School District Contractor: Headwaters Construction End Time: 11:00 AM Inspection Type(s): Epoxy Embeds/ Anchors Location(s): Classrooms 121 & 119, BA1 & 123, BA6 & 125 Observations/ Remarks: Arrived on site at 9:15 AM and spoke with contractor about placing anchors in epoxy. We placed several anchors in various rooms and I observed that the epoxy was not expired and that said anchors were put in correctly. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 03/06/2023 File Name: 22229DFR03062023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1678120646216 2 Inspection Date: 03/06/2023 File Name: 22229DFR03062023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. b8bc23e67404a7c5-1678120646216 3 Inspector's Signature:Inspector's Name: Ben E Ball Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/10/2023 Inspection Date: 02/21/2023 File Name: 22229DFR02212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 672F9709-E2A3-4D86-BE40-69C03275E1FD 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:00 PM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 03:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Southern section of the building. Observations/ Remarks: I arrived at the job and looked over the rebar before the truck arrived. I found the bar to be up to spec, in both placement and size. I reported to the foreman and waited for the truck to arrive. The truck arrived shortly after and we began pouring the grout. The pour went well and I observed as they used several different styles of consolidation including vibration. Once the pour concluded I returned to my vehicle. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 02/21/2023 File Name: 22229DFR02212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 672F9709-E2A3-4D86-BE40-69C03275E1FD 2 Inspection Date: 02/21/2023 File Name: 22229DFR02212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 672F9709-E2A3-4D86-BE40-69C03275E1FD 3 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/24/2023 Inspection Date: 02/22/2023 File Name: 22229DFR02222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5DD83061-01AC-4DC7-9330-FC5BD15E1B71 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 01:00 PM Client: Madison School District Contractor: Headwaters Construction End Time: 03:00 PM Inspection Type(s): Epoxy Embeds/ Anchors Location(s): Shown in picture Observations/ Remarks: I arrived at the job site and met with the superintendent with Headwaters. He directed me to the foreman. After speaking with the foreman, he led me to the area where they were doing the epoxy. I observed as they placed the epoxy and inserted the bolts. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 02/22/2023 File Name: 22229DFR02222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5DD83061-01AC-4DC7-9330-FC5BD15E1B71 2 Inspection Date: 02/22/2023 File Name: 22229DFR02222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5DD83061-01AC-4DC7-9330-FC5BD15E1B71 3 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/24/2023 Inspection Date: 03/14/2023 File Name: 22229DFR03142023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 13905B46-DDED-4B9E-BE57-38204B2F4987 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:45 PM Client: Madison School District Contractor: M-L Masonry End Time: 02:45 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See attached photo of plans. Observations/ Remarks: I arrived on-site around 1:00 PM upon arrival grout placement had took place. I immediately obtained a ticket from the supplier and began my observation of the masonry reinforcement. I noted a section (circled in blue) did not have the reinforcement required. I observed the contractor place the reinforcement post grout placement. I took pictures and returned to my vehicle to write this report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 03/14/2023 File Name: 22229DFR03142023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 13905B46-DDED-4B9E-BE57-38204B2F4987 2 Inspection Date: 03/14/2023 File Name: 22229DFR03142023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 13905B46-DDED-4B9E-BE57-38204B2F4987 3 Inspection Date: 03/14/2023 File Name: 22229DFR03142023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 13905B46-DDED-4B9E-BE57-38204B2F4987 4 Inspection Date: 03/14/2023 File Name: 22229DFR03142023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 13905B46-DDED-4B9E-BE57-38204B2F4987 5 Inspection Date: 03/14/2023 File Name: 22229DFR03142023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 13905B46-DDED-4B9E-BE57-38204B2F4987 6 Inspector's Signature:Inspector's Name: Luke Hammar Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/24/2023 Inspection Date: 03/20/2023 File Name: 22229DFR03202023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CF596D-115A-459A-8750-F89CCD23E14C 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:30 PM Client: Madison School District Contractor: M-L Masonry End Time: 02:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See attached picture of plans Observations/ Remarks: I arrived on site and located where the grout placement was to take place. The contractor had just started placing the reinforcement and I observed them place the reinforcement. The grout truck arrived around 1:00 PM. I observed the grout placement and noted that the contractor used a mechanical vibrator to achieve