Loading...
HomeMy WebLinkAboutCONCRETE FIELD TEST10 - 22-00269 - Hibbard Elementary SchoolFile name: 22229FB06012023JPC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3A39F358-8A85-4D8D-98C7-23B2CF4B7F34 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Compressive Strength of Concrete Test Specimens Project Number: 22-229 Cumulative Test Load Amount: 4.5 Project Name: Hibbard Elementary Test Location: Top lift of gym wall. See photo referencing Structural Plans, page S2.0 Client: Madison School District Admixtures: P-200N Ticket Number: 79116554 Contractor: ML Masonry Supplier: IMC Mix Number: 3336531 Date: 5/25/2023 Cylinder Log #: 213 Field Test Results: Set #: 1 Entrained Air (%): 0.0 Concrete Temperature (°F): 69 Ambient Temperature (°F): 68 Unit Weight (PCF): 0 Tested By: E. Vail Date: 5/25/2023 Picked Up By: Jense Christensen Date: 5/26/2023 Time: 7:45 AM Max, Min Temperature 80, 60 Initial Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 6/1/2023 3.400 9.07 39,535.0 4359 4,000.0 Type 6 Date: 06/01/2023 Reviewed By: Luke Hammar Signature: