Loading...
HomeMy WebLinkAboutINFRASTRUCTURE & LANDSCAPE PLAN Rev.(2) 3.23.22 - 22-00007 - 253 W 2nd S - Sundance Bldg C12�I�w 12//w VI 1�L Ni = 4852.55 5 INVERT-= 4852.60 z `D Lu vl tN N K , / `z L: r U � a l� m 0 PP N S I N O 6�0 , ti 0 • N / z FBC CC TBIC CC �D 24'-0" I6' -O" o m CL SEW MHDWN 11.25 S 11.30 E 11.30 N W d° � dJ E (STING IMANHOLE RIM EL =4863A E INVERT = 4852.60 1�L Ni = 4852.55 5 INVERT-= 4852.60 2 `D Lu vl tN z K z / N r U � a l� m 0 PP N S I j O 6�0 , ti 0 • WM / EY FBC CC TBIC CC �D 24'-0" [40 H❑ CC3 �D 1�L 64. 2 C)i r, vl W O z NEW 6" 62.ag r U � a l� m 0 BW FWQP/EO I 'K CC O 6�0 , ti • WM / EY FBC CC TBIC CC [40 H❑ CC3 �D 5"5501 m 0 r O m TGH BW WEST 2ND SOUTH 12 " w 1 " W 1 " w 12 „ W - „ W w 12" EX15TINO GITY YVATER 1 � „ w HOT TAP EXIST. 12" 1 INSTALL VALVE 63. ia 6360 INSTALL FH • • 4 VALVE • O 63.g1 '194*57' �",07764.75 � Q MATCH m 64.81 64.11 nar�u Y 65.33 U <Trr 65.33 W wN C) Of z LnW FRONT YARD SETBAC 8" INVERT = 4860.18 O � O N p 1�L 64. 2 C)i r, H W O T c. r NEW 6" 62.ag r U � a l� m 0 'K CC O 5,212 FT 2 SURF G BC CC • hJCI II LPTT: N EY -74A FT' z 24'-0" I6' -O" o 5"5501 m 0 r O m TGH BW WEST 2ND SOUTH 12 " w 1 " W 1 " w 12 „ W - „ W w 12" EX15TINO GITY YVATER 1 � „ w HOT TAP EXIST. 12" 1 INSTALL VALVE 63. ia 6360 INSTALL FH • • 4 VALVE • O 63.g1 '194*57' �",07764.75 � Q MATCH m 64.81 64.11 nar�u Y 65.33 U <Trr 65.33 W wN C) Of z LnW FRONT YARD SETBAC 8" INVERT = 4860.18 O � O N p 1�L 64. C)i r, H W O T c. r NEW 6" 62.ag r U � Eq O m 0 i O 5,212 FT 2 SURF G r • hJCI II LPTT: O (b GHAMBER5 REQUIRED AT -74A FT' 24'-0" I6' -O" 62 a jj j ; 2" WATER METER 3" DOMESTIC NATER-0- 6' ATER6" FIRE LINE- .. j� 64.33 1�L 64. C)i r, H W O T c. r NEW 6" 62.ag r U � Eq O m 0 i O 5,212 FT 2 SURF G r 445 FT3 STORAGE NEEDED hJCI II LPTT: O (b GHAMBER5 REQUIRED AT -74A FT' 24'-0" I6' -O" o m laho =ally, C 8301 i d° � Fax; '2�8-27-840` 1f) r MECHANICAL ENGINEERING r-etellc, Idaho 83204 AREA #2 Tel: X2^,8) 33-0501 64.33 1�L 64. C)i r, H W O T c. r NEW 6" 62.ag r U � F.L. G900 0 AREA #1 0 Q z � m 5,212 FT 2 SURF G r 445 FT3 STORAGE NEEDED hJCI II LPTT: (b GHAMBER5 REQUIRED AT -74A FT' 24'-0" I6' -O" 6 64.33 64.16 BP _ laho =ally, C 8301 64. d° Fax; '2�8-27-840` 1f) r MECHANICAL ENGINEERING r-etellc, Idaho 83204 AREA #2 Tel: X2^,8) 33-0501 H14P4 FT2 5URFAGE ARE ELECTRICAL ENGINEERING 1,018 FT3 STORAGE NEE 8j 2;2-4430 14 GHAMBER5 REQUIRED 4.q FT N 64.18 BP 24'-0" 17'-0" I6'-0" 1 10_ - 10 12 64.34 DUMPSTER AREA #4 4,024 FT 2 SURFACE AREA 344 FT' STORAGE NEEDED N 5 GHAMBER5 REQU I RED AT 74A FT' AA #5 q. (I q FT2 78 FT'' 64.17 LIP NG 64.P LI24 64.34 64.34 LIP LIP 614P.17 11 T 24'-0" AREA #3 10,882 FT SURFACE AREA 931 FT3 STORAGE NEEDED 13 GHAMBER5 REQU I RED AT 74A F2T3 63.29 LIP 19 64.24 LIP EXISTING FENCE tu FT3 Z P'� IL BITE PLAN - LAYOUT SGALE: 1 " = 20'-0" z X to NG AREA # 115,701 F SURFACE AREA �� 1,342 F 3 STORAGE NED PN CN ` 2 LIP33 1211W 12"W 12"W 12"W 12"W 12"W ZON I N6 INFORMATION ZONE: HIGH DEN51 TY RES I DF -NT I AL (HDR2) PEDSTR I ANMPA515 D15TRIOT2 1.55' AGRE5 = 60125-7 5.F. DEN51 TY ALLOWED: 42 UN I T5/ACRE BUILDING HE I GHT ALLOWED: 55 FEET LOT COVERAGE ALLOWF-D : 50% LOT AREA = 60125 5.F. X 20%=12,051 5.F. LAND5GAPF- AREA 55.2% -75% PARKING PROVIDED 5' FRONT YARD REaU I RF -D 52 UN 1 T5 PROVIDED -------- 112 -\112 TOTAL BEDS w !L 4 5TOR1 E5 z MAIN LEVEL 5.F . 15,556 TOTAL S -F JBU I LD I NG = 461-7205.F. w TYPF- V-A 0ON5TRUGT I ON 15R F I RE 5UPPRE551 ON 144 PARKING 5PAGF-5 REOU I RED 4-1 FULL 51 ZE 5PAGE5 REOU I RED WITH DEVELOPER OFTIONII 146 5PAGF-5 PRO\/I DF -D 50 FULL 51 ZE SPAGF-5 PROVIDED 4 DUMP5TER 5TREET TREE5 20 FEET ON CENTER 5' PDOTRI AN WALK - P�I��OTRI AN AR�AO WI T� 6�1�1G� 5 NORTH OIALL WORK 15 TO BE DONE I N ACCORDANCE TO 01 TY OF REXBURG STANDARDS w ALL 6' WATER LINE 15 TO BE CLASS 50 DUCTILE IRON, AMA 0-151 IN PUBLIC ROW. 12 GAUGE INSULATED COPPER W IRE TO BE INSTALLED ABOVE MAIN LINES AND SERVICES UP TO THE METER. O ALL SEWER LINE PIPING SHALL BE ASTM D-3034 SDR 35 O MINIMUM COVER OVER WATER LINES SHALL BE 6 FEET. O WATER LINE MUST HAVE A MINIMUM SEPARATION OF 10 FEET FROM ANY SANITARY SEWER OR STORM SEWER AS PER 15PWC, STANDARD DRAWING 5D-40-1. OR055 AT RIGHT ANGLES WITH FULL PIPE SECTIONS AND A MINIMUM OF 1.5 VERTICAL SEPARATION. O6 THRUST BLOCKS SHALL BE PLACED AT ALL DIRECTION CHANGES IN THE PRESSURE PIPE. O ALL EX 15T I NG WATER AND SEWER SERV I GES ARE TO REE\\/ 5E:r;� 5/:25/:2:2 BE TERMINATED AS PER 017'Y' STANDARDS. 12"W 5TREET L 16HT1 NG A5 PER ORD I NANGE O "'230.00', ��EXISTING FENCE �1C COR WS 4 6 Il 64 LLIF 0 o,6z�� 2 IAREA #2 0�GE AREA 4204 FT3 5TO,052 f=T2 RA6E, NEEDED C)i r, W T c. r Q r U � 0 0 Q z � m r hJCI II LPTT: STRUCTURAL ENGINEERING Fr_,t Ttri-turd nQneerina 2C Lircoln Mood laho =ally, C 8301 Tei: 208; 227-84C,� Fax; '2�8-27-840` MECHANICAL ENGINEERING r-etellc, Idaho 83204 Tel: X2^,8) 33-0501 Fax (2(-,8 133-052-+ ELECTRICAL ENGINEERING 8j 2;2-4430 -_ 2^8; ''32-1435 U 0 U' 0 Q z z? J 0 O= ~ z W Q o J o W Ill I- W 0 V) U� zQ 0 � Q I W zm cn � Q c J tz w CD Z o � Of REVISION: DRAWN BY: JOB NO: JizW X93 CHECKED BY. DATE: J FSB 2022 PLOT DATE: DRAWING N0. FlLE: SfDI.� OF