Loading...
HomeMy WebLinkAboutPLAN REVIEW RESPONSE - 22-00694 - U-Haul Bldg B - New CommercialAuthor Name Author Email Author Phone No.: Cody Jones Cody.Jones@rexburg.org 208-372-2173 Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Don Allen Don.Allen@rexburg.org 208-372-2174 Alex Owens Alex.Owens@rexburg.org 208-372-2172 Description : U-Haul Bldg B - New Commercial Address : 328 N 2nd E Application Type : Document Filename : 718081 UHaul Rexburg - Bldg B Compiled Set Resubmittal 20220919.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments T1.1 Free text Cody Jones : Building Open 1 Brett G stated Special Inspector will be identified once hired by general contractor. Penetration's shall be protected as per section 714. Landings at doors and cross slopes of sidewalks not to exceed 2%. T1.1 Free text Cody Jones : Building Open 1 6B T1.1 Free text Cody Jones : Building Open 1 R-25 +R-11 LS T1.1 Free text Cody Jones : Building Open 1 Attic R-49 T1.1 Free text Cody Jones : Building Open 1 As per Energy code C402.1.3 slabs to have an R-10 for 24" below slab. As per IBC section 1805, slab to have a 6 mill damp proofing material installed. # 22-00694 New Commercial Building Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 09.26.2022 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments T1.1 Free text Cody Jones : Building Open 1 Envelope COMM check calls out 6B climate zone and passes. A1.1 Free text Cody Jones : Building Open 4 Building will need at least one accessible parking stall which will need to be van accessible as per section 1106.5 A7.0 Free text Cody Jones : Building Open 9 Glass and Glazing to meet requirements of Chapter 24. SO Free text Cody Jones : Building Open 17 36" E0.1 Callout Alex Owens : Electrical Open 28 Please verify: 2017 NEC allows various wiring methods. Will require conduit/emt if engineer desires. E4.1 Callout Alex Owens : Electrical Open 33 For verification: 2017 NEC allows #4 Cu to concrete encased electrode "UFER". Please verify 2/0 is desired. E4.1 Callout Alex Owens : Electrical Open 33 For verification: 2017 NEC allows #6 Cu to grounding electrode rods. Please verify 2/0 is required. A1.1 Free text Kyle Baldwin : P&Z Open 4 Landscape, screening and snow storage requirements are shown and addressed on permit # 22-00610 Report Date: 09.26.2022 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org)