Loading...
HomeMy WebLinkAboutJoel's email for Summerfield Issues for Div 7.msgItems needing addressed prior to final CO: 1. Street lights completed. 2. Street repaired from construction. (gouges) 3. Storm drain pipe mandrel tested. 4. Catch basins and manholes exposed. 5. Water valve between 69 and 70 found. 6. Trash enclosure bollards must be inside front of enclosure.