HomeMy WebLinkAboutCOMCHECK - 23-00170 - Rexburg 10 Ward LDS MeetinghouseCOMcheck Software Version 4.1.5.3
Envelope Compliance Certificate
Project Title:
2018 IECC
Project Type:New Construction
Vertical Glazing / Wall Area:16%
Location:Rexburg, Idaho
Climate Zone:6b
Construction Site:
411 University Boulevard
Rexburg, ID
Owner/Agent:Designer/Contractor:
Lafe Harris
BHD Architects
65 East Wadsworth Park Drive,
Suite 205
Draper, UT 84020
801.571.0010
lafe@bhdarchitects.com
Project Information
Energy Code:
Rexburg ID Custom 10 Ward Meetinghouse
Credits: 1.0 Required 1.0 Proposed
Enhanced Envelope Performance, 1.0 credit
Additional Efficiency Package(s)
Building Area Floor Area
1-Religious Building : Nonresidential 31338
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Religious Building] :
Comment:
31338 49.0 0.0 0.021 0.021
Floor 1: Slab-On-Grade:Unheated, Vertical 2 ft., [Bldg. Use 1 -
Religious Building] : Comment: (c)
937 ---10.0 0.540 0.540
NORTH
2x6 Fiber Cement - NORTH: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
228 20.4 7.0 0.042 0.051
Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious
Building] (b)
125 ------0.430 0.770
2x10 R-32+brick - NORTH: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
1487 33.6 7.2 0.033 0.051
Vinyl Window: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
na, SHGC 0.20, [Bldg. Use 1 - Religious Building] (b)
75 ------0.310 0.360
2x12 FR-38+brick - NORTH: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
751 42.7 7.2 0.030 0.051
EAST
2x6 R19+brick - EAST: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious
Building] : Comment:
2017 20.4 7.2 0.041 0.051
Vinyl Window: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
na, SHGC 0.20, [Bldg. Use 1 - Religious Building] (b)
275 ------0.310 0.360
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
111 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious
Building] (b)
25 ------0.430 0.770
Hollow Metal Door: Insulated Metal, Swinging, [Bldg. Use 1 - Religious
Building]
25 ------0.170 0.370
2x12 FR-38+brick - EAST: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
199 42.7 7.2 0.030 0.051
2x6 Fiber Cement - EAST: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
350 20.4 7.0 0.042 0.051
Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious
Building] (b)
170 ------0.430 0.770
SOUTH
2x6 Fiber Cement - SOUTH: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
200 20.4 7.0 0.042 0.051
Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious
Building] (b)
105 ------0.430 0.770
2x6 R19+brick - SOUTH: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
884 20.4 7.2 0.041 0.051
Vinyl Window: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
na, SHGC 0.20, [Bldg. Use 1 - Religious Building] (b)
100 ------0.310 0.360
WEST
2x6 R19+brick - WEST: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
2017 20.4 7.2 0.041 0.051
Vinyl Window: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
na, SHGC 0.20, [Bldg. Use 1 - Religious Building] (b)
250 ------0.310 0.360
Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious
Building] (b)
25 ------0.430 0.770
Hollow Metal Door: Insulated Metal, Swinging, [Bldg. Use 1 - Religious
Building]
25 ------0.170 0.370
2x12 FR-38+brick - WEST: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
199 42.7 7.2 0.030 0.051
2x6 Fiber Cement - WEST: Wood-Framed, 16" o.c., [Bldg. Use 1 -
Religious Building] : Comment:
350 20.4 7.0 0.042 0.051
Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door,
Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious
Building] (b)
170 ------0.430 0.770
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.3 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Lafe T Harris - Architect
Name - Title Signature Date
Envelope PASSES: Design 0.4% better than code
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
112 ofPage
11 April 2023
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
113 ofPage
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.5.3
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2018 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
C402.4.1
[PR10]1
The vertical fenestration area <= 30
percent of the gross above-grade wall
area.
Complies
Does Not
Not Observable
Not Applicable
C402.4.1
[PR11]1
The skylight area <= 3 percent of the
gross roof area.
Complies
Does Not
Not Observable
Not Applicable
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
114 ofPage
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C303.2
[FO4]2
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[FO6]1
Exterior insulation protected against
damage, sunlight, moisture, wind,
landscaping and equipment
maintenance activities.
