HomeMy WebLinkAboutPLAN REVIEW RESPONSE - 22-00694 - U-Haul Bldg B - New CommercialAuthor Name Author Email Author Phone No.:
Cody Jones Cody.Jones@rexburg.org 208-372-2173
Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314
Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164
Don Allen Don.Allen@rexburg.org 208-372-2174
Alex Owens Alex.Owens@rexburg.org 208-372-2172
Description : U-Haul Bldg B - New Commercial
Address : 328 N 2nd E
Application Type :
Document Filename : 718081 UHaul Rexburg - Bldg B Compiled Set Resubmittal 20220919.pdf Array
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Revisions Required
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
T1.1 Free text Cody Jones : Building Open 1 Brett G stated Special Inspector will be identified once hired by
general contractor.
Penetration's shall be protected as per section 714.
Landings at doors and cross slopes of sidewalks not to exceed
2%.
T1.1 Free text Cody Jones : Building Open 1 6B
T1.1 Free text Cody Jones : Building Open 1 R-25 +R-11 LS
T1.1 Free text Cody Jones : Building Open 1 Attic R-49
T1.1 Free text Cody Jones : Building Open 1 As per Energy code C402.1.3 slabs to have an R-10 for 24"
below slab.
As per IBC section 1805, slab to have a 6 mill damp proofing
material installed.
# 22-00694
New Commercial Building
Please digitally re-submit all pages of the plan set in response to requested revisions
for our next review cycle, with noted items resolved.
Report Date: 09.26.2022
Approval of plans does not constitute approval of variance from code
Page 1 of 2
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
T1.1 Free text Cody Jones : Building Open 1 Envelope COMM check calls out 6B climate zone and passes.
A1.1 Free text Cody Jones : Building Open 4 Building will need at least one accessible parking stall which
will need to be van accessible as per section 1106.5
A7.0 Free text Cody Jones : Building Open 9 Glass and Glazing to meet requirements of Chapter 24.
SO Free text Cody Jones : Building Open 17 36"
E0.1 Callout Alex Owens : Electrical Open 28 Please verify: 2017 NEC allows various wiring methods. Will
require conduit/emt if engineer desires.
E4.1 Callout Alex Owens : Electrical Open 33 For verification: 2017 NEC allows #4 Cu to concrete encased
electrode "UFER". Please verify 2/0 is desired.
E4.1 Callout Alex Owens : Electrical Open 33 For verification: 2017 NEC allows #6 Cu to grounding electrode
rods. Please verify 2/0 is required.
A1.1 Free text Kyle Baldwin : P&Z Open 4 Landscape, screening and snow storage requirements are
shown and addressed on permit # 22-00610
Report Date: 09.26.2022
Approval of plans does not constitute approval of variance from code
Page 2 of 2
Powered by TCPDF (www.tcpdf.org)