Loading...
HomeMy WebLinkAboutINFRASTRUCTURE - 22-00888 - Teton River Temple Subdivision - Plat-Reviewed-Corrections-Required (1)Author Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : Teton River Temple Subdivision - Plat Address : Approx. 1500 N 2nd E Application Type : Document Filename : INFRASTRUCTURE - 22-00888 - Teton River Temple Subdivision - Plat.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments C.3.0 Callout Joel Gray : PW Open 6 Sewer and water stub outs required. C.3.0 Callout Joel Gray : PW Open 6 Sewer and water stub outs required C.3.0 Callout Joel Gray : PW Open 6 Does this tie into existing street? C.3.0 Callout Joel Gray : PW Open 6 Sewer and water stub outs across 2nd East. C.4.0 Callout Joel Gray : PW Open 7 Roadway to continue wideneing to highway off ramp C.4.0 Callout Joel Gray : PW Open 7 Sidewalk to extend to parcel line. C.4.4 Callout Joel Gray : PW Open 11 Signal pole behind sidewalk C.4.4 Free Text Joel Gray : PW Open 11 and junction boxes C.5.0 Callout Joel Gray : PW Open 12 5? C.5.1 Callout Joel Gray : PW Open 13 4? C.5.2 Callout Joel Gray : PW Open 14 4? C.6.0 Callout Joel Gray : PW Open 15 Water valve needed. C.6.1 Free Text Joel Gray : PW Open 16 Place water valves closer to intersections. C.7.0 Free Text Joel Gray : PW Open 18 Water valves moved closer to intersection. # 22-00888 Plat Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 12.19.2022 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments C.7.1 Callout Joel Gray : PW Open 19 water valve on stub outs? C.7.2 Free Text Joel Gray : PW Open 20 Water valve closer to intersection. C.9.0 Callout Joel Gray : PW Open 24 East? C.9.0 Free Text Joel Gray : PW Open 24 26 ft of asphalt minimum. C.9.0 Callout Joel Gray : PW Open 24 East? C.10 Free Text Joel Gray : PW Open 25 Has irrigation company okayed piping of ditch design? Report Date: 12.19.2022 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.1.0_COVER SHEET.dwg - COVER SHEET - 12/02/2022 03:08pm, tyler.melander 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S ID-6177-22 CJF TLM CJF 12/01/2022 COVER SHEET TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 C . 1 . 0 51 78 9520I-8493I-84 I-86I-15 I-15 I-1530342693203375262026287521 9355I-84 52 95 95 95 121395 95 I-90 95 95MONTANAWYOMINGUTAH CANADAWASHINGTONOREGONBOUNDARYBONNERKOOTENAISHOSHONEBENEWAHLATAHCLEARWATERNEZ PERCELEWISIDAHOADAMSWASHINGTONVALLEYLEMHICUSTERCLARKFREMONTBOISEGEMPAYETTEBLAINECAMASELMOREADACANYONOWYHEEBUTTELINCOLNGOODINGJEROMETWIN FALLSCASSIA MINIDOKAPOWERONEIDABANNOCK CARIBOUFRANKLINBEAR LAKE BINGHAM BONNEVILLE JEFFERSONMADISONTETONNEVADASTATE MAP V I C I N I T Y M A P E N G I N E E R : H O R R O C K S E N G I N E E R S Know what's below.Call before you dig.R P R O J E C T S I T E I M P R O V E M E N T D R A W I N G S F O R TETON RIVE R T E M P L E O F F S I T E I M P R O V E M E N T S R E X B U R G , I D A H O S H E E T I N D E X PAGE # S H E E T # S H E E T T I T L E 1 C . 1 . 0 C O V E R S H E E T 2 C . 1 . 1 G E N E R A L N O T E S 3 C . 1 . 2 L E G E N D 4 C . 1 . 3 F I N A L P L A T 5 C . 2 . 0 E X I S T I N G C O N D I T I O N S & D E M O 6 C . 3 . 0 O V E R A L L S I T E P L A N & K E Y M A P 7 C . 4 . 0 2 N D E A S T P L A N A N D P R O F I L E 1 8 C . 4 . 1 2 N D E A S T P L A N A N D P R O F I L E 2 9 C . 4 . 2 2 N D E A S T P L A N A N D P R O F I L E 3 10 C . 4 . 3 2 N D E A S T P L A N A N D P R O F I L E 4 11 C . 4 . 4 2 N D E A S T P L A N A N D P R O F I L E 5 12 C . 5 . 0 M O O D Y R D P L A N A N D P R O F I L E 1 13 C . 5 . 1 M O O D Y R D P L A N A N D P R O F I L E 2 14 C . 5 . 2 M O O D Y R D P L A N A N D P R O F I L E 3 15 C . 6 . 0 S T R E E T A P L A N A N D P R O F I L E 1 16 C . 6 . 1 S T R E E T A P L A N A N D P R O F I L E 2 17 C . 6 . 2 S T R E E T A P L A N A N D P R O F I L E 3 18 C . 7 . 0 S T R E E T B P L A N A N D P R O F I L E 1 19 C . 7 . 1 S T R E E T B P L A N A N D P R O F I L E 2 20 C . 7 . 2 S T R E E T B P L A N A N D P R O F I L E 3 21 C . 8 . 0 S T R E E T C P L A N A N D P R O F I L E 1 22 C . 8 . 1 S T R E E T C P L A N A N D P R O F I L E 2 23 C . 8 . 2 S T R E E T C P L A N A N D P R O F I L E 3 24 C . 9 . 0 T Y P I C A L C R O S S S E C T I O N D E T A I L S 25 C . 1 0 . 0 I R R I G A T I O N P L A N A N D P R O F I L E 1 26 C . 1 0 . 1 I R R I G A T I O N P L A N A N D P R O F I L E 2 27 C . 1 0 . 2 I R R I G A T I O N P L A N A N D P R O F I L E 3 2 8 C . 1 0 . 3 I R R I G A T I O N P L A N A N D P R O F I L E 4 2 9 C . 1 0 . 4 I R R I G A T I O N P L A N A N D P R O F I L E 5 3 0 C . 1 1 . 0 2 N D E A S T S T R I P I N G E X H I B I T 3 1 C . 1 2 . 0 E R O S I O N C O N T R O L 2 1 9 4 S n a k e R i v e r P k w y . , S u i t e 2 0 5 I d a h o F a l l s , I D 8 3 4 0 2 ( 2 0 8 ) 5 2 2 - 1 2 2 3 C O N T A C T : C A D E N F U H R I M A N , P E U T I L I T I E S : P O W E R - R O C K Y M O U N T A I N P O W E R G A S - I N T E R M O U N T A I N G A S S E W E R - C I T Y O F R E X B U R G W A T E R - C I T Y O F R E X B U R G O W N E R : T H E C H U R C H O F J E S U S C H R I S T O F L A T T E R D A Y S A I N T S 5 0 E A S T N O R T H T E M P L E 2 W W S A L T L A K E C I T Y , U T 8 4 1 5 0 C O N T A C T : D A V E C H A N N E R REVISIONSREV No.SHEET No.DATE OF REVDESCRIPTION# M O O D Y R O A D M O O D Y R O A D N 2 N D E A S T N 2 N D E A S T U S - 2 0 U S - 2 0 T H I S S I T E P L A N C O N F O R M S T O A N A C T U A L S U R V E Y T H A T W A S P E R F O R M E D O N T H E G R O U N D B Y A L I C E N S E D L A N D S U R V E Y O R I N A N D F O R T H E S T A T E O F I D A H O . I T I S T H E O W N E R ' S R E S P O N S I B I L I T Y T O C O N S T R U C T A L L S T R U C T U R E S S H O W N O N T H I S S I T E P L A N I N A C C O R D A N A N C E W I T H S A I D S U R V E Y . C E N T R A L M E R I D I A N O F T H E E A S T Z O N E O F T H E I D A H O S T A T E P L A N E C O O R D I N A T E - V E R T I C A L C O N T R O L D A T U M B A S E D O N N A V D 8 8 C P # 1 E L E V : 4 8 7 8 . 5 2 9 ' N : 7 9 9 , 2 1 4 . 5 9 9 0 ' E : 7 5 8 , 8 5 0 . 8 6 8 0 ' F O U N D : A L C A P C P # 2 E L E V : 4 8 9 6 . 8 8 8 ' N : 8 0 0 , 6 2 6 . 5 6 2 0 ' E : 7 5 8 , 8 7 9 . 9 2 5 0 ' F O U N D : P L C A P C P # 3 E L E V : 4 8 7 4 . 4 1 9 ' N : 7 9 7 , 9 4 6 . 4 7 2 0 ' E : 7 5 7 , 0 6 6 . 7 6 6 0 ' F O U N D : P L C A P C P # B A S I S O F B E A R I N G C O N T R O L P O I N T S S U R V E Y N O T E A P P L I C A N T : J R W & A S S O C I A T E S 1 1 5 2 B O N D A V E N U E R E X B U R G , I D A H O 8 3 4 4 0 ( 2 0 8 ) 3 5 9 - 2 3 0 9 C O N T A C T : J O H N N Y W A T S O N 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.1.1_NOTES.dwg - GENERAL NOTES - 12/02/2022 03:09pm, tyler.melander 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N ID-6177-22 CJF TLM CJF 12/01/2022 GENERAL NOTES TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 C . 1 . 1 1 . A L L C O N T R A C T O R S W O R K I N G W I T H I N T H E P U B L I C R O A D R I G H T - O F - W A Y A R E R E Q U I R E D T O S E C U R E A R I G H T - O F - W A Y C O N S T R U C T I O N P E R M I T F R O M C I T Y O F R E X B U R G A T L E A S T T W E N T Y - F O U R ( 2 4 ) H O U R S P R I O R T O A N Y C O N S T R U C T I O N . GENERAL NOTES U T I L I T Y N O T E S I N T E R M O U N T A I N G A S C O M P A N Y 1 5 2 7 H O L L I P A R K D R . I D A H O F A L L S , I D A H O 8 3 4 0 1 ( 2 0 8 ) 5 4 2 - 6 6 0 0 N A T U R A L G A S P O W E R C I T Y O F R E X B U R G P U B L I C W O R K S 3 5 N O R T H 1 S T E A S T R E X B U R G , I D A H O 8 3 4 4 0 ( 2 0 8 ) 3 7 2 - 2 3 2 0 W A T E R / S E W E R R O C K Y M O U N T A I N P O W E R 1 7 0 W 2 N D N R E X B U R G , I D 8 3 4 4 0 ( 2 0 8 ) 3 5 9 - 6 1 5 5 U T I L I T Y C O N T A C T S 1. THE STANDARD SPECIFICATIONS AND DRAWINGS USED FOR THIS PROJECT ARE CITY OF REXBURGENGINEERING DEPARTMENT STANDARD SPECIFICATIONS AND DRAWINGS (2016), AND IDAHO STANDARD S FOR PUBLIC WORKS CONSTRUCTION(ISPWC, 2021).2. ALL SURPLUS EXCAVATION SHALL BE REMOVED FROM SITE AS PART OF THE PROJECT AND DISPOSED O F A T AN APPROVED LOCATION.3. ALL CONSTRUCTION OF WATER, SEWER AND STORM SHALL BE TO THE CITY OF IDAHO FALLS STANDARD S UNLESS SPECIFIED OTHERWISE BY THE CITY OF REXBURG. THE SPECIFICATIONS AND DRAWINGS AREAVAILABLE ONLINE AT: http://www.idahofallsidaho.gov/ OR http://rexburg.org/4. ALL CONSTRUCTION OF STREETS LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE TO THE CITY OFREXBURG STANDARDS.5. THE CONTRACTOR SHALL LOCATE, RETAIN, AND PROTECT ALL EXISTING UTILITIES UNLESS DESIGNATED T O BE REMOVED.7. ALL UTILITIES ADJUSTMENT OF MANHOLES, WATER VALVES, ETC. SHALL BE ADJUSTED TO FINISH GRAD E B Y THE CONTRACTOR AFTER PAVING AND LANDSCAPING ARE COMPLETE.8. CONTRACTOR IS REQUIRED TO HAVE A SWPPP IN PLACE PRIOR TO ANY EARTH WORK OR CONSTRUCTIO N . 9. CONTRACTOR IS REQUIRED TO MAINTAIN THE SWPPP UNTIL THE NOTICE OF TERMINATION (NOT) IS FILE D . 10. ANY MODIFICATION TO THE CONSTRUCTION, TO THE CONSTRUCTION SCHEDULE, OR TO THECONSTRUCTION PHASE LIMITS SHALL BE APPROVED BY THE CITY ENGINEER. PRIOR TO SAID APPROVAL A L L IMPROVEMENT DRAWINGS SHALL BE RE-SUBMITTED TO THE CITY ENGINEER DEPT. SHOWING THEPROPOSED CHANGES.11. CONTRACTOR IS RESPONSIBLE TO CONTROL ALL TEMPORARY STORM WATER POLLUTION AND DUSTABATEMENT DURING THE CONSTRUCTION PHASE AS REQUIRED BY THE FEDERAL CLEAN WATER ACT.12. ALL STORM PIPE AND SANITARY SEWER PIPE SHALL BE TO THE CITY OF REXBURG STANDARDS.13.THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. T H E CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCI N G WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ANY AND ALL DAMAGES CAUSED BY HISFAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.14.THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE FACILITIES WITHIN THE CONSTRUCTION AR E A UNTIL THE DRAINAGE IMPROVEMENTS ARE IN PLACE AND FUNCTIONING.15.ALL CONTRACTORS WORKING WITHIN THE PROJECT BOUNDARIES ARE RESPONSIBLE FOR COMPLIANCEWITH ALL APPLICABLE SAFETY LAWS OF ANY JURISDICTIONAL BODY. THE CONTRACTOR SHALL BERESPONSIBLE FOR ALL BARRICADES, SAFETY DEVICES AND CONTROL OF TRAFFIC WITHIN AND AROUND T H E CONSTRUCTION AREA.16.THE CONTRACTOR SHALL KEEP ON SITE AT ALL TIMES A COPY OF THE APPROVED CONSTRUCTION PLAN S ON WHICH IS RECORDED THE ACTUAL LOCATIONS OF THE CONSTRUCTED UTILITIES AND ANY OTHER UTILITIES ENCOUNTERED. THE CONTRACTOR SHALL PROVIDE THESE LOCATIONS TO THE DESIGNENGINEER.17.THE CONTRACTOR(S) SHALL REMOVE ALL OBSTRUCTIONS, BOTH ABOVE AND BELOW GROUND, ASREQUIRED FOR THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. THIS SHALL INCLUDE CLEARIN G AND GRUBBING WHICH CONSISTS OF CLEARING THE GROUND SURFACE OF ALL TREES, STUMPS, BRUSH , UNDERGROWTH, HEDGES, HEAVY GROWTH OF GRASS OR WEEDS, FENCES, STRUCTURES, DEBRIS,RUBBISH, AND SUCH MATERIAL WHICH IN THE OPINION OF THE ENGINEER, IS UNSUITABLE FOR THEFOUNDATION OF PAVEMENTS. ALL MATERIAL NOT SUITABLE FOR FUTURE USE ON SITE SHALL BE DISPO S E D OF OFF SITE.18.CONTRACTOR IS REQUIRED TO CALL DIG LINE OF IDAHO 1-800-342-1585 AT LEAST (2) BUSINESS DAYS PRI O R TO CONSTRUCTION, TO DETERMINE LOCATION OF UNDERGROUND UTILITIES.19.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL RECOMMENDATIONS WITHIN THEGEOTECHNICAL REPORT.20.GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF WORK AND BETWEEN TRADES.SUB-CONTRACTORS ARE ALSO RESPONSIBLE FOR COORDINATION WITH OTHER TRADES AND DISCIPLIN E S INCLUDED IN THE CONTRACT DOCUMENTS. IF ANY DISCREPANCIES ARE FOUND, THE GENERALCONTRACTOR IS TO NOTIFY ENGINEER IMMEDIATELY BEFORE COMMENCEMENT OF WORK. NO EXTRACOSTS TO THE PROJECT WILL BE INCURRED DUE TO FAILURE OF GENERAL CONTRACTOR AND/ORSUB-CONTRACTORS TO REVIEW CONTRACT DOCUMENTS AND COORDINATE WITH OTHER TRADES.21.ALL TRAFFIC CONTROL SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES ANDCITY STANDARDS.22.THE CONTRACTOR MUST OBTAIN A PERMIT FROM THE BUILDING DEPARTMENT FOR ANY WALLSGREATER THAN 4' IN HEIGHT CONSTRUCTED WITHIN THE PROJECT. ALL ROCK WALLS CONSTRUCTED WI T H I N THE PROJECT MUST BE CERTIFIED AND INSPECTED BY A LICENSED ENGINEER PRIOR TO THE CITY'S FIN A L ACCEPTANCE. 1 . T H E W A T E R L I N E C O N S T R U C T I O N S H A L L C O N F O R M T O R E X B U R G S T A N D A R D D R A W I N G S & S P E C I F I C A T I O N S A N D T H E D E P A R T M E N T O F E N V I R O N M E N T A L Q U A L I T Y R E G U L A T I O N S O F P U B L I C D R I N K I N G W A T E R S Y S T E M S A N D D I S I N F E C T I O N S P E C I F I C A T I O N S S H O U L D B E T O A N S I / A W W A C 6 5 1 - 9 2 : D I S I N F E C T I O N O F W A T E R M A I N S S T A N D A R D S . 2 . T H E C O N T R A C T O R S H A L L M A I N T A I N 1 0 ' H O R I Z . A N D 1 8 ' ' V E R T . S E P A R A T I O N B E T W E E N W A T E R A N D N O N - P O T A B L E L I N E S . 3 . C O N T R A C T O R S H A L L C O N F O R M T O T H E C I T Y O F R E X B U R G R E Q U I R E M E N T S H A V I N G T R A C E R W I R E O N A L L W A T E R L I N E S . W A T E R S E W E R 1 . A L L S A N I T A R Y S E W E R P I P E S H A L L B E T O T H E P R O J E C T S T A N D A R D S . 2 . C O N T R A C T O R S H A L L I N S T A L L A L L S A N I T A R Y S E W E R M A I N S A N D S E R V I C E L I N E S P R I O R T O I N S T A L L I N G A N Y W A T E R S Y S T E M I M P R O V E M E N T S . A D J U S T W A T E R L I N E S A S P E R P L A N S T O M A I N T A I N S E P A R A T I O N O F M A I N L I N E S A N D T O A V O I D S A N I T A R Y S E W E R S E R V I C E L I N E S . 3 . T H E C O N T R A C T O R S H A L L M A I N T A I N 1 0 ' H O R I Z . A N D 1 8 ' ' V E R T . S E P A R A T I O N B E T W E E N W A T E R A N D N O N - P O T A B L E L I N E S . 4 . A L L N E W A N D E X I S T I N G S E W E R S Y S T E M S W I L L B E M A N D R E L A N D A I R T E S T E D . 5 . A L L R E M O V E D E X I S T I N G S E W E R O R W A T E R U T I L I T I E S S H A L L E I T H E R B E S A L V A G E D O R P R O P E R L Y D I S P O S E D O F A C C O R D I N G T O G O V E R N I N G R E G U L A T I O N S . 6 . S E W E R L A T E R A L S M A Y E I T H E R B E C O M P L E T E L Y R E M O V E D O R A B A N D O N E D I N P L A C E . L A T E R A L S T O B E R E M O V E D S H A L L B E C U T A T T H E M A I N A N D C A P P E D O N B O T H E N D S A S I N D I C A T E D I N N O T E 6 A B O V E . A . H O R R O C K S E N G I N E E R S H A S P R E P A R E D G R A D I N G P L A N S A N D S I Z E D D R A I N A G E F A C I L I T Y S H O W N O N T H I S P L A N T O C O N T A I N T H E R U N O F F F R O M T H E C I T Y O F R E X B U R G S P E C I F I E D D E S I G N S T O R M E V E N T F O R T H E P R O P O S E D S I T E . O N L Y . B . A L L I M P O R T E D S T R U C T U R A L F I L L , I F R E Q U I R E D , S H A L L B E A P P R O V E D B Y T H E G E O T E C H N I C A L E N G I N E E R P R I O R T O D E L I V E R Y T O T H E S I T E C . T H E G R A D I N G A N D D R A I N A G E P L A N S D O N O T I D E N T I F Y T H E C O N S T R U C T I O N M E T H O D S , E Q U I P M E N T , P R O C E D U R E S , A N D O R S E Q U E N C I N G T O B E E M P L O Y E D B Y T H E C O N T R A C T O R . A L L G R A D I N G O P E R A T I O N S I N C L U D I N G B U T N O T L I M I T E D T O S I T E P R E P A R A T I O N , S C A R I F I C A T I O N , E X C A V A T I O N , O V E R - E X C A V A T I O N , P L A C E M E N T O F F I L L S , A N D C O M P A C T I O N O F F I L L S , S H A L L B E P E R F O R M E D B Y T H E C O N T R A C T O R I N C O N F O R M A N C E W I T H T H E G E O T E C H N I C A L R E Q U I R E M E N T S F O R T H E S I T E A N D O N S I T E F I E L D O B S E R V A T I O N S A S R E Q U I R E D B Y T H E G E O T E C H N I C A L F I R M . D . I T I S T H E C O N T R A C T O R S R E S P O N S I B I L I T Y T O N O T I F Y H O R R O C K S I M M E D I A T E L Y I F T H E R E A R E A N Y C O N F L I C T S B E T W E E N T H E R E Q U I R E M E N T S O F T H E G R A D I N G A N D D R A I N A G E P L A N S A N D T H E R E Q U I R E M E N T S O F T H E G E O T E C H N I C A L R E P O R T O R G E O T E C H N I C A L F I E L D O B S E R V A T I O N S . E . A L L E X C A V A T I O N , G R A D I N G , A N D F I L L O P E R A T I O N S W I T H I N T H E B U I L D I N G A R E A S H O U L D B E O B S E R V E D B Y T H E G E O T E C H N I C A L E N G I N E E R T O V E R I F Y S U B S O I L C O N D I T I O N S A N D D E T E R M I N E A D E Q U A C Y O F S I T E P R E P A R A T I O N , S U I T A B I L I T Y O F F I L L M A T E R I A L S A N D C O M P L I A N C E W I T H C O M P A C T I O N R E Q U I R E M E N T S . F . T H E C O N T R A C T O R S H A L L P R O V I D E S U I T A B L E M E T H O D S & E Q U I P M E N T T O C O N T R O L D U S T A N D A I R P O L L U T I O N C A U S E D B Y C O N S T R U C T I O N O P E R A T I O N S , T H E C O N T R A C T O R S H A L L A L S O P R O V I D E S U I T A B L E M U D A N D D I R T C O N T A I N M E N T T O M A I N T A I N T H E W O R K S I T E . A C C E S S R O A D W A Y S A N D A D J A C E N T P R O P E R T I E S I N A C L E A N C O N D I T I O N . G . A L L E X C A V A T I O N A N D G R A D I N G S H A L L B E I N A C C O R D A N C E W I T H T H E C U R R E N T R E Q U I R E M E N T S O F I D A H O C I T Y C O D E S , U N I F O R M B U I L D I N G C O D E S , A N D T H E G E O T E C H N I C A L I N V E S T I G A T I O N S T U D Y . H . T H E G E O T E C H N I C A L E N G I N E E R S H A L L P R O V I D E A F I N A L G R A D I N G R E P O R T T O C O N F I R M W O