Complies
Does Not
Not Observable
Not Applicable
C105
[FO3]2
Installed slab-on-grade insulation type
and R-value consistent with insulation
specifications reported in plans and
COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.4
[FO7]2
Slab edge insulation depth/length.
Slab insulation extending away from
building is covered by pavement or
>= 10 inches of soil.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[FO12]3
Radiant heating systems panels
insulated to >=R-3.5 on face opposite
space being heated.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
115 ofPage
Section
#
& Req.ID
Framing / Rough-In Inspection Complies?Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
C303.1.3
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not
Not Observable
Not Applicable
C402.4.3
[FR10]1
Vertical fenestration SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3,
C402.4.3.
4
[FR8]1
Vertical fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.4
[FR14]2
U-factor of opaque doors associated
with the building thermal envelope
meets requirements.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
2.1
[FR19]1
The building envelope contains a
continuous air barrier that is sealed in
an approved manner and material
permeability <= 0.004 dfm/ft2. Air
barrier penetrations are sealed in an
approved manner.
Complies
Does Not
Not Observable
Not Applicable
C402.5.2,
C402.5.4
[FR18]3
Factory-built fenestration and doors
are labeled as meeting air leakage
requirements.
Complies
Does Not
Not Observable
Not Applicable
C402.5.7
[FR17]3
Vestibules are installed on all building
entrances. Doors have self-closing
devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
116 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.5.5,
C403.2.4.
3
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close. Refernece section C403.7.7 for
operational details.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
117 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.6
[EL26]2
Low-voltage dry-type distribution
electric transformers meet the
minimum efficiency requirements of
Table C405.6.
Complies
Does Not
Not Observable
Not Applicable
C405.7
[EL27]2
Electric motors meet the minimum
efficiency requirements of Tables
C405.7(1) through C405.7(4).
Efficiency verified through certification
under an approved certification
program or the equipment efficiency
ratings shall be provided by motor
manufacturer (where certification
programs do not exist).
Complies
Does Not
Not Observable
Not Applicable
C405.8.2,
C405.8.2.
1
[EL28]2
Escalators and moving walks comply
with ASME A17.1/CSA B44 and have
automatic controls configured to
reduce speed to the minimum
permitted speed in accordance with
ASME A17.1/CSA B44 or applicable
local code when not conveying
passengers.
Complies
Does Not
Not Observable
Not Applicable
C405.9
[EL29]2
Total voltage drop across the
combination of feeders and branch
circuits <= 5%.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
118 ofPage
Section
#
& Req.ID
Insulation Inspection Complies?Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in
12.
Complies
Does Not
Not Observable
Not Applicable
C402.2.1
[IN20]1
Insulation installed on a suspended
ceiling having ceiling tiles is not being
specified for roor/ceiling assemblies.
Continuous insulation board installed
in 2 or more layers with edge joints
offset between layers.
Complies
Does Not
Not Observable
Not Applicable
C303.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not
Not Observable
Not Applicable
C303.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
C105
[IN6]1
Installed above-grade wall insulation
type and R-value consistent with
insulation specifications reported in
plans and COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.3
[IN8]2
Installed floor insulation type and R-
value consistent with insulation
specifications reported in plans and
COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[IN18]3
Radiant panels and associated
components, designed for heat
transfer from the panel surfaces to the
occupants or indoor space are
insulated with a minimum of R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C105
[IN2]1
Installed roof insulation type and R-
value consistent with insulation
specifications reported in plans and
COMcheck reports. For some ceiling
systems, verification may need to
occur during Framing Inspection.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
119 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
C402.5.8
[FI26]3
Recessed luminaires in thermal
envelope to limit infiltration and be IC
rated and labeled. Seal between
interior finish and luminaire housing.
Complies
Does Not
Not Observable
Not Applicable
C408.1.1
[FI57]1
Building operations and maintenance
documents will be provided to the
owner. Documents will cover
manufacturers' information,
specifications, programming
procedures and means of illustrating
to owner how building, equipment and
systems are intended to be installed,
maintained, and operated.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
1110 ofPage
Project Title:
Data filename:
Rexburg ID Custom 10 Ward Meetinghouse
T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck
04/11/23Report date:
1111 ofPage