Loading...
HomeMy WebLinkAboutCOMCHECK - 23-00170 - Rexburg 10 Ward LDS MeetinghouseCOMcheck Software Version 4.1.5.3 Envelope Compliance Certificate Project Title: 2018 IECC Project Type:New Construction Vertical Glazing / Wall Area:16% Location:Rexburg, Idaho Climate Zone:6b Construction Site: 411 University Boulevard Rexburg, ID Owner/Agent:Designer/Contractor: Lafe Harris BHD Architects 65 East Wadsworth Park Drive, Suite 205 Draper, UT 84020 801.571.0010 lafe@bhdarchitects.com Project Information Energy Code: Rexburg ID Custom 10 Ward Meetinghouse Credits: 1.0 Required 1.0 Proposed Enhanced Envelope Performance, 1.0 credit Additional Efficiency Package(s) Building Area Floor Area 1-Religious Building : Nonresidential 31338 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Religious Building] : Comment: 31338 49.0 0.0 0.021 0.021 Floor 1: Slab-On-Grade:Unheated, Vertical 2 ft., [Bldg. Use 1 - Religious Building] : Comment: (c) 937 ---10.0 0.540 0.540 NORTH 2x6 Fiber Cement - NORTH: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 228 20.4 7.0 0.042 0.051 Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious Building] (b) 125 ------0.430 0.770 2x10 R-32+brick - NORTH: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 1487 33.6 7.2 0.033 0.051 Vinyl Window: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID na, SHGC 0.20, [Bldg. Use 1 - Religious Building] (b) 75 ------0.310 0.360 2x12 FR-38+brick - NORTH: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 751 42.7 7.2 0.030 0.051 EAST 2x6 R19+brick - EAST: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 2017 20.4 7.2 0.041 0.051 Vinyl Window: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID na, SHGC 0.20, [Bldg. Use 1 - Religious Building] (b) 275 ------0.310 0.360 Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 111 ofPage Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious Building] (b) 25 ------0.430 0.770 Hollow Metal Door: Insulated Metal, Swinging, [Bldg. Use 1 - Religious Building] 25 ------0.170 0.370 2x12 FR-38+brick - EAST: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 199 42.7 7.2 0.030 0.051 2x6 Fiber Cement - EAST: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 350 20.4 7.0 0.042 0.051 Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious Building] (b) 170 ------0.430 0.770 SOUTH 2x6 Fiber Cement - SOUTH: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 200 20.4 7.0 0.042 0.051 Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious Building] (b) 105 ------0.430 0.770 2x6 R19+brick - SOUTH: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 884 20.4 7.2 0.041 0.051 Vinyl Window: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID na, SHGC 0.20, [Bldg. Use 1 - Religious Building] (b) 100 ------0.310 0.360 WEST 2x6 R19+brick - WEST: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 2017 20.4 7.2 0.041 0.051 Vinyl Window: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID na, SHGC 0.20, [Bldg. Use 1 - Religious Building] (b) 250 ------0.310 0.360 Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious Building] (b) 25 ------0.430 0.770 Hollow Metal Door: Insulated Metal, Swinging, [Bldg. Use 1 - Religious Building] 25 ------0.170 0.370 2x12 FR-38+brick - WEST: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 199 42.7 7.2 0.030 0.051 2x6 Fiber Cement - WEST: Wood-Framed, 16" o.c., [Bldg. Use 1 - Religious Building] : Comment: 350 20.4 7.0 0.042 0.051 Storefront Door: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID na, SHGC 0.24, [Bldg. Use 1 - Religious Building] (b) 170 ------0.430 0.770 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.3 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Lafe T Harris - Architect Name - Title Signature Date Envelope PASSES: Design 0.4% better than code Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 112 ofPage 11 April 2023 Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 113 ofPage Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.5.3 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2018 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C402.4.1 [PR10]1 The vertical fenestration area <= 30 percent of the gross above-grade wall area. Complies Does Not Not Observable Not Applicable C402.4.1 [PR11]1 The skylight area <= 3 percent of the gross roof area. Complies Does Not Not Observable Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 114 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable C105 [FO3]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.4 [FO7]2 Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [FO12]3 Radiant heating systems panels insulated to >=R-3.5 on face opposite space being heated. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 115 ofPage Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable C303.1.3 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Vertical fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.4 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 2.1 [FR19]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable C402.5.2, C402.5.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable C402.5.7 [FR17]3 Vestibules are installed on all building entrances. Doors have self-closing devices. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 116 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.5.5, C403.2.4. 3 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Refernece section C403.7.7 for operational details. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 117 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.6 [EL26]2 Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6. Complies Does Not Not Observable Not Applicable C405.7 [EL27]2 Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist). Complies Does Not Not Observable Not Applicable C405.8.2, C405.8.2. 1 [EL28]2 Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers. Complies Does Not Not Observable Not Applicable C405.9 [EL29]2 Total voltage drop across the combination of feeders and branch circuits <= 5%. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 118 ofPage Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C402.2.1 [IN20]1 Insulation installed on a suspended ceiling having ceiling tiles is not being specified for roor/ceiling assemblies. Continuous insulation board installed in 2 or more layers with edge joints offset between layers. Complies Does Not Not Observable Not Applicable C303.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C105 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.3 [IN8]2 Installed floor insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable C105 [IN2]1 Installed roof insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 119 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable C402.5.8 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable C408.1.1 [FI57]1 Building operations and maintenance documents will be provided to the owner. Documents will cover manufacturers' information, specifications, programming procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 1110 ofPage Project Title: Data filename: Rexburg ID Custom 10 Ward Meetinghouse T:\Church Meetinghouses\2109 Rexburg 10-Ward\Reports\Architect - Other Reports\Rexburg.cck 04/11/23Report date: 1111 ofPage