HomeMy WebLinkAboutDISCRIPTION OF REVISIONS - 22-00694 - U-Haul Bldg B - New Commercial
Brett Gulash
Hillside Architecture, PLLC
409 S 8th Str., Ste 201 Boise, ID 83702
775-722-1682
Project:
718081 U-Haul Moving & Storage of Rexburg – BLDG B
328 N 2nd E
Rexburg, ID 83440
Revision 1 Narrative:
Delta #: 1
Description: UHI Comments / City Resubmittal
Date: 10.05.2022
Architectural
Sheet# DESCRIPTION OF REVISION____________________
T1.0 Updated Energy Code analysis – Climate Zone, and S.O.G. requirements, added
General notes from city
T4.1 Added Vertical Continuous Insulation R-10 at Slab on Grade per code requirements
A1.1 Added Knox Box (2 locations) and FDC locations to both buildings. Updated site
plan to match civil site plan. Added ADA stall to Building B.
A2.1 Enlarged Riser Room to accommodate Fire Pump, Switched Riser room with
Restroom due to size and orientation. Updated roofing per enlarged room. Added
Air Hand Dryer.
A4.1 Updated South, North and West elevation showing enlarged riser room size and
updated relationship of Riser room and Restroom.
A7.0 Added Door notes from UHI, added material legend, finish schedule, and color
legend for Riser Room and restroom, updated window notes to match UHI, added
door hardware type O, added door type Type 4A.
A8.6 Updated Detail 1/A8.6
A10.21 Watermark “NOT USED” added.
Structural, Mechanical, Electrical, and Plumbing
Sheet# DESCRIPTION OF REVISION____________________
See applicable discipline narrative.
Fire Protection
Sheet# DESCRIPTION OF REVISION____________________
FP101 Enlarged Riser room, updated keynotes 4, 11, and 14. Added remote FDC location,
located near GL K and GL 1.
FP500 Updated enlarged plan 4/FP500, Updated Riser detail, updated keynotes 4, 11, 14,
added general notes 19 and 20.
5509 N. Glenwood St., Garden City, ID 83714 | o: 208.501.2289 | www.structuraledge.com
October 10, 2022
Brett Gulash
Hillside Architecture
409 S. 8th St, STE 201
Boise, ID 83702
RE: U-Haul Building B
Rexburg, ID
Plan Revisions
Brett,
This letter summarizes the changes made to the above-mentioned project.
S0:
1. Frost depth was updated to 36”.
S1:
1. Perimeter wall footing was added at the contractor’s request.
2. Plan work and detailing was added for the CFS framed fire riser and restroom area.
3. Foundation wall thickness was updated to 10”.
S1.1:
1. Details 1-4: foundation wall thickness was updated to 10” and raised to 1ft above F.F.
2. Details 7 & 8: foundation was raised to 1ft above F.F.
S1.2:
1. Detail 4: foundation wall thickness was updated to 10” and raised to 1ft above F.F.
If you have any questions, please don’t hesitate to contact our office.
Sincerely,
David Sansotta, P.E., S.E.
(208) 914-5087 www.apexeng.co PO Box 5221
(208) 989-2572 Boise, ID 83705
October 26, 2022
Project U-Haul Rexburg
Subject: Narrative for Building B – City Resubmittal Delta #1
M0.1 Mechanical Cover Sheet
1. Added Exhaust Fan EF-3 to mechanical schedules.
2. Added Louver L-2 to mechanical schedules.
M1.1 Mechanical Plan
1. Revised mechanical layout in restroom and riser room per updated architectural plan.
2. Added Exhaust Fan EF-3 in riser room for combustion air.
3. Added Louver L-2 in riser room for combustion air.
P0.1 Plumbing Cover Sheet
1. Added equipment for snow melt system to plumbing fixture schedule. Equipment
includes Boiler B-1, Circulation pump CP-1, Manifolds MAN-1/MAN-2, and floor
sink FS-1.
2. Revised gas calculation with increased gas load for Boiler B-1.
3. Update plumbing sheet index with new sheet for snow melt specifications. P0.3.
P0.3 Snow Melt Specifications (New Sheet)
1. Created sheet P0.3 for snow melt specifications.
P1.1 Plumbing Plans
1. Revised plumbing layout in restroom and riser room per updated architectural plan.
2. Added snow melt system for sidewalk and truck dock.
3. Added equipment in riser room for snow melt system. Equipment includes Boiler B-1,
Circulation pump CP-1, Manifolds MAN-1/MAN-2, and floor sink FS-1.
4. Added gas connection to Boiler B-1. Updated gas sizing per increased load.
5. Added snow melt installation requirement notes.
Tyler Brown
Apex Engineering
Edwards Engineering Consulting
208-210-9733
luke@edenco.biz
1 of 1
October 26, 2022
Project: U-Haul Rexburg Building B
Subject: Narrative for Electrical Delta 1 revision
The following revisions have been made to the electrical drawings.
E1.1 Site Electrical Plan
1. New utility service shown with transformer, CT, sand main disconnects.
E2.1 Power Plan
1. Fire pump equipment added.
2. Snow melt system circuits added.
3. Circuiting revisions of reconfigured rooms.
E3.1 Lighting Plan
1. Lights added to enlarged riser room.
2. Wall Packs relocated for adjusted rooms.
3. Window accent lighting added per uhaul criteria.
4. Lighting override switched added at each exit per uhaul criteria.
E4.1 One-Line Diagram
1. Fire pump service added.
2. Service and main panel revised.
3. Panel schedules updated to reflect circuiting changes.
Signed,
Luke M. Edwards, PE
Principal
Edwards Engineering Consulting