HomeMy WebLinkAboutAPPROVED JRW RESPONSE - 22-00699 - Mountain Archery - AdditionAuthor Name Author Email Author Phone No.:
Cody Jones Cody.Jones@rexburg.org 208-372-2173
Description : Mountain Archery - Addition
Address : 651 E 3000 N
Record Type : Madison County - Commercial Addition
Document Filename : JRW response for Mountain Archery.pdf
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Approved
# 22-00699
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 1 Stamp Cody Jones : Building Open 1 Approved - Building Inspector
Madison County - Commercial Addition
Approval of plans does not constitute approval of variance from code
Powered by TCPDF (www.tcpdf.org)
JRW response for Mountain Archery
G1.1 Free text Cody Jones : Building Open 1 As per table 601, Exterior bearing walls of a type IIIB need to
have a 2 hour rating. Exterior walls are nonbearing. Structure uses steel frame system.
See Table 601 “Primary Structural Frame”
G1.1 Free text Cody Jones : Building Open 1 Concealed spaces if any need to comply with section 718.
Acknowledged
Landings at doors and cross slope of sidewalk not to exceed 2%. Acknowledged
Need engineered steel building plans. Submitted 9-29-2022 on portal
Special inspector needs to be identified. (bolts, welding). Atlas Technical Consultants will being doing
any special inspections required for this project. Their address is 1753 E Precision Dr Idaho Falls, ID
83401. 208-529-8242
Exit lighting and exit signs to comply with section 1008 and 1013. General Note #10 added: “Exit lighting
and Exits signs shall comply with Section 1008 and 1013.
As per table C402.1.3 in the IECC, slabs to be insulated 24" below for unheated slab. Per Table C402.1.3
of the IECC, building perimeter shall receive a minimum of R10 insulation, a minimum of 24” below slab.
A1.1 Free text Cody Jones : Building Open 4 As per section 706.6, In order for fire wall to terminate at
roof decking a minimum of class B roof covering is required. In exception 4.3 roof decking will need to
protected on each side for four feet.
Fire wall terminates at underside of roof decking. The existing has metal roof panels, and the new
building will as well (Exception 706.6.2.3).
Metal roof panel PBR has a Class A rating (see attached).
Exception 4 is not applicable as the roof sheathing isn’t combustible.
SD1.1 Free text Stan Crittenden : Fire Open 2 Need to be able to park the fire truck and reach anywhere
on the building with a 150 ft. firehose (IFC 2018 503.1.1) See new Drawing