R K H A S B E E N P E R F O R M E D I N C O N F O R M A N C E W I T H T H E I R R E C O M M E N D A T I O N S . G R A D I N G & D R A I N A G E N O T E S R O A D W A Y · I D A H O S T A N D A R D S F O R P U B L I C W O R K S C O N S T R U C T I O N ( I S P W C , 2 0 2 0 ) . · I D A H O D E Q T E C H N I C A L G U I D A N C E M A N U A L · C I T Y O F R E X B U R G E N G I N E E R I N G S T A N D A R D S ( 2 0 2 1 ) N O T E : C O N T R A C T O R S H A L L M A I N T A I N A C U R R E N T C O P Y O F A L L P R O J E C T S P E C I F I C A T I O N S A N D S T A N D A R D S A T T H E J O B S I T E D U R I N G C O N S T R U C T I O N . P R O J E C T S P E C I F I C A T I O N S A N D S T A N D A R D S T H E E X I S T E N C E A N D L O C A T I O N O F A N Y U N D E R G R O U N D U T I L I T Y P I P E S O R S T R U C T U R E S S H O W N O N T H E S E D R A W I N G S A R E O B T A I N E D B Y A S E A R C H O F T H E A V A I L A B L E R E C O R D S . T O T H E B E S T O F O U R K N O W L E D G E T H E R E A R E N O E X I S T I N G U T I L I T I E S E X C E P T A S S H O W N O N T H E S E D R A W I N G S A N D W E A S S U M E N O R E S P O N S I B I L I T Y A S T O T H E A C C U R A C Y O F T H E I R D E P I C T E D L O C A T I O N O N T H E S E D R A W I N G S . T H E C O N T R A C T O R I S R E Q U I R E D T O T A K E D U E P R E C A U T I O N A R Y M E A S U R E S T O P R O T E C T T H E U T I L I T Y L I N E S S H O W N , A N D A L L O T H E R L I N E S N O T O F R E C O R D O R N O T S H O W N O N T H E S E D R A W I N G B Y V E R I F I C A T I O N O F T H E I R L O C A T I O N I N T H E F I E L D P R I O R T O T H E S T A R T O F C O N S T R U C T I O N A C T I V I T I E S . E N G I N E E R ' S N O T I C E T O C O N T R A C T O R U S E O F T H E I N F O R M A T I O N C O N T A I N E D I N T H I S I N S T R U M E N T F O R O T H E R T H A N T H E S P E C I F I C P U R P O S E F O R W H I C H I T W A S I N T E N D E D A N D F O R O T H E R T H A N T H E C L I E N T F O R W H O M I T W A S P R E P A R E D I S F O R B I D D E N U N L E S S E X P R E S S L Y P E R M I T T E D I N W R I T I N G I N A D V A N C E T O H O R R O C K S E N G I N E E R S , A N D H O R R O C K S E N G I N E E R S S H A L L H A V E N O L I A B I L I T Y T O A N Y U S E O F T H I S I N F O R M A T I O N W I T H O U T T H E I R W R I T T E N C O N S E N T . L E G A L N O T I C E T O C O N T R A C T O R 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 3/4'' W3/4'' W1'' W1'' W2'' W2'' W3'' W3'' W4'' W4'' W6'' W6'' W8'' W8'' W WATERPROPOSEDEXISTINGWW A A L G E B R A I C G R A D E C H A N G E A B C A G G R E G A T E B A S E C O U R S E A C A S P H A L T I C C E M E N T O R C O N C R E T E B C B U I L D I N G C O R N E R B C R B A C K O F C U R B R E T U R N B F E B A S E F L O O D E L E V A T I O N B F F B A S E M E N T F I N I S H F L O O R B L D G B U I L D I N G B M B E N C H M A R K B P B E G I N P O I N T B V B U T T E R F L Y V A L V E B V C B E G I N V E R T I C A L C U R V E B V C E B E G I N V E R T I C A L C U R V E E L E V A T I O N B V C S B E G I N V E R T I C A L C U R V E S T A T I O N B V P B E G I N V E R T I C A L P R O F I L E B V W B O T T O M O F V I S I B L E W A L L C & G C U R B & G U T T E R C B C A T C H B A S I N C L C E N T E R L I N E C L R C L E A R C O C L E A N O U T C O N C C O N C R E T E C u C O P P E R C . Y . C U B I C Y A R D D I A D I A M E T E R D W G D R A W I N G E E A S T O R E A S T I N G E A E A C H E G E X I S T I N G G R A D E / G R O U N D E L E V E L E V A T I O N E O C E D G E O F C O N C R E T E E O P E D G E O F P A V E M E N T E P E N D P O I N T E S M T E A S E M E N T E V C E N D V E R T I C A L C U R V E E V C E E N D V E R T I C A L C U R V E E L E V A T I O N E V C S E N D V E R T I C A L C U R V E S T A T I O N E V P E N D V E R T I C A L P R O F I L E E X E X I S T I N G F E F L A N G E E N D F F F I N I S H E D F L O O R F G F I N I S H E D G R A D E F J F L A N G E J O I N T F L F L O W L I N E F M F O R C E M A I N F P S F E E T P E R S E C O N D F T F O O T O R F E E T F U T F U T U R E G G A S L I N E G B G R A D E B R E A K G F F G A R A G E F I N I S H E D F L O O R G V G A T E V A L V E H G L H Y D R A U L I C G R A D E L I N E H P H I G H P O I N T H R Z H O R I Z O N T A L H W M H I G H W A T E R M A R K I D I N S I D E D I A M E T E R I N I N C H ( E S ) I R R I R R I G A T I O N ( P R E S S U R I Z E D ) / N O N - P O T A B L E K V E R T I C A L C U R V E C O E F F I C I E N T L L E N G T H L F L I N E A R F E E T L P L O W P O I N T L / S L A N D S C A P E L T L E F T L V C L E N G T H O F V E R T I C A L C U R V E M A X M A X I M U M M E M A T C H E X I S T I N G M F R M A N U F A C T U R E R M G D M I L L I O N G A L L O N S P E R D A Y M H M A N H O L E M I D M I D D L E M I N M I N I M U M M J M E C H A N I C A L J O I N T N N O R T H O R N O R T H I N G , F R I C T I O N F A C T O R N / A N O T A P P L I C A B L E N T S N O T T O S C A L E O C O N C E N T E R O D O U T S I D E D I A M E T E R O V H P O V E R A L L H I G H P O I N T O V L P O V E R A L L L O W P O I N T P C P O I N T O F C U R V E P C C P O I N T O F C O M P O U N D C U R V E P H P H A S E P I P O I N T O F I N T E R S E C T I O N P L P R O P E R T Y L I N E P R C P O I N T O F R E V E R S E C U R V E P T P O I N T O F T A N G E N C Y P U E P U B L I C U T I L I T Y E A S E M E N T P V I P O I N T O F V E R T I C A L I N T E R S E C T I O N Q R A T E O F F L O W R R A D I U S R E V R E V I S I O N R T R I G H T R / W R I G H T O F W A Y S S L O P E S D S T O R M D R A I N S D M H S T O R M D R A I N M A N H O L E S E C S E C T I O N S F S Q U A R E F O O T / F O O T A G E S / L S T R E E T L I G H T S P E C S P E C I F I C A T I O N S S S S A N I T A R Y S E W E R S S M H S A N I T A R Y S E W E R M A N H O L E S T A S T A T I O N S T D S T A N D A R D S V E S I G H T V I S I B I L I T Y E A S E M E N T S / W S I D E W A L K T A T O P O F A S P H A L T T B C T O P B A C K O F C U R B T B D C T O P B A C K O F D E P R E S S E D C U R B T B M T E M P O R A R Y B E N C H M A R K T C T O P O F C O N C R E T E T E M P T E M P O R A R Y T F T O P O F F O O T I N G T G T O P O F G R A T E T R W T O P O F R E T A I N I N G W A L L T W T O P O F W A L L T Y P T Y P I C A L U T C U N T R E A T E D B A S E C O U R S E V V E L O C I T Y V C V E R T I C A L C U R V E V R T V E R T I C A L W / W I T H W M H W A T E R M A N H O L E W T R W A T E R * A L L A B B R E V I A T I O N S M A Y N O T B E U S E D M A T C H L I N E S T A . X X + X X . X X S E E S H E E T P P - X X UNKNOWN18'' W18'' W24'' W24'' W30'' W30'' W36'' W36'' W E X I S T I N G P R O P O S E D E L E C T R I C A L M A N H O L E # F I N I S H E D F L O O R E L E V A T I O N P A R K I N G S T A L L C O U N T T B C & T B D C S P O T E L E V A T I O N F L & T G S P O T E L E V A T I O N F F : 2 7 5 2 . 8 4 A B B R E V I A T I O N S * S T A N D A R D S Y M B O L S H A T C H P A T T E R N S S U R F A C E F E A T U R E S B U I L D I N G / P A D C O N C R E T E S I D E W A L K / F L A T W O R K P O O L D E C K X E R I S C A P E H E A V Y D U T Y P A V E M E N T S E C T I O N L I G H T D U T Y P A V E M E N T S E C T I O N R I P R A P C A L L O U T S C O N S T R U C T I O N K E Y N O T E T A G S D E T A I L R E F E R E N C E 1-1/2'' W1-1/2'' W S C A L E : X - D E T A I L N A M E N T S A D A A C C E S S R A M P T R U N C A T E D D O M E S G R A V E L L A N D S C A P E A R E A S / G R A S S 3 5 D 0 0 O R D E M O P L A N O R G R A D I N G P L A N O R S I T E P L A N O R W A T E R O R S E W E R O R S T O R M D R A I N O R I R R I G A T I O N O R C A B L E T V O R T E L E P H O N E O R G A S O R M I S C E L L A N E O U S 6 6 3 6 8 1 5 1 9 1 9 4 9 7 A 0 1 G 1 G 9 D 9 9 5 0 6 5 8 0 9 0 9 3 9 6 9 9 Z 0 0 0 0 O R P O W E R F O T V T E J B I R P P S S D W E T F O I R W G G T V T C O S D T P B H f o t v t j b i r p p s w e t f o i r w g g t v t b c o e s d F I B E R O P T I C M A N H O L E T E L E P H O N E M A N H O L E C A B L E T V M A N H O L E E L E C T R I C A L P O W E R P O L E S I G N A L P O L E E L E C T R I C A L B O X F I B E R O P T I C B O X J U N C T I O N B O X T E L E P H O N E B O X T E L E P H O N E P E D E S T A L C A B L E T V B O X L I G H T P O L E L I G H T P O L E O P T 2 L I G H T P O L E O P T 3 G A S M A N H O L E G A S M E T E R C L E A N O U T S E W E R M A N H O L E I R R I G A T I O N M A N H O L E I R R I G A T I O N B O X W A T E R M A N H O L E W A T E R M E T E R F I R E H Y D R A N T F I R E H Y D R A N T O P T 2 G A T E V A L V E G A T E V A L V E O P T 2 C R O S S T E E 9 0 ° B E N D 4 5 ° B E N D 2 2 . 5 ° B E N D 1 1 . 2 5 ° B E N D W Y E R E D U C E R C A P & P L U G S T O R M D R A I N M A N H O L E A R E A D R A I N R O U N D A R E A D R A I N S Q U A R E D R O P I N L E T C U R B I N L E T C U R B I N L E T O P T 2 C U R B I N L E T O P T 3 C U R B D O U B L E I N L E T C U R B D O U B L E I N L E T O P T 2 C O M B O B O X O I L / W A T E R S A N D / G R E A S E O I L / W A T E R S A N D / G R E A S E O P T 2 F L A R E D E N D P L A N S I G N B O L L A R D B O R E H O L E T E S T P I T S D T P B H D E C O R A T I V E B R I C K / S I D E W A L K / F L A T W O R K / L A N D S C A P E A R E A S 10'' W10'' W12'' W12'' W14'' W14'' W16'' W16'' W48'' W48'' W60'' W60'' W72'' W72'' W 3/4 INCH1 INCH1-1/2 INCH2 INCH3 INCH4 INCH6 INCH8 INCH10 INCH12 INCH14 INCH16 INCH18 INCH24 INCH30 INCH36 INCH48 INCH60 INCH72 INCH 4'' SD4'' SD6'' SD6'' SD10'' SD10'' SD12'' SD12'' SD15'' SD15'' SD16'' SD16'' SD18'' SD18'' SD STORMPROPOSEDEXISTINGSDSDUNKNOWN48'' SD48'' SD54'' SD54'' SD60'' SD60'' SD66'' SD66'' SD 8'' SD8'' SD24'' SD24'' SD30'' SD30'' SD36'' SD36'' SD42'' SD42'' SD72'' SD72'' SD 4 INCH6 INCH8 INCH10 INCH12 INCH15 INCH16 INCH18 INCH24 INCH30 INCH36 INCH42 INCH48 INCH54 INCH60 INCH66 INCH72 INCH 4'' SS4'' SS6'' SS6'' SS10'' SS10'' SS12'' SS12'' SS14'' SS14'' SS15'' SS15'' SS16'' SS16'' SS SEWERPROPOSEDEXISTINGSSSSUNKNOWN8'' SS8'' SS18'' SS18'' SS24'' SS24'' SS30'' SS30'' SS36'' SS36'' SS 4 INCH6 INCH8 INCH10 INCH12 INCH15 INCH16 INCH18 INCH24 INCH30 INCH36 INCH 14 INCHSERVICE LATERAL1'' IRR1'' IRR2'' IRR2'' IRR6'' IRR6'' IRR8'' IRR8'' IRR10'' IRR10'' IRR12'' IRR12'' IRR IRRIGATIONPROPOSEDEXISTINGIRRIRRUNKNOWN4'' IRR4'' IRR 1 INCH2 INCH4 INCH6 INCH8 INCH10 INCH12 INCH18 INCH24 INCH30 INCH36 INCH B E L B E L 2 ' ' B E L 2 ' ' B E L 4 ' ' B E L 4 ' ' B E L 6 ' ' B E L 6 ' ' B E L 8 ' ' B E L 8 ' ' B E L 1 0 ' ' B E L 1 0 ' ' B E L A - 1 / 0 A - 1 / 0 A - 1 / 0 P O W E R P R O P O S E D EXISTING O H P O H P O V E R H E A D 3 ' ' B E L 3 ' ' B E L A - 4 / 0 A - 4 / 0 A - 4 / 0 B - 1 / 0 B - 1 / 0 B - 4 / 0 B - 4 / 0 B - 4 / 0 C - 1 / 0 C - 1 / 0 U N D E R G R O U N D 2 I N C H 3 I N C H 4 I N C H 6 I N C H 1 0 I N C H 1 P H A 1 / 0 1 P H A 4 / 0 1 P H B 1 / 0 1 P H B 4 / 0 1 P H C 1 / 0 8 I N C H SERVICE LATERALSERVICE LATERAL C - 4 / 0 C - 4 / 0 A B C - 4 / 0 A B C - 4 / 0 A B C - 7 5 0 S E C S E C S L S L S L A-1/0A-1/0A-1/0A-4/0A-4/0A-4/0B-1/0B-1/0B-4/0B-4/0B-4/0C-1/0C-1/0C-4/0C-4/0ABC-4/0ABC-4/0ABC-750SECSECSLSLSL 1 P H C 4 / 0 3 P H A B C 4 / 0 3 P H A B C 7 5 0 A S E C O N D A R Y S T R E E T L I G H T B C T V B C T V B F O B F O T E L T E L B T E L B T E L B T E L C O M M U N I C A T I O N S P R O P O S E D EXISTING C T V C T V O V E R H E A D C A B L E T V F O F O U N D E R G R O U N D C A B L E T V O V E R H E A D F I B E R O P T I C U N D E R G R O U N G F I B E R O P T I C O V E R H E A D T E L E P H O N E U N D E R G R O U N D T E L E P H O N E 1 ' ' G 1 ' ' G 2 ' ' G 2 ' ' G 6 ' ' G 6 ' ' G 8 ' ' G 8 ' ' G 1 2 ' ' G 1 2 ' ' G G A S P R O P O S E D EXISTING G G U N K N O W N 4 ' ' G 4 ' ' G 1 I N C H 2 I N C H 4 I N C H 6 I N C H 8 I N C H 1 2 I N C H 3 I N C H H P G H P G H I G H P R E S S U R E LDLDLAND DRAIN F I L L F I L L L O D L O D G B G B G B H W M H W M 1 Y R H W M 5 Y R H W M 1 0 Y R C U T C U T C U T H W M 2 5 Y R H W M 5 0 Y R H W M 1 0 0 Y R X X X X X C U T L I N E F I L L L I N E L I M I T S O F D I S T U R B A N C E D I T C H G R A D E B R E A K H I G H W A T E R M A R K H I G H W A T E R M A R K - 1 Y E A R E V E N T H I G H W A T E R M A R K - 5 Y E A R E V E N T H I G H W A T E R M A R K - 1 0 Y E A R E V E N T H I G H W A T E R M A R K - 2 5 Y E A R E V E N T H I G H W A T E R M A R K - 5 0 Y E A R E V E N T H I G H W A T E R M A R K - 1 0 0 Y E A R E V E N T F E N C E - B A R B E D F E N C E - C H A I N L I N K F E N C E - D E C O R A T I V E F E N C E - W O O D W A L L - B L O C K W A L L - P A N E L W A L L - R O C K R / W R I G H T O F W A Y W A L L - C O N C R E T E C E N T E R L I N E ( R O A D / E N T I T Y ) C U R B & G U T T E R P A R C E L L I N E P R O P E R T Y B O U N D A R Y 1 0 ' P U B L I C U T I L I T Y & D R A I N A G E E A S E M E N T ( P . U . E . ) J U T T O P T O P T O P > > > M I S C E L L A N E O U S P R O P O S E D EXISTING D E M O T O E T O E U N K N O W N P I P E J O I N T U T I L I T Y T R E N C H T O E O F S L O P E T O P O F S L O P E D I R E C T I O N A L F L O W L I N E G U A R D R A I L R A I L R O A D T R A C K S E D G E O F P A V E M E N T toptoptop toetoe P A I N T S T R I P E - S O L I D P A I N T S T R I P E - D O U B L E S O L I D P A I N T S T R I P E - B R O K E N P A I N T S T R I P E - B I K E L A N E I N T E R S E C T I O N P A I N T S T R I P E - L A N E D R O P P A I N T S T R I P E - L A N E L I N E E X T E N S I O N F U T F U T L T G L T G P E D P E D D E T D E T E X I S T I N G / P R O P O S E D T R A F F I C S I G N A L - D E T E C T I O N C O N D U I T P W R P W R S I G S I G T R A F F I C S I G N A L - F U T U R E C O N D U I T T R A F F I C S I G N A L - L I G H T I N G C O N D U I T T R A F F I C S I G N A L - P E D E S T R I A N C O N D U I T T R A F F I C S I G N A L - P O W E R S O U R C E C O N D U I T T R A F F I C S I G N A L - S I G N A L C O N D U I T 4 0 0 0 4 0 0 2 40004002 C O N T O U R - M A J O R C O N T O U R - M I N O R N/AN/AN/AN/AN/AN/AN/A N / A N/AN/AN/AN/A W A T E R M E T E R O P T 2 B L O W - O F F B O W M T B C : 2 7 5 2 . 8 5 F L : 2 7 5 2 . 8 6 P V C P O L Y V I N Y L C H L O R I D E R C P R E I N F O R C E D C O N C R E T E P I P E V C P V I T R I F I E D C L A Y P I P E C I P C A S T I R O N P I P E H D P E H I G H D E N S I T Y P O L Y E T H Y L E N E D I P D U C T I L E I R O N P I P E C M P C O R R U G A T E D M E T A L P I P E C P P C O R R U G A T E D P O L Y E T H Y L E N E P I P E P O L Y P O L Y E T H Y L E N E * A L L A B B R E V I A T I O N S M A Y N O T B E U S E D P I P E A B B R E V I A T I O N S * F L A R E D E N D P R O F I L E F L A R E D E N D S E C T I O N B E N C H M A R K S E C T I O N C O R N E R C O N T R O L P O I N T H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.1.2_LEGEND.dwg - LEGEND - 12/02/2022 03:09pm, tyler.melander 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N ID-6177-22 CJF TLM CJF 12/01/2022 LEGEND TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 3 C . 1 . 2 NOT E : NOT A L L H A T C H E S , L I N E T Y P E S , AND S Y M B O L S S H O W N O N T H I S SHE E T A R E I N C L U D E D I N T H I S PLAN S E T . 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 39.5' 3 9 . 5 ' 3 9 . 5 ' 62.5' EXISTING 10'IDAHO TRANSPORTATIONDEPARTMENT EASEMENTINST. NO. 175547 EXISTING 30'IDAHO TRANSPORTATIONDEPARTMENT EASEMENTINST. NO. 175547 EXISTING 33' PRESCRIPTIVE RIGHT-OF-WAY EASEMENT S 0 ° 1 4 ' 0 7 " E 2 0 2 4 . 7 3 ' S89°38'53"W 475.07' L 1 L2 L 3 S89°38'53"W 1189.93' N 0 ° 1 4 ' 0 7 " W 2 5 8 1 . 8 1 ' C1 L4 N89°44'53"E 1638.05'S5°54'22"E 610.63' L 5 S 0 ° 1 4 ' 0 5 " E 6 4 7 . 2 8 ' N89°45'53"E 611.59' N 0 ° 1 4 ' 0 7 " W 1 5 0 3 . 6 8 ' S89°45'53"W 1734.29' S 8 9 ° 3 8 ' 5 3 " W 6 7 . 1 0 ' S 0 ° 1 4 ' 0 7 " E 1 5 0 3 . 9 2 ' L 1 4 L 7 L 6 L 8 L 1 3 L 1 2 S89°38'53"W 949.80' L 1 1 S 0 ° 1 4 ' 0 7 " E 1 5 0 6 . 2 7 ' L 1 0 N89°45'53"E 949.79' L 9 150.00' 4 0 7 . 0 4 ' 1 6 1 7 . 6 9 ' 311.30' 2 9 9 . 3 3 ' 9 2 0 . 9 3 ' 1 5 6 3 . 8 8 ' 39.5' S89°38'53"W 394.48' S 0 ° 1 4 ' 0 5 " E 1 5 0 2 . 6 2 ' S0°14'08"E2632.18'S0°14'08"E607.62' S89°45'53"W 750.00'S89°45'53"W 1065.00' S 0 ° 1 4 ' 0 7 " E 1 6 1 9 . 8 0 ' 124.93'1065.00' 1 6 0 . 4 7 ' 1 6 0 . 4 7 ' 39.5' 3 9 . 5 ' 3 9 . 5 ' 62.5' 3 9 . 5 0 ' 3 9 . 5 0 ' 3 9 . 5 0 ' 5 7 . 5 0 ' 1 5 ' 15' 15' 50' 1 5 ' 1 5 ' 15' 94'15' N 8 9 ° 4 5 ' 5 3 " E 3 9 . 5 0 ' E X I S T I N G 2 5 ' P R E S C R I P T I V E R I G H T - O F - W A Y - E A S E M E N T EXISTING 33' PRESCRIPTIVE RIGHT-OF-WAY EASEMENT E X I S T I N G 2 5 ' P R E S C R I P T I V E R I G H T - O F - W A Y - E A S E M E N T N89°44'53"E93.32' L i n e T a b l e L i n e # L 1 L 2 L 3 L 4 L 5 L 6 L 7 L 8 L 9 L 1 0 L 1 1 L 1 2 L 1 3 L 1 4 L e n g t h 1 9 9 . 9 6 ' 1 5 0 . 0 0 ' 1 9 9 . 9 7 ' 3 2 . 1 2 ' 3 3 . 0 0 ' 2 5 . 6 3 ' 2 5 . 7 5 ' 2 5 . 7 7 ' 2 5 . 7 5 ' 2 5 . 4 6 ' 2 5 . 4 8 ' 2 5 . 7 2 ' 2 5 . 5 8 ' 2 5 . 6 3 ' D i r e c t i o n N 0 ° 2 1 ' 0 2 " W S 8 9 ° 3 8 ' 5 3 " W S 0 ° 2 1 ' 0 2 " E N 5 8 ° 2 7 ' 2 4 " E N 8 9 ° 4 5 ' 5 3 " E S 4 4 ° 4 5 ' 5 3 " W N 4 4 ° 4 5 ' 5 3 " E N 4 5 ° 1 7 ' 3 7 " W S 4 5 ° 1 4 ' 0 7 " E N 4 4 ° 4 5 ' 5 3 " E N 4 5 ° 1 7 ' 3 7 " W S 4 4 ° 4 2 ' 2 3 " W S 4 4 ° 4 2 ' 2 3 " W S 4 5 ° 1 4 ' 0 7 " E C u r v e T a b l e C u r v e # C 1 L e n g t h 6 7 . 3 1 ' R a d i u s 3 1 5 4 . 0 5 ' D e l t a 1 ° 1 3 ' 2 2 " C h o r d D i r e c t i o n N 5 6 ° 1 9 ' 4 7 " E C h o r d L e n g t h 6 7 . 