Loading...
HomeMy WebLinkAboutE211820c-040822=On=A-rpt010adsigned.pdf - 21-00270 - Iron Horse Division 1 - 1076 S 12th W - Plat - Infrastructure Acceptance1774 Precision East Drive  Idaho Falls, ID 83402  (208) 529-8242  Fax (208) 529-6911 oneatlas.com Tana Barney Phone: (208) 616-1050 Ball Ventures, LLC Fax: PO Box 51298 Other: E-REPORTS ONLY Idaho Falls, ID 83705 Project: Iron Horse 1, Civil Work Only, Rexburg, ID CMT - Ball Ventures Permit #: Project Manager: Derrick Fontes File #: E211820c INSPECTION/TESTING REPORT Our representative(s) performed work on the above referenced project. Attached you will find the corresponding inspection and/or test reports. Please refer to the attached reports for details and locations of our testing and inspection services. If there are questions concerning the attachment(s), please contact the project manager at (208) 529-8242. Respectfully submitted, Atlas Technical Consultants, LLC cc: Attachments: 4/13/2022 Page 1 of 2 rpt010ad www.oneatlas.com DENSITY OF BITUMINOUS CONCRETE IN PLACE BY NUCLEAR METHODS (ASTM D-2950) Rev. Sept 28, 2020  Make & Model:Gauge #:Serial #:Standard Counts: DS:MS: NOTICE: Our professionals are represented on site solely to observe operations of the contractor to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.  This Report is Preliminary. observation was performed. Observations and/or conclusions and/or shall take precedence over those indicated in a preliminary report.  This Report is Final. conclusions drawn from this report should be discussed with and evaluated by the professional involved. Inspector: _________________________________________ Date: ________________ Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. Reviewed by: ______________________________________Date: ________________ Contractor Initials: ____________ Date: _______________ File #: _____________________ Project Name: ____________________________________ Contractor: _________________________________________ Permit #: ________________________________________ Inspector: __________________________________________ Weather: _______________________________________ Paving Contractor: ___________________________________ % Compaction Spec.: ______________________________ Material Source: _______________________________ Asphalt Mix Description: _________________________________ Marshall Unit Weight:____________ Hveem Max. Theoretical: ___________ Super Pave Max. Theoretical: ____________ Mix Temperature (˚F) (Delivered): __________ Mix Design Provided: Yes No Mat Thickness Spec.: ___________ No cores have been taken to establish a core to gauge correlation factor. Compaction values reports above are uncorrected and for information only. Test #Element and Location Test A (pcf)Test B (pcf) Average (pcf)Core Correlation Corrected Density (pcf) % Compaction Core Thickness Notes: Date of Last Calibration: 4/8/2022 E211820c Iron horse 1 Depatco Not provide Chance Prouse Warm York Pit 92-100 Pit 209 5828 151.6 280 4 4 1 Final lift From farthest north median halfway on median 10 feet north of median 145.4 143.9 144.7 144.7 95.4 2 Core #3 from farthest north road median farthest east corner.10 feet North of corner.145.7 143.2 144.5 144.5 95.3 3 Core #4. From farthest north road to east T of road curb 400’ S 9’W 140.2 140.2 140.2 140.2 92.5 4 From above noted core 10 S 4’N 139.5 139.3 139.4 139.4 92.0 42 Troxler 3430 27237 2088 623 2/25/2022 4/8/2022 4 4/13/2022 Jocelynn Silva 4/13/2022 Page 2 of 2