HomeMy WebLinkAbout22-7058 Rice - 21-00270 - Iron Horse Division 1 - 1076 S 12th W - Plat - Infrastructure Acceptance T HEORETICAL M AXIMUM
S PECIFIC G RAVITY - R ICE
PAGE #1 OF 1
PRINT DATE 4/29/2022
C:\Users\thornockb\Box\Reports\Eastern
Idaho\2021 Reports\E211820c - Iron Horse 1, Civil
Work Only, Rexburg, ID CMT - Ball
Ventures\Asphalt\22-7058 Rice.docx
«Office_Address»
www.oneatlas.com Revised: September 29, 2020
Tana Barney Phone: (208) 616-1050
Ball Ventures, LLC Fax:
PO Box 51298 Other: E-REPORTS ONLY
Idaho Falls, ID 83705
Project: Iron Horse 1, Civil Work Only, Rexburg,
ID
Project Manager: Derrick Fontes
Lab Technician: Daniel Webb
Test Date: April 28, 2022
As requested Atlas has performed specific gravity testing on the sample referenced below. The testing was
performed in accordance with current standards indicated below. The results obtained in our laboratory were
as follows:
Source and Type of Mix: Depatco ½” SP3 PG 58-28, A521-0012. Sampled from onsite paving operations at
09:30
Date Obtained: April 28, 2022
Sample ID: 22-7058
Sampling and Preparation: ASTM D979: X AASHTO T168:
Test Standard: ASTM D2041: X AASHTO T209:
Sample Mass (g) 1527.7 1526.4
Container Type Bowl Bowl
Procedure Type Weight in Water Weight in Water
Maximum Specific Gravity
(g/cc) 2.440 2.436
Average = 2.438 g/cc = 151.7 lbf
If there are questions concerning this report (22-7041 Rice), please contact the project manager at (208) 529-
8242.
Respectfully submitted,
ATLAS TECHNICAL CONSULTANTS
Reviewed By: Brock Thornock
Idaho Falls Senior Inspector
Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony u nder Federal Statute.
cc: