Loading...
HomeMy WebLinkAboutSTRUCTURAL CALCS - 23-00277 - BYUI Romney - RemodelBE Structural Solutions PLLC BYUI Romney Remodel - Structural Calculations BE23002.xmcd Page 1 of 4 Printing Date: 4/28/2023 Structural Calculations BYUI Romney Remodel 2023 Project: BE23002 Date: By: DLB BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 1 of 12 04/28/2023 BE Structural Solutions PLLC BYUI Romney Remodel - Structural Calculations BE23002.xmcd Page 2 of 4 Printing Date: 4/28/2023 Project #BE23002 BYUI Romney Remodel Engineer - Notes Scope: Most of the remodel is non-structural. There are a few structural items. 1. Door openings are being installed on a maonsry bearing wall in the basement of the 1987 Remodel. 2. A small segment of masonry bearing walll is being removed in the basement of the 1987 remodel. 3. A new hallway is being formed by removing a wall near the elevator in the basement of the 1987 remodel. 4. Penetrations (upto 14"x14") are being installed in the old-addition wall. Provide lintels for them. Snippet of architectural demolition plan BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 2 of 12 BE Structural Solutions PLLC BYUI Romney Remodel - Structural Calculations BE23002.xmcd Page 3 of 4 Printing Date: 4/28/2023 Load on Bearing wall (load will be similar above door openings and where wall is removed) DL 80psf:= LL 80psf:= Trib 20ft 2 10.00ft=:= wTL DL LL+( ) Trib1.60 klf=:= Snippet from 1987 Remodel plan. Note that plan is rotated 180 deg from demo plan. Hence "L" shaped wall removal is on the left below and on the right in the demo plan. Section above masonry bearing wall See enercalc for angle design. Brace angle to bend in orthogonal direction (vertical, not diagonal). BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 3 of 12 BE Structural Solutions PLLC BYUI Romney Remodel - Structural Calculations BE23002.xmcd Page 4 of 4 Printing Date: 4/28/2023 Bracing of Lintel Angle Fy 36ksi:=Ω 1.67:= Fb Fy Ω 21.56 ksi=:= ybar 1.62in:= A 6in ybar-( ) 3 8 in 1.64 in 2=:= C Fb 2 A17.70 kip=:= Brace force is 1%. 0.01 C0.18 kip= Use (4) Titen Turbo screws spaced 8" o.c. at center of span and (2) at each end. BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 4 of 12 Steel Beam LIC# : KW-06016364, Build:20.23.04.05 TBSE, INC (c) ENERCALC INC 1983-2023 DESCRIPTION:Lintel over Door Opening BE Structural Solutions 137 W 1900 N Layton, UT 84041 801 698 1806 Project File: BYUI Romney Remodel BE23002.ec6 Project Title:BYUI Romney Remodel 2023 Engineer:DLB Project ID:BE23002 Printed: 28 APR 2023, 10:56AM Project Descr: CODE REFERENCES Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : ksi Bending Axis :Major Axis Bending Completely Unbraced Allowable Strength Design Fy : Steel Yield :36.0 ksi Beam Bracing :E: Modulus :29,000.0 Vertical Leg Up .Service loads entered. Load Factors will be applied for calculations.Applied Loads Beam self weight NOT internally calculated and added Uniform Load : D = 0.080, L = 0.080 ksf, Tributary Width = 10.0 ft .Design OKDESIGN SUMMARY Maximum Bending Stress Ratio =0.611 : 1 Load Combination +D+L Span # where maximum occurs Span # 1 3.20 k Mn / Omega : Allowable 5.240 k-ft Vn/Omega : Allowable L6x6x5/16Section used for this span Span # where maximum occurs Location of maximum on span Span # 1 Load Combination +D+L 24.290 k Section used for this span L6x6x5/16 Ma : Applied Maximum Shear Stress Ratio =0.132 : 1 0.000 ft 3.200 k-ft Va : Applied 0 <600.0 1955 Ratio =0 <360.0 Maximum Deflection Max