3 1 ' T E T O N R I V E R S U B D I V I S I O N L O C A T E D I N T H E S . E . 1 / 4 O F S E C T I O N 7 , T O W N S H I P 6 N O R T H , R A N G E 4 0 E A S T O F T H E B O I S E M E R I D I A N , C I T Y O F R E X B U R G , M A D I S O N C O U N T Y , I D A H O - 2 0 2 3 - H O R R O C K S E N G I N E E R S N 0 1 5 0 ' 3 0 0 ' S C A L E : 1 " = 1 5 0 ' S U B D I V I S I O N B O U N D A R Y L I N E L O T L I N E P U B L I C U T I L I T I E S E A S E M E N T L I N E ( P . U . E . ) ( O R A S N O T E D O T H E R W I S E ) F O U N D P . L . S . S . C O R N E R A S N O T E D S E C T I O N L I N E P O I N T O F B E G I N N I N G P . O . B . S E T 1 / 2 " R E B A R W / P L A S T I C C A P - P . L . S . 1 9 9 6 1 THE BEARINGS SHOWN ARE BASED UPON THE EST LINE OF SECTION 7 B E T W E E N F O U N D MONUMENTS. DISTANCES SHOWN ARE BASED UPON A MODIFIED EA S T Z O N E , I D A H O S T A T E PLANE COORDINATE SYSTEM (NAD83), WITH A COMBINED SCALE FAC T O R O F 1 . 0 0 0 2 7 2 0 6 0 8 , SCALED FROM COORDINATES 0,0. S E T 5 / 8 " R E B A R W I T H P L A S T I C C A P - P . L . S . 1 9 9 6 1 1 . R I G H T - O F - W A Y C O N V E Y E D T O T H E C I T Y O F R E X B U R G P U R S U A N T T O O W N E R S D E D I C A T I O N O N S H E E T 2 O F T H I S P L A T . 2 . T O T A L R I G H T - O F - W A Y D E D I C A T E D T O T H E C I T Y O F R E X B U R G I S 1 1 . 8 7 A C R E S . 2 1 9 4 S n a k e R i v e r P a r k w a y S u i t e 2 0 5 I d a h o F a l l s , I d a h o M a i n : 2 0 8 - 5 2 2 - 1 2 2 3 S H E E T 1 o f 2 ( M O N U M E N T E D B A S I S O F B E A R I N G S ) T H E P U R P O S E O F T H I S S U R V E Y I S T O S U B D I V I D E T H E P A R C E L A S S H O W N H E R E O N . T H E S O U T H L I N E O F T H E P R O P E R T Y W A S D E T E R M I N E D B Y F O U N D S E C T I O N M O N U M E N T S A L O N G T H E S O U T H L I N E O F S E C T I O N 7 . T H E W E S T A N D N O R T H E R L Y L I N E S W E R E D E T E R M I N E D B Y F O U N D M O N U M E N T S A S S H O W N O N R E C O R D - O F - S U R V E Y I N S T R # 4 4 7 1 6 5 . T H E E A S T E R L Y L I N E W A S D E T E R M I N E D B Y F O U N D M O N U M E N T S A S S H O W N O N S A I D R E C O R D - O F - S U R V E Y A N D M O N U M E N T S F O U N D O N T H E E A S T L I N E O F S E C T I O N 7 . F O U N D P . L . S . S . C O R N E R A S N O T E D F O U N D 1 / 2 " R E B A R N O C A P F O U N D 5 / 8 " R E B A R W I T H P L A S T I C C A P - P . L . S . 1 3 9 3 3 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.1.3_FINAL PLAT.dwg - Layout1 - 12/02/2022 03:10pm, tyler.melander 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N ID-6177-22 CJF TLM CJF 12/01/2022 FINAL PLAT TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 3 C . 1 . 3 I N T E R I O R S T R E E T I N T E R S E C T I O N M O N U M E N T S 5 / 8 " R E B A R W I T H 2 " A L U M I N U M C A P M A R K E D P . L . S . 1 9 9 6 1 STREET A S T R E E T B S T R E E T C N . 2 N D S T . E . MOODY RD. P . O . B S . E . C O R S E C 7 C P & F I N S T . N O . 3 9 9 6 9 4 E. 1/4 COR. SEC 7CP&F INST. NO. 267966 N.E. COR. SEC 7CP&F INST. NO. 404597 C A L C U L A T E D P O S I T I O N N O T H I N G S E T 20' W.C. 2 0 ' W . C . FOUND MONUMENTPER ROS (TYP) S E T 5 / 8 R E B A R W I T H 2 " A L U M C A P P . L . S . 1 9 9 6 1 ( T Y P ) P L A T S H O W N H E R E O N F O R H O R I Z O N T A L C O N T R O L R E F E R E N C E P U R P O S E S S U R V E Y T I E L I N E E X I S T I N G E A S E M E N T A S N O T E D A P P R O X I M A T E L O C A T I O N O F E X I S T I N G C A N A L R I G H T - O F - W A Y P U R S U A N T T O I . C . § 4 2 - 1 1 0 2 TETON ISLAND CANAL W I T N E S S C O R N E R W . C . R O A D C E N T E R L I N E 1 2 2 . 3 8 A C R E S B L O C K 1 1 3 4 . 8 7 A C R E S B L O C K 2 1 39. 0 4 A C R E S B L O C K 3 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y t o p t o p to p to p to p t o p to p to p t o p to p to p to p t o p to p t o p to p t o p to p to p t o p to p t o p t o p to p to p t o p t o p to p to p toptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoetoetoetoetoe t o e t o e t o e to e to e to e t o e to e t o e t o e t o e to e t o e t o e t o e to e t o e t o e t o e g g g g g g g g g g g g g g g g g g g g g g g g g g g gtoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptop toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toetoetoe toe toe toetoptoptoptoptop toptoptoptoptoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoe to e to e top top top top top top top top top top top top top top top top top top top top top top top top top top top top toptoptoptoptoptoptoptoptoptoptoptoptoptoptoptop top toptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoe to e t o e t o e to e t o e t o e to e to e t o e to e t o e t o e to e t o e to e to e t o e t o e to e toe toetoetoetoetoetoetoetoetoetoetoe to e t o e t o e to e t o e t o e to e to e t o e to e to e t o e to e t o e to e t o e to e t o e to e toetoetoetoetoetoetoetoetoetoetoetoe t o e to e t o e t o e t o e t o e to e to e t o e t o e t o e t o e t o e t o e top top top toptoptoptoptoptoptoptoptoptoptoptop toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toe toetoe toetoetoetoetoetoetoetoetoetoetoe t o e to e t o e t o e t o e to e t o e t o e t o e pppppppp pp pppp pp pp pp pp pp pp pp pp pp pppppppppp pp pppp ir ir S sd sd sd sd sd sdsd t o e t o e to p t o p t o p t o p t o p to p to p to p t o p to p to p t o p to p to p to p t o p to p t o p to p t o p to p to p t o p to p t o p t o p to p to p t o p t o p to p to p toptoptoptoptop 4875 4876 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4876 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 7 4877 4 8 7 7 4877 4 8 7 8 4878 4 8 7 8 4878487848784878487848784879 N 0 ° 1 4 ' 0 2 " W 2 6 3 1 . 8 7 ' S 0 ° 1 4 ' 0 2 " E 1 0 2 9 . 0 0 ' S 0 ° 1 4 ' 0 2 " E 2 0 0 . 0 0 ' S 8 9 ° 3 8 ' 5 8 " W 2 2 5 . 0 0 ' S 8 9 ° 3 8 ' 5 8 " W 2 5 0 . 0 0 ' S 8 9 ° 3 8 ' 5 8 " W 1 5 0 . 0 0 ' S89°38'58"W 1190.00' N89°45'58"E 217.00' S89°45'58"W 217.00' N 0 ° 1 4 ' 0 2 " W 2 0 0 . 0 0 ' N 0 ° 1 4 ' 0 2 " W 2 0 0 . 0 0 ' N89°38'58"E 225.00' N 0 ° 2 1 ' 0 2 " W 1 9 9 . 9 7 ' S89°38'53"W 150.00' N 0 ° 2 1 ' 0 2 " W 1 9 9 . 9 6 ' N89°44'53"E 1638.05'S5°54'22"E 610.63'N89°45'53"E 33.00'A=67.31R=3154.050D=1°13'22"C=67.31CB=N56° 19' 47"EH:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.2.0_EX & DEMO.dwg - EXISTING CONDITIONS & DEMO - 12/02/2022 03:11pm, tyler.melander 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N ID-6177-22 CJF TLM CJF 12/01/2022 EXISTING CONDITIONS & DEMO TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 5 C . 2 . 0 1 . C O N T R A C T O R T O V E R I F Y A L L U T I L I T Y S I Z E S , L O C A T I O N S & E L E V A T I O N S P R I O R T O O R D E R I N G M A T E R I A L S F O R C O N S T R U C T I O N . 2 . C O N T O U R S A R E S H O W N A T 1 ' A N D 5 ' I N T E R V A L S . T H I S S I T E P L A N C O N F O R M S T O A N A C T U A L S U R V E Y T H A T W A S P E R F O R M E D O N T H E G R O U N D B Y A L I C E N S E D L A N D S U R V E Y O R I N A N D F O R T H E S T A T E O F I D A H O . I T I S T H E O W N E R ' S R E S P O N S I B I L I T Y T O C O N S T R U C T A L L S T R U C T U R E S S H O W N O N T H I S S I T E P L A N I N A C C O R D A N A N C E W I T H S A I D S U R V E Y . D E M O L I T I O N / E X I S T I N G K E Y N O T E S : E X I S T I N G A P P R O A C H E X I S T I N G A S P H A L T E X I S T I N G C U R B & G U T T E R E X I S T I N G S T O R M D R A I N S T R U C T U R E O V E R H E A D P O W E R ( R E M O V E A N D R E P L A C E B Y O T H E R S ) P O W E R P O L E ( R E M O V E , R E P L A C E A N D R E L O C A T E B Y O T H E R S ) E X I S T I N G C U L V E R T E X I S T I N G F E N C E E X I S T I N G I N T E R S E C T I O N T R A F F I C L I G H T S E X I S T I N G B U I L D I N G S A N D C O R R E S P O N D I N G S T R U C T U R E S E X I S T I N G I R R I G A T I O N L I N E A N D C O R R E S P O N D I N G I R R I G A T I O N B O X E S / S T R U C T U R E S E X I S T I N G B U R I E D E L E C T R I C A L E X I S T I N G T R E E S E X I S T I N G E L E C T R I C A L B O X E X I S T I N G U S E R D I T C H E X I S T I N G I R R I G A T I O N H E A D G A T E D 0 1 D 0 2 D 0 3 D 0 4 D 0 5 D 0 6 D 0 7 D 0 8 D 0 9 D 1 0 D 1 1 D 1 2 D 1 3 D 1 4 D 1 5 D 1 6 C E N T R A L M E R I D I A N O F T H E E A S T Z O N E O F T H E I D A H O S T A T E P L A N E C O O R D I N A T E P R O T E C T I N P L A C E N O T E S : E X I S T I N G A P P R O A C H E X I S T I N G C U R B A N D G U T T E R E X I S T I N G A S P H A L T E X I S T I N G B U R I E D E L E C T R I C E X I S T I N G S A N I T A R Y S E W E R L I N E E X I S T I N G S E W E R M A N H O L E E X I S T I N G O V E R H E A D P O W E R L I N E E X I S T I N G P O W E R P O L E E X I S T I N G B U I L D I N G & C O R R E S P O N D I N G S T R U C T U R E S E X I S T I N G I N T E R S E C T I O N T R A F F I C L I G H T S E X I S T I N G G A S L I N E A N D C O R R E S P O N D I N G G A S V A L V E E X I S T I N G E L E C T R I C A L B O X E X I S T I N G T E L E C O M M U N C A T I O N S B O X E X I S T I N G F E N C E E X I S T I N G S T O R M D R A I N P I P E E X I S T I N G S T O R M D R A I N M A N H O L E E X I S T I N G S T O R M D R A I N I N L E T E X I S T I N G W A T E R L I N E A N D C O R R E S P O N D I N G V A L V E S E X I S T I N G S T R I P I N G P 0 1 P 0 2 P 0 3 P 0 4 P 0 5 P 0 6 P 0 7 P 0 8 P 0 9 P 1 0 P 1 1 P 1 2 P 1 3 P 1 4 P 1 5 P 1 6 P 1 7 P 1 8 P 1 9 - V E R T I C A L C O N T R O L D A T U M B A S E D O N N A V D 8 8 C P # 1 E L E V : 4 8 7 8 . 5 2 9 ' N : 7 9 9 , 2 1 4 . 5 9 9 0 ' E : 7 5 8 , 8 5 0 . 8 6 8 0 ' F O U N D : A L C A P C P # 2 E L E V : 4 8 9 6 . 8 8 8 ' N : 8 0 0 , 6 2 6 . 5 6 2 0 ' E : 7 5 8 , 8 7 9 . 9 2 5 0 ' F O U N D : P L C A P C P # 3 E L E V : 4 8 7 4 . 4 1 9 ' N : 7 9 7 , 9 4 6 . 4 7 2 0 ' E : 7 5 7 , 0 6 6 . 7 6 6 0 ' F O U N D : P L C A P C P # S H E E T N O T E B A S I S O F B E A R I N G C O N T R O L P O I N T S S U R V E Y N O T E H O R R O C K S E N G I N E E R S N 0 1 0 0 ' 2 0 0 ' S C A L E : 1 " = 1 0 0 ' P 0 1 P 0 1 P 0 2 P02 P 0 3 P03 P 0 3 P 0 4 P 0 4 P 0 4 P 0 6 P 0 5 P04 P 0 7 P 0 8 P 1 4 P 1 4 P 0 7 P 0 8 P 0 7 P 0 8 P 0 8 P 0 7 P 0 8 P 0 7 P 0 7 P 0 7 P 0 7 P07 P 0 7 P07 P 0 8 P 0 8 P 0 8 P 0 8 P 0 8 P 0 8 P 0 8 P 0 8 P08P08 P08 P 0 9 P 1 0 P 1 0 P 1 1 P 1 1 P 1 1 P 1 1 P 1 1 P 1 2 P 1 5 P 1 5 P 1 5 P 1 5 P16P17 P16P17 P 1 6 P 1 7 P 1 6 P 1 7 P 1 6 P 1 7 P 1 6 P 1 7 P 0 8 P 0 1 D 0 1 D 0 1 D 0 2 D 0 2 D 0 2 D 0 2 D02D02 D 0 3 D 0 3 D 0 3 D 0 4 D 0 4 D 0 6 D06 D05D05 D 0 5 D 0 5 D 0 6 D 0 5 D 0 5 D 0 8 D 0 8 D08 D 0 7 D 0 7 P 1 0 P 1 8 D 1 0 D 1 0 D 1 1 D 1 1 D 1 1 D 1 1 D 1 2 D11 D 1 2 D 1 2 D 1 2 D12 D11D11 D 1 3 A L L T R E E S , S H R U B S , A N D L A N D S C A P E O N T H I S P R O P E R T Y T O B E R E M O V E D ± 7 9 , 9 6 4 S F T O T A L A S P H A L T T O B E R E M O V E D ± 7 9 , 9 6 4 S F T O T A L A S P H A L T T O B E R E M O V E D ±79,964 SF TOTAL ASPHALT TO BE REMOVED P 1 1 P11 P 1 1 D 1 4 D 1 3 P 1 9 P19P19 C P # 3 C P # 1 CP#2 2 N D E A S T MOODY RD T H I S L I G H T P O L E T O R E M O V E D A N D R E L O C A T E D ( B Y O T H E R S ) D15 D15 D15 D15 D15 D15IRRIGATION DITCH TO BEREMOVED AND RELOCATED D15D16 D16CONTRACTOR TO FIELD VERIFY FORADDITIONAL IRRIGATION STRUCTURESFOR DEMOTETON ISLAND CANAL APPROXIMATE CANAL RIGHT OF WAYAPPROXIMATE CANAL RIGHT OF WAYAPPROXIMATE CANAL RIGHT OF WAY 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y g g g g g g g g g g g g g g g g g g g g g g g g g g g gtoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoetoptoptop toetoe toetoetoetoetoetoetoetoetoetoe t o e t o e to e t o e t o e t o e to e t o e t o e t o e pppppp pp pppp pp pp pp pp pp pp pp pp pppppppp pp pp pppp S sd sd sd sd sd sdsd t o e t o e to p t o p 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W 8'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W s s s S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SSSSSS S SD SD SD S D S D S D S D S D S D S D S D SD S D SDSD SDSDSD SD SD SD SD SD SD SD SD 7+508+009+0010+0011+0012+0013+0014+0015+0016+0017+00 1 8 + 0 0 1 9 + 0 0 2 0 + 0 0 2 1 + 0 0 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 2 6 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 1 + 0 0 3 2 + 0 0 3 3 + 0 0 3 4 + 0 0 3 5 + 0 0 BP: 7+50.00PI: 8+10.54 PI: 14+10.07 PI: 34+80.55 P I : 3 5 + 2 3 . 1 3 BVP: 8+10.54Overall HP: 8+10.54BREAK: 8+26.54BREAK: 8+31.04BREAK: 11+15.04BREAK: 14+10.07 BREAK: 17+65.18 BREAK: 18+54.19BREAK: 18+58.69 BREAK: 19+00.00 BREAK: 21+00.00 BREAK: 23+00.00 BREAK: 25+00.00 BREAK: 27+00.00 BREAK: 29+00.00 BREAK: 32+00.00 BREAK: 33+00.00 BREAK: 33+78.55BREAK: 33+83.05 BREAK: 34+72.05Overall LP: 34+72.05BREAK: 34+76.55 BREAK: 35+2 3 . 7 2 EVP: 35+36.9 2 PVI: 8+26.54PVI: 8+31.04PVI: 11+15.04PVI: 14+10.07 PVI: 17+65.18 PVI: 18+54.19PVI: 18+58.69 PVI: 19+00.00 PVI: 21+00.00 PVI: 23+00.00 PVI: 25+00.00 PVI: 27+00.00 PVI: 29+00.00 PVI: 32+00.00 PVI: 33+00.00 PVI: 33+78.55PVI: 33+83.05 PVI: 34+72.05PVI: 34+76.55 PVI: 35+23.72 IR IRIRR IRIRR I R IRR I R I R IR I R H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.3.0_SITE KEY MAP.dwg - Layout1 - 12/02/2022 03:15pm, tyler.melander 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N ID-6177-22 CJF TLM CJF 12/01/2022 OVERALL SITE PLAN & KEYMAP TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 6 C . 3 . 0 H O R R O C K S E N G I N E E R S N 0 1 0 0 ' 2 0 0 ' S C A L E : 1 " = 1 0 0 ' 2ND EASTPLAN AND PROFILE 1SHEET C.4.0 2ND EASTPLAN AND PROFILE 2SHEET C.4.1 2 N D E A S T P L A N A N D P R O F I L E 3 S H E E T C . 4 . 2 2 N D E A S T P L A N A N D P R O F I L E 4 S H E E T C . 4 . 3 2 N D E A S T P L A N A N D P R O F I L E 5 S H E E T C . 4 . 4 S T R E E T C P L A N A N D P R O F I L E 1 S H E E T C . 8 . 0 S T R E E T C P L A N A N D P R O F I L E 2 S H E E T C . 8 . 1 S T R E E T C P L A N A N D P R O F I L E 3 S H E E T C . 8 . 2 S T R E E T B P L A N A N D P R O F I L E 1 S H E E T C . 7 . 0 S T R E E T B P L A N A N D P R O F I L E 2 S H E E T C . 7 . 1 S T R E E T B P L A N A N D P R O F I L E 3 S H E E T C . 7 . 2 STREET A PLAN AND PROFILE 3 SHEET C.6.2 STREET A PLAN AND PROFILE 2 SHEET C.6.1 STREET A PLAN AND PROFILE 1 SHEET C.6.0 MOODY RD PLAN AND PROFILE 3 SHEET C.5.2 MOODY RD PLAN AND PROFILE 2 SHEET C.5.1 MOODY RD PLAN AND PROFILE 1 SHEET C.5.0 2 N D E A S T - I R R P & P 5 - S H E E T C . 1 0 . 4 2 N D E A S T - I R R P & P 4 - S H E E T C . 1 0 . 3 2 N D E A S T - I R R P & P 3 - S H E E T C . 1 0 . 2 2ND EAST - IRRP&P 2 - SHEET C.10.1 2ND EAST - IRRP&P 1 - SHEET C.10.0 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y S e w e r a n d w a t e r s t u b o u t s a c r o s s 2 n d E a s t . S e w e r a n d w a t e r s t u b o u t s r e q u i r e d . S e w e r a n d w a t e r s t u b o u t s D o e s t h i s t i e i n t o e x i s t i n g s t r e e t ? 7+008+009+00 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 - 2 . 7 7 % -3.15%-3.38% - 3 . 2 8 % - 2 . 9 5 % - 1 . 5 0 % L O W P T S T A : 1 2 + 5 0 . 0 0 L O W P T E L E V : 4 8 8 2 . 6 5 P V I S T A : 1 2 + 0 0 . 0 0 P V I E L E V : 4 8 8 3 . 4 0 K : 7 8 . 3 3 L V C : 1 0 0 . 0 0 BVCS: 11+50.00 BVCE: 4884.79 EVCS: 12+50.00 EVCE: 4882.65 GRADE BREAK STA = 7+92.31CL ELEV = 4896.07GRADE BREAK STA = 9+00.00CL ELEV = 4892.67 GRADE BREAK STA = 10+00.00 CL ELEV = 4889.29 GRADE BREAK STA = 10+50.00 CL ELEV = 4887.65 GRADE BREAK STA = 11+00.00 CL ELEV = 4886.17 GRADE BREAK STA = 13+00.00 CL ELEV = 4881.91 7+008+009+00 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 7+00 4897.508+00 4895.824893.979+00 4892.674890.95 1 0 + 0 0 4889.29 4887.72 1 1 + 0 0 4886.17 4884.54 1 2 + 0 0 4883.56 4881.29 1 3 + 0 0 4881.91 4880.13 g g g g g g g g g g g g g g g gtoptoptoptoptop toetoetoetoe to e to e to e to e to e to e to e to e to e to e to e to e to e to e pp 7+008+009+00 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 PI: 7+92.315'23' 4891 4890 4889 4888 4 8 8 7 4885 4884 4 8 8 3 48924893489448954896 489748994881488348864889489248954895 4 8 8 1 48954892 4 8 9 1 48 8 9 4 8 8 9 4 8 8 6 4 8 8 4 4 8 8 4 488548894884 4 8 8 3 4 8 8 1 4 8 7 8 7+008+009+00 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 PI: 7+92.31 I R I R R I R R I R R TBC: 4894.85TOC: 4893.62TOC: 4893.70 TOA:4894.50 TOA:4896.00Elevation4850486048704880489049004+00Elevation4850486048704880489049004+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.4.0 - 4.4_P&P 2ND EAST.dwg - 2ND EAST PLAN AND PROFILE 1 - 12/02/2022 03:19pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N ID-6177-22 CJF TLM CJF 12/01/2022 2ND EAST PLAN AND PROFILE 1 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 7 C . 4 . 0 H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' SHEET C.4.1 2ND EAST P L A N A N D P R O F I L E 1 2ND EAST S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 C.9.0 3 C . 9 . 0 1 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 PROPOSED SURFACEEXISTING SUR F A C E 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERE CURB ISPROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG4. ALIGNMENT IS BASED OFF OF LIP OF CURB AND NOT CENTERLINE OF ROAD.5. REFERENCE C.11.0 FOR STRIPING EXHIBIT SHEET NOTE 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y Sidewalk to e x t e n d to p arcel lin e . R oadway to continue wideneing to h ig h way off ram p 13+0014+0015+00 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 1 9 + 0 0 - 0 . 