consolidation. I then returned to my vehicle and wrote this report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 03/20/2023 File Name: 22229DFR03202023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CF596D-115A-459A-8750-F89CCD23E14C 2 Inspection Date: 03/20/2023 File Name: 22229DFR03202023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CF596D-115A-459A-8750-F89CCD23E14C 3 Inspection Date: 03/20/2023 File Name: 22229DFR03202023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CF596D-115A-459A-8750-F89CCD23E14C 4 Inspector's Signature:Inspector's Name: Luke Hammar Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/27/2023 Inspection Date: 03/22/2023 File Name: 22229DFR03222023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. CF03EE41-9865-4E8B-BAEC-4EE110418B56 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:30 PM Client: Madison School District Contractor: M-L Masonry End Time: 02:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See attached photo of plans. @12’ Observations/ Remarks: I arrived on site and located where the placement was to take place. I climbed up the scaffolding and began my observation of the masonry reinforcement. I noted that it was in general conformity to project guidelines. I then observed the placement of the grout. I noted that the contractor used a mechanical vibrator to achieve consolidation where required. I then returned to my vehicle and wrote this report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 03/22/2023 File Name: 22229DFR03222023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. CF03EE41-9865-4E8B-BAEC-4EE110418B56 2 Inspection Date: 03/22/2023 File Name: 22229DFR03222023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. CF03EE41-9865-4E8B-BAEC-4EE110418B56 3 Inspection Date: 03/22/2023 File Name: 22229DFR03222023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. CF03EE41-9865-4E8B-BAEC-4EE110418B56 4 Inspection Date: 03/22/2023 File Name: 22229DFR03222023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. CF03EE41-9865-4E8B-BAEC-4EE110418B56 5 Inspector's Signature:Inspector's Name: Luke Hammar Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/27/2023 Inspection Date: 03/24/2023 File Name: 22229DFR03242023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 327ED7E8-2372-4308-A028-FCDC57B22492 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:00 PM Client: Madison School District Contractor: ML Masonry/Headwaters Construction End Time: 02:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Interior masonry walls, 5th lift. See picture referencing Foundation Plans, page S2.0. Observations/ Remarks: I arrived on site at 12:30 pm and checked in with ML Masonry. They informed me that the grout would be here shortly. So I hopped up on the scaffolding and looked over the rebar. I checked for correct size, spacing, and lap length. All of which appeared to be in accordance with project documents. I observed the entire pour and saw that mechanical vibration was used on the cells that had vertical rebar in it, and that each cell was in fact filled with grout. I left location around 1:45 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 03/24/2023 File Name: 22229DFR03242023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 327ED7E8-2372-4308-A028-FCDC57B22492 2 Inspection Date: 03/24/2023 File Name: 22229DFR03242023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 327ED7E8-2372-4308-A028-FCDC57B22492 3 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/27/2023 File Name: 22229DFR03282023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D69E5FC8-C65A-41D1-BE0B-9ED9A8F01636 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Construction Client: Madison School District Inspection Date: 03/28/2023 Start Time: 01:30 PM End Time: 03:30 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 37 Wind: 5-15 mph Inspection Type(s): Epoxy Embeds/ Anchors Location(s): See photo referencing Structural Plans, page S2.0. Observations/ Remarks: I arrived on site at 2:00 pm and met with Dax from Headwaters Construction. He informed me that they would be epoxying a total of 16 holes in 4 different locations. We went to each spot and I observed that Hilti HIT-HY 200-A V3 epoxy was being used. I noted that each package of epoxy that was used was NOT expired. I also saw that each hole was free of debris, that a sufficient amount of epoxy was used in each hole, and that a twisting motion was used as the all- threads were being inserted. The whole process went smoothly and was in accordance with project documents. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR03282023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D69E5FC8-C65A-41D1-BE0B-9ED9A8F01636 2 File Name: 22229DFR03282023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D69E5FC8-C65A-41D1-BE0B-9ED9A8F01636 3 File Name: 22229DFR03282023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D69E5FC8-C65A-41D1-BE0B-9ED9A8F01636 4 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/29/2023 Inspection Date: 03/16/2023 File Name: 22229DFR03162023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6EB83668-3009-45A3-9BF9-B0FDFE8A42F4 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Hibbard Elementary Project Number: 22-229 Start Time: 12:30 PM Client: Madison School District Contractor: Headwaters End Time: 03:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Southern most wall Observations/ Remarks: I arrived at the job site and looked over the bar. The reinforcement appeared to be placed within specifications. I informed the masonry crew and waited for the truck to arrive. I observed as the crew poured the grout and consolidated it in place with a mechanical vibrator. Once the pour completed I returned to my vehicle and began my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 03/16/2023 File Name: 22229DFR03162023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6EB83668-3009-45A3-9BF9-B0FDFE8A42F4 2 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: Jacob Christensen Reviewed Date: 04/04/2023 File Name: 22229DFR03212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AD0240AE-DF33-4A3B-B2D1-74B7FB6F5CFC 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Client: Madison School District Inspection Date: 03/21/2023 Start Time: 12:00 PM End Time: 02:30 PM Current Weather Conditions: Overcast Ambient Temperature (°F): 24 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Interior walls, southern section of building Observations/ Remarks: I arrived at the job site and observed that they had started placing grout. I went to area where the pour was happening and observed that the reinforcement was in general conformance with the project specifications. After the placement was complete, I returned to my vehicle to begin a report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR03212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AD0240AE-DF33-4A3B-B2D1-74B7FB6F5CFC 2 File Name: 22229DFR03212023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. AD0240AE-DF33-4A3B-B2D1-74B7FB6F5CFC 3 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: Jacob Christensen Reviewed Date: 04/04/2023 File Name: 22229DFR03272023JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1680619331679 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Construction Client: Madison School District Inspection Date: 03/27/2023 Start Time: 11:00 AM End Time: 03:00 PM Current Weather Conditions: Overcast Ambient Temperature (°F): 38 Wind: 5-15 mph Inspection Type(s): Epoxy Embeds/ Anchors Masonry Reinforcement Masonry Grout Placement Location(s): Grout - Storage room South of Gymnasium Epoxy - North Wall Gymnasium Kindergarten Room, East outer wall Steel columns Observations/ Remarks: 11:00 - 1:00 PM I arrived on site and observed the reinforcement of the masonry wall at the 18' elevation. I observed the contractor pump the grout into place and consolidate it with a mechanical vibrator. 1:00 - 3:00 PM While on site and met with Daxx from Headwaters. I checked each hole for depth and cleanliness prior to the laborer inject the epoxy into each of the anchor bolts holes prior to inserting the new anchor bolt. I observed that there was adequate epoxy in each hole. I notified the contractor of my observations prior to leaving. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR03272023JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1680619331679 2 File Name: 22229DFR03272023JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1680619331679 3 Inspector's Signature:Inspector's Name: Jacob Christensen Reviewer's Signature:Reviewer's Name: Jacob Christensen Reviewed Date: 04/04/2023 File Name: 22229DFR03312023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B1EA5E09-A713-48AA-8128-493852B18D38 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: ML Masonry/Headwaters Construction Client: Madison School District Inspection Date: 03/31/2023 Start Time: 08:30 AM End Time: 10:30 AM Current Weather Conditions: Overcast Ambient Temperature (°F): 31 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See picture referencing Structural Plans page S2.0. Interior masonry wall, 2nd lift. Observations/ Remarks: I arrived on site at 9:10 am for the 9:30 am pour and the had apparently showed up earlier than expected. I was not able to look over the entirety of the rebar, but the rebar I did see looked good. I checked for correct size, spacing, and lap length. There were some vertical pieces that were temporarily removed for ease of pouring the grout, but they were immediately replaced after the cells were filled. I did notice that mechanical vibration was being used to help consolidate the grout. I also observed that every cell was filled with grout. I stayed for the remainder of the pour and then wrote this report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR03312023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B1EA5E09-A713-48AA-8128-493852B18D38 2 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 03/31/2023 File Name: 22229DFR04032023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. FB7CB6BC-FACA-4FF0-A765-C2E58D9FDE0A 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Client: Madison School District Inspection Date: 04/03/2023 Start Time: 08:30 AM End Time: 11:00 AM Current Weather Conditions: Sunny/Clear Ambient Temperature (°F): 25 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo Observations/ Remarks: I arrived at the job site and looked over the rebar and spacing. Not all the bar had been placed yet, but I observed them placing it when the truck arrived. I ensured that the reinforcement was placed according to the project documents prior to the contractor placing the grout. The truck arrived at approximately 9:15. I observed the crew prepping the equipment for the pour and I also watched as the crew began pouring. The pour went smoothly, there weren’t any issues. Once the pour was completed I returned to my vehicle to begin writing my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR04032023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. FB7CB6BC-FACA-4FF0-A765-C2E58D9FDE0A 2 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: Jacob Christensen Reviewed Date: 04/05/2023 File Name: 22229DFR04042023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CB6283-663F-475E-83FF-34FB9F2631D6 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Construction Client: Madison School District Inspection Date: 04/04/2023 Start Time: 12:30 PM End Time: 02:30 PM Current Weather Conditions: Overcast Ambient Temperature (°F): 37 Wind: Calm Inspection Type(s): Epoxy Embeds/ Anchors Location(s): Classrooms 121 & 119, BA1 & 123, BA6 & 125 Observations/ Remarks: I arrived on site and located where the contractor had to re do the anchor bolts that were done on 3-6-23. I observed that the holes were cleaned out via compressed air and wire brush. I observed that the contractor had placed a sufficient amount of epoxy then placing the bolts with a twisting motion. I noted that the epoxy was not expired. I watched the contractor place a total of 8 anchors. Upon completion I returned to my vehicle and wrote this report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR04042023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CB6283-663F-475E-83FF-34FB9F2631D6 2 File Name: 22229DFR04042023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CB6283-663F-475E-83FF-34FB9F2631D6 3 File Name: 22229DFR04042023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CB6283-663F-475E-83FF-34FB9F2631D6 4 File Name: 22229DFR04042023LSH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 66CB6283-663F-475E-83FF-34FB9F2631D6 5 Inspector's Signature:Inspector's Name: Luke Hammar Reviewer's Signature:Reviewer's Name: Jacob Christensen Reviewed Date: 04/05/2023 File Name: 22229DFR04052023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1DC6B853-2C98-4975-BA8F-403D69B507C1 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: ML Masonry/Headwaters Construction Client: Madison School District Inspection Date: 04/05/2023 Start Time: 09:30 AM End Time: 12:00 PM Current Weather Conditions: Sunny/Clear Ambient Temperature (°F): 21 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans page S2.0. Interior masonry wall. 16’-20’. Observations/ Remarks: I arrived on site and the grout was already there, they had apparently just started so I didn’t miss much. I hopped up and looked over the rebar. I checked for correct size, spacing, and lap length. All appeared to be within spec. Some of the rebar had been temporarily removed for ease of grout placement. But as soon as the grout was in the rebar was replaced. I stayed for the duration of the pour and noticed that mechanical vibration was used in the appropriate cells and that every cell was filled with grout. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR04052023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1DC6B853-2C98-4975-BA8F-403D69B507C1 2 File Name: 22229DFR04052023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1DC6B853-2C98-4975-BA8F-403D69B507C1 3 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/07/2023 File Name: 22229DFR04122023JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1681329911105 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: ML Masonry Client: Madison School District Inspection Date: 04/12/2023 Start Time: 12:30 PM End Time: 03:30 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 58 Wind: 15-25 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): East maintenance room - 20' West high wall - 20' See also attached drawing Observations/ Remarks: I arrived on site and began my observations of the masonry reinforcement. I observed that the contractor had placed the reinforcement in general conformance with the project documents. Grouting began at approximately 1:15 PM. After grouting the East area, the contractor had to move the pump around to the West side of the building. Grouting was completed at 2:45 PM. I notified the contractor of my observations prior to leaving. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR04122023JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1681329911105 2 File Name: 22229DFR04122023JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1681329911105 3 File Name: 22229DFR04122023JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1fbaea54224c7895-1681329911105 4 Inspector's Signature:Inspector's Name: Jacob Christensen Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/17/2023 File Name: 22229DFR03232023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E05905AA-59D0-4465-8534-6449AE0F3C49 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Construction Client: Madison School District Inspection Date: 03/23/2023 Start Time: 11:45 AM End Time: 02:15 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 20 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans. Observations/ Remarks: I arrived at the job site and the truck was already there. I looked over the rebar and spoke with the crew about how long the truck had been there. I observed the remainder of the pour and