Downward Transient Deflection 0.012 in 3,909Ratio =>=600. Max Upward Transient Deflection 0.000 in Ratio = Max Downward Total Deflection 0.025 in Ratio =>=360. Max Upward Total Deflection 0.000 in Span: 1 : L Only Span: 1 : +D+L .Maximum Forces & Stresses for Load Combinations Span # Summary of Moment ValuesLoad Combination Summary of Shear ValuesMax Stress Ratios M V Mmax -Mmax +Rm VnxMa Max Mnx/Omega Cb Va MaxMnx Vnx/OmegaSegment Length D Only Dsgn. L = 4.00 ft 1 0.305 0.066 1.60 1.60 8.75 5.24 1.14 1.00 1.60 40.56 24.29 +D+L Dsgn. L = 4.00 ft 1 0.611 0.132 3.20 3.20 8.75 5.24 1.14 1.00 3.20 40.56 24.29 +D+0.750L Dsgn. L = 4.00 ft 1 0.534 0.115 2.80 2.80 8.75 5.24 1.14 1.00 2.80 40.56 24.29 +0.60D Dsgn. L = 4.00 ft 1 0.183 0.040 0.96 0.96 8.75 5.24 1.14 1.00 0.96 40.56 24.29 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections +D+L 1 0.0246 2.011 0.0000 0.000 . Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 3.200 3.200 Max Upward from Load Combinations 3.200 3.200 Max Upward from Load Cases 1.600 1.600 D Only 1.600 1.600 +D+L 3.200 3.200 +D+0.750L 2.800 2.800 +0.60D 0.960 0.960 BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 5 of 12 Steel Beam LIC# : KW-06016364, Build:20.23.04.05 TBSE, INC (c) ENERCALC INC 1983-2023 DESCRIPTION:Lintel over Door Opening BE Structural Solutions 137 W 1900 N Layton, UT 84041 801 698 1806 Project File: BYUI Romney Remodel BE23002.ec6 Project Title:BYUI Romney Remodel 2023 Engineer:DLB Project ID:BE23002 Printed: 28 APR 2023, 10:56AM Project Descr: Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS L Only 1.600 1.600 BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 6 of 12 Steel Beam LIC# : KW-06016364, Build:20.23.04.05 TBSE, INC (c) ENERCALC INC 1983-2023 DESCRIPTION:Wall Opening BE Structural Solutions 137 W 1900 N Layton, UT 84041 801 698 1806 Project File: BYUI Romney Remodel BE23002.ec6 Project Title:BYUI Romney Remodel 2023 Engineer:DLB Project ID:BE23002 Printed: 28 APR 2023, 10:57AM Project Descr: CODE REFERENCES Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : ksi Bending Axis :Major Axis Bending Beam is Fully Braced against lateral-torsional buckling Allowable Strength Design Fy : Steel Yield :36.0 ksi Beam Bracing :E: Modulus :29,000.0 Vertical Leg Up .Service loads entered. Load Factors will be applied for calculations.Applied Loads Beam self weight NOT internally calculated and added Uniform Load : D = 0.080, L = 0.080 ksf, Tributary Width = 10.0 ft .Design OKDESIGN SUMMARY Maximum Bending Stress Ratio =0.781 : 1 Load Combination +D+L Span # where maximum occurs Span # 1 4.80 k Mn / Omega : Allowable 9.224 k-ft Vn/Omega : Allowable L6x6x3/8Section used for this span Span # where maximum occurs Location of maximum on span Span # 1 Load Combination +D+L 29.102 k Section used for this span L6x6x3/8 Ma : Applied Maximum Shear Stress Ratio =0.165 : 1 0.000 ft 7.200 k-ft Va : Applied 0 <600.0 686 Ratio =0 <360.0 Maximum Deflection Max Downward Transient Deflection 0.052 in 1,372Ratio =>=600. Max Upward Transient Deflection 0.000 in Ratio = Max Downward Total Deflection 0.105 in Ratio =>=360. Max Upward Total Deflection 0.000 in Span: 1 : L Only Span: 1 : +D+L .Maximum Forces & Stresses for Load Combinations Span # Summary of Moment ValuesLoad Combination Summary of Shear ValuesMax Stress Ratios M V Mmax -Mmax +Rm VnxMa Max Mnx/Omega Cb Va MaxMnx Vnx/OmegaSegment Length D Only Dsgn. L = 6.00 ft 1 0.390 0.082 3.60 3.60 15.40 9.22 1.00 1.00 2.40 48.60 29.10 +D+L Dsgn. L = 6.00 ft 1 0.781 0.165 7.20 7.20 15.40 9.22 1.00 1.00 4.80 48.60 29.10 +D+0.750L Dsgn. L = 6.00 ft 1 0.683 0.144 6.30 6.30 15.40 9.22 1.00 1.00 4.20 48.60 29.10 +0.60D Dsgn. L = 6.00 ft 1 0.234 0.049 2.16 2.16 15.40 9.22 1.00 1.00 1.44 48.60 29.10 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections +D+L 1 0.1049 3.017 0.0000 0.000 . Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 4.800 4.800 Max Upward from Load Combinations 4.800 4.800 Max Upward from Load Cases 2.400 2.400 D Only 2.400 2.400 +D+L 4.800 4.800 +D+0.750L 4.200 4.200 +0.60D 1.440 1.440 BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 7 of 12 Steel Beam LIC# : KW-06016364, Build:20.23.04.05 TBSE, INC (c) ENERCALC INC 1983-2023 DESCRIPTION:Wall Opening BE Structural Solutions 137 W 1900 N Layton, UT 84041 801 698 1806 Project File: BYUI Romney Remodel BE23002.ec6 Project Title:BYUI Romney Remodel 2023 Engineer:DLB Project ID:BE23002 Printed: 28 APR 2023, 10:57AM Project Descr: Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS L Only 2.400 2.400 BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 8 of 12 Steel Beam LIC# : KW-06016364, Build:20.23.04.05 TBSE, INC (c) ENERCALC INC 1983-2023 DESCRIPTION:Lintel over Hallway BE Structural Solutions 137 W 1900 N Layton, UT 84041 801 698 1806 Project File: BYUI Romney Remodel BE23002.ec6 Project Title:BYUI Romney Remodel 2023 Engineer:DLB Project ID:BE23002 Printed: 28 APR 2023, 10:56AM Project Descr: CODE REFERENCES Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : ksi Bending Axis :Major Axis Bending Completely Unbraced Allowable Strength Design Fy : Steel Yield :36.0 ksi Beam Bracing :E: Modulus :29,000.0 Vertical Leg Up .Service loads entered. Load Factors will be applied for calculations.Applied Loads Beam self weight NOT internally calculated and added Uniform Load : D = 0.080, L = 0.080 ksf, Tributary Width = 7.50 ft .Design OKDESIGN SUMMARY Maximum Bending Stress Ratio =0.873 : 1 Load Combination +D+L Span # where maximum occurs Span # 1 3.30 k Mn / Omega : Allowable 5.197 k-ft Vn/Omega : Allowable L6x6x5/16Section used for this span Span # where maximum occurs Location of maximum on span Span # 1 Load Combination +D+L 24.290 k Section used for this span L6x6x5/16 Ma : Applied Maximum Shear Stress Ratio =0.136 : 1 0.000 ft 4.538 k-ft Va : Applied 0 <600.0 1003 Ratio =0 <360.0 Maximum Deflection Max Downward Transient Deflection 0.033 in 2,005Ratio =>=600. Max Upward Transient Deflection 0.000 in Ratio = Max Downward Total Deflection 0.066 in Ratio =>=360. Max Upward Total Deflection 0.000 in Span: 1 : L Only Span: 1 : +D+L .Maximum Forces & Stresses for Load Combinations Span # Summary of Moment ValuesLoad Combination Summary of Shear ValuesMax Stress Ratios M V Mmax -Mmax +Rm VnxMa Max Mnx/Omega Cb Va MaxMnx Vnx/OmegaSegment Length D Only Dsgn. L = 5.50 ft 1 0.437 0.068 2.27 2.27 8.68 5.20 1.14 1.00 1.65 40.56 24.29 +D+L Dsgn. L = 5.50 ft 1 0.873 0.136 4.54 4.54 8.68 5.20 1.14 1.00 3.30 40.56 24.29 +D+0.750L Dsgn. L = 5.50 ft 1 0.764 0.119 3.97 3.97 8.68 5.20 1.14 1.00 2.89 40.56 24.29 +0.60D Dsgn. L = 5.50 ft 1 0.262 0.041 1.36 1.36 8.68 5.20 1.14 1.00 0.99 40.56 24.29 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections +D+L 1 0.0658 2.766 0.0000 0.000 . Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 3.300 3.300 Max Upward from Load Combinations 3.300 3.300 Max Upward from Load Cases 1.650 1.650 D Only 1.650 1.650 +D+L 3.300 3.300 +D+0.750L 2.888 2.888 +0.60D 0.990 0.990 BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 9 of 12 Steel Beam LIC# : KW-06016364, Build:20.23.04.05 TBSE, INC (c) ENERCALC INC 1983-2023 DESCRIPTION:Lintel over Hallway BE Structural Solutions 137 W 1900 N Layton, UT 84041 801 698 1806 Project File: BYUI Romney Remodel BE23002.ec6 Project Title:BYUI Romney Remodel 2023 Engineer:DLB Project ID:BE23002 Printed: 28 APR 2023, 10:56AM Project Descr: Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS L Only 1.650 1.650 BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 10 of 12 Steel Beam LIC# : KW-06016364, Build:20.23.04.05 TBSE, INC (c) ENERCALC INC 1983-2023 DESCRIPTION:Lintel over Door Opening 5' BE Structural Solutions 137 W 1900 N Layton, UT 84041 801 698 1806 Project File: BYUI Romney Remodel BE23002.ec6 Project Title:BYUI Romney Remodel 2023 Engineer:DLB Project ID:BE23002 Printed: 28 APR 2023, 10:55AM Project Descr: CODE REFERENCES Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : ksi Bending Axis :Major Axis Bending Completely Unbraced Allowable Strength Design Fy : Steel Yield :36.0 ksi Beam Bracing :E: Modulus :29,000.0 Vertical Leg Up .Service loads entered. Load Factors will be applied for calculations.Applied Loads Beam self weight NOT internally calculated and added Uniform Load : D = 0.080, L = 0.080 ksf, Tributary Width = 10.0 ft .Design OKDESIGN SUMMARY Maximum Bending Stress Ratio =0.740 : 1 Load Combination +D+L Span # where maximum occurs Span # 1 4.0 k Mn / Omega : Allowable 6.757 k-ft Vn/Omega : Allowable L6x6x3/8Section used for this span Span # where maximum occurs Location of maximum on span Span # 1 Load Combination +D+L 29.102 k Section used for this span L6x6x3/8 Ma : Applied Maximum Shear Stress Ratio =0.137 : 1 0.000 ft 5.000 k-ft Va : Applied 0 <600.0 1186 Ratio =0 <360.0 Maximum Deflection Max Downward Transient Deflection 0.025 in 2,371Ratio =>=600. Max Upward Transient Deflection 0.000 in Ratio = Max Downward Total Deflection 0.051 in Ratio =>=360. Max Upward Total Deflection 0.000 in Span: 1 : L Only Span: 1 : +D+L .Maximum Forces & Stresses for Load Combinations Span # Summary of Moment ValuesLoad Combination Summary of Shear ValuesMax Stress Ratios M V Mmax -Mmax +Rm VnxMa Max Mnx/Omega Cb Va MaxMnx Vnx/OmegaSegment Length D Only Dsgn. L = 5.00 ft 1 0.370 0.069 2.50 2.50 11.28 6.76 1.14 1.00 2.00 48.60 29.10 +D+L Dsgn. L = 5.00 ft 1 0.740 0.137 5.00 5.00 11.28 6.76 1.14 1.00 4.00 48.60 29.10 +D+0.750L Dsgn. L = 5.00 ft 1 0.647 0.120 4.38 4.38 11.28 6.76 1.14 1.00 3.50 48.60 29.10 +0.60D Dsgn. L = 5.00 ft 1 0.222 0.041 1.50 1.50 11.28 6.76 1.14 1.00 1.20 48.60 29.10 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections +D+L 1 0.0506 2.514 0.0000 0.000 . Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 4.000 4.000 Max Upward from Load Combinations 4.000 4.000 Max Upward from Load Cases 2.000 2.000 D Only 2.000 2.000 +D+L 4.000 4.000 +D+0.750L 3.500 3.500 +0.60D 1.200 1.200 BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 11 of 12 Steel Beam LIC# : KW-06016364, Build:20.23.04.05 TBSE, INC (c) ENERCALC INC 1983-2023 DESCRIPTION:Lintel over Door Opening 5' BE Structural Solutions 137 W 1900 N Layton, UT 84041 801 698 1806 Project File: BYUI Romney Remodel BE23002.ec6 Project Title:BYUI Romney Remodel 2023 Engineer:DLB Project ID:BE23002 Printed: 28 APR 2023, 10:55AM Project Descr: Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS L Only 2.000 2.000 BE Structural Solutions BYUI Romney Remodel - Structural Calculation BE23002 - Stamped.pdf 12 of 12