5 0 % - 0 . 0 1 % -1.50%-1.18% 0 . 5 0 % -0.71%-0.45% - 0 . 4 5 % - 0 . 6 5 % 0 . 5 0 % GRADE BREAK STA = 13+00.00CL ELEV = 4881.91GRADE BREAK STA = 13+69.96CL ELEV = 4881.08GRADE BREAK STA = 14+65.00CL ELEV = 4880.40GRADE BREAK STA = 15+49.96CL ELEV = 4880.02 GRADE BREAK STA = 16+18.45 CL ELEV = 4879.71 GRADE BREAK STA = 17+49.96 CL ELEV = 4880.37 GRADE BREAK STA = 18+11.50 CL ELEV = 4880.36 GRADE BREAK STA = 18+65.73 CL ELEV = 4880.09 GRADE BREAK STA = 18+90.75 CL ELEV = 4879.93 13+0014+0015+00 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 1 9 + 0 0 13+00 4881.914880.1314+00 4880.874878.5215+00 4880.244879.61 1 6 + 0 0 4879.79 4878.82 1 7 + 0 0 4880.12 4877.85 1 8 + 0 0 4880.36 4879.42 1 9 + 0 0 4879.97 4876.06 g g g g g g g g g g g g g g g g g g g g g g g g g toe toe toe toe toe toe toe toetoetoetoetoe t o e t o e t o e t o e t o e t o e t o e t o e t o e t o e t o e t o e to e to e pppp pp pppp sd sd13+0014+0015+00 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 1 9 + 0 0 PI: 13+69.96PI: 15+49.96 PI: 17+49.96 PI: 18+59.73 PI: 18+65.73 6 . 5 ' R 2 3 . 5 ' R 1 8 . 5 ' 5.5' 5 4 ' 23.1' 5' R 3 0 ' R 3 0 ' 180' 2 9 0 ' R 1 8 . 5 ' R 2 3 . 5 ' 4882488248814881 4 8 8 0 4880 4 8 8 0 4880 4879 4881 4 8 7 8 4 8 7 8 4 8 7 9 4 8 7 9 3.5' S T A : 1 8 + 9 0 . 7 2 S D M H - Y R I M : 4 8 8 0 . 5 8 I N V I N : 4 8 7 6 . 4 1 1 2 " ( E ) I N V O U T : 4 8 7 6 . 4 1 1 2 " ( S ) S T A : 1 8 + 9 0 . 7 5 S D I N L E T - Y R I M : 4 8 7 9 . 8 2 I N V O U T : 4 8 7 6 . 8 2 1 2 " ( W ) S T A : 1 7 + 4 9 . 9 6 S D I N L E T - Z Z R I M : 4 8 8 0 . 2 6 I N V O U T : 4 8 7 7 . 2 6 1 2 " ( N ) S T A : 1 6 + 1 8 . 4 5 S D I N L E T - Z R I M : 4 8 7 9 . 6 0 I N V I N : 4 8 7 6 . 6 0 1 2 " ( S ) I N V O U T : 4 8 7 6 . 6 0 1 2 " ( W ) S T A : 1 6 + 1 8 . 4 5 S D M H - Z R I M : 4 8 8 0 . 1 7 I N V I N : 4 8 7 6 . 4 4 1 2 " ( E ) I N V O U T : 4 8 7 6 . 4 4 1 2 " ( S ) 8'' W S 13+0014+0015+00 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 1 9 + 0 0 PI: 13+69.96PI: 15+49.96 PI: 17+49.96 PI: 18+59.73 PI: 18+65.73 SD S D S D IRIRRIRR I R IRRIRR I R R I R R I R R I R I R R I R 3 L F O F 1 2 " S . D . @ 0 . 0 0 % 2 1 L F O F 1 2 " S . D . @ 2 . 0 0 % 1 3 2 L F O F 1 2 " S . D . @ 0 . 5 0 % 8 L F O F 1 2 " S . D . @ 2 . 0 0 % 3 L F O F 1 2 " S . D . @ 0 . 0 0 % T B C : 4 8 8 0 . 3 7 T O C : 4 8 8 0 . 0 8 T O C : 4 8 7 9 . 9 8 T O C : 4 8 8 0 . 1 6 T O C : 4 8 8 0 . 8 6 T O C : 4 8 8 0 . 7 9 T B C : 4 8 8 0 . 4 4 T O C : 4 8 8 0 . 8 7 T O C : 4 8 8 0 . 9 5 T O C : 4 8 8 0 . 1 6 T O C : 4 8 8 0 . 0 8 T O C : 4 8 7 9 . 9 8 T O C : 4 8 7 9 . 6 2 T O A : 4 8 7 9 . 6 3 T B C : 4 8 8 0 . 7 0 TBC: 4881.44 T O G : 4 8 7 9 . 6 0 T O G : 4 8 8 0 . 2 6 T O G : 4 8 7 9 . 8 2 T B C : 4 8 8 0 . 0 7 T B C : 4 8 8 0 . 7 2 5' T B C : 4 8 8 0 . 2 8 TBC: 4880.7515'P.U.E.4850 4860 4870 4880 4890 4900 4+004850486048704880489049004+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.4.0 - 4.4_P&P 2ND EAST.dwg - 2ND EAST PLAN AND PROFILE 2 - 12/02/2022 03:20pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 2ND EAST PLAN AND PROFILE 2 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 8 C . 4 . 1 SHEET C.4.2 2ND EAST P L A N A N D P R O F I L E 2 SHEET C.4.0 2ND EAST S H E E T C . 6 . 2 STREET A 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERE CURB ISPROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG4. ALIGNMENT IS BASED OFF OF LIP OF CURB AND NOT CENTERLINE OF ROAD.5. REFERENCE C.11.0 FOR STRIPING EXHIBIT SHEET NOTE C . 9 . 0 1 C . 9 . 0 3 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 6 6 6 6 6 7 6 7 6 7 6 8 P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y Station19+0020+0021+00 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 - 0 . 5 0 % - 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % -0.5 0 % 0.50%-0.50%0.50%GRADE BREAK STA = 18+90.75CL ELEV = 4879.93GRADE BREAK STA = 19+43.21CL ELEV = 4880.19GRADE BREAK STA = 20+59.99CL ELEV = 4879.60GRADE BREAK STA = 21+16.03CL ELEV = 4879.88 GRADE BREAK STA = 22+06.94 CL ELEV = 4879.43 GRADE BREAK STA = 22+83.02 CL ELEV = 4879.81 GRADE BREAK STA = 23+95.86 CL ELEV = 4879.25 GRADE BREAK STA = 24+49.61 CL ELEV = 4879.51 Station19+0020+0021+00 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 19+00 4879.974876.0620+00 4879.904875.8121+00 4879.804875.92 2 2 + 0 0 4879.46 4876.33 2 3 + 0 0 4879.73 4875.74 2 4 + 0 0 4879.27 4875.68 2 5 + 0 0 4879.26 4875.45 g g g g g g g g g g g g g g g g g g g g g g g g g toe toe toetoetoetoetoetoetoetoetoetoe t o e t o e t o e to e to e to e t o e t o e t o e t o e t o e t o e t o e t o e pppppp pp sd sd sd sd sd19+0020+0021+00 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 PI: 18+59.73PI: 18+65.7323.1'5' 5.5' R18.5'4880 4 8 7 9 4 8 8 0 4 6 ' 5.5' 4 6 ' 5.5' 46'5.5'39'5.5'4879 4 8 8 0 4 8 8 0 4 8 8 0 4880 4880 4 8 8 0 4 8 8 0 I N V I N : 4 8 7 5 . 5 0 1 2 " ( E ) I N V O U T : 4 8 7 5 . 5 0 1 2 " ( N ) STA: 18+90.72SDMH-YRIM: 4880.58INV IN: 4876.41 12" (E)INV OUT: 4876.41 12" (S)STA: 18+90.75SD INLET-YRIM: 4879.82INV OUT: 4876.82 12" (W)STA: 20+60.00SD INLET-XRIM: 4879.49INV OUT: 4876.49 12" (W)STA: 20+60.03SDMH-XRIM: 4880.25INV IN: 4876.07 12" (E)INV OUT: 4876.07 12" (S) S T A : 2 2 + 0 6 . 9 4 S D M H - W R I M : 4 8 8 0 . 0 8 I N V I N : 4 8 7 5 . 9 3 1 2 " ( E ) I N V O U T : 4 8 7 5 . 9 3 1 2 " ( S ) S T A : 2 2 + 0 6 . 9 4 S D I N L E T - W R I M : 4 8 7 9 . 3 2 I N V O U T : 4 8 7 6 . 3 2 1 2 " ( W ) S T A : 2 3 + 9 5 . 8 6 S D I N L E T - V R I M : 4 8 7 9 . 1 4 I N V O U T : 4 8 7 4 . 9 7 1 2 " ( W ) S T A : 2 3 + 9 5 . 8 6 S D M H - V R I M : 4 8 7 9 . 9 0 I N V I N : 4 8 7 4 . 5 6 1 2 " ( E ) I N V O U T : 4 8 7 4 . 5 6 1 2 " ( S ) 19+0020+0021+00 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 PI: 18+59.73PI: 18+65.73SDSD S D S D IR 2 1 L F O F 1 2 " S . D . @ 2 . 0 0 % 3 L F O F 1 2 " S . D . @ 0 . 0 0 % 3LF OF 12" S.D. @ 0.00%21LF OF 12" S.D. @ 2.00%21LF OF 12" S.D. @ 2.00% 3 L F O F 1 2 " S . D . @ 0 . 0 0 % 2 1 L F O F 1 2 " S . D . @ 1 . 8 8 % 2 1 L F O F 1 2 " S . D . @ 2 . 0 0 % 3 L F O F 1 2 " S . D . @ 0 . 0 0 % 3LF OF 12" S.D. @ 0.00%TOC: 4880.08 TOC: 4880.16 TOC: 4880.86 TOC: 4880.79 TOG: 4879.82TOG: 4879.49 T O G : 4 8 7 9 . 3 2 T O G : 4 8 7 9 . 1 4 TBC: 4880.28TBC: 4880.53TBC: 4879.96 T B C : 4 8 7 9 . 7 8 T B C : 4 8 7 9 . 6 0 15' P.U.E. Elevation485048604870 4880 4890 4900 4+00Elevation4850486048704880489049004+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.4.0 - 4.4_P&P 2ND EAST.dwg - 2ND EAST PLAN AND PROFILE 3 - 12/02/2022 03:21pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 2ND EAST PLAN AND PROFILE 3 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 9 C . 4 . 2 SHEET C.4.3 2ND EAST P L A N A N D P R O F I L E 3 SHEET C.4.1 2ND E A S T C.9.0 3 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 6 6 6 6 6666 6 7 6 7 6 7 6 7 67676767 6 8 6 8 6868 P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERE CURB ISPROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG4. ALIGNMENT IS BASED OFF OF LIP OF CURB AND NOT CENTERLINE OF ROAD.5. REFERENCE C.11.0 FOR STRIPING EXHIBIT SHEET NOTE A P P R O X I M A T E C A N A L R I G H T O F W A Y 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 25+0026+0027+00 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 1 + 0 0 0 . 5 0 % - 0 . 5 9 % 0 . 5 0 % - 0 . 5 0 % 0.50%-0.50%0.50%-0.50%-0.50%GRADE BREAK STA = 25+47.06CL ELEV = 4879.03GRADE BREAK STA = 26+02.40CL ELEV = 4879.30GRADE BREAK STA = 26+57.77CL ELEV = 4879.03GRADE BREAK STA = 26+77.77CL ELEV = 4879.13GRADE BREAK STA = 27+60.15CL ELEV = 4878.72 GRADE BREAK STA = 28+06.97 CL ELEV = 4878.95 GRADE BREAK STA = 29+38.58 CL ELEV = 4878.29 GRADE BREAK STA = 29+89.05 CL ELEV = 4878.55 GRADE BREAK STA = 30+95.47 CL ELEV = 4877.92 25+0026+0027+00 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 1 + 0 0 25+00 4879.264875.4526+00 4879.294875.5027+00 4879.024875.23 2 8 + 0 0 4878.92 4875.16 2 9 + 0 0 4878.49 4874.91 3 0 + 0 0 4878.48 4875.01 3 1 + 0 0 4877.95 4877.17 g g g g g g g g g g g g g g g g g g g g g g g g g g toetoetoetoeppsd25+0026+0027+00 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 1 + 0 0 PI: 25+50.77PI: 26+51.77 PI: 29+89.05 23'5'40'5'23'R30'R30' 3 3 7 . 3 ' 54'5.5'32'5.5' 3 9 ' 5.5' 5.5' 5 4 ' 5.5' 6 1 ' 4879487948804879 4 8 7 8 4 8 7 9 4 8 7 9 4 8 7 9 4 8 7 9 4879 S T A : 3 0 + 9 6 . 2 8 S D M H - Q R I M : 4 8 7 8 . 4 7 I N V I N : 4 8 7 4 . 5 3 1 2 " ( E ) I N V O U T : 4 8 7 4 . 5 3 1 2 " ( N ) S T A : 3 0 + 9 5 . 2 8 S D I N L E T - Q R I M : 4 8 7 7 . 8 1 I N V O U T : 4 8 7 4 . 8 1 1 2 " ( W ) STA: 25+47.03SDMH-URIM: 4879.68INV IN: 4875.50 12" (E)INV OUT: 4875.50 12" (N)STA: 25+47.06SD INLET-URIM: 4878.92INV OUT: 4875.92 12" (W)STA: 26+57.78SDMH-TRIM: 4879.68INV IN: 4875.50 12" (E)INV OUT: 4875.50 12" (S)STA: 26+57.78SD INLET-TRIM: 4878.92INV OUT: 4875.92 12" (W) S T A : 2 7 + 6 0 . 1 5 S D M H - S R I M : 4 8 7 9 . 3 7 I N V I N : 4 8 7 1 . 0 2 1 2 " ( E ) I N V O U T : 4 8 7 1 . 0 2 1 2 " ( S ) S T A : 2 7 + 6 0 . 1 5 S D I N L E T - S R I M : 4 8 7 8 . 6 1 I N V O U T : 4 8 7 1 . 4 4 1 2 " ( W ) S T A : 2 9 + 3 8 . 5 0 S D M H - R R I M : 4 8 7 8 . 9 4 I N V I N : 4 8 7 3 . 7 6 1 2 " ( E ) I N V O U T : 4 8 7 3 . 7 6 1 2 " ( N ) S T A : 2 9 + 3 8 . 5 8 S D I N L E T - R R I M : 4 8 7 8 . 1 8 I N V O U T : 4 8 7 4 . 1 8 1 2 " ( W ) 25+0026+0027+00 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 1 + 0 0 PI: 25+50.77PI: 26+51.77 PI: 29+89.05 SDSDSD S D SD 1 4 L F O F 1 2 " S . D . @ 2 . 0 0 % 3 L F O F 1 2 " S . D . @ 0 . 0 0 % 21LF OF 12" S.D. @ 2.00%3LF OF 12" S.D. @ 0.00%3LF OF 12" S.D. @ 0.00%21LF OF 12" S.D. @ 2.00% 3 L F O F 1 2 " S . D . @ 0 . 0 0 % 2 1 L F O F 1 2 " S . D . @ 2 . 0 0 % 4 L F O F 1 2 " S . D . @ 0 . 0 0 % 2 1 L F O F 1 2 " S . D . @ 2 . 0 0 % TOG: 4878.92TBC: 4879.09 TBC: 4879.41 TOG: 4878.92TBC: 4879.40TBC: 4879.10 TOG: 4878.61 T O G : 4 8 7 8 . 1 8 T O G : 4 8 7 7 . 8 4 T B C : 4 8 7 8 . 9 0 TBC: 4879.38 TBC: 4879.38TBC: 4879.07 T B C : 4 8 7 8 . 6 5 T B C : 4 8 7 8 . 2 8 DTBC:4879.09DTBC:4879.08DTBC:4879.13DTBC:4879.10 TBC: 4879.48 T B C : 4 8 7 9 . 3 0 15' P.U.E. 4850 4860 4870 4880 4890 4900 4+004850486048704880489049004+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.4.0 - 4.4_P&P 2ND EAST.dwg - 2ND EAST PLAN AND PROFILE 4 - 12/02/2022 03:21pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 2ND EAST PLAN AND PROFILE 4 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 0 C . 4 . 3 SHEET C.4.4 2ND EAST PLA N A N D P R O F I L E 4 SHEET C.4.2 2 N D E A S T C.9.0 3C.9.0 2 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 6 8 6 8 686868 6 7 6 7 6 7 6 7 6 7 67 676767 6 6 6 6 66 6666 P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERE CURB ISPROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG4. ALIGNMENT IS BASED OFF OF LIP OF CURB AND NOT CENTERLINE OF ROAD.5. REFERENCE C.11.0 FOR STRIPING EXHIBIT SHEET NOTE A P P R O X I M A T E C A N A L R I G H T O F W A Y 01 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 31+0032+0033+00 3 4 + 0 0 3 5 + 0 0 3 6 + 0 0 3 7 + 0 0 -0.50%0.50%0.50% - 1 . 0 3 % - 0 . 5 0 % GRADE BREAK STA = 30+95.47CL ELEV = 4877.92GRADE BREAK STA = 31+69.05CL ELEV = 4878.29GRADE BREAK STA = 32+74.73CL ELEV = 4877.76 GRADE BREAK STA = 33+69.05 CL ELEV = 4878.23 GRADE BREAK STA = 34+20.03 CL ELEV = 4877.71 GRADE BREAK STA = 35+08.03 CL ELEV = 4877.27 31+0032+0033+00 3 4 + 0 0 3 5 + 0 0 3 6 + 0 0 3 7 + 0 0 31+00 4877.954877.1732+00 4878.144878.5633+00 4877.894877.82 3 4 + 0 0 4877.92 4878.02 3 5 + 0 0 4877.31 4877.49 3 6 + 0 0 g g g g g g g g g g g g w pp pp S to e to e t o e t o e to e to e t o e t o e to p to p to p t o p t o p t o p to p to p to p t o p t o p to p 31+0032+0033+00 3 4 + 0 0 PI: 31+69.05 PC: 33+69.05 P T : 3 4 + 2 0 . 0 3 6 . 5 ' 5 ' R1 8 . 5 ' 10' 5'61'89'5.5'4 8 7 8 4878 4878 R 3 0 ' R 3 0 ' 4 ' STA: 32+74.73SD INLET-PRIM: 4877.66INV OUT: 4874.99 12" (W)STA: 32+74.86SDMH-PRIM: 4878.22INV IN: 4874.95 12" (E)INV OUT: 4874.95 12" (N)STA: 30+96.28SDMH-QRIM: 4878.47INV IN: 4874.53 12" (E)INV OUT: 4874.53 12" (N)STA: 30+95.28SD INLET-QRIM: 4877.81INV OUT: 4874.81 12" (W) 16'' W 16'' W s s s s s s s S S 31+0032+0033+00 3 4 + 0 0 PI: 31+69.05 PC: 33+69.05 P T : 3 4 + 2 0 . 0 3 SDSD IR I R I R R 8LF OF 12" S.D. @ 0.50%3LF OF 12" S.D. @ 0.00%14LF OF 12" S.D. @ 2.00%3LF OF 12" S.D. @ 0.00%TOG: 4877.84TBC: 4878.64TBC: 4 8 7 8 . 5 9 TOC: 4 8 7 8 . 7 4 T O C : 4 8 7 8 . 1 4 T O C : 4 8 7 8 . 2 2 TOC: 4 8 7 8 . 8 1 T B C : 4 8 7 8 . 0 5 TOG: 4877.66 R 2 3 . 5 ' TBC: 4878.28TBC: 4878.1215'P.U.E.4850 4860 4870 4880 4890 4900 4+004850486048704880489049004+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 3 7 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.4.0 - 4.4_P&P 2ND EAST.dwg - 2ND EAST PLAN AND PROFILE 5 - 12/02/2022 03:22pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 2ND EAST PLAN AND PROFILE 5 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 1 C . 4 . 4 2ND E A S T P L A N A N D P R O F I L E 5 SHEET C.4.3 S H E E T C . 5 . 2 2ND EAST MOODY STREET C.9.0 1 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 6868 67 6767 67 66 66PROPOSED SURFACEE X I S T I N G S U R F A C E S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 R E L O C A T E D T R A F F I C S I G N A L . A P P R O X I M A T E L O C A T I O N . 0 1 0 2 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERE CURB ISPROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG4. ALIGNMENT IS BASED OFF OF LIP OF CURB AND NOT CENTERLINE OF ROAD.5. REFERENCE C.11.0 FOR STRIPING EXHIBIT SHEET NOTE 0 2 APPROXIMATE CANAL RIGHT OF WAY 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y a n d j u n c t i o n b o x e s S i g n a l p o l e b e h i n d s i d e w a l k 41+0042+0043+00 4 4 + 0 0 4 5 + 0 0 4 6 + 0 0 4 7 + 0 0 -0.50%-0.50%0.50% - 0 . 5 0 % GRADE BREAK STA = 41+00.00CL ELEV = 4875.74GRADE BREAK STA = 41+57.62CL ELEV = 4875.45 GRADE BREAK STA = 44+00.00 CL ELEV = 4876.60 GRADE BREAK STA = 45+66.23 CL ELEV = 4875.77 CURB P.C. LT. STA = 41+00.00INTERSECTION ROAD C CL ELEV = 4875.74CURB P.C. LT. STA = 41+57.62CL ELEV = 4875.45 41+0042+0043+00 4 4 + 0 0 4 5 + 0 0 4 6 + 0 0 4 7 + 0 0 41+00 4875.6942+00 4875.604875.8543+00 4876.104876.08 4 4 + 0 0 4876.60 4876.24 4 5 + 0 0 4876.10 4876.44 4 6 + 0 0 4875.94 4876.70 4 7 + 0 0 4876.44 4876.91 STA: 41+01.26 (-22.61, L)SSMH - 6RIM: 4875.19INV IN: 4853.72 - 12" (E)292.29' of 12" S.S. @ 0.22% STA: 43+93.55 (-22.61, L) SSMH - 5 RIM: 4876.12 INV IN: 4854.46 - 12" (E) INV OUT: 4854.36 - 12" (W) 2 3 0 . 0 2 ' o f 1 2 " S . S . @ 0 . 2 2 % STA: 46+23.57 (-22.61, L) SSMH - 4 RIM: 4875.61 INV IN: 4855.07 - 12" (E) INV OUT: 4854.97 - 12" (W) ↕ 21.47' (SS) ↕ 2 1 . 7 6 ' ( S S ) ↕ 2 0 . 6 4 ' ( S S ) STA = 41+09.28T.O.W. = 4868.60STA = 41+63.61T.O.W. = 4868.33 STA = 44+00.00 T.O.W. = 4869.54 STA = 45+66.22 T.O.W. = 4868.75 1 6 " W A T E R M A I N STA: 43+46.0116" x 6" WATER TEESTA: 41+57.4916" BUTTERFLY VALVESTA: 41+09.2816" PLUG p p pp 41+0042+0043+00 4 4 + 0 0 4 5 + 0 0 4 6 + 0 0 4 7 + 0 0 16'' W16'' W16'' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W S SS S SS SS SS SS SS SS SS41+0042+0043+00 4 4 + 0 0 4 5 + 0 0 4 6 + 0 0 4 7 + 0 0 S S D SD 5'27'6.5'5' 1 5 . 5 ' 5 ' 2 7 ' 27'487448764876 4 8 7 5 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4875TBC: 4875.31 TOC: 4875.40TOA:4874.95 TOC: 4875.41 TOC: 4875.48TBC: 4875.31 TOA:4874.95TOC: 4875.48 0 . 5 % 0 . 5 % 0 . 5 % 0.5%0.5% 0 . 5 % 2.1% 2.1% 2.1%1.7%TOG:4874.85 5.5'61' 5 . 5 ' 1 0 4 ' T O G : 4 8 7 5 . 1 6 1 2 " S . S . 12" S.S.SSMH - 6 S S M H - 5 S S M H - 4 S T A : 4 5 + 6 6 . 3 2 S D M H - D R I M : 4 8 7 5 . 6 8 I N V I N : 4 8 7 2 . 1 4 1 2 " ( S ) I N V O U T : 4 8 7 2 . 1 4 1 2 " ( E ) S T A : 4 5 + 6 6 . 3 2 S D I N L E T - D R I M : 4 8 7 5 . 1 6 I N V O U T : 4 8 7 2 . 1 6 1 2 " ( N ) 4 L F O F 1 2 " S . D . @ 0 . 5 0 % 3 L F O F 1 2 " S . D . @ 0 . 0 0 % 3LF OF 12" S.D. @ 0.00%STA: 41+63.62SDMH-ERIM: 4875.32INV IN: 4871.79 12" (S)INV OUT: 4871.79 12" (E)4LF OF 12" S.D. @ 0.50%STA: 41+63.62SD INLET-ERIM: 4874.81INV OUT: 4871.81 12" (N)R30'R23.5'R18.5'TBC: 4875.28TOA:4875.66 15'P.U.E. T B C : 4 8 7 6 . 4 5 T B C : 4 8 7 5 . 6 3 T O A : 4 8 7 6 . 4 2 T O A : 4 8 7 5 . 6 0 Elevation484048504860 4870 4880 4890 39+00Elevation48404850486048704880489039+00 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 6 1 + 0 0 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 6 1 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.5.0 - 5.2_P&P MOODY.dwg - MOODY RD PLAN AND PROFILE 1 - 12/02/2022 03:28pm, tyler.meland e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' H R Z S C A L E : 1 " = 3 0 ' V R T S C A L E : SHEET C.8.2 ID-6177-22 CJF TLM CJF 12/01/2022 MOODY RD PLAN AND PROFILE 1 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 2 C . 5 . 0 SHEET C.5.1 MOOD Y R O A D P L A N A N D P R O F I L E 1 M O O D Y R O A D 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTE S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 C.9.0 43342 4 3 38 5 5 55 5 5 53 5 3 5 3 6 6 66 67 67 6 7 6 7 6 8 6841 4 3 6 ' M I N I M U M PROPOSED SURF A C E E X I S T I N G S U R F A C E W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 5 9 1 L F O F 1 6 " D . I . W A T E R M A I N L I N E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 5 ? 47+0048+0049+00 5 0 + 0 0 5 1 + 0 0 5 2 + 0 0 5 3 + 0 0 0 . 5 0 % - 0 . 5 0 % 0.50%-0.50% 0 . 5 0 % - 0 . 