urged the crew to grab a vibrator to help with consolidation. I watched as the pour concluded and returned to my vehicle to fill out my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR03232023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E05905AA-59D0-4465-8534-6449AE0F3C49 2 File Name: 22229DFR03232023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E05905AA-59D0-4465-8534-6449AE0F3C49 3 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/17/2023 File Name: 22229DFR03102023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7E5A526F-81AA-443D-A842-0AA1935E6EC7 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Construction Client: Madison School District Inspection Date: 03/10/2023 Start Time: 11:30 AM End Time: 01:30 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 20 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Southern wall Observations/ Remarks: I arrived at the job site and spoke with the crew about when the truck would be expected. I looked over the rebar and spoke with the crew about the placement. The truck arrived and began prepping for the pour. I observed as the crew used vibration for consolidation. I watched the remainder of the pour and returned to my vehicle once the pour was concluded. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR03102023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7E5A526F-81AA-443D-A842-0AA1935E6EC7 2 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/17/2023 File Name: 22229DFR03012023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F7AFE810-4537-47A8-83F3-ABAF3E9C00A3 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Construction Client: Madison School District Inspection Date: 03/01/2023 Start Time: 01:30 PM End Time: 03:45 PM Current Weather Conditions: Overcast Ambient Temperature (°F): 20 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Southern most wall of building. See photo referencing Structural Plans. Observations/ Remarks: I arrived at the job site and the crew was already pouring. I looked over what I could but wasn’t able to see all of the rebar due to the fact that the block already partially filled. I observed as the crew used vibration as well as moving the bar to help with consolidation. I observed the remainder of the pour and returned to my vehicle. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR03012023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F7AFE810-4537-47A8-83F3-ABAF3E9C00A3 2 File Name: 22229DFR03012023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F7AFE810-4537-47A8-83F3-ABAF3E9C00A3 3 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/17/2023 File Name: 22229DFR04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8A4663BC-CF8E-405D-B056-FEC7FCC4DFB4 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: ML Masonry/Headwaters Construction Client: Madison School District Inspection Date: 04/18/2023 Start Time: 10:30 AM End Time: 12:30 PM Current Weather Conditions: Overcast Ambient Temperature (°F): 41 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photos referencing the Structural Plans. Masonry wall, top lift. Observations/ Remarks: We arrived at the job site around 10:40 am. The truck arrived around 11:00 am. We looked over the rebar and spoke with the crew about placement and using vibration for consolidation. The truck finished up it’s prep and began pouring. We observed as the crew used vibration as well as shaking the bar for consolidation. We observed the remainder of the pour. Once the pour was completed we returned to the vehicle and began filling out the report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8A4663BC-CF8E-405D-B056-FEC7FCC4DFB4 2 File Name: 22229DFR04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8A4663BC-CF8E-405D-B056-FEC7FCC4DFB4 3 File Name: 22229DFR04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8A4663BC-CF8E-405D-B056-FEC7FCC4DFB4 4 File Name: 22229DFR04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8A4663BC-CF8E-405D-B056-FEC7FCC4DFB4 5 File Name: 22229DFR04182023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8A4663BC-CF8E-405D-B056-FEC7FCC4DFB4 6 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/19/2023 File Name: 22229DFR04202023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. EE35A734-FB99-4DE8-A64D-1F227F22C463 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: ML Masonry/Headwaters Construction Client: Madison School District Inspection Date: 04/20/2023 Start Time: 12:00 PM End Time: 02:00 PM Current Weather Conditions: Overcast Ambient Temperature (°F): 43 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans page S2.0. Exterior masonry wall for 0-4’. Observations/ Remarks: I arrived on site at 12:45 pm for the 1:00 pm grout pour, and apparently the grout showed up early and the pour was completed already. But I was able to look over the vertical rebar that was exposed, and it was in the appropriate cells. They also had the mechanical vibrator out with evidence of being used. From what I could tell, the pour went smoothly and the methods and means were in conformance to project documents. I left location at 1:30 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR04202023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. EE35A734-FB99-4DE8-A64D-1F227F22C463 2 File Name: 22229DFR04202023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. EE35A734-FB99-4DE8-A64D-1F227F22C463 