Loading...
HomeMy WebLinkAboutPLANS - 23-00388 - BYUI Tennis Court ImprovementsAddress: 312 S. 1st W. Rexburg, Idaho 83440 Set Date: 06.16.23 109 Ft 116 FtSheet G1 Project Site Project Title: BYU-I Tennis Court Improvements Site Access from 3rd S. City street sign temporarily moved Site access and material laydown areaDumpster.staging / equipment prarking. Construction passenger vehicle parking. Sheet G2 Site Logistics Plan 19'-6" 22 FT116'-0"109'-0"17'-0"20'-10"78'-0"36'-0"12'-0"12'-0" Existing Gate Existing sidewalk Existing Gate Existing Site Demo Plan Sheet D1 Existing Site Demo Plan Dispose of tennis net posts Demo & dispose of existing fence, gates and raised concrete curb around perimeter of the courts. Existing asphault court to be demolished and hauled off. Existing power lines and pole. Plan all work with heavy equipment to maintain a safe (20 ft) working distance at all times from power lines Existing light poles to remain Existing electrical equipment to remain protected during construction. Electrician to de-energize during the course of construction Existing light poles to remain Existing light poles to remain Existing light poles to remain Excavate 9" down for the area of the court shown. Additionally the perimeter of the court will need to be excavated 16'' deep x 18'' wide for a thickened slab edge. Demo & dispose of existing fence, gates and raised concrete curb around perimeter of the courts. Existing sidewalks to remain protected during construction Existing sidewalks to remain protected during construction Electrician to temporarily remove equipment for new court and fence construction. Protect and preserve existing trees and turf Protect and preserve existing trees and turf Two existing concrete footing structures. Remove and dispose. 116'-0"109'-0" New gate at this location Existing sidewalk to remain Tennis/Pickle Ball Court Rebuild Plan / Base Bid Layout Sheet A1 Tennis Court Rebuild Plan New gate at this location Existing sidewalk to remain New post tensioned slab with new perimeter fencing and gates complete. Also provide surface coatings, game lines, post sleeves, posts and nets. (2) Tennis courts and (6) Pickleball courts. See sheet A2 for gamelines New vinyl coated chain link fence 10ft tall around perimeter of the court. Two new lockable fence gates at locations shown. Tennis court subcontractor to provide aggregate base course and compaction 4" in depth. Electrical contractor to reconnect equipment after court and fence construction. Replace lighting timer dial like for like. Existing sprinkler control box to remain Existing light poles to remain Protect and preserve existing trees and turf Protect and preserve existing trees and turf on east side. 116'-0"109'-0" New gate at this location Existing sidewalk to remain Tennis/Pickle Ball Court Rebuild Plan Sheet A2 Game line Dimension Plan New gate at this location Existing sidewalk to remain 20'-0"44'-0"12'-4"12'-1" 12'-4"12'-4"12'-4" 36'-0"78'-0"10'-0"7'-0"12'-4"12'-1"19'-0"7'-0"19'-0"7'-0"7'-0"12'-4" Key Dashed red lines indicate pickleball court locations. Dashed blue lines indicate tennis court locations Dashed black lines indicate permanent net systems 116'-0"109'-0" New gate at this location Existing sidewalk to remain Tennis/Pickle Ball Court Rebuild Plan Sheet A3 Tennis Court Game Line & Surfacing Plan New gate at this location Existing sidewalk to remain New PT slab with new perimeter fencing and gates complete. Also provide surface coatings game lines, embeds for net posts, posts and nets. Pickleball court layout (6 courts) without expanding the slab length. Tennis courts would be centered north to south and east to west. Final Color Selection "Medium blue - Grey" combo with solid white lines for each pickleball court "Light Green" main surface Shadow Lines for both tennis courts Typical Post-Tensioned Detail.Sheet A4Renner Slab &Excavation DetailRefrences