5 0 % GRADE BREAK STA = 48+66.72CL ELEV = 4877.28GRADE BREAK STA = 49+43.17CL ELEV = 4876.89 GRADE BREAK STA = 51+07.62 CL ELEV = 4877.71 GRADE BREAK STA = 51+65.00 CL ELEV = 4878.00 GRADE BREAK STA = 52+22.62 CL ELEV = 4877.71 GRADE BREAK STA = 53+23.68 STA = 51+65.00 INTERSECTION ROAD B CL ELEV = 4878.00 STA = 51+07.62 CL ELEV = 4877.71 CURB P.C. LT. STA = 52+22.62 CL ELEV = 4877.71 STA = 52+89.93 LOT LOCATION 47+0048+0049+00 5 0 + 0 0 5 1 + 0 0 5 2 + 0 0 5 3 + 0 0 47+00 4876.444876.9148+00 4876.944877.1849+00 4877.114877.30 5 0 + 0 0 4877.17 4877.52 5 1 + 0 0 4877.67 4877.92 5 2 + 0 0 4877.83 4877.99 5 3 + 0 0 4877.33 4877.97 242.02' of 12" S.S. @ 0.22%STA: 48+65.60 (-22.61, L)SSMH -3RIM: 4876.82INV IN: 4855.70 - 12" (E)INV OUT: 4855.60 - 12" (W) 3 0 5 . 4 5 ' o f 1 2 " S . S . @ 0 . 2 2 % STA: 51+71.05 (-22.61, L) SSMH - 2 RIM: 4877.80 INV IN: 4856.47 - 12" (E) INV IN: 4856.47 - 12" (N) INV OUT: 4856.37 - 12" (W) ↕ 21.22' (SS) ↕ 2 1 . 4 3 ' ( S S ) STA = 48+66.73T.O.W. = 4870.25STA = 49+43.18T.O.W. = 4869.78 S T A = 5 1 + 6 4 . 9 7 T . O . W . = 4 8 7 0 . 8 7 STA: 52+22.62 16" BUTTERFLY VALVE STA: 51+59.02 16" x 8" WATER TEE STA: 51+07.62 16" BUTTERFLY VALVE 1 6 " W A T E R M A I N 1 6 " W A T E R M A I N STA: 47+40.3016" x 6" WATER TEE p p pp 47+0048+0049+00 5 0 + 0 0 5 1 + 0 0 5 2 + 0 0 5 3 + 0 0 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 16'' W16'' W16'' W16'' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W S SS SS S SS SS SS SS SS SS SS S S 47+0048+0049+00 5 0 + 0 0 5 1 + 0 0 5 2 + 0 0 5 3 + 0 0 SD 6 . 5 ' 6 . 5 ' 5 ' 4 6 . 5 ' 6 . 5 ' 5 ' 6 . 5 ' 5 ' 5 ' 2 7 ' 16.6' 1 2 ' 4 8 7 7 4 8 7 7 48774877 48774877 4876 4 8 7 7 4876 0 . 5 % T B C : 4 8 7 7 . 5 7 T B C : 4 8 7 7 . 5 7 T B C : 4 8 7 7 . 5 7 T B C : 4 8 7 7 . 5 7 T O C : 4 8 7 7 . 6 6 T O C : 4 8 7 7 . 7 4 T O C : 4 8 7 7 . 6 6 T O C : 4 8 7 7 . 6 6 T O C : 4 8 7 7 . 7 4 T O C : 4 8 7 7 . 6 6 T O C : 4 8 7 7 . 7 4 T O A : 4 8 7 7 . 2 1 T O A : 4 8 7 7 . 7 1 T O A : 4 8 7 7 . 3 1 T O A : 4 8 7 7 . 2 1 T O A : 4 8 7 7 . 2 1 T O C : 4 8 7 7 . 7 4 0 . 5 % 0.5%0.5%2.1%2.1% 2.1% 2.1% 2.1% 2 . 1 % 2 . 0 % 2.1% 2.1% 5.5'TOG:4876.34 6 8 ' 5 . 5 ' 1 0 6 . 5 ' 12" S.S.STA: 49+ 4 3 . 4 1 SDMH-CRIM: 487 6 . 7 9 INV IN: 4 8 7 3 . 2 6 1 2 " ( S ) INV OUT : 4 8 7 3 . 2 6 1 2 " ( E ) 4LF OF 1 2 " S . D . @ 0 . 5 0 % STA: 49+ 4 3 . 4 1 SD INLE T - C RIM: 487 6 . 2 8 INV OUT: 4 8 7 3 . 2 8 1 2 " ( N ) 3LF OF 1 2 " S . D . @ 0 . 0 0 % 1 2 " S . S . SSMH -3 S S M H - 2 R 3 0 ' R 2 3 . 5 ' R 1 8 . 5 ' R 3 0 ' R 2 3 . 5 ' R 1 8 . 5 ' 15'P.U.E. T O A : 4 8 7 7 . 3 2 TOA:4876.71 TBC: 4876.75 T O A : 4 8 7 7 . 2 1 TOA:4877.09 TBC: 4877.13Elevation48404850486048704880489039+00Elevation48404850486048704880489039+00 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 6 1 + 0 0 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 6 1 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.5.0 - 5.2_P&P MOODY.dwg - MOODY RD PLAN AND PROFILE 2 - 12/02/2022 03:29pm, tyler.meland e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' H R Z S C A L E : 1 " = 3 0 ' V R T S C A L E : S H E E T C . 7 . 2 ID-6177-22 CJF TLM CJF 12/01/2022 MOODY RD PLAN AND PROFILE 2 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 3 C . 5 . 1 SHEET C.5.2 SHEET C.5.0MOOD Y R O A D P L A N A N D P R O F I L E 2 M O O D Y R O A D 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTEC.9.0 4 C . 9 . 0 3 4 2 4 2 3 4 3853 5 3 5555 5 5 66 6 7 6 7 6843 4 3 4 3 4 1 41 6 ' M I N I M U M P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 591 LF O F 1 6 " D . I . W A T E R M A I N L I N E S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 4 ? 53+0054+0055+00 5 6 + 0 0 5 7 + 0 0 5 8 + 0 0 5 9 + 0 0 -0.50%-0.50% 0 . 5 0 % 1 . 5 0 % 0 . 5 0 % -0.50%0.57% - 0 . 5 0 % GRADE BREAK STA = 53+23.68CL ELEV = 4877.21GRADE BREAK STA = 53+62.04CL ELEV = 4877.01GRADE BREAK STA = 54+06.59CL ELEV = 4876.79GRADE BREAK STA = 54+65.00CL ELEV = 4876.50 GRADE BREAK STA = 56+08.48 CL ELEV = 4877.32 GRADE BREAK STA = 56+34.12 CL ELEV = 4877.19 GRADE BREAK STA = 58+50.12 CL ELEV = 4878.27 GRADE BREAK STA = 58+81.95 CL ELEV = 4878.43 GRADE BREAK STA = 59+08.00 CL ELEV = 4878.82 CURB P.C. LT. STA = 58+38.12 CL ELEV = 4878.21 STA = 59+08.00 INTERSECTION 2ND CL ELEV = 4878.82 STA = 53+23.68CL ELEV = 4877.21STA = 53+62.04CL ELEV = 4877.01STA = 52+89.93LOT LOCATIONSTA = 54+39.93LOT LOCATION STA = 58+81.95 CL ELEV = 4878.43 53+0054+0055+00 5 6 + 0 0 5 7 + 0 0 5 8 + 0 0 5 9 + 0 0 53+00 4877.334877.9754+00 4876.834878.0455+00 4876.704878.16 5 6 + 0 0 4877.27 4878.31 5 7 + 0 0 4877.52 4878.48 5 8 + 0 0 4878.02 4878.70 5 9 + 0 0 4878.70 4878.81 365.11' of 12" S.S. @ 0.22%STA: 55+36.15 (-19.29, L)SSMH - 1RIM: 4876.52INV IN: 4857.37 - 12" (E)INV IN: 4857.37 - 12" (N)INV OUT: 4857.27 - 12" (W) 3 6 0 . 8 5 ' o f 1 2 " S . S . @ 0 . 2 2 % STA: 58+97.00 (-17.07, L) EX-SSMH - 1 RIM: 4878.72 INV IN: 4858.49 - 8" (E) INV OUT: 4858.16 - 12" (W) ↕ 19.25' (SS) ↕ 2 0 . 5 6 ' ( S S ) STA = 54+65.09T.O.W. = 4869.34 STA = 59+07.80 T.O.W. = 4871.41 STA: 59+32.91 16" CONNECTION TO EX. MAIN STA: 58+34.78 16" BUTTERFLY VALVE STA: 58+23.32 16" x 6" WATER TEE 1 6 " W A T E R M A I N STA: 54+54.9116" x 6" WATER TEE 16" WATER MAIN g g p p pp S to e toe toe toe to p top top to p top top 53+0054+0055+00 5 6 + 0 0 5 7 + 0 0 5 8 + 0 0 5 9 + 0 0 16'' W16'' W16'' W16'' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W 1 6 ' ' W s ss S SS SS SS SS SS SS SS SS SS53+0054+0055+00 5 6 + 0 0 5 7 + 0 0 5 8 + 0 0 5 9 + 0 0 S D SD I R I R I R R 6.5' 6 . 5 ' 5 ' 1 0 ' 5 ' 48784877 4876 4 8 7 7 4877 4877 T B C : 4 8 7 8 . 0 5 TBC: 4876.86TBC: 4877.07 TOC: 4877.14 TOC: 4877.21TOC: 4877.06TOC: 4876.99 T O C : 4 8 7 8 . 1 4 T O C : 4 8 7 8 . 2 2 T O A : 4 8 7 7 . 7 1 T B C : 4 8 7 8 . 0 6 T O A : 4 8 7 7 . 7 7 TOA:4876.51TOA:4876.72 T B C : 4 8 7 8 . 1 3 0.5% 0 . 3 % 0 . 5 % 2.1%2.1%2.1%2.1% 2.1% 2.1% 2.1% 2.0% 2.1%2.1% T B C : 4 8 7 8 . 0 4 TOG:4875.86 96.3' 5 . 5 ' T O G : 4 8 7 6 . 6 2 6 8 ' 5 . 5 ' 12" S.S.SSMH - 1 1 2 " S . S . 30LF OF 1 2 " S . S . @ 0 . 2 2 % SS PLU G - 1 RIM: 487 6 . 7 3 INV OUT : 4 8 5 7 . 4 4 1 2 " ( S ) 4 L F O F 1 2 " S . D . @ 0 . 0 0 % 4 L F O F 1 2 " S . D . @ 0 . 5 0 % S T A : 5 6 + 3 4 . 3 7 S D M H - A R I M : 4 8 7 7 . 0 9 I N V I N : 4 8 7 3 . 5 6 1 2 " ( S ) I N V O U T : 4 8 7 3 . 5 6 1 2 " ( E ) S T A : 5 6 + 3 4 . 3 7 S D I N L E T - A R I M : 4 8 7 6 . 5 8 I N V O U T : 4 8 7 3 . 5 8 1 2 " ( N ) 4LF OF 12" S.D. @ 0.00%STA: 54+64.91SDMH-BRIM: 4876.40INV IN: 4872.87 12" (S)INV OUT: 4872.87 12" (E)4LF OF 12" S.D. @ 0.50%STA: 54+64.91SD INLET-BRIM: 4875.89INV OUT: 4872.89 12" (N) R 2 3 . 5 ' R 1 8 . 5 ' R 2 7 . 5 ' R 3 0 ' DTBC:4876.89 DTBC:4877.04 1 5 ' P . U . E . TOA:4876.39TOA:4876.10 T O A : 4 8 7 6 . 9 1 T O A : 4 8 7 6 . 7 9 T O A : 4 8 7 7 . 7 9 TBC: 4876.35 T B C : 4 8 7 7 . 1 6 T B C : 4 8 7 7 . 0 5 T B C : 4 8 7 8 . 0 3 0.5%Elevation484048504860 4870 4880 4890 39+00Elevation48404850486048704880489039+00 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 6 1 + 0 0 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 6 1 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.5.0 - 5.2_P&P MOODY.dwg - MOODY RD PLAN AND PROFILE 3 - 12/02/2022 03:30pm, tyler.meland e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' H R Z S C A L E : 1 " = 3 0 ' V R T S C A L E : S H E E T C . 4 . 4 MO O D Y R O A D P L A N A N D P R O F I L E 3 ID-6177-22 CJF TLM CJF 12/01/2022 MOODY RD PLAN AND PROFILE 3 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 4 C . 5 . 2 SHEET C.5.1MOODY ROAD 2ND EAST 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTEC.9.0 3 6 8 68 6 7 6 7 676766 6 6 5 1 53 52 54 5 5 55 4 2 4 3 43 4 1 41 3 8 38 6 ' M I N I M U M P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 6 0 1 L F O F 1 6 " D . I . W A T E R M A I N L I N E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 4 ? 61+0062+0063+00 6 4 + 0 0 6 5 + 0 0 6 6 + 0 0 6 7 + 0 0 -0.50%-0.50% - 0 . 5 0 % - 0 . 5 0 % 0 . 5 0 % GRADE BREAK STA = 61+00.00CL ELEV = 4878.62GRADE BREAK STA = 61+57.52CL ELEV = 4878.33 GRADE BREAK STA = 63+81.99 CL ELEV = 4877.21 GRADE BREAK STA = 64+23.99 CL ELEV = 4877.00 GRADE BREAK STA = 65+81.42 CL ELEV = 4876.21 STA = 61+00.00INTERSECTION OF STREET C CL ELEV = 4878.62CURB P.C. RT. STA = 61+57.50CL ELEV = 4878.33 STA = 64+23.99 CL ELEV = 4877.00 STA = 63+81.99 CL ELEV = 4877.21 61+0062+0063+00 6 4 + 0 0 6 5 + 0 0 6 6 + 0 0 6 7 + 0 0 61+00 4878.624876.8362+00 4878.124876.2463+00 4877.624876.38 6 4 + 0 0 4877.12 4876.49 6 5 + 0 0 4876.62 4876.69 6 6 + 0 0 4876.31 4876.70 6 7 + 0 0 4876.81 4876.92 STA: 61+01.99 (5.81, R)SSMH - 17RIM: 4877.45INV OUT: 4866.70 - 8" (E)307.00' of 8" S.S. @ 0.40% 2 3 0 . 0 3 ' o f 8 " S . S . @ 0 . 4 0 % STA: 64+08.99 (6.00, R) SSMH - 16 RIM: 4876.96 INV IN: 4865.46 - 8" (W) INV IN: 4865.46 - 8" (S) INV IN: 4865.46 - 8" (N) INV OUT: 4865.36 - 8" (E) 2 3 0 . 0 3 ' o f 8 " S . S . @ 0 . 4 0 % 2 3 0 . 0 3 ' o f 8 " S . S . @ 0 . 4 0 % STA: 66+39.02 (6.00, R) SSMH - 15 RIM: 4876.38 INV IN: 4864.44 - 8" (W) INV OUT: 4864.34 - 8" (E) ↕ 10.75' (SS) ↕ 1 1 . 6 0 ' ( S S ) ↕ 1 2 . 0 5 ' ( S S ) 8" WATER MAIN 8 " W A T E R M A I N STA = 61+04.64T.O.W. = 4871.45 STA = 65+81.46 T.O.W. = 4868.82 STA: 61+04.628" PLUGSTA: 61+18.278" x 6" WATER TEESTA: 61+57.548" GATE VALVE STA: 63+96.99 8" x 8" CROSS STA: 64+26.84 8" GATE VALVE 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W S S S S S S S S S S S SSSSSSSS 61+0062+0063+00 6 4 + 0 0 6 5 + 0 0 6 6 + 0 0 6 7 + 0 0 S D SD 4877 4 8 7 7 4877 4878 4878 4 8 7 7 4 8 7 7 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 TBC: 4878.19 TBC: 4878.19T B C : 4 8 7 7 . 0 7 T B C : 4 8 7 6 . 8 6 TB C : 4 8 7 7 . 0 5 T B C : 4 8 7 6 . 8 7 TOC: 4878.29TOC: 4878.28 T O C : 4 8 7 7 . 0 7 T O C : 4 8 7 7 . 1 9 T O C : 4 8 7 7 . 1 2 T O C : 4 8 7 7 . 0 0 T O C : 4 8 7 7 . 1 3 T O C : 4 8 7 6 . 9 8 0 . 5 % 0 . 5 % 0.5%0.5% 2.1% 2.1% 2.1%2.1%2.1%1.5% 2.1%2.1% TOA:4877.83 T O C : 4 8 7 7 . 0 6 T O C : 4 8 7 7 . 2 1 T O A : 4 8 7 6 . 5 0 T O A : 4 8 7 6 . 7 1 DT B C : 4 8 7 6 . 5 6 D T B C : 4 8 7 6 . 4 1 D T B C : 4 8 7 6 . 4 3 D T B C : 4 8 7 6 . 5 5 TOA:4877.83TOC: 4878.36 TOC: 4878.36 6.5'233.5' 8 . 8 ' 5' 3 0 ' 1 1 . 5 ' 8. 8 ' 285' 8. 8 ' 6.5'5' 2 4 ' 1 1 . 5 ' 6.5'5' 1 2 ' 1 2 ' TOC: 4878.55 TOC: 4878.62TBC: 4878.45 T O G : 4 8 7 5 . 6 4 T O G : 4 8 7 5 . 6 2 6.5' 2 1 8 ' 2 1 8 ' SSMH - 17 S S M H - 1 5 S S P L U G - 7 R I M : 4 8 7 6 . 5 7 I N V O U T : 4 8 6 5 . 6 6 8 " ( S ) S S M H - 1 6 S S P L U G - 8 R I M : 4 8 7 6 . 3 4 I N V O U T : 4 8 6 5 . 6 1 8 " ( N ) 3 8 L F O F 8 " S S @ 0 . 4 0 % 5 1 L F O F 8 " S S @ 0 . 4 0 % 8 " S . S . 8" S.S. S T A : 6 5 + 8 1 . 4 3 S D M H - H R I M : 4 8 7 6 . 1 2 I N V I N : 4 8 7 2 . 5 9 1 2 " ( S ) I N V O U T : 4 8 7 2 . 5 9 1 2 " ( E ) S T A : 6 5 + 8 1 . 3 2 S D M H - I R I M : 4 8 7 6 . 1 2 I N V I N : 4 8 7 2 . 5 9 1 2 " ( N ) I N V O U T : 4 8 7 2 . 5 9 1 2 " ( E ) S T A : 6 5 + 8 1 . 4 2 S D I N L E T - H R I M : 4 8 7 5 . 6 1 I N V O U T : 4 8 7 2 . 6 1 1 2 " ( N ) S T A : 6 5 + 8 1 . 4 2 S D I N L E T - I R I M : 4 8 7 5 . 6 1 I N V O U T : 4 8 7 2 . 6 1 1 2 " ( S ) 4 L F O F 1 2 " S . D . @ 0 . 5 0 % 4 L F O F 1 2 " S . D . @ 0 . 0 0 % 4 L F O F 1 2 " S . D . @ 0 . 5 0 % 3 L F O F 1 2 " S . D . @ 0 . 0 0 % 5 . 5 ' 5 . 5 ' TBC: 4878.19 TBC: 4878.19TB C : 4 8 7 7 . 0 7 TB C : 4 8 7 7 . 0 7 T B C : 4 8 7 6 . 8 6 T B C : 4 8 7 6 . 0 7 T B C : 4 8 7 6 . 0 7 15' P.U.E.15' P.U.E.4850 4860 4870 4880 4890 4900 59+0048504860487048804890490059+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 8 1 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 8 1 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.6.0 - 6.2_P&P STREET A.dwg - STREET A PLAN AND PROFILE 1 - 12/02/2022 03:33pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' SHEET C.8.0 ID-6177-22 CJF TLM CJF 12/01/2022 STREET A PLAN AND PROFILE 1 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 5 C . 6 . 0 SHEET C.6.1 STR E E T A P L A N A N D P R O F I L E 1 STREET A 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTE C . 9 . 0 6 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 6 8 3 7 3 9 37 3 7 3 7 4 0 4 0 4 1 4 1 40 6 6 6 7 6 7 6 6 6 7 6 7 6 8 5 4 5 4 5 4 5 2 5 2 5 3 5 3 5352 5 2 3845 3 8 4 5 4 5 S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 6' MINIMUM P R O P O S E D S U R F A C E EXISTING SURFACE600 LF OF 8" D.I. WATER MAI N L I N E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y W ater v alv e needed. 67+0068+00 6 9 + 0 0 7 0 + 0 0 7 1 + 0 0 7 2 + 0 0 7 3 + 0 0 0 . 5 0 % - 0 . 5 0 % - 0 . 5 0 % 0.50% 0 . 5 0 % 0.50%GRADE BREAK STA = 68+54.05CL ELEV = 4877.59 GRADE BREAK STA = 68+96.05 CL ELEV = 4877.80 GRADE BREAK STA = 71+07.50 CL ELEV = 4878.85 GRADE BREAK STA = 71+65.00 CL ELEV = 4879.14 GRADE BREAK STA = 72+22.50 CL ELEV = 4878.85 CURB P.C. RT. STA = 71+07.50 CL ELEV = 4878.85 CURB P.C. RT. STA = 72+22.50 CL ELEV = 4878.85 STA = 71+65.00 INTERSECTION ROAD B CL ELEV = 4879.14 STA = 68+96.05 CL ELEV = 4877.80 STA = 68+54.05CL ELEV = 4877.59 67+0068+00 6 9 + 0 0 7 0 + 0 0 7 1 + 0 0 7 2 + 0 0 7 3 + 0 0 67+00 4876.814876.9268+00 4877.314877.06 6 9 + 0 0 4877.82 4877.15 7 0 + 0 0 4878.32 4877.07 7 1 + 0 0 4878.82 4877.50 7 2 + 0 0 4878.97 4877.47 7 3 + 0 0 4878.47 4877.55 STA: 66+39.02 (6.00, R)SSMH - 15RIM: 4876.38INV IN: 4864.44 - 8" (W)INV OUT: 4864.34 - 8" (E)242.03' of 8" S.S. @ 0.40%STA: 68+81.05 (6.00, R)SSMH - 14RIM: 4877.60 INV IN: 4863.37 - 8" (W) INV IN: 4863.37 - 8" (S) INV IN: 4863.37 - 8" (N) INV OUT: 4863.27 - 8" (E) 2 8 9 . 9 6 ' o f 8 " S . S . @ 0 . 4 0 % STA: 81+06.00 (-6.00, L) SSMH - 11 RIM: 4879.03 INV IN: 4862.11 - 8" (W) INV IN: 4862.11 - 8" (E) INV OUT: 4862.01 - 8" (S) 2 7 4 . 0 6 ' o f 8 " S . S . @ 0 . 4 0 % ↕ 12.05' (SS)↕ 14.33' (SS) ↕ 1 7 . 0 2 ' ( S S ) 8 " W A T E R M A I N 8 " W A T E R M A I N STA = 71+65.10 T.O.W. = 4871.71 STA: 68+50.568" x 6" WATER TEESTA: 68+69.058" x 8" CROSS STA: 70+78.13 8" x 6" WATER TEE STA: 71+07.70 8" GATE VALVE STA: 71+59.00 8" WATER TEE STA: 72+22.70 8" GATE VALVE 66+0067+0068+00 6 9 + 0 0 7 0 + 0 0 7 1 + 0 0 7 2 + 0 0 7 3 + 0 0 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8'' W 8'' W 8'' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8'' W 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' WSS S SS SS S S S S S S S S S S SSSSSSSS 66+0067+0068+00 6 9 + 0 0 7 0 + 0 0 7 1 + 0 0 7 2 + 0 0 7 3 + 0 0 SD SD 48774877487648764877487748774877 4 8 7 8 4 8 7 8 4 8 7 8 4 8 7 8 4877 4877 0.5%0.5%2.1%2.1%TBC: 4877.45 D T B C : 4 8 7 7 . 1 4 DTBC:4877.01 T O A : 4 8 7 7 . 2 9 TOA:4877.10 T O A : 4 8 7 7 . 3 0 TOA:4877.09 T O A : 4 8 7 8 . 3 5 T O A : 4 8 7 8 . 3 5 T O A : 4 8 7 8 . 3 5 T O A : 4 8 7 8 . 3 5 T O C : 4 8 7 7 . 7 2 T O C : 4 8 7 7 . 7 9 TOC: 4877.64 TOC: 4877.57 TBC: 4877.44 T O C : 4 8 7 7 . 7 1 T O C : 4 8 7 7 . 7 8 TOC: 4877.65TOC: 4877.58 T O C : 4 8 7 8 . 8 0 T O C : 4 8 7 8 . 8 8 T O C : 4 8 7 8 . 8 0 T O C : 4 8 7 8 . 8 8 T O C : 4 8 7 8 . 8 0 T O C : 4 8 7 8 . 8 8 T O C : 4 8 7 8 . 8 8 T O C : 4 8 7 8 . 8 0 T B C : 4 8 7 8 . 7 1 2.1% 2.1% 1.4 % 1 . 4 % 2.1% 2.1% 0 . 5 % 0 . 5 % 0 . 5 % 0 . 5 % T B C : 4 8 7 8 . 7 1 D T B C : 4 8 7 7 . 1 5 DTBC:4877.00 T B C : 4 8 7 7 . 6 4 8.8'30' 8. 8 ' 6 . 5 ' 26'8.8' 8 . 8 ' 6 . 5 ' 5 ' 6 . 5 ' 5 ' 6 . 5 ' 5 ' 5 ' 2 1 3 . 5 ' 5 ' 12'12'TOG: 4875.64TOG: 4875.62 R 3 0 ' R 1 8 . 5 ' R 2 3 . 5 ' R 1 8 . 5 ' R 2 3 . 5 ' R 3 0 ' T B C : 4 8 7 7 . 6 5 218'218' S S M H - 1 1 S S P L U G - 5 R I M : 4 8 7 7 . 2 9 I N V O U T : 4 8 6 3 . 5 7 8 " ( S ) S S M H - 1 4 S S P L U G - 6 R I M : 4 8 7 7 . 0 9 I N V O U T : 4 8 6 3 . 5 2 8 " ( N ) SSMH - 15 8 " S . S . 3 8 L F O F 8 " S S @ 0 . 4 0 % 5 0 L F O F 8 " S S @ 0 . 4 0 % 8 " S . S . 8" S.S.STA: 65+81.43SDMH-HRIM: 4876.12INV IN: 4872.59 12" (S)INV OUT: 4872.59 12" (E)STA: 65+81.32SDMH-IRIM: 4876.12INV IN: 4872.59 12" (N)INV OUT: 4872.59 12" (E)STA: 65+81.42SD INLET-HRIM: 4875.61INV OUT: 4872.61 12" (N)STA: 65+81.42SD INLET-IRIM: 4875.61INV OUT: 4872.61 12" (S)4LF OF 12" S.D. @ 0.50%4LF OF 12" S.D. @ 0.00%4LF OF 12" S.D. @ 0.50%3LF OF 12" S.D. @ 0.00%11.5'11.5'5.5'5.5'TBC: 4877.31 T B C : 4 8 7 7 . 6 6 T B C : 4 8 7 7 . 6 6 T B C : 4 8 7 8 . 7 2 T B C : 4 8 7 8 . 7 2 T B C : 4 8 7 8 . 7 0 T B C : 4 8 7 8 . 7 0 1 5 ' P . U . E . 1 5 ' P . U . E . 4850 4860 4870 4880 4890 4900 59+0048504860487048804890490059+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 8 1 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 8 1 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.6.0 - 6.2_P&P STREET A.dwg - STREET A PLAN AND PROFILE 2 - 12/02/2022 03:34pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N ID-6177-22 CJF TLM CJF 12/01/2022 STREET A PLAN AND PROFILE 2 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 6 C . 6 . 1 S H E E T C . 7 . 0 SHEET C.6.2 S T R E E T A P L A N A N D P R O F I L E 2 S T R E E T A SHEET C.6.0 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTE S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 C.9.0 66667 6766676768 6837 3 7 4 4 3 7 39 37 40374041 5 2 5 2 5 3 5 3 52 5352 5 2 5 2 5 4 5 4 4 1 3 8 4 5 45 6 ' M I N I M U M P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 45 38 4 5 610 LF OF 8" D.I. WATER MAIN LINE 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P l a c e w a t e r v a l v e s c l o s e r t o i n t e r s e c t i o n s . 73+0074+0075+00 7 6 + 0 0 7 7 + 0 0 7 8 + 0 0 7 9 + 0 0 0 . 5 0 % 1 . 8 0 % 0 . 5 7 % -0.50%0.50%GRADE BREAK STA = 74+26.06CL ELEV = 4877.84GRADE BREAK STA = 74+72.06CL ELEV = 4878.07 GRADE BREAK STA = 78+50.00 CL ELEV = 4880.22 GRADE BREAK STA = 78+77.35 CL ELEV = 4880.36 GRADE BREAK STA = 79+07.99 CL ELEV = 4880.91 CL P.C. STA = 78+50.00 CL ELEV = 4880.22 STA = 79+07.99 INTERSECTION 2ND CL ELEV = 4880.91 STA = 78+77.35 CL ELEV = 4880.36 STA = 74+72.06CL ELEV = 4878.07STA = 74+30.06CL ELEV = 4877.86 73+0074+0075+00 7 6 + 0 0 7 7 + 0 0 7 8 + 0 0 7 9 + 0 0 73+00 4878.474877.5574+00 4877.974877.7175+00 4878.234877.65 7 6 + 0 0 4878.80 4877.78 7 7 + 0 0 4879.36 4877.88 7 8 + 0 0 4879.93 4877.64 7 9 + 0 0 4880.76 4880.76 274.06' of 8" S.S. @ 0.40%STA: 74+45.06 (6.00, R)SSMH - 12RIM: 4877.81INV IN: 4863.31 - 8" (E)INV IN: 4863.31 - 8" (N)INV IN: 4863.31 - 8" (S)INV OUT: 4863.21 - 8" (W) 4 0 0 . 0 0 ' o f 8 " S . S . @ 0 . 4 0 % STA: 78+45.06 (6.00, R) SSMH -13 RIM: 4880.07 INV OUT: 4864.91 - 8" (W) ↕ 14.60' (SS) ↕ 1 5 . 1 6 ' ( S S ) 8" WATER MAIN 8 " W A T E R M A I N STA = 74+26.09T.O.W. = 4870.44 STA = 78+15.64 T.O.W. = 4872.51 STA: 74+57.068" x 8" CROSSSTA: 74+75.948" x 6" WATER TEE STA: 78+09.66 8" x 6" WATER TEE STA: 78+12.66 8" GATE VALVE STA: 78+15.66 8" PLUG p p 73+0074+0075+00 7 6 + 0 0 7 7 + 0 0 7 8 + 0 0 7 9 + 0 0 8'' W 8'' W 8'' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W S S SS SS SS SS SS SS SS 73+0074+0075+00 7 6 + 0 0 7 7 + 0 0 7 8 + 0 0 7 9 + 0 0 SD S D SD I R I R R I R I R R I R 26' 4878 4878 4878 48 7 8 4878 4878 4878 4878 4878487848784878 4 8 7 9 4 8 7 9 4 8 7 9 4 8 8 0 4 8 8 0 4 8 8 0 TBC: 4877.72 TBC: 4877.91 T B C : 4 8 7 9 . 9 8 T B C : 4 8 8 0 . 0 8 TBC: 4877.71TBC: 4877.92 T O A : 4 8 7 9 . 7 3 T O A : 4 8 7 9 . 6 5 TOA:4877.57 TOA:4877.36 TOA:4877.37 TOA:4877.56 T O C : 4 8 8 0 . 0 8 T O C : 4 8 8 0 . 1 6 TOC: 4877.85 TOC: 4877.92TOC: 4877.98 TOC: 4878.05TOC: 4877.99TOC: 4877.84 TOC: 4878.06TOC: 4877.91 T B C : 4 8 7 9 . 5 0 T B C : 4 8 7 9 . 9 8 T O C : 4 8 8 0 . 0 8 0 . 6 % 0 . 6 % 0.4%0.4%2.1%2.1%0.5%DTBC:4877.42DTBC:4877.26 DTBC:4877.41DTBC:4877.27 2.1% 2.1% 2.1% 2.1% 8.8'6.5' 5 ' 3 7 0 . 4 ' 6 . 5 ' 5 ' 5 ' 3 6 4 . 4 ' 8.8'8.8' 5 ' 5'8.8' R 2 3 . 5 ' R 1 8 . 5 ' R 1 8 . 5 ' R 2 3 . 5 ' TOG: 4877.28 TOG: 4877.25 T O C : 4 8 8 0 . 1 6 4878 154'153.9' S S M H - 1 3 SS PLUG - 3RIM: 4877.84INV OUT: 4863.51 8" (S)SS PLUG - 4RIM: 4877.73INV OUT: 4863.46 8" (N)SSMH - 12 8 " S . S . 8" S.S.51LF OF 8" SS @ 0.40%39LF OF 8" SS @ 0.40%STA: 74+25.96SDMH-KRIM: 4877.74INV IN: 4874.21 12" (N)INV OUT: 4874.21 12" (W)STA: 74+26.06SDMH-JRIM: 4877.74INV IN: 4874.21 12" (S)INV OUT: 4874.21 12" (W)STA: 74+26.06SD INLET-JRIM: 4877.23INV OUT: 4874.23 12" (N)STA: 74+26.06SD INLET-KRIM: 4877.23INV OUT: 4874.23 12" (S)4LF OF 12" S.D. @ 0.50%4LF OF 12" S.D. @ 0.00% 2 1 L F O F 1 2 " S . D . @ 2 . 0 0 % 4LF OF 12" S.D. @ 0.50%3LF OF 12" S.D. @ 0.00%30'11.5'11.5'5.5'5.5' R 3 0 ' 2 3 ' R 3 0 ' TBC: 4877.70 TBC: 4877.20TBC: 4877.73 T B C : 4 8 8 0 . 1 6 T B C : 4 8 8 0 . 0 6 15' P.U.E.15' P.U.E.4850 4860 4870 4880 4890 4900 59+0048504860487048804890490059+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 8 1 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 8 1 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.6.0 - 6.2_P&P STREET A.dwg - STREET A PLAN AND PROFILE 3 - 12/02/2022 03:35pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N ID-6177-22 CJF TLM CJF 12/01/2022 STREET A PLAN AND PROFILE 3 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 7 C . 6 . 2 S H E E T C . 4 . 2 SHEET C.6.1STR E E T A P L A N A N D P R O F I L E 3 STREE T A S H E E T C . 4 . 1 2ND EAST 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTEC.9.0 6 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 66676768 66 67 67 683737413941374040375454525253 5 3 5 2 52 3 8 38 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 45 45 4 5 4 0 3 7 6 ' M I N I M U M P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E 5 1 5 L F O F 8 " D . I . W A T E R M A I N L I N E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 81+0082+0083+00 8 4 + 0 0 8 5 + 0 0 8 6 + 0 0 8 7 + 0 0 - 0 . 5 0 % -0.50%-0.50 % - 0 . 5 0 % GRADE BREAK STA = 81+00.00CL ELEV = 4879.14 GRADE BREAK STA = 84+94.68 CL ELEV = 4877.17 GRADE BREAK STA = 87+04.36 CL ELEV = 4876.12 STA = 81+00.00INTERSECTION ROAD A CL ELEV = 4879.14CL P.T. STA = 81+57.50CL ELEV = 4878.85 STA = 84+94.68 CL ELEV = 4877.17 STA = 85+36.68 CL ELEV = 4876.96 81+0082+0083+00 8 4 + 0 0 8 5 + 0 0 8 6 + 0 0 8 7 + 0 0 STA: 81+06.00 (-6.00, L)SSMH - 11RIM: 4879.03INV IN: 4862.11 - 8" (W)INV IN: 4862.11 - 8" (E)INV OUT: 4862.01 - 8" (S)390.52' of 8" S.S. @ 0.40% STA: 84+96.52 (-6.00, L) SSMH -10 RIM: 4877.04 INV IN: 4860.45 - 8" (N) INV OUT: 4860.35 - 8" (S) 3 9 0 . 5 2 ' o f 8 " S . S . @ 0 . 4 0 % ↕ 1 6 . 6 9 ' ( S S ) ↕ 17.02' (SS)81+00 4879.144877.3982+00 4878.644877.2483+00 4878.144877.17 8 4 + 0 0 4877.64 4877.04 8 5 + 0 0 4877.14 4876.84 8 6 + 0 0 4876.64 4876.80 8 7 + 0 0 4876.14 4876.71 STA = 80+94.01T.O.W. = 4871.96 STA = 87+04.31 T.O.W. = 4868.78 STA: 80+94.008" WATER TEESTA: 81+57.658" GATE VALVE 8" WATER MAIN STA: 84+89.50 8" x 6" WATER TEE 8 " W A T E R M A I N 1 6 1 ' 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W S SS S SSSSSS S S S S S S S S S S SS SS 81+00 82+0083+00 8 4 + 0 0 8 5 + 0 0 8 6 + 0 0 8 7 + 0 0 SD SD R30'R18.5'R23.5'6.5'5'R18.5'R23.5'R30'6.5'5'4878 4878 4 8 7 7 4 8 7 7 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 TBC: 4878.71 T B C : 4 8 7 7 . 0 2 T B C : 4 8 7 6 . 8 1 T O C : 4 8 7 6 . 9 4 T O C : 4 8 7 7 . 0 1 T O C : 4 8 7 7 . 1 6 T O C : 4 8 7 7 . 0 9 T O A : 4 8 7 6 . 4 9 T O A : 4 8 7 6 . 6 4 T O C : 4 8 7 7 . 0 9 T O C : 4 8 7 6 . 9 4 T O C : 4 8 7 7 . 0 1 T O C : 4 8 7 7 . 1 6 T O A : 4 8 7 6 . 4 6 D T B C : 4 8 7 6 . 3 7 D T B C : 4 8 7 6 . 5 2 T O A : 4 8 7 6 . 6 4 T O A : 4 8 7 6 . 4 9 T B C : 4 8 7 6 . 8 1 T B C : 4 8 7 7 . 0 2 T B C : 4 8 7 6 . 6 7 D T B C : 4 8 7 6 . 3 7 D T B C : 4 8 7 6 . 5 2 T O A : 4 8 7 6 . 6 7 T O A : 4 8 7 6 . 4 6 TOA:4878.35TOC: 4878.80TOC: 4878.88TOC: 4878.80 TBC: 4878.71TOA:4878.35 TOC: 4878.80TBC: 4878.71TOA:4878.35TOC: 4878.88 TOC: 4878.88 0 . 5 % 0 . 5 % 1.5%1.5% 2.1% 2.1% 2.1% 2.1% T O G 4 8 7 5 . 5 1 T O G 4 8 7 5 . 5 1 SSMH - 11 S S M H - 1 0 8 " S . S . 8 " S . S . S T A : 8 7 + 0 4 . 5 8 S D M H - M R I M : 4 8 7 6 . 0 2 I N V I N : 4 8 7 4 . 1 9 1 2 " ( W ) I N V O U T : 4 8 7 4 . 1 9 1 2 " ( N ) S T A : 8 7 + 0 4 . 5 8 S D M H - L R I M : 4 8 7 6 . 0 2 I N V I N : 4 8 7 2 . 4 9 1 2 " ( E ) I N V O U T : 4 8 7 2 . 4 9 1 2 " ( N ) S T A : 8 7 + 0 4 . 5 8 S D I N L E T - M R I M : 4 8 7 5 . 8 8 I N V O U T : 4 8 7 4 . 2 1 1 2 " ( E ) S T A : 8 7 + 0 4 . 5 8 S D I N L E T - L R I M : 4 8 7 5 . 5 1 I N V O U T : 4 8 7 2 . 5 1 1 2 " ( W ) 4 L F O F 1 2 " S . D . @ 0 . 5 0 % 4 L F O F 1 2 " S . D . @ 0 . 0 0 % 4 L F O F 1 2 " S . D . @ 0 . 5 0 % 5 L F O F 1 2 " S . D . @ 0 . 0 0 % 3 0 ' 11.5' 8. 8 ' 8 . 8 ' 1 6 1 ' 6.5' 8 . 8 ' 8. 8 ' 3 0 ' 11.5' T B C : 4 8 7 7 . 0 3 T B C : 4 8 7 7 . 0 3 T B C : 4 8 7 5 . 9 8 T B C : 4 8 7 5 . 9 8 5.5' 15' P.U.E.15' P.U.E.Elevation4840485048604870 4880 4890 4900 79+00Elevation484048504860487048804890490079+00 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 9 9 + 0 0 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 9 9 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.7.0 - 7.2_P&P STREET B.dwg - STREET B PLAN AND PROFILE 1 - 12/02/2022 03:40pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N SHEET C.6.2 ID-6177-22 CJF TLM CJF 12/01/2022 STREET B PLAN AND PROFILE 1 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 8 C . 7 . 0 S T R E E T B P L A N A N D P R O F I L E 1 S T R E E T B SHEET C.7.1 STREET A SHEET C.6.2 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTE C . 9 . 0 6 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 53 5 3 5 2 52 3 7 374144 6 7 6 7 6 7 6 7 6 8 6 6 6 6 6 8 3 8 6' MINIMUM PROPOS E D S U R F A C E EXISTING SURFACE 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 45610 LF OF 8 " D . I . W A T E R M A I N L I N E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y W ater v alv es m ov ed closer to intersection. 87+0088+0089+00 9 0 + 0 0 9 1 + 0 0 9 2 + 0 0 9 3 + 0 0 0 . 5 0 % -0.50%0.51% - 0 . 5 0 % 0 . 5 0 % GRADE BREAK STA = 87+04.36CL ELEV = 4876.12GRADE BREAK STA = 88+72.04CL ELEV = 4876.97 GRADE BREAK STA = 91+92.92 CL ELEV = 4875.37 GRADE BREAK STA = 93+07.91 CL ELEV = 4875.94 STA = 88+72.04CL ELEV = 4876.97STA = 89+14.04CL ELEV = 4876.76 STA = 92+65.91 CL ELEV = 4875.73 STA = 93+07.91 CL ELEV = 4875.94 87+0088+0089+00 9 0 + 0 0 9 1 + 0 0 9 2 + 0 0 9 3 + 0 0 390.52' of 8" S.S. @ 0.40%STA: 88+87.04 (-6.00, L)SSMH - 9RIM: 4876.78INV IN: 4858.78 - 8" (N)INV IN: 4858.78 - 12" (W)INV IN: 4858.78 - 8" (E)INV OUT: 4858.45 - 12" (S) 2 0 5 . 0 4 ' o f 1 2 " S . S . @ 0 . 2 2 % STA: 90+92.08 (-6.00, L) SSMH - 8 RIM: 4875.75 INV IN: 4858.00 - 12" (N) INV OUT: 4857.90 - 12" (S) 4 1 0 . 0 8 ' o f 1 2 " S . S . @ 0 . 2 2 % ↕ 1 7 . 8 5 ' ( S S ) ↕ 18.33' (SS)87+00 4876.144876.7188+00 4876.614876.5289+00 4876.834876.47 9 0 + 0 0 4876.33 4876.26 9 1 + 0 0 4875.83 4876.04 9 2 + 0 0 4875.40 4875.93 9 3 + 0 0 4875.90 4875.78 STA = 87+04.31T.O.W. = 4868.78STA = 88+72.10T.O.W. = 4869.55 STA = 91+92.94 T.O.W. = 4867.99 8 " W A T E R M A I N 8 " W A T E R M A I N STA: 88+69.448" x 6" WATER TEESTA: 88+98.908" x 8" CROSS STA: 92+63.21 8" x 6" WATER TEE 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8'' W 8'' W 8'' W 8'' W 8'' WS S SS S S S S S S S S S S SSSS88+0089+00 9 0 + 0 0 9 1 + 0 0 9 2 + 0 0 9 3 + 0 0 SD SD SS6.5'5'12'12'48764876 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 T O C : 4 8 7 5 . 7 9 T O C : 4 8 7 5 . 7 2 T B C : 4 8 7 5 . 5 9 T O C : 4 8 7 5 . 8 7 T O C : 4 8 7 5 . 9 4 T B C : 4 8 7 5 . 8 0 T O C : 4 8 7 5 . 9 4 T O C : 4 8 7 5 . 8 7 T O C : 4 8 7 5 . 7 9 T O C : 4 8 7 5 . 7 2 T B C : 4 8 7 5 . 5 9 T B C : 4 8 7 5 . 8 0 T O A : 4 8 7 5 . 4 4 T O A : 4 8 7 5 . 2 3 T O A : 4 8 7 5 . 2 3 T O A : 4 8 7 5 . 4 4 0 . 5 % 0 . 5 % 0 . 5 % 0 . 5 % 0.4%0.4%TBC: 4876.83TBC: 4876.62 2.1% 2.1% 2.1%2.1%2.1%2.1%TOA:4876.29DTBC:4876.17DTBC:4876.32 TOA:4876.44TOA:4876.47TOC: 4876.90TOC: 4876.97 TOC: 4876.82 TOC: 4876.75 TOA:4876.26 TBC: 4876.62TOA:4876.26DTBC:4876.17TOA:4876.29DTBC:4876.32TOA:4876.44 TBC: 4876.83TOA:4876.47 TOC: 4876.90 TOC: 4876.97TOC: 4876.75 TOC: 4876.82 D T B C : 4 8 7 5 . 2 9 T O A : 4 8 7 5 . 4 1 D T B C : 4 8 7 5 . 1 4 T O A : 4 8 7 5 . 2 6 T O A : 4 8 7 5 . 2 6 D T B C : 4 8 7 5 . 1 4 T O A : 4 8 7 5 . 4 1 D T B C : 4 8 7 5 . 2 9 T O G 4 8 7 4 . 7 6 T O G 4 8 7 4 . 7 6 SSMH - 9 STA: ???SS PLUG - 2RIM: 4876.47INV OUT: 4859.02 8" (W) S S M H - 8 1 2 " S . S . 1 2 " S . S . 59LF OF 8" SS @ 0.40% S T A : 9 1 + 9 2 . 9 2 S D M H - N R I M : 4 8 7 5 . 2 7 I N V I N : 4 8 7 1 . 7 4 1 2 " ( E ) I N V I N : 4 8 7 1 . 7 4 1 2 " ( N ) S T A : 9 1 + 9 2 . 9 5 S D M H - O R I M : 4 8 7 5 . 2 7 I N V I N : 4 8 7 1 . 7 4 1 2 " ( W ) I N V O U T : 4 8 7 1 . 7 4 1 2 " ( N ) S T A : 9 1 + 9 2 . 9 2 S D I N L E T - N R I M : 4 8 7 4 . 7 6 I N V O U T : 4 8 7 1 . 7 6 1 2 " ( W ) S T A : 9 1 + 9 2 . 9 2 S D I N L E T - O R I M : 4 8 7 4 . 7 6 I N V O U T : 4 8 7 1 . 7 6 1 2 " ( E ) 4 L F O F 1 2 " S . D . @ 0 . 5 0 % 4 L F O F 1 2 " S . D . @ 0 . 5 0 % 4 L F O F 1 2 " S . D . @ 0 . 0 0 % 4 L F O F 1 2 " S . D . @ 0 . 0 0 % 8.8'8.8'30'11.5'30'11.5'8.8'8.8' 1 7 5 ' 6.5' 1 7 5 ' 6.5' 8. 8 ' 8 . 8 ' 3 0 ' 11.5' 3 0 ' 11.5' 8 . 8 ' 8. 8 ' 5.5' 5.5' 12" S.S. T B C : 4 8 7 5 . 2 2 T B C : 4 8 7 5 . 2 2 15' P.U.E.15' P.U.E.Elevation4840485048604870 4880 4890 4900 79+00Elevation484048504860487048804890490079+00 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 9 9 + 0 0 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 9 9 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.7.0 - 7.2_P&P STREET B.dwg - STREET B PLAN AND PROFILE 2 - 12/02/2022 03:41pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N ID-6177-22 CJF TLM CJF 12/01/2022 STREET B PLAN AND PROFILE 2 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 1 9 C . 7 . 1 SHEET C.7.0 S T R E E T B P L A N A N D P R O F I L E 2 STREET B SHEET C.7.2 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTEC.9.0 6 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 6 6 6 7 6 7 6 8 6 7 6 7 6 8 6 6 5 3 53 55 5 5 5 5 52 54 3 7 3 7 37383740 4037394145415452 3 8 6' MINIMUM PROPOSED S U R F A C E EXISTING SURFACE 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 600 LF OF 8" D.I. WATER MAI N L I N E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y water v alv e on stub outs? 93+0094+00 9 5 + 0 0 9 6 + 0 0 9 7 + 0 0 0.50%0. 5 0 % 0 . 5 0 % 0 . 5 0 % GRADE BREAK STA = 93+07.91CL ELEV = 4875.94 GRADE BREAK STA = 96+61.60 CL ELEV = 4877.71 GRADE BREAK STA = 97+19.26 CL ELEV = 4878.00 CL P.C. STA = 96+61.60 CL ELEV = 4877.71 STA = 97+19.24 INTERSECTION MOODY CL ELEV = 4878.00 STA = 92+65.91CL ELEV = 4875.73STA = 93+07.91CL ELEV = 4875.94 STA = 96+94.22 CL ELEV = 4877.88 93+0094+00 9 5 + 0 0 9 6 + 0 0 9 7 + 0 0 410.08' of 12" S.S. @ 0.22% STA: 95+02.16 (-6.00, L) SSMH - 7 RIM: 4876.79 INV IN: 4857.00 - 12" (N) INV OUT: 4856.90 - 12" (S) 1 9 4 . 4 3 ' o f 1 2 " S . S . @ 0 . 2 2 % STA: 51+71.05 (-22.61, L) SSMH - 2 RIM: 4877.80 INV IN: 4856.47 - 12" (E) INV IN: 4856.47 - 12" (N) INV OUT: 4856.37 - 12" (W) ↕ 2 1 . 4 3 ' ( S S ) ↕ 1 9 . 9 0 ' ( S S ) 93+00 4875.904875.7894+00 4876.404875.81 9 5 + 0 0 4876.90 4875.70 9 6 + 0 0 4877.40 4875.73 9 7 + 0 0 4877.90 4877.63 STA = 97+12.16 T.O.W. = 4870.59 8" WATER MAINSTA: 92+63.218" x 6" WATER TEE STA: 97+12.16 16" x 6" WATER TEE STA: 96+57.77 8" x 6" WATER TEE STA: 96+61.60 8" GATE VALVE 8 " W A T E R M A I N pp 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 16'' W 16'' W 16'' W S S S S S S SSSSSS S S S S 93+0094+00 9 5 + 0 0 9 6 + 0 0 9 7 + 0 0 R3 0 ' R 2 3 . 5 ' R 1 8 . 5 ' 6 . 5 ' 5 ' 5 4 ' R 3 0 ' R 2 3 . 5 ' R 1 8 . 5 ' 6 . 5 ' 5 ' 6.5' 5' 12' 1 3 . 5 ' 4876 4876 48764876 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 6 4876 TOC: 4875.79TOC: 4875.72TBC: 4875.59 TOC: 4875.87 TOC: 4875.94TBC: 4875.80 T O C : 4 8 7 7 . 7 4 T O C : 4 8 7 7 . 6 6 T O C : 4 8 7 7 . 5 7 T O C : 4 8 7 7 . 6 6 T O C : 4 8 7 7 . 5 7 T O C : 4 8 7 7 . 7 4 T O C : 4 8 7 7 . 6 6 T O C : 4 8 7 7 . 7 4 T O C : 4 8 7 7 . 7 4 T O C : 4 8 7 7 . 6 6 T O C : 4 8 7 7 . 5 7 TOC: 4875.94 TOC: 4875.87TOC: 4875.79 TOC: 4875.72 TBC: 4875.59TBC: 4875.80 T B C : 4 8 7 7 . 5 7 TOA:4877.71 TOA:4877.16 T O A : 4 8 7 7 . 2 1 T O A : 4 8 7 7 . 2 1 TOA:4875.44TOA:4875.23TOA:4875.23TOA:4875.44 6.5' T B C : 4 8 7 7 . 2 1 0.5%0.5%0.5%0.5%DTBC:4875.29TOA:4875.41 DTBC:4875.14TOA:4875.26TOA:4875.26DTBC:4875.14 TOA:4875.41DTBC:4875.29 2.1%2.1% 2.1% 2.1% 2 . 1 % 2 . 1 % S S M H - 2 S S M H - 7 12" S.S. 1 2 " S . S . 4LF OF 12" S.D. @ 0.50%8.8'8.8'30'11.5'30'11.5'8.8'8.8'15' P.U.E.15' P.U.E.Elevation4840485048604870 4880 4890 4900 79+00Elevation484048504860487048804890490079+00 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 9 9 + 0 0 4 8 4 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 9 9 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.7.0 - 7.2_P&P STREET B.dwg - STREET B PLAN AND PROFILE 3 - 12/02/2022 03:42pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N ID-6177-22 CJF TLM CJF 12/01/2022 STREET B PLAN AND PROFILE 3 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 0 C . 7 . 2 S H E E T C . 5 . 1 SHEET C.7.1STREET B PLAN A N D P R O F I L E 3 S T R E E T B S H E E T C . 5 . 2 MOODY ROAD 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTEC.9.0 6 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 5 3 5 3 5 5 5537 3 7 3 4 4 1 38 3 8 4 5 6' MINIMUM P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 425 LF OF 8" D.I. WATER MAIN LINE 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y W a t e r v a l v e c l o s e r t o i n t e r s e c t i o n . 100+00101+00102+001 0 3 + 0 0 1 0 4 + 0 0 1 0 5 + 0 0 1 0 6 + 0 0 - 0 . 5 0 % - 0 . 5 0 % 2.00%-0.50% - 0 . 5 0 % GRADE BREAK STA = 100+75.00CL ELEV = 4878.12 GRADE BREAK STA = 104+94.68 CL ELEV = 4876.65 STA = 101+00.00INTERSECTION ROAD A CL ELEV = 4878.62CURB P.C. LT. STA = 101+57.55CL ELEV = 4878.33 STA = 104+94.68 CL ELEV = 4876.65 STA = 105+36.68 CL ELEV = 4876.44 STA = 100+75.00CL ELEV = 4878.12 100+00101+00102+001 0 3 + 0 0 1 0 4 + 0 0 1 0 5 + 0 0 1 0 6 + 0 0 101+00 4878.624876.83102+00 4878.124876.77 1 0 3 + 0 0 4877.62 4876.86 1 0 4 + 0 0 4877.12 4876.05 1 0 5 + 0 0 4876.62 4876.32 1 0 6 + 0 0 4876.12 4876.56 100+00101+00102+001 0 3 + 0 0 1 0 4 + 0 0 1 0 5 + 0 0 1 0 6 + 0 0 BP: 100+00.00 8'' W8'' W8'' WS SS100+00101+00102+001 0 3 + 0 0 1 0 4 + 0 0 1 0 5 + 0 0 1 0 6 + 0 0 BP: 100+00.00 6.5'6.5'5'6.5'5'4878 487848784878 4 8 7 7 4 8 7 6 4877 4 8 7 7 4 8 7 6 4 8 7 6 4 8 7 6 TBC: 4878.19 TBC: 4878.19 TOC: 4878.29TOC: 4878.36TOC: 4878.28 T O C : 4 8 7 6 . 5 7 T O C : 4 8 7 6 . 4 2 T O C : 4 8 7 6 . 6 4 T O C : 4 8 7 6 . 4 9 T B C : 4 8 7 6 . 2 9 T B C : 4 8 7 6 . 5 0 TOA:4877.83 TOA:4877.83TOA:4878.10TOC: 4878.62TOC: 4878.55 TOC: 4878.36 0 . 5 % 0 . 5 % D T B C : 4 8 7 5 . 8 5 T O C : 4 8 7 5 . 9 7 D T B C : 4 8 7 6 . 0 0 T O C : 4 8 7 6 . 1 2 T O C : 4 8 7 6 . 1 5 T O C : 4 8 7 5 . 9 4 TBC: 4878.4526.8%2.1% 2.1% 2.1% 8. 8 ' 8 . 8 ' 6.5'11.5' 3 0 ' T B C : 4 8 7 6 . 2 6 15' P.U.E. Elevation485048604870 4880 4890 4900 99+00Elevation48504860487048804890490099+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 1 1 9 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 1 1 9 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.8.0 - 8.2_P&P STREET C.dwg - STREET C PLAN AND PROFILE 1 - 12/02/2022 03:46pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' SHEET C.8.1 ID-6177-22 CJF TLM CJF 12/01/2022 STREET C PLAN AND PROFILE 1 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 1 C . 