Loading...
HomeMy WebLinkAboutREVISED PLAN - 22-00588 - Cedar Point Trucking - New Commercial Bldg156' - 0" 10 0 ' - 0 " 3' - 0"2' - 0"16' - 0"6' - 0"16' - 0"13' - 0"16' - 0"6' - 0"16' - 0"1' - 0"3' - 0" 3' - 0"2' - 0"16' - 0"6' - 0"16' - 0"13' - 0"16' - 0"6' - 0"16' - 0"2' - 2"3' - 0" 26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0" 0' - 6 " 24 ' - 6 " 25 ' - 0 " 25 ' - 0 " 24 ' - 6 " 0' - 6 " 1234 5 6 7 A B C D E 25 ' - 0 " 25 ' - 0 " 7' - 6 " www.titansteelidaho.com Scale Date Drawn By Checked By Project Number TITAN STEEL LLC P.O. BOX 326 Rigby, ID 83442 (208) 709-7553 Layne Walker (208) 351-8677 Steve Wilcox (208) 709-7553 Kent Smith (208) 512-4159 COPYRIGHT 2020 by TITAN STEEL All rights reserved. Reproduction or translation of any part of this work without written permission is unawfull. Violaters will be prosecuted. 1" 6'-0" 6/ 2 0 / 2 0 2 2 4 : 4 8 : 5 2 P M A01 FLOOR PLAN CEDARPOINT TRUCKING RKS AR 05/17/2022 Project Number No.Description Date 1" 6'-0"1FLOOR PLAN 12' X 14' SHOP OFFICE20' X 50' PARS AREA 50' X 50' LOUNGE AREA 1/2 LOAD MAIN FRAME T.O. WALL ELEV 102' - 0" T.O. PIER ELEV 100' - 0" T.O. PIER ELEV 100' - 0" T.O. PIER ELEV 100' - 0" 1/2 LOAD MAIN FRAME T.O. WALL ELEV 102' - 0" ENDWALL COL @ ELEV 102' - 0" (TYP U.N.O.) FULL HGT LINER PANEL AT SHOP AREA - MATCH EXTERIOR COLORSBASE OF COLUMN @ ELEV 100' - 0" BASE OF COLUMN @ ELEV 100' - 0" OVERHEAD DOOR 16' X 14' OVERHEAD DOOR 16' X 14' OVERHEAD DOOR 16' X 14' (WASH BAY) OVERHEAD DOOR 16' X 14' (WASH BAY) OVERHEAD DOOR 16' X 14' (CAR WASH) OVERHEAD DOOR 16' X 14' (CAR WASH) OVERHEAD DOOR 16' X 14' OVERHEAD DOOR 16' X 14' "PBR" LINER PANEL FROM T.O. STEMWALL TO EAVE @ SHOP AREA - LINER COLORS TO MATCH EXTERIOR OPTIONAL ARCHITECTURAL BUILDING BUMP OUT 29' X 4' 52' X 100' SHOP AREA FULL CEILING LINER @ WASH BAY AND T.O. STEMWALL ELEV 102' - 0" T.O. WALL PIER ELEV 102' - 0" T.O. WALL PIER ELEV 102' - 0" T.O. WALL PIER ELEV 102' - 0" 3/4" T&G PLYWOOD FROM T.O. STEMWALL TO 10' - 0" AFF METAL PANEL ABOVE PLYWOOD ENDWALL COL & T.O. WALL ELEV 102' - 0" (TYPICAL U.N.O) 50LF CONCRETE FLOOR DRAINS (TYP) ENDWALL COL & T.O. WALL ELEV 102' - 0" (TYPICAL U.N.O) ENDWALL COL & T.O. WALL ELEV 102' - 0" (TYPICAL U.N.O) T.O. PIER ELEV 100' - 0" T.O.PIER ELEV 100' - 0" T.O. PIER ELEV 100' - 0" L HGT L LINER "X" BRACE FULL HGT LINER PANEL OVERHEAD DOOR 8" X 10' 15' X 50' EQUIPMENT ROOM T.O.W. ELEV 102' - 0" FULL HGT WALL & CEILING LINER BASE OF COLUMN @ ELEV 100' - 0" FULL HGT LINER VI 05/26/2022 VII 05/27/2022 VIII 06/07/2022 10' X 7' 2" OPENING CENTER BETWEEN COLUMNS IX 06/20/2022 NOTES: - CONNECT 4 WET BAY DRAINS TO GREASE INTERCEPTOR THEN TO STORM RETENTION SWALE ALONG THE ROAD. - BOTH BAYS CLOSER TO THE OFFICES WILL BE "WET" MAINTENANCE. ALL DRAINS WILL CONNECT TO SAND OIL INTERCEPTOR AND THEN FLOW INTO STORM AWALE AT ROAD. SLOPE FLOOR TO OVERHEAD DOOR