Loading...
HomeMy WebLinkAboutLATERAL REDLINES - 22-00151 - 1011 Pine Brook Ln - New SFRREF MASTER BED. 14'3" X 16'1" OFFICE 11'11" X 11'10" BED. #2 14'0" X 12'6" BED. #3 14'0" X 11'8" PTY. 9'11" X 7'1" 3-CAR GARAGE 27'2" X 38'4" REC. ROOM 24'1" X 14'1" DINING 12'3" X 16'0" KITCHEN 12'3" X 18'8" GREAT RM. 19'4" X 15'0" FOYER 8'4" X 13'5" FR W.I.C. 7'0" X 14'9" MASTER BATH 12'2 X 14'9" (tray ceiling) LAWN STR. 14'10" X 15'2" (tray ceiling) HALL 03 16'5" X 3'8" DW WO CONC. PATIO 44'10" X 12'6" CONC. PORCH HALL 01 13'3" X 4'0" HALL 02 3'7" X 13'11" MUD RM. 16'9" X 7'0" BATH 4 8'5" X 5'6" BATH 3 9'1" X 5'6" BATH 2 5'2" X 7'3" LAUNDRY 10'1" X 8'9"21 3 4 5 6 7 89 10 11 12 14 13 15 16 A-1 FL O O R P L A N 2102 Ma d i s o n C o u n t y , I d a h o Je r r y & M a r i a n n e M e r r i l l R E S I D E N C E 04/06/21 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . DATE: PROJECT: REVISION DATES: 02/22/22 10/26/21 HOLDOWN SCHEDULE HD1 - Simpson STHD10 strap tie with (2) 2x stud column. HD2 may be used in lieu of HD1. HD2 - Simpson HDU2 with (2) 2x stud column and 5/8" diameter threaded rod anchor with 7" embed using Simpson AT-XP. SHEAR WALL SCHEDULE SW1 - 2x wood stud wall with 7/16 OSB wall sheathing. Fasten OSB with 8d common nails (or equivalent staples) spaced at 6" centers at panel edges and 12" centers at intermediate studs. Block all horizontal panel joints. Provide 2x pressure treated sill plate with 1/2" diameter anchor bolts spaced at 4'-0" centers with 3"x3"x1/4" plate washers. SW2 - 2x wood stud wall with 7/16 OSB wall sheathing. Fasten OSB with 8d common nails (or equivalent staples) spaced at 4" centers at panel edges and 12" centers at intermediate studs. Block all horizontal panel joints. Provide 2x pressure treated sill plate with 1/2" diameter anchor bolts spaced at 32" centers with 3"x3"x1/4" plate washers. HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 SW2 SW1 SW1 SW 1 SW 1 HD1 Note: 1) Provide 7/16 OSB roof sheathing and fasten with 8d common nails (or equivalent staples) spaced at 6" centers at supported panel edges and 12" centers at intermediate supports. 2) Provide 2x full height blocking or truss blocking between roof trusses at the perimeter shear walls at every truss bay. Nail roof sheathing to the blocking with 8d common nails spaced at 6" centers. Nail the blocking to the double top plate with toe nails spaced at 6" centers. 3) Anchor roof trusses to the supporting walls with Simpson H2.5A or H1 anchors. Redlines Only G&S Structural Engineers Lateral Design #22056 03-31-2022 RF