8 . 0 S T R E E T C P L A N A N D P R O F I L E 1 S T R E E T C SHEET C.6.0 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTE C . 9 . 0 7 STREET A W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 PROPOSED SURFA C E EXISTING SURFACE S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 106+00107+00108+00 1 0 9 + 0 0 1 1 0 + 0 0 1 1 1 + 0 0 1 1 2 + 0 0 - 0 . 5 1 % 0 . 5 0 % -0.50%0.50%GRADE BREAK STA = 107+04.36CL ELEV = 4875.60 GRADE BREAK STA = 108+72.04 CL ELEV = 4876.44 STA = 108+72.04 CL ELEV = 4876.44 STA = 109+14.04 CL ELEV = 4876.65 106+00107+00108+00 1 0 9 + 0 0 1 1 0 + 0 0 1 1 1 + 0 0 1 1 2 + 0 0 106+00 4876.124876.56107+00 4875.624875.88108+00 4876.084875.72 1 0 9 + 0 0 4876.58 4875.65 1 1 0 + 0 0 4876.21 4875.23 1 1 1 + 0 0 4875.71 4875.54 1 1 2 + 0 0 4875.20 4875.09 106+00107+00108+00 1 0 9 + 0 0 1 1 0 + 0 0 1 1 1 + 0 0 106+00107+00108+00 1 0 9 + 0 0 1 1 0 + 0 0 1 1 1 + 0 0 SD4876487648 7 6 4876 4 8 7 6 4 8 7 6 4 8 7 5 4 8 7 5 TBC: 4876.292.1% 2.1% T O A : 4 8 7 6 . 1 5 T O A : 4 8 7 6 . 1 2 T O A : 4 8 7 5 . 9 7 T O A : 4 8 7 5 . 9 4 T B C : 4 8 7 6 . 5 0 T B C : 4 8 7 6 . 2 9 T O C : 4 8 7 6 . 5 7 T O C : 4 8 7 6 . 6 4 T O C : 4 8 7 6 . 4 2 T O C : 4 8 7 6 . 4 9 D T B C : 4 8 7 5 . 8 5 D T B C : 4 8 7 6 . 0 0 0 . 5 % 0.0%TOG: 4875.03 8. 8 ' 8 . 8 ' 11.5' 3 0 ' 6.5'140'STA: 107+04.30SDMH-GRIM: 4875.50INV IN: 4871.95 12" (W)INV OUT: 4871.99 12" (S)STA: 107+04.30SD INLET-GRIM: 4874.99INV OUT: 4871.99 12" (E)4LF OF 12" S.D. @ 1.00%4LF OF 12" S.D. @ 0.00%5.5'TBC: 4875.45 T B C : 4 8 7 6 . 2 8 15' P.U.E. Elevation485048604870 4880 4890 4900 99+00Elevation48504860487048804890490099+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 1 1 9 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 1 1 9 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.8.0 - 8.2_P&P STREET C.dwg - STREET C PLAN AND PROFILE 2 - 12/02/2022 03:47pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 STREET C PLAN AND PROFILE 2 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 2 C . 8 . 1 STREET C P L A N A N D P R O F I L E 2 STREET B SHEET C.8.2 SHEET C.8.0 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTE C . 9 . 0 7 W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 66 676768 S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 P R O P O S E D S U R F A C E EXISTING SURFACE 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 111+00112+00113+00 1 1 4 + 0 0 1 1 5 + 0 0 1 1 6 + 0 0 1 1 7 + 0 0 -0.50%-0.51% 0 . 5 0 % 0 . 5 0 % - 0 . 5 0 % 0 . 5 0 % GRADE BREAK STA = 112+65.91CL ELEV = 4874.87 GRADE BREAK STA = 114+06.18 CL ELEV = 4874.17 GRADE BREAK STA = 116+63.82 CL ELEV = 4875.45 GRADE BREAK STA = 117+21.38 CL ELEV = 4875.74 CURB P.C. LT. STA = 116+63.82 CL ELEV = 4875.45 STA = 117+21.38 STA = 112+65.91CL ELEV = 4874.87STA = 113+07.91CL ELEV = 4874.66 STA = 116+63.82 CL ELEV = 4875.45 STA = 116+96.27 CL ELEV = 4875.62 111+00112+00113+00 1 1 4 + 0 0 1 1 5 + 0 0 1 1 6 + 0 0 1 1 7 + 0 0 111+00 4875.714875.54112+00 4875.204875.09113+00 4874.704874.48 1 1 4 + 0 0 4874.20 4874.21 1 1 5 + 0 0 4874.63 4874.34 1 1 6 + 0 0 4875.13 4873.76 1 1 7 + 0 0 4875.63 4875.18 pp 111+00112+00113+00 1 1 4 + 0 0 1 1 5 + 0 0 1 1 6 + 0 0 1 1 7 + 0 0 16'' W S S 111+00112+00113+00 1 1 4 + 0 0 1 1 5 + 0 0 1 1 6 + 0 0 1 1 7 + 0 0 S SD SD R 3 0 ' R 2 3 . 5 ' R 1 8 . 5 ' 6 . 5 ' 5 ' 6.5' 5' 4875487548754875 4875 4 8 7 4 4874 4874 4875 4875 4875 4 8 7 4 4 8 7 4 4 8 7 5 4 8 7 5 4875 T B C : 4 8 7 5 . 3 1 T B C : 4 8 7 5 . 3 1 TBC: 4874.72TBC: 4874.51 TOC: 4874.72TOC: 4874.64TOC: 4874.79 TOC: 4874.87TOA:4874.34TOA:4874.19 DTBC: 4874.06DTBC: 4874.21 TOA:4874.16TOA:4874.37 0 . 5 % 0.5%2.1% 2.1% 2.1% 1.9% 1 . 5 % T O C : 4 8 7 5 . 4 1 T O C : 4 8 7 5 . 4 8 T O C : 4 8 7 5 . 4 0 T O C : 4 8 7 5 . 4 8 T O G : 4 8 7 3 . 5 9 8.8'11.5'8.8'30' S T A : 1 1 4 + 0 5 . 9 6 S D M H - F R I M : 4 8 7 4 . 0 7 I N V I N : 4 8 7 0 . 5 6 1 2 " ( W ) I N V O U T : 4 8 7 0 . 5 6 1 2 " ( S ) S T A : 1 1 4 + 0 5 . 9 6 S D I N L E T - F R I M : 4 8 7 3 . 5 6 I N V O U T : 4 8 7 0 . 5 6 1 2 " ( E ) 4 L F O F 1 2 " S . D . @ 0 . 0 5 % 4 L F O F 1 2 " S . D . @ 0 . 0 0 % 1 4 0 ' 6.5' 5.5' TBC: 4874.51 T B C : 4 8 7 4 . 0 3 T B C : 4 8 7 5 . 3 2 15' P.U.E. Elevation485048604870 4880 4890 4900 99+00Elevation48504860487048804890490099+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 1 1 9 + 0 0 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 4 9 0 0 1 1 9 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.8.0 - 8.2_P&P STREET C.dwg - STREET C PLAN AND PROFILE 3 - 12/02/2022 03:48pm, tyler.melan d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 STREET C PLAN AND PROFILE 3 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 3 C . 8 . 2 SHEET C.8.1 S H E E T C . 5 . 0 S T R E E T C P L A N A N D P R O F I L E 3 STREET C 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERECURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE.2. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS3. ALL ELEVATIONS ARE FG SHEET NOTEC.9.0 7 M O O D Y R D W A T E R K E Y N O T E S I N S T A L L 1 6 " P L U G I N S T A L L 1 6 " X 8 " T E E I N S T A L L 1 6 " T O 1 4 " R E D U C E R T I E I N T O E X I S T I N G 1 4 " W A T E R M A I N I N S T A L L 8 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L F I R E H Y D R A N T P E R I S P W C S D - 4 0 4 . F I R E H Y D R A N T T O M E E T C I T Y O F R E X B U R G S T A N D A R D S . I N C L U D E 8 " X 6 " T E E A N D A P P U R T E N A N C E S . I N S T A L L 8 " X 8 " C R O S S I N S T A L L 8 " P L U G P O T A B L E & N O N - P O T A B L E V E R T I C A L L I N E C R O S S I N G P E R I S P W C S D - 4 0 7 , M I N I M U M 1 . 5 ' V E R T I C A L S E P A R A T I O N I N S T A L L 1 6 " V A L V E I N S T A L L 1 6 " D U C T I L E I R O N P I P E ( P E R C I T Y O F C I T Y O F R E X B U R G S T A N D A R D ) , L E N G T H P E R P L A N S , M U S T M A I N T A I N 5 ' C O V E R I N S T A L L 8 " X 8 " T E E I N S T A L L 8 " G A T E V A L V E 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 L E G E N D M E T O A : M A T C H E X I S T I N G T O P O F A S P H A L T T B C : T O P B A C K O F C U R B D T B C : D E P R E S S E D T O P B A C K O F C U R B M E T B C : M A T C H E X I S T I N G T O P B A C K C U R B T O C : T O P O F C O N C R E T E M E T O C : M A T C H E X I S T I N G T O P O F C O N C R E T E T O G : T O P O F G R A T E S T O R M D R A I N K E Y N O T E S I N S T A L L S T O R M D R A I N C A T C H B A S I N P E R I S P W C S D - 6 0 1 T Y P E 1 . G R A T E T O B E N E E N A H M O D E L N U M B E R R - 3 0 6 7 O R A P P R O V E D E Q U A L I N S T A L L S T O R M D R A I N P I P E , S I Z E A N D L E N G T H P E R P L A N I N S T A L L I N F I L T R A T O R D R A I N P E R R E X B U R G S D - 1 6 . T O I N C L U D E M A N H O L E , C H A M B E R S , A N D D R A I N R O C K M A T E R I A L S 6 6 6 7 6 8 S E W E R K E Y N O T E S T I E I N T O E X I S T I N G S A N I T A R Y S E W E R M A I N L I N E I N S T A L L 8 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) I N S T A L L S A N I T A R Y S E W E R M A N H O L E P E R I S P W C - S D - 5 0 1 A I N S T A L L C A P A N D M A R K ( T O S U R F A C E ) S E E A R C H I T E C T S P L A N S F O R C O N T I N U A T I O N I N S T A L L 1 2 " S A N I T A R Y S E W E R M A I N L I N E ( L E N G T H P E R P L A N S ) 5 1 5 2 5 3 5 4 5 5 6 6 6 7 6 7 6 8 P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E S I T E P L A N K E Y N O T E S I N S T A L L T Y P E T E R M I N U S B A R R I C A D E P E R I S P W C S D - 1 1 3 2 0 1 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y CARPARKING CENTERLINE TO PROPERTY LINETHRU TRAFFIC RIGHT TURNOR THRUTRAFFICTHRUTRAFFICONLYCAR PARKING 39.5'CARPARKINGCARPARKING 2 7 . 5 ' 47'62.5' 1 0 ' 2ND WEST HALF ROW W/ PROPOSED TURN LANE TYPICAL STRE E T S E C T I O N 1C.9.0 5 ' 0 . 5 ' P / L 6.5'FOR FURTHER REFERENCE, SEE CITY OF REXBURG STANDARDS, TYPICAL SECTION FOUR, SHEET 3SEE CITY OF REXBURG STANDARDS, SHEET 4, FOR TYPICAL GEOTEXTILE FABRIC OVERLAP DETAILSSCALE: NTS.REFERENCE STATIONS 51+07 THROUGH 59+00 MOODY ROAD FULL ROW TYPICAL STREET SECTION4C.9.0 2.5'5'15'EASEMENT 0.5'P/L 6 . 5 ' M O O D Y R O A D H A L F R O W T Y P I C A L S T R E E T S E C T I O N 5 C . 9 . 0 2 . 5 ' 5 ' 0 . 5 ' P / L STREETS A & B INTERIOR TYPICAL STREET SECTION6C.9.0 6.5'2%5'0.5'2% 0 . 5 ' 6.5'5' 1 5 ' E A S E M E N T 6 . 5 ' S T R E E T C H A L F I N T E R I O R T Y P I C A L S T R E E T S E C T I O N 7 C . 9 . 0 2 . 5 ' 5 ' 0 . 5 ' P / L 2ND WEST HALF ROW TYPICAL STREET SECTION3C.9.0 34'23' G R A N U L A R B O R R O W 2.5' TYP 5 ' 0 . 5 ' P / L GEOTEXTILE FABRICBELOW AND UPSIDES 20" GRANULAR BORROW4" - 3/4"AGGREGATEBASE CHIP ANDSEAL COAT(FULL WIDTH)3" ASPHALT PLANT MIXPAVEMENT 2%2%2% 2 % 2 % 2 % T I E I N T O E X I S T I N G S U R F A C E ± 6 . 5 4" TYP 2 % 2 % GEOTEXTILE FABRIC BELOWAND UP SIDES 6 " V E R T I C A L C U R B & G U T T E R P E R C I T Y O F R E X B U R G S T A N D A R D S , S H E E T 6 G R A N U L A R B O R R O W 20" GRANULAR BORROW6" - 3/4" AGGREGATE BASE CHIP AND SEALCOAT (FULL WIDTH)4" ASPHALT PLANTMIX PAVEMENT EXISTING SURFACETIE IN, SAW CUTLINE4" TYPGRANULARBORROWGRANULARBORROW G R A N U L A R B O R R O W G R A N U L A R B O R R O W 2%2% 2 % 2 % 2%6" VERTICALCURB & GUTTERPER CITY OF REXBURGSTANDARDS, SHEET 6GEOTEXTILE FABRICBELOW AND UPSIDES 6" VE R T I C A L CURB & G U T T E R PER CITY OF RE X B U R G STANDARDS, S H E E T 6 20"GRANULARBORROW 4" - 3/4"AGGREGATE BASE CHIP AND SEALCOAT (FULL WIDTH)3" ASPHALT PLANT MIXPAVEMENT G R A N U L A R B O R R O W G E O T E X T I L E F A B R I C B E L O W A N D U P S I D E S 2 0 " G R A N U L A R B O R R O W 4 " - 3 / 4 " A G G R E G A T E B A S E C H I P A N D S E A L C O A T ( F U L L W I D T H ) 3 " A S P H A L T P L A N T M I X P A V E M E N T G E O T E X T I L E F A B R I C B E L O W A N D U P S I D E S 2 0 " G R A N U L A R B O R R O W 4 " - 3 / 4 " A G G R E G A T E B A S E C H I P A N D S E A L C O A T ( F U L L W I D T H ) 3 " A S P H A L T P L A N T M I X P A V E M E N T 12" TYP 6" VERTICALCURB & GUTTERPER CITY OF RE X B U R G STANDARDS, SH E E T 6 12" TYP12" TYP6" VERTICALCURB & GUTTERPER CITY OF REXBURGSTANDARDS, SHEET 6 12" TYP 6 " V E R T I C A L C U R B & G U T T E R P E R C I T Y O F R E X B U R G S T A N D A R D S , S H E E T 6 1 2 " T Y P 6 " V E R T I C A L C U R B & G U T T E R P E R C I T Y O F R E X B U R G S T A N D A R D S , S H E E T 6 1 2 " T Y P FOR FURTHER REFERENCE, SEE CITY OF REXBURG STANDARDS, TYPICAL SECTION FOUR, SHEET 3SEE CITY OF REXBURG STANDARDS, SHEET 4, FOR TYPICAL GEOTEXTILE FABRIC OVERLAP DETAILSSCALE: NTS. F O R F U R T H E R R E F E R E N C E , S E E C I T Y O F R E X B U R G S T A N D A R D S , T Y P I C A L S E C T I O N F O U R , S H E E T 3 S E E C I T Y O F R E X B U R G S T A N D A R D S , S H E E T 4 , F O R T Y P I C A L G E O T E X T I L E F A B R I C O V E R L A P D E T A I L S S C A L E : N T S . F O R F U R T H E R R E F E R E N C E , S E E C I T Y O F R E X B U R G S T A N D A R D S , T Y P I C A L S E C T I O N F O U R , S H E E T 3 S E E C I T Y O F R E X B U R G S T A N D A R D S , S H E E T 4 , F O R T Y P I C A L G E O T E X T I L E F A B R I C O V E R L A P D E T A I L S S C A L E : N T S . R E F E R E N C E S T A T I O N S 4 1 + 0 0 T H R O U G H 5 1 + 0 7 FOR FURTHER REFERENCE, SEE CITY OF REXBURG STANDARDS, TYPICAL SECTION EIGHT, SHEET 4SEE CITY OF REXBURG STANDARDS, SHEET 4, FOR TYPICAL GEOTEXTILE FABRIC OVERLAP DETAILSSCALE: NTS.REFERENCE STATIONS 8+00 THROUGH 11+00 & 18+00 THROUGH 27+00 FOR FURTHER REFERENCE, SEE CITY OF REXBURG STANDARDS, TYPICAL SECTION EIGHT, SHEET 4SEE CITY OF REXBURG STANDARDS, SHEET 4, FOR TYPICAL GEOTEXTILE FABRIC OVERLAP DETAILSSCALE: NTS.REFERENCE STATIONS 11+00 THROUGH 18+00 & 27+00 THROUGH 34+00PROPERTY LINE TO PROPERTY LINE 1 5 ' E A S E M E N T 1 5 ' E A S E M E N T 15'EASEMENT 1 5 ' E A S E M E N T 1 5 ' E A S E M E N T 4 : 1 4 : 1 13'14'±34'EX 2.5' TYP2%1.5 - 3%EX ±14'EX ±13'13'2. 5 ' T Y P 14' 2 N D W E S T H A L F R O W W / E X I S T I N G E A S T T U R N L A N E I N S T A L L T Y P I C A L S T R E E T S E C T I O N 3 C . 9 . 0 F O R F U R T H E R R E F E R E N C E , S E E C I T Y O F R E X B U R G S T A N D A R D S , T Y P I C A L S E C T I O N E I G H T , S H E E T 4 S E E C I T Y O F R E X B U R G S T A N D A R D S , S H E E T 4 , F O R T Y P I C A L G E O T E X T I L E F A B R I C O V E R L A P D E T A I L S S C A L E : N T S . R E F E R E N C E S T A T I O N S 2 6 + 0 0 T H R O U G H 3 0 + 0 0 2 % E X I S T I N G S U R F A C E T I E I N 27.5'27.5'9'12.5'12.5'9'12'2.5'P/L2.5' P / L 55'79'27.5'27.5'9'12.5'12.5'9'12' 9 ' 1 2 . 5 ' 6 ' 2 2 . 5 ' 5 ' P / L & C L C L CL CLCL 3 9 . 5 ' 1 1 . 5 ' 1 1 ' 62.5'CL±7' 3 9 . 5 ' ± 1 2 ' BACK OF CURB TO CENTERLINELANDSCAPELANDSCAPETRAFFICLANETRAFFICLANELEFT TURN LANE PROPERTY LINE TO PROPERTY LINEBACK OF CURB TO BACK OF CURB P R O P E R T Y L I N E T O P R O P E R T Y L I N E T R A F F I C L A N E T R A F F I C L A N E L A N D S C A P E LANDSCAPETRAFFICLANETRAFFICLANELEFT TURN LANE C A R P A R K I N G L A N D S C A P E T R A F F I C L A N E L E F T T U R N O R T H R U T R A F F I C P R O P E R T Y L I N E T O C E N T E R L I N E B A C K O F C U R B T O C E N T E R L I N E LEFT TURNONLY CENTERLINE TO BACK OF CURB PROPERTY LINE TO PROPERTY LINETHRUTRAFFICONLYTHRUTRAFFICONLY13'7'GEOTEXTILE FABRICBELOW AND UP SIDES6" VERTICALCURB & GUTTE R PER CITY OF RE X B U R G STANDARDS, S H E E T 6 20" GRANULAR BORROW6" - 3/4" AGGREGATE BASE CHIP AND SEALCOAT (FULL WIDTH)4" ASPHALT PLANTMIX PAVEMENT LEFT TURN LANE ±14' R I G H T T U R N O R T H R U T R A F F I C T H R U T R A F F I C O N L Y ± 4 5 ' E X 2 . 5 ' T Y P E X ± 1 2 ' E X ± 1 2 ' ± 7 ' L E F T T U R N L A N E 7'±7'RIGHT TURNOR THRUTRAFFICTHRUTRAFFICONLY ±34'EX 2.5' TYP EX ±14'EX ±13'±14'LEFT TURN LANE THRUTRAFFICONLY CENTERLINE TO BACK OF CURBEXISTINGSURFACE TIE INSAWCUT LINE UTILITY & LANDS C A P E S T R I P T H R U T R A F F I C 6 2 . 5 ' 3 4 ' 2 3 ' G R A N U L A R B O R R O W 2 . 5 ' T Y P 5 ' 0 . 5 ' P / L 4" TYP 2 % 1 5 ' E A S E M E N T 1 3 ' 1 4 ' G E O T E X T I L E F A B R I C B E L O W A N D U P S I D E S 6 " V E R T I C A L C U R B & G U T T E R P E R C I T Y O F R E X B U R G S T A N D A R D S , S H E E T 6 2 0 " G R A N U L A R B O R R O W 6 " - 3 / 4 " A G G R E G A T E B A S E C H I P A N D S E A L C O A T ( F U L L W I D T H ) 4 " A S P H A L T P L A N T M I X P A V E M E N T 7 ' T H R U T R A F F I C O N L Y C E N T E R L I N E T O B A C K O F C U R B U T I L I T Y & L A N D S C A P E S T R I P C E N T E R L I N E T O P R O P E R T Y L I N E C L ± 1 4 ' E X ± 1 4 ' T H R U T R A F F I C O N L Y L E F T T U R N L A N E 1.5 - 3% 1 . 5 - 3 % 3 ' T I E I N T O E X I S T I N G S U R F A C E 1 2 " T Y P 3 : 1 1' 3'3:1 1' 2 N D E A S T D I T C H T Y P I C A L S E C T I O N 8 C . 9 . 0 2 % 0 . 5 ' 5 ' 1 5 ' E A S E M E N T P / L L A N D S C A P E 2 % 1 0 : 1 ± 3 : 1 2 : 1 2 : 1 3 : 1 C L 2 1 ' 1 0 ' 5 ' 4 ' 6 ' 8 ' 3' 4 ' H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.9.0_TYPICAL CROSS SECTIONS.dwg - TYPICAL CROSS SECTION DETAILS - 12/02/2022 03:51pm, t y l e r . m e l a n d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N ID-6177-22 CJF TLM CJF 12/01/2022 TYPICAL CROSS SECTION DETAILS TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 4 C . 9 . 0 D R A I N A G E S Y S T E M C A L C U L A T I O N S S Y S T E M R E Q U I R E M E N T S : D R A I N A G E A R E A F O R " T E T O N R I V E R O F F S I T E I M P R O V E M E N T S " 3 6 9 , 0 6 4 S F D E S I G N S T O R M 2 5 Y E A R ( R E X B U R G , 1 H R ) S U M M A R Y : S T O R A G E S Y S T E M : I N F I L T R A T O R * S E E I N F I L T R A T I O N S U M M A R Y T A B L E B E L O W - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - T O T A L S T O R A G E R E Q U I R E D : 2 8 , 0 6 0 C F T O T A L S T O R A G E P R O V I D E D : 2 9 , 2 8 5 . 9 C F I N F I L T R A T I O N D A T A S U M M A R Y I N L E T S T O R A G E R E Q U I R E D ( C F ) S T O R A G E P R O V I D E D ( C F ) A 6 1 4 6 7 4 . 1 B 9 2 0 9 7 3 . 7 C 6 0 1 6 7 4 . 1 D 9 8 0 1 0 4 8 . 6 E 5 9 2 5 9 9 . 2 F 1 3 6 1 1 4 2 3 . 1 G 1 3 7 6 1 4 2 3 . 1 H 2 2 3 8 2 2 4 7 I 2 1 9 9 2 2 4 7 J 1 5 3 3 1 5 7 2 . 9 K 1 5 4 8 1 5 7 2 . 9 L 1 5 9 6 1 6 4 7 . 8 M 1 5 8 3 1 6 4 7 . 8 N 1 7 5 3 1 7 9 7 . 6 O 1 7 5 6 1 7 9 7 . 6 P 8 5 6 8 9 8 . 8 Q 5 3 0 5 9 9 . 2 R 4 7 7 5 2 4 . 3 S 3 1 1 3 7 4 . 5 T 2 2 5 2 9 9 . 6 U 4 6 3 5 2 4 . 3 V 4 1 7 4 4 9 . 4 W 4 2 2 4 4 9 . 4 X 4 3 8 4 4 9 . 4 Y 3 1 9 3 7 4 . 5 Z 2 9 3 2 2 9 9 . 6 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y East?East? 2 6 f t o f a s p h a l t m i n i m u m . 8+009+00 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 8+00 4879.269+00 4872.774878.82 1 0 + 0 0 4872.58 4878.51 1 1 + 0 0 4872.39 4878.43 1 2 + 0 0 4872.26 4878.11 1 3 + 0 0 4872.15 4877.97 STA: 8+26.54 (0.00, )IRMH - ARIM: 4878.91INV OUT: 4873.00 - 48" (S) 2 9 8 . 5 6 ' o f 4 8 " R C P @ 0 . 1 0 % STA: 11+25.09 (0.00, ) IRMH - B RIM: 4878.38 INV IN: 4872.70 - 48" (N) INV OUT: 4872.70 - 48" (S) 2 8 4 . 9 8 ' o f 4 8 " R C P @ 0 . 