3 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/27/2023 File Name: 22229DFR04212023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. A5AA7AEE-8C4F-4281-93EA-041F22757D35 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Construction Client: Madison School District Inspection Date: 04/21/2023 Start Time: 07:45 AM End Time: 09:45 AM Current Weather Conditions: Snow Ambient Temperature (°F): 30 Wind: 5-15 mph Inspection Type(s): Structural Steel and Bolting Location(s): 4 columns in the gym - 4 columns in the K class rooms - 2 columns in the Media Center Observations/ Remarks: Arrived on site at 8:04 am. Paul with Headwaters showed me 10 columns that had non-shrink grout between the top of the footer and the bottom of the column. They were over 8 schedule 105 footings and a 104 in the Southeast corner of the gym and a 116 in the Media Center. I observed the locations had been cleaned after installing and grout was completely packed into the space. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR04212023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. A5AA7AEE-8C4F-4281-93EA-041F22757D35 2 File Name: 22229DFR04212023BB PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. A5AA7AEE-8C4F-4281-93EA-041F22757D35 3 Inspector's Signature:Inspector's Name: Ben E Ball Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/27/2023 File Name: 22229DFR04252023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 51DD6378-E65F-415A-8851-2252E00DD8D2 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: ML Masonry/Headwaters Construction Client: Madison School District Inspection Date: 04/25/2023 Start Time: 11:30 AM End Time: 01:45 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 54 Wind: Calm Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans. Observations/ Remarks: I arrived at the job site around 12:30 pm and the truck was arriving as I did. I looked over the rebar and saw that the spacing and placement was within general conformance. I observed as the crew began placing the material. The crew used vibration and tapping as the grout was poured. The crew poured in multiple areas and moved their equipment as they went. Once the crew concluded the pour, I returned to my vehicle and began filling out my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR04252023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 51DD6378-E65F-415A-8851-2252E00DD8D2 2 File Name: 22229DFR04252023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 51DD6378-E65F-415A-8851-2252E00DD8D2 3 File Name: 22229DFR04252023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 51DD6378-E65F-415A-8851-2252E00DD8D2 4 File Name: 22229DFR04252023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 51DD6378-E65F-415A-8851-2252E00DD8D2 5 File Name: 22229DFR04252023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 51DD6378-E65F-415A-8851-2252E00DD8D2 6 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 04/28/2023 File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FC233A0-C043-4EF7-B6FE-B79388ECFF1D 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Headwaters Construction/ML Masonry Client: Madison School District Inspection Date: 05/22/2023 Start Time: 08:45 AM End Time: 01:15 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 66 Wind: Calm Inspection Type(s): Epoxy Embeds/ Anchors Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans page S2.0: Epoxy is identified by the dots Grout is identified by the lines Observations/ Remarks: I arrived at the job site and met with the foreman for the epoxy inspection, we discussed where epoxy was needed and when we’d be able to take care of the inspection. They finished up their prep and finished cleaning out their holes. Once that was finished the crew was able to begin injecting the epoxy into the drilled holes. I observed and I also took note of the epoxy they were using and confirmed it’s expiration date. It was going smoothly until they ran out of epoxy. The foreman ran to grab some more, in the meantime the truck had arrived for grout. I went up the scaffolding and looked over the bar and observed as the pour took place. I observed as the crew used vibration as well as shaking the bar to help with consolidation. As the pour was wrapping up the foreman returned with additional epoxy. I joined up with him and observed as he continued the injection process. Once completed I returned to my vehicle and began filling out my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FC233A0-C043-4EF7-B6FE-B79388ECFF1D 2 Inspection Images: File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FC233A0-C043-4EF7-B6FE-B79388ECFF1D 3 File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FC233A0-C043-4EF7-B6FE-B79388ECFF1D 4 File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FC233A0-C043-4EF7-B6FE-B79388ECFF1D 5 File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FC233A0-C043-4EF7-B6FE-B79388ECFF1D 6 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 05/24/2023 File Name: 22229DFR05242023CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F5D221A7-F987-4325-A89E-3740D007A6F8 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: M L Masonry Client: Madison School District Inspection Date: 05/24/2023 Start Time: 10:30 AM End Time: 02:30 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 62 Wind: Calm Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans, page S2.0 Observations/ Remarks: I arrived on site and began observations on the reinforcement for the masonry on the southeast corner of the building 8’ below top of building. I observed that the contractor had adequate reinforcement according to project guidelines. The grout truck arrived late at 12:20 PM and the contractor immediately began to pump upon arrival. I observed the contractor pump all of the grout and observed that the contractor mechanically consolidated the grout with an electric vibrator at each cell with a vertical piece of steel. I remained on site for the duration of the pour and left the job site afterwards. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR05242023CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F5D221A7-F987-4325-A89E-3740D007A6F8 2 File Name: 22229DFR05242023CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F5D221A7-F987-4325-A89E-3740D007A6F8 3 File Name: 22229DFR05242023CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F5D221A7-F987-4325-A89E-3740D007A6F8 4 Inspector's Signature:Inspector's Name: C Hammar Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 05/24/2023 File Name: 22229DFR05242023CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F5D221A7-F987-4325-A89E-3740D007A6F8 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: M L Masonry Client: Madison School District Inspection Date: 05/24/2023 Start Time: 10:30 AM End Time: 02:30 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 62 Wind: Calm Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans, page S2.0 Observations/ Remarks: I arrived on site and began observations on the reinforcement for the masonry on the southeast corner of the building 8’ below top of building. I observed that the contractor had adequate reinforcement according to project guidelines. The grout truck arrived late at 12:20 PM and the contractor immediately began to pump upon arrival. I observed the contractor pump all of the grout and observed that the contractor mechanically consolidated the grout with an electric vibrator at each cell with a vertical piece of steel. I remained on site for the duration of the pour and left the job site afterwards. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR05242023CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F5D221A7-F987-4325-A89E-3740D007A6F8 2 File Name: 22229DFR05242023CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F5D221A7-F987-4325-A89E-3740D007A6F8 3 File Name: 22229DFR05242023CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. F5D221A7-F987-4325-A89E-3740D007A6F8 4 Inspector's Signature:Inspector's Name: C Hammar Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 05/24/2023 File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 61B1C7BF-6D33-4401-B47E-50A09A2FF946 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: ML Masonry/Headwaters Construction Client: Madison School District Inspection Date: 05/22/2023 Start Time: 08:45 AM End Time: 01:15 PM Current Weather Conditions: Partly Cloudy Ambient Temperature (°F): 50 Wind: 5-15 mph Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): See photo referencing Structural Plans page S2.0. From 8’-12’. Observations/ Remarks: I arrived at the job site and looked over the rebar and looked at the placement. We then waited for the truck to arrive. Once the truck arrived we were able to begin pouring right away. I observed as the crew used vibration as well as fidgeting with the bar to help consolidate the material. I observed the remainder of the pour and returned to my vehicle once the pour was concluded to fill out my report. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 61B1C7BF-6D33-4401-B47E-50A09A2FF946 2 File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 61B1C7BF-6D33-4401-B47E-50A09A2FF946 3 File Name: 22229DFR05222023MM PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 61B1C7BF-6D33-4401-B47E-50A09A2FF946 4 Inspector's Signature:Inspector's Name: M.Mansfield Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 05/31/2023 File Name: 22229DFR06212023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5E74D642-6F0B-4B92-9336-CAD2F1139AD4 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Daily Field Report Project Number: 22-229 Project Name: Hibbard Elementary Contractor: Intermountain Steel/Headwaters Construction Client: Madison School District Inspection Date: 06/21/2023 Start Time: 09:30 AM End Time: 11:30 AM Current Weather Conditions: Sunny/Clear Ambient Temperature (°F): 57 Wind: Calm Inspection Type(s): Welding Location(s): Roof decking over gymnasium Observations/ Remarks: I arrived on site and checked in with Dave Rose of Headwaters and he informed me that he wasn’t on site but told me what I was to be looking over and that I could check in with the steel guys if I needed. I was looking over the steel and decking welds over the gymnasium. I checked the puddle welds for correct penetration as well as the crimping on the decking sheets. They appeared to be in accordance with project documents. Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Inspection Images: File Name: 22229DFR06212023EV PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5E74D642-6F0B-4B92-9336-CAD2F1139AD4 2 Inspector's Signature:Inspector's Name: E. Vail Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/23/2023