Loading...
HomeMy WebLinkAboutFOUNDATION DESIGN - 23-00268 - Golden West Irrigation - Shell OnlyFOUNDATION DESIGN FOR GOLDEN WEST BUILDING REXBURG, IDAHO For SteelVision Construction NOTES: 1. Foundation configuration provided by Trevor Haslem of SteelVision Construction. 2. Foundation loads from Nucor Drawings, Sheet F2 of 2, Job No. U23M0274A, dated 05/15/23. 3. Exact anchor bolt locations shall be as shown on Nucor Drawings. 4. Concrete 28 -day strength shall be 3000 psi minimum. Slump shall be 3-4.5 in. 5. Reinforcement bars shall be ASTM A615 with Fy = 60,000 psi. 6. Concrete construction per ACI -318. 7. Assumed allowable soil bearing pressure = 2000 ps£ 8. Rectangular piers shown on drawings may be replaced with circular piers formed by sonotubes if the reinforcement is the same, the concrete area is equal to that of the rectangular pier, and there is sufficient cover for the reinforcement as required by ACI -318. 9. The "jab" method of placing anchor bolts or vertical reinforcing bars is acceptable if the following conditions are met: a. The anchor bolts and vertical bars are placed when the footing concrete is still fluid enough for it to fill in around the bolts and bars when they are placed and hand vibrated into the correct position as shown on the Behlen drawings and the foundation details. b. The vertical bars are located, relative to the horizontal bars in the footing, as shown on the foundation details. The details show the horizontal bend on the vertical bars going below the horizontal bars in the footing. c. The vertical bars meet the ACI code development length requirements. INDEX TO ATTACHED DOCUMENTS Detail Yat Foundation Plan I Detail 1—Foundation for Corner Columns on Framelines 1 & 7 2 Detail 2 —Foundation for Interior Columns on Framelines 1 & 7 3 Detail 3 Foundation for Columns A2 thru A6 4 Detail 4 — Foundation for Columns D2 thru D6 5 Detail 5 — Foundation for Interior Partition Wall Columns 6 �J us IFNI G � Q W U Q D Q Ga Q�f J Z = W O N MQ OU Wz� J J U H U Q wo QW dS Q� D Z,,66 �Qw W U Q Q W z zA D W J = a HZ _ _j 1. - D I-- p LO OJ Q O Q W Q J EYD C6 D L J U J zQ O 2m: J ~z�cy- a Q U � W Q� Q W W fa WU H C -0Z W af d (QUI- � Q W U Q D Q Ga Q�f J Z = W O N MQ OU Wz� J J U H U Q wo QW ENDWALL 4'-0' �- 24' PLAN VIEW EWALL F❑❑TING REINFORCEMENT: k4 CONTINUOUS LONGITUDINAL BARS, ) #4 TRANSVERSE BARS @ 18' O.C. LL FOOTING REINF❑RCEMENT1 CONTINUOUS LONGITUDINAL BARS, 4 TRANSVERSE BARS @ 18' O,C. 12" 3/4' DIA. ANCHOR BOLTS ��- 1/2" --- 7 #3 TIES; 4 IN AREA ❑F ANCH❑R BOLTS, THEN AT 10' ❑.C. BEL❑W. TYP. SIDEWALL & ENDWALL REINFORCEMENT 5 #4 HORIZONTAL BARS EVENLY SPACED. #4 VERTICAL BARS @ 18' ❑.C. 4 #4 VERT. BARS IN CORNERS ❑F ENLARGED WALL 3 #4 LONGITUDINAL BARS IN ENDWALL FOOTING #4 @ TRANSVERSE BARS @ 18' O.C. 4"-----� SECTION GOLDEN WEST BUILDING DETAIL 1 FOUNDATION FOR CORNER COLUMNS ❑N F-RAMELINES 1 & 7 05/16/2023 3'-6' SQ, GRADE 4 HAIRPIN BAR. EXTEND IN. OF 5' INTO SLAB. 12" 3/4 DIA. ANCHOR BOLTS -�I- 1/2" �--19.5' --I 7 #3 TIES; 4 IN AREA OF ANCHOR BOLTS, THEN 3 @ 10" SPACING #4 HAIRPIN BAR INT❑ SLAB, PR❑VIDE MIN. OF 3' CONCRETE BETWEEN BAR AND SOIL. 4'-0" --------- 4 VERT. BARS 18' D.C. 5 #4 HORIZ. BARS CONTINUOUS IN WALL I I 12" I---------- I I----- 3'-6' SQ. --� SECTION GOLDEN WEST BUILDING 4 #4 VERT, BARS IN CORNERS OF ENLARGED WALL 4 #4 BARS EACH WAY EVENLY SPACED IN ENLARGED FOOTING DETAIL 2 FOUNDATI❑N FOR INTERI❑R COLUMNS ON ERAMELINES 1 & 7 05/16/2023 8'-0' SQ, I I I I I 18" WIDE SIDEWALL FOOTING PLAN VIEW SIDEWALL I 81-}- -18" i I I I I I I I I GRADE I I I I I I I I I 6 #6 VERTICAL BARS, EXTEND INTO FOOTING AS SHOWN 8'-0" SQ. SECTION SIX 1' DIA. ANCH❑R BOLTS, 5 #3 TIES IN AREA OF ANCH❑R BOLTS. RS FOR i. EXTEND MIN. ❑F SOIL. 2 #6 X -TIE BARS 2 #6 X -TIE BARS FROM SIDE TO SIDE AROUND ANCHOR BOLTS, PR❑VIDE MIN, OF 3" CONCRETE BETWEEN BARS & SOIL. 24" 16' 1 GOLDEN WEST BUILDING DETAIL _3 FOUNDATION F❑R COLUMNS A2 THRU AC 05/16/2023 8 #6 BARS EACH WAY EVENLY SPACED 7'-0" SQ. GRADE 'IERS FOR D5, EXTEND IDE MIN. OF & SOIL. 2 #6 X -TIE BARS I I I I I I I I I I I I I 18" WIDE SIDEWALL FOOTING PLAN VIEW SIDEWALL I 8°18" I I I I I I I I I I I I I I ( I I I I 6 #6 VERTICAL BARS. EXTEND INTO FOOTING AS SHOWN 7'-0" SQ. SECTI❑N SIX 1" DIA. ANCHOR BOLTS, II�1/2' 5 #3 TIES IN AREA OF ANCHOR BOLTS. 2 #6 X -TIE BARS FROM SIDE TO SIDE AROUND ANCHOR BOLTS, PROVIDE MIN. OF 3" CONCRETE BETWEEN BARS & SOIL. GOLDEN WEST BUILDING DETAIL 4 FOUNDATION FOR COLUMNS D2 THRU D6 05/16/2023 24" 14" 9 #5 BARS EACH WAY EVENLY SPACED • #4 HAIRP 2'-0" SQ, 10" INT❑ SLAB 0 0 FLOOR SLAB PLAN VIEW 10" 16" �---- 2'-0' SQ, - -� SECTI❑N IN BAR; EXTEND MIN. OF 5 FT. 3/4 DIA. ANCHOR BOLTS 195 - TWO #3 TIES #4 HAIRPIN BAR; PR❑VIDE MINIMUM OF 3" CONCRETE BETWEEN BAR & S❑IL. FOUR #5 VERTICAL BARS THREE #4 BARS EACH WAY EVENLY SPACED GOLDEN WEST BUILDING DETAIL 5 FOUNDATI❑N FOR INTERI❑R PARTITION WALL COLUMNS 05/17/2023