1 0 % top top top top top top top toptoetoetoetoetoetoetoptoptoptoptoptoptoptoptoptop7+50 8+00 9+00 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 BP: 7+50.00PI: 8+10.54 BVP: 8+10.54Overall HP: 8+10.54BREAK: 8+26.54BREAK: 8+31.04 BREAK: 11+15.04 PVI: 8+26.54PVI: 8+31.04 PVI: 11+15.04 IR I R IRR I R R I R R I R R I R R I R R I R R 4 8 7 8 4 8 8 2 4 8 8 2 4885 4 8 8 3 4 8 8 4 4886 4 8 8 7 4888 4889 4 8 8 5 4 8 8 5 4 8 9 0 48 9 0 4895 4 8 8 3 4 8 8 3 4 8 8 4 4 8 8 4 4 8 8 6 48 8 6 4 8 8 7 48 8 7 4 8 8 8 48 8 8 4 8 8 9 48 8 9 4 8 9 1 48 9 1 4 8 9 2 48 9 2 4893 489348944894489448854888 4 8 7 9 4 8 8 3 4 8 8 4 4 8 8 8 4 8 8 5 4 8 8 2 4 8 7 9 4 8 7 8 Elevation485048604870 4880 4890 7+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 3 6 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.10.0 - 10.4_P&P IRRIGATION.dwg - IRRIGATION PLAN & PROFILE 1 - 12/02/2022 03:55pm, tyler.me l a n d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 1 0 0 ' 2 0 0 ' S C A L E : 1 " = 1 0 0 ' I R R I G A T I O N K E Y N O T E S I N S T A L L 9 6 " I R R I G A T I O N C O N C R E T E S T R U C T U R E I N S T A L L 4 8 " C U L V E R T ( C O N C R E T E O R M E T A L ) T I E I N T O E X I S T I N G C U L V E R T 8 1 8 2 8 3 ID-6177-22 CJF TLM CJF 12/01/2022 IRRIGATION PLAN & PROFILE 1 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 5 C . 1 0 . 0 I R R I G A T I O N P L A N A N D P R O F I L E 1 SHEET C.10.1 1. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS2. ALL ELEVATIONS ARE FG3. ALL DIMENSIONS AND CORRESPONDING DETAILS PERTAINING TOPLAN AND PROFILE SHEETS C.10.0 - C.10.4 ARE SHOWN ON C.4.0 -C.4.4 AND WILL NOT BE PRESENTED ON THESE SHEETS DUE TO THEPURPOSE BEING SOLELY A FOCUS ON THE IRRIGATION DETAILING SHEET NOTE 8 1 81 8 2 8 2 P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y H a s i r r i g a t i o n c o m p a n y o k a y e d p i p i n g o f d i t c h d e s i g n ? 13+0014+0015 + 0 0 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 1 9 + 0 0 13+00 4872.154877.9714+00 4872.034878.0715 + 0 0 4871.90 4877.80 1 6 + 0 0 4871.77 4877.76 1 7 + 0 0 4871.63 4877.59 1 8 + 0 0 4871.37 4877.87 1 9 + 0 0 4875.83 4877.50 284.98' of 48" RCP @ 0.10%STA: 14+10.07 (0.00, )IRMH - CRIM: 4878.05INV IN: 4872.42 - 48" (N)INV OUT: 4872.42 - 48" (S) 3 5 5 . 1 1 ' o f 4 8 " R C P @ 0 . 1 0 % STA: 17+65.18 (0.00, ) IRMH - D RIM: 4878.90 INV IN: 4872.06 - 48" (N) INV OUT: 4872.06 - 48" (S) 8 9 . 0 1 ' o f 4 8 " R C P @ 0 . 1 0 % STA: 18+54.19 (0.00, ) IRMH - E RIM: 4878.90 INV IN: 4871.97 - 48" (N) INV OUT: 4871.97 - 48" (S) 4 5 . 8 1 ' o f 4 8 " R C P @ 0 . 1 0 % STA: 19+00.00 (0.00, ) IRMH - F RIM: 4877.50 INV IN: 4871.92 - 48" (N) pp 8'' W8'' W S S S SD S D S D 13+00 14+0015 + 0 0 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 1 9 + 0 0 PI: 14+10.07BREAK: 14+10.07 BREAK: 17+65.18 BREAK: 18+54.19 BREAK: 18+58.69 BREAK: 19+00.00 PVI: 14+10.07 PVI: 17+65.18 PVI: 18+54.19 PVI: 18+58.69 PVI: 19+00.00 IRIRRIRR I R IRR I R R I R R I R R I R R I R I R R I R 48784878 4878 4 8 8 0 4881 488148824882 4 8 7 9 4878 4 8 8 0 4 8 8 0 4 8 8 0 48834883 T O P T O P T O P T O P Elevation485048604870 4880 4890 7+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 3 6 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.10.0 - 10.4_P&P IRRIGATION.dwg - IRRIGATION PLAN & PROFILE 2 - 12/02/2022 03:56pm, tyler.me l a n d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 1 0 0 ' 2 0 0 ' S C A L E : 1 " = 1 0 0 ' 1. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS2. ALL ELEVATIONS ARE FG3. ALL DIMENSIONS AND CORRESPONDING DETAILS PERTAINING TOPLAN AND PROFILE SHEETS C.10.0 - C.10.4 ARE SHOWN ON C.4.0 -C.4.4 AND WILL NOT BE PRESENTED ON THESE SHEETS DUE TO THEPURPOSE BEING SOLELY A FOCUS ON THE IRRIGATION DETAILING SHEET NOTE ID-6177-22 CJF TLM CJF 12/01/2022 IRRIGATION PLAN & PROFILE 2 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 6 C . 1 0 . 1 IR R I G A T I O N P L A N A N D P R O F I L E 2 SHEET C.10.2 SHEET C.10.0 S H E E T C . 6 . 2 2 N D E A S T I R R I G A T I O N K E Y N O T E S I N S T A L L 9 6 " I R R I G A T I O N C O N C R E T E S T R U C T U R E I N S T A L L 4 8 " C U L V E R T ( C O N C R E T E O R M E T A L ) T I E I N T O E X I S T I N G C U L V E R T 8 1 8 2 8 3 8 1 8 1 8 1 81 8 2 8 2 8 2 82 P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 19+0020+0021+00 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 19+00 4875.834877.5020+00 4875.714877.4721+00 4875.604878.55 2 2 + 0 0 4875.50 4877.75 2 3 + 0 0 4875.41 4877.26 2 4 + 0 0 4875.34 4877.17 2 5 + 0 0 4875.27 4877.09 45.81' of 48" RCP @ 0.10%STA: 19+00.00 (0.00, )IRMH - FRIM: 4877.50INV IN: 4871.92 - 48" (N) g g g g g g g g g g g g g g g g g g g g g g g g toe toe toetoetoetoetoetoetoetoepp pp sd sd sd sd SDSD S D S D 19+0020+0021+00 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 BREAK: 19+00.00BREAK: 21+00.00 BREAK: 23+00.00 BREAK: 25+00.00 PVI: 19+00.00PVI: 21+00.00 PVI: 23+00.00 PVI: 25+00.00 IR 4879 4880 4 8 8 0 4 8 8 0 4 8 8 0 4 8 7 9 4876 487648774877 48794880 4 8 8 0 TOPTOPTOPTOPTOPTOPTOPTOPTOPTOP T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P TOPTOPTOPTOPTOPTOPTOPTOPTOPTOP T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P Elevation485048604870 4880 4890 7+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 3 6 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.10.0 - 10.4_P&P IRRIGATION.dwg - IRRIGATION PLAN & PROFILE 3 - 12/02/2022 03:57pm, tyler.me l a n d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 1 0 0 ' 2 0 0 ' S C A L E : 1 " = 1 0 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 IRRIGATION PLAN & PROFILE 3 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 7 C . 1 0 . 2 I R R I G A T I O N P L A N A N D P R O F I L E 3 SHEET C.10.3 SHEET C.10.1 2 N D E A S T 1. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS2. ALL ELEVATIONS ARE FG3. ALL DIMENSIONS AND CORRESPONDING DETAILS PERTAINING TOPLAN AND PROFILE SHEETS C.10.0 - C.10.4 ARE SHOWN ON C.4.0 -C.4.4 AND WILL NOT BE PRESENTED ON THESE SHEETS DUE TO THEPURPOSE BEING SOLELY A FOCUS ON THE IRRIGATION DETAILING SHEET NOTE I R R I G A T I O N K E Y N O T E S I N S T A L L 9 6 " I R R I G A T I O N C O N C R E T E S T R U C T U R E I N S T A L L 4 8 " C U L V E R T ( C O N C R E T E O R M E T A L ) T I E I N T O E X I S T I N G C U L V E R T 8 1 8 2 8 3 8182PROPOSED SURFACE EXISTING SURFACE C.9.0 8 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 25+0026+0027+00 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 1 + 0 0 25+00 4875.274877.0926+00 4875.194877.0027+00 4875.124876.97 2 8 + 0 0 4874.93 4876.87 2 9 + 0 0 4874.74 4876.65 3 0 + 0 0 4874.77 4876.37 3 1 + 0 0 4874.80 4876.32 g g g g g g g g g g g g g g g g g g g g g g g g gSDSD S D S D SD 25+0026+0027+00 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 1 + 0 0 BREAK: 25+00.00BREAK: 27+00.00 BREAK: 29+00.00 PVI: 25+00.00PVI: 27+00.00 PVI: 29+00.00 4 8 7 9 4 8 7 9 4 8 7 7 4 8 7 8 4 8 7 9 4 8 7 8 4 8 7 5 4 8 7 7 4 8 7 8 4 8 7 7 4 8 7 5 4879 4880 4 8 7 9 4 8 7 9 TOPTOPTOPTOPTOPTOPTOPTOPTOPTOP T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P TOPTOPTOPTOPTOPTOPTOPTOPTOPTOP T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P T O P Elevation485048604870 4880 4890 7+00 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 3 6 + 0 0 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.10.0 - 10.4_P&P IRRIGATION.dwg - IRRIGATION PLAN & PROFILE 4 - 12/02/2022 03:58pm, tyler.me l a n d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 1 0 0 ' 2 0 0 ' S C A L E : 1 " = 1 0 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 IRRIGATION PLAN & PROFILE 4 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 8 C . 1 0 . 3 I R R I G A T I O N P L A N A N D P R O F I L E 4 SHEET C.10.4 SHEET C.10.2 2 N D E A S T 1. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS2. ALL ELEVATIONS ARE FG3. ALL DIMENSIONS AND CORRESPONDING DETAILS PERTAINING TOPLAN AND PROFILE SHEETS C.10.0 - C.10.4 ARE SHOWN ON C.4.0 -C.4.4 AND WILL NOT BE PRESENTED ON THESE SHEETS DUE TO THEPURPOSE BEING SOLELY A FOCUS ON THE IRRIGATION DETAILING SHEET NOTE I R R I G A T I O N K E Y N O T E S I N S T A L L 9 6 " I R R I G A T I O N C O N C R E T E S T R U C T U R E I N S T A L L 4 8 " C U L V E R T ( C O N C R E T E O R M E T A L ) T I E I N T O E X I S T I N G C U L V E R T 8 1 8 2 8 3 P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E C . 9 . 0 8 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y 4 8 5 0 4 8 6 0 4 8 7 0 4 8 8 0 4 8 9 0 31+0032+00 3 3 + 0 0 3 4 + 0 0 3 5 + 0 0 3 6 + 0 0 4874.804876.324874.834876.20 4874.75 4877.31 4870.45 4877.98 4874.04 4876.72 STA: 33+78.55 (0.00, ) IRMH - G RIM: 4876.61 INV OUT: 4870.00 - 48" (S) 9 8 . 0 0 ' o f 4 8 " R C P @ 0 . 1 0 % STA: 34+76.55 (0.00, ) IRMH - H RIM: 4877.93 INV IN: 4869.90 - 48" (N) g g g g g g g g g g g g w S to e to e t o e t o e to e to e t o e t o e to p to p to p t o p t o p t o p top to p to p t o p t o p to p 16'' W 16'' W s s s s s S S S S SD S D 31+0032+00 3 3 + 0 0 3 4 + 0 0 3 5 + 0 0 3 5 + 5 9 PI: 34+80.55 P I : 3 5 + 2 3 . 1 3 PI: 35+37.07 EP: 35+58.63 BREAK: 32+00.00 BREAK: 33+00.00 BREAK: 33+78.55 BREAK: 33+83.05 BREAK: 34+72.05Overall LP: 34+72.05 BREAK: 34+76.55 BREAK: 35+23 . 7 2 EVP: 35+36.9 2 PVI: 32+00.00 PVI: 33+00.00 PVI: 33+78.55 PVI: 33+83.05 PVI: 34+72.05 PVI: 34+76.55 PVI: 35+23.72 IR I R I R R 4 8 7 8 4 8 7 8 4878 4877 4875 48764877 4878 4 8 7 7 4 8 7 6 4 8 7 7 4 8 7 7 4 8 7 4 4878 4877 TOPTOPTOPTOPTOPTOPTOPT O P T O P T O P T O P T O P T O P TOPTOPTOPTOPTOPTOPTOPT O P T O P T O P T O P T O P T O P 4 2 . 6 ' 4 ' 4850 4860 4870 4880 4890 7+00H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.10.0 - 10.4_P&P IRRIGATION.dwg - IRRIGATION PLAN & PROFILE 5 - 12/02/2022 03:58pm, tyler.me l a n d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 1 0 0 ' 2 0 0 ' S C A L E : 1 " = 1 0 0 ' C.9.0 8 ID-6177-22 CJF TLM CJF 12/01/2022 IRRIGATION PLAN & PROFILE 5 TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 2 9 C . 1 0 . 4 I R R I G A T I O N P L A N A N D P R O F I L E 5 SHEET C.10.0 S H E E T C . 5 . 2 2 N D E A S T MOODY RD 1. CONTOURS SHOWN AT 1.0' AND 5.0' INTERVALS2. ALL ELEVATIONS ARE FG3. ALL DIMENSIONS AND CORRESPONDING DETAILS PERTAINING TOPLAN AND PROFILE SHEETS C.10.0 - C.10.4 ARE SHOWN ON C.4.0 -C.4.4 AND WILL NOT BE PRESENTED ON THESE SHEETS DUE TO THEPURPOSE BEING SOLELY A FOCUS ON THE IRRIGATION DETAILING SHEET NOTE I R R I G A T I O N K E Y N O T E S I N S T A L L 9 6 " I R R I G A T I O N C O N C R E T E S T R U C T U R E I N S T A L L 4 8 " C U L V E R T ( C O N C R E T E O R M E T A L ) T I E I N T O E X I S T I N G C U L V E R T 8 1 8 2 8 3 8 1 8 1 8 2 P R O P O S E D S U R F A C E E X I S T I N G S U R F A C E 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y g g g g g g g g g g g g g g g g g g g g g gtop to e to e to e to e to e to e to e to e to e to e to e to e to e to e t o e pp g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g toe toetoetoetoetoetoetoetoetoetoetoetoe t o e t o e t o e t o e t o e to e to e to e t o e t o e t o e t o e t o e t o e t o e t o e t o e t o e t o e t o e to e to e pp pp pppp pp sd sd sd sdsd g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g toetoetoetoetoetoetoetoetoetoetoe toepppp pp pp sdsdggggggggg w S to e to e t o e t o e to e to e t o e t o e to p to p to p t o p t o p t o p to p to p to p t o p t o p to p LOD LODH:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.11.0_2ND EAST STRIPING EXHIBIT.dwg - 2ND EAST STRIPING EXHIBIT - 12/02/2022 04:01pm, tyl e r . m e l a n d e r 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 3 0 ' 6 0 ' S C A L E : 1 " = 3 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 2ND EAST STRIPING EXHIBIT TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 3 0 C . 1 1 . 0 VIEWPORT 1 THIS SHEETVIEWPORT 2 THIS SHEETVIEWPORT 3 THIS SHEET VIEWPORT 2 THIS SHEETVIEWPORT 3 THIS SHEETVIEWPORT 4 THIS SHEET V I E W P O R T 1 V I E W P O R T 2 V I E W P O R T 3 VIEWPORT 4 2ND EAST 2ND EA S T 2ND EAST2ND EAST 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y g g g g g g g g g g g g g g g g g g g g g g g g g g g gtoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoetoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoptoetoptoptop toetoe toetoetoetoetoetoetoe to e t o e t o e t o e t o e to e t o e t o e t o e to e t o e t o e t o e pppp pp pp pppp pp pp pp pp pp pp pp pppppppppp pp S sd sd sd sd sd sd sd t o e t o e to p t o p SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D LOD LOD LOD L O D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODL O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD L O D LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF 4 8 7 5 4 8 7 6 487 6 4 8 7 6 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 7 4 8 7 7 4879 4879 4878 4878 4878 4878 4 8 7 9 4 8 7 7 4 8 7 7 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 7 4 8 7 7 487748774876 4876 4877 4878 4 8 7 7 4 8 7 7 4 8 7 6 4 8 7 5 4 8 7 5 H:\!2022\ID-6177-22 Lupine Meadows - Rexburg\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.12.0_EROSION CONTROL.dwg - EROSION CONTROL - 12/02/2022 04:04pm, tyler.melander 1 5 REVISIONS REV #DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE CITY REVIEW SET www.horrocks.com P A G E C PROJECT CHECKED D B A # 2 3 4 2194 Snake River Pkwy., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N H O R R O C K S E N G I N E E R S N 0 1 0 0 ' 2 0 0 ' S C A L E : 1 " = 1 0 0 ' ID-6177-22 CJF TLM CJF 12/01/2022 EROSION CONTROL TETON RIVER TEMPLE OFFSITE IMPROVEMENTS REXBURG, IDAHO 3 1 C . 1 2 . 0 R 2 5 ' 1" TO 3"COARSE AGGREGAT E FILTER FABRIC 5 0 ' M I N PUBLIC ROADHARD SURFACESTABILIZE D C O N S T R U C T I O N E N T R A N C E E C - 5 3 0 ' M I N 12"DIAMETER ROCK 6" MIN 18" MIN18" MIN48" MIN48" MIN 4" PVC PIPEFLOWCROSS-SECTION WOVEN FABRIC SANDBAG FILLED WITHCOARSE SAND-MIN WEIGHT 40 LBS.24" MINFRONT VIEW 4" PVC PIPE FOR DRAINAGESANDBAG BARRIERSPC-2INLET PROTECTION (PAVED AREA)BMP 31 RETRI E V A L S T R A P OVERFLOW(PEAK STOR M ) SEDIMENT ACCU M U L A T I O N GEOTEXTILE FABRICSILT FENCEBMP 63-68 EQUAL ALTERNATE: STEEL FENCE POSTFILTER FABRIC MATERIAL 60" WIDE ROLLS. USESTAPLES OR WIRE RINGS TO ATTACH FABRICTO WIRE 2" X 2" 14 GA WIREFABRIC OR EQUIV.BURY BOTTOM OF FILTER MATERIAL IN8" X 12" TRENCH FILTER FABRIC MATERIAL2" X 2" 14 GA WIREFABRIC OR EQUIV.PROVIDE 3/4" - 1 1/2" WASHED GRAVELBACKFILL IN TRENCH AND ON BOTHSIDES OR FILTER FENCE FABRIC ONTHE SURFACE2" X 4" WOOD POST ALT:STEEL FENCE POSTS 8" 12" 2'-6"2'-0"5'-0"6"LEGENDSILT FENCE SEE DETAIL THIS SHEETCONSTRUCTION FENCEINLET PROTECTION SEE DETAIL THIS SHEETSTABILIZED CONSTRUCTION ENTRANCE SEE DETAILTHIS SHEET PROPERTY BOUNDARYLIMITS OF DISTURBANCEPORTABLE TOILET CONTAINMENTJOBSITE DUMPSTERCONCRETE WASHOUT AREA DIRECTION OF EXISTING OVERLAND FLOWINSTALL TEMPORARY INLET PROTECTION AT STORM DRAININLETS, 2 BAGS HIGH PER BMP31. ALL SILT TO BE REMOVEDREGULARLY(FOR EXISTING AND PROPOSED INLETS)STABILIZED CONSTRUCTION ENTRANCE PER APWA 126 ATENTRANCES AS SHOWN.CONSTRUCT SILT FENCE/PRESERVATION PER BMP 63-68PROVIDE DUST CONTROL FOR ENTIRE SITE.CONCRETE WASHOUT AREAAPPROXIMATE QUANTITY SUMMARYLINEAR FIBER ROLL-SILT FENCE4395 LFCONSTRUCTION FENCE-EARTH DIKE & DRAINAGESWALE-RIP RAP-HYDROSEEDING-STABILIZED CONSTRUCTIONENTRANCE2STABILIZED STAGING AREA2CONCRETE WASH OUT2SEDIMENT BASIN-WHEEL WASH-INLET PROTECTION29CHECK DAM-LIMITS OF DISTURBANCE±16.86 ACPROJECT ACRES±16.86 AC 12345 1)BMP NEEDS FOR STORM WATER RUNOFF FOR A PARTICULAR AREA W I L L B E DETERMINED WHEN A NEW STRUCTURE IS PROPOSED FOR CONSTR U C T I O N . 2)IT IS NOT INTENDED FOR THE SITE TO RECEIVE ANY ONCOMING FLO W F R O M OUTSIDE SOURCES NOT CONTAINED IN EXISTING FLOW STRUCTUR E S . 3)FIELD MARK LIMITS OF DISTURBANCE FOR APPROVAL BY LOCAL A U T H O R I T Y AND OBTAIN APPROPRIATE STORM WATER MANAGEMENT PERMIT.4)INSTALL SILT FENCE AND/OR ENVIRONMENTAL FENCE AROUND PE R I M E T E R O F PROJECT AS INDICATED ON THIS PLAN SHEET.5)INSTALL SEDIMENT CONTROL MEASURES INDICATED IN ALL EXISTI N G S T O R M DRAIN INLETS ADJACENT TO THE CONSTRUCTION SITE.6)CONTRACTOR WILL BEGIN DEMOLITION, GRADING, EXCAVATION, A N D CONSTRUCTING SITE UTILITY IMPROVEMENTS AS NEW DRAINAGE E L E M E N T S ARE COMPLETED, CONSTRUCT SEDIMENT PROTECTION AT ALL NE W I N L E T S . 7)AREAS DISTURBED BY CONSTRUCTION ACTIVITIES WILL BE STABILI Z E D W I T H NATIVE GRASS MATERIAL OUTSIDE THE STREET RIGHT OF WAY AN D PAVEMENT AREAS OF PARKING AND DRIVEWAY AREAS. SITE STABI L I Z A T I O N OF AREAS DISTURBED BY CONSTRUCTION ACTIVITIES TO BE COMP L E T E D WITHIN 14 DAYS OF FINISHING AN AREA TO THE FINAL LINES AND G R A D E S INDICATED ON THE GRADING PLAN.8)LANDSCAPE ESTABLISHMENT, REMOVE TEMPORARY MEASURES A N D C L E A N STORM DRAIN SYSTEM PRIOR TO RELEASING SYSTEM TO PROJECT O W N E R . 9)DISCHARGE FROM THE SITE WILL BE THROUGH THE NEW STORM D R A I N SYSTEM AND INTO THE SNAKE RIVER LANDING COMMUNAL SYSTEM . 10)THE BMPS AND SITE WILL BE MONITORED REGULARLY, ANY ADDITI O N A L BMPS THAT ARE NEEDED WILL BE DETERMINED DURING REGULARINSPECTIONS AND INSTALLED ACCORDING TO SPECIFICATIONS.11)CONTRACTOR TO UTILIZE STABLIZED CONSTRUCTION ENTRANCE F O R VEHICLE TIRE WASH, AS NECESSARY.EROSION CONTROL NOTESNOTE: SEE LANDSCAPE PLAN FOR FINAL STABILIZATION SFSFLODLOD 2 2 3 3 3 4 4 4 4 4 4 4 4 4 5 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 / 0 1 / 2 2 PRELIMIN A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N F O R R E V I E W O N L Y