Loading...
HomeMy WebLinkAboutUPDATED PLANS - 22-00466 - 1324 Stone Dr - New SFRDRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" A. BEN B. FOUNDATION PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s CS.1 BEN B. COVER PAGE RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 LOT SPECIFIC SHEET LIST CS.1 COVER PAGE A.1 ELEVATIONS A.2 ELEVATIONS A.3 FOUNDATION PLAN A.4 BASEMENT PLAN A.5 1ST FLOOR PLAN A.6 2ND FLOOR PLAN A.7 ROOF PLAN A.8 HOUSE SECTIONS E.1 BASEMENT ELECTRICAL PLAN E.2 1ST FLOOR ELECTRICAL PLAN E.3 2ND FLOOR ELECTRICAL PLAN S.1 1ST FLOOR FRAMING PLAN S.2 ROOF FRAMING PLAN M.1 BASEMENT HVAC PLAN M.2 1ST FLOOR HVAC PLAN M.3 2ND FLOOR HVAC PLAN LOT SPECIFIC AREAS Heated Area Area of 1st Floor 1322 SF 1322 SF Unheated Area Area of Garage 426 SF Area of Porch - Rear 93 SF Area of Unfinished Basement 1331 SF 1850 SF Total 3172 SF SELECTED OPTIONS LIST 0' - 0" F.F. 1ST FLOOR 8' - 1 1/8" A.F.F. 1ST FLOOR PLATE -10' - 2 1/8" T.O. FOOTING -9' - 10 1/8" BASEMENT -1' - 2 1/8" T.O. FOUNDATION 6' - 10" A.F.F. 1ST WINDOW HEIGHT ARCHITECTURAL SHINGLE 5: 1 2 RIDGE HORIZONTAL SIDING STONE4" TRIM SHAKE 6" TRIM STONE 3' - 0 " HB 4' - 0 1 / 8 " 0' - 0" F.F. 1ST FLOOR 8' - 1 1/8" A.F.F. 1ST FLOOR PLATE -10' - 2 1/8" T.O. FOOTING -9' - 10 1/8" BASEMENT -1' - 2 1/8" T.O. FOUNDATION 6' - 10" A.F.F. 1ST WINDOW HEIGHT 5: 1 2 5: 1 2 ARCHITECTURAL SHINGLE ARCHITECTURAL SHINGLE RIDGE RIDGE RIDGE 4" TRIM HORIZONTAL SIDING 4" TRIM HORIZONTAL SIDING HB PLACE 1/2" CONDUIT FOR SPRINKILER SYSTEM DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" A.1 BEN B. ELEVATIONS RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" FRONT VIEW1 (ON ARCH D PAPER)1/4" = 1'-0" LEFT VIEW2 SELECTED OPTIONS ELEVATION NOTES: • GRADE CONDITIONS MAY VARY FOR INDIVIDUAL SITE FROM THAT SHOWN. BUILDER SHALL VERIFY AND COORDINATE PER ACTUAL SITE CONDITION. • PROVIDE STEEL LINTELS ABOVE ALL OPENINGS IN BRICK OR STONE. 0' - 0" F.F. 1ST FLOOR 8' - 1 1/8" A.F.F. 1ST FLOOR PLATE -10' - 2 1/8" T.O. FOOTING -9' - 10 1/8" BASEMENT -1' - 2 1/8" T.O. FOUNDATION 6' - 10" A.F.F. 1ST WINDOW HEIGHT ARCHITECTURAL SHINGLE RIDGE 5: 1 2 HORIZONTAL SIDING 4" TRIM 4" TRIM HB 0' - 0" F.F. 1ST FLOOR 8' - 1 1/8" A.F.F. 1ST FLOOR PLATE -10' - 2 1/8" T.O. FOOTING -9' - 10 1/8" BASEMENT -1' - 2 1/8" T.O. FOUNDATION 6' - 10" A.F.F. 1ST WINDOW HEIGHT RIDGE RIDGE 5: 1 2 5: 1 2 ARCHITECTURAL SHINGLE ARCHITECTURAL SHINGLE 4" TRIM HORIZONTAL SIDING HORIZONTAL SIDING 4" TRIM VENT DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" A.2 BEN B. ELEVATIONS RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" REAR VIEW1 (ON ARCH D PAPER)1/4" = 1'-0" RIGHT VIEW2 ELEVATION NOTES: • GRADE CONDITIONS MAY VARY FOR INDIVIDUAL SITE FROM THAT SHOWN. BUILDER SHALL VERIFY AND COORDINATE PER ACTUAL SITE CONDITION. • PROVIDE STEEL LINTELS ABOVE ALL OPENINGS IN BRICK OR STONE. SELECTED OPTIONS WALL LEGEND NON-BEARING FRAMING BEARING FRAMING POURED FOUNDATION MASONRY LEDGE 50 ' - 1 0 " 21 ' - 1 " 13 ' - 8 " 12 ' - 9 " 3' - 4 " 40'-0" 20'-0"6'-6"13'-6" 14 ' - 1 1 " 6' - 2 " 8' - 7 " 6' - 4 " 14 ' - 1 0 " 14 ' - 1 0 " 14 ' - 1 0 " 50 ' - 1 0 " 40'-0" 12'-0"11'-9"16'-3" 2' - 0 " 5' - 4 " 1'-5 1/2" 2'-10 1/2"15'-8 1/2"2'-10 1/2"15'-6 1/2" 2 1/2" 6' - 1 " 6' - 8 " 12 ' - 3 " 3' - 9 1 / 2 " 6' - 6 1 / 2 " 6' - 2 1 / 4 " 2' - 1 1 / 4 " 4' - 1 " 6' - 4 3 / 4 " 4' - 4 1 / 4 " 8' - 1 0 " 6' - 0 " SIMPSON HP STHD10 HOLD DOWN STRAP OR EQUAL (IF REQ'D BY 2018 IRC R602) GARAGE 4" CONCRETE SLAB ON GRANULAR FILL HOUSE SLAB 4" CONCRETE SLAB 1'-10 1/2"16'-3"1'-10 1/2" 8"x16" FOOTING 8"x16" FOOTING 8"x16" FOOTING TYP. COUNTERFORT COUNTERFORT COUNTERFORT 1'-7" 4'-2" 6'-11" 4'-11 1/2" 5'-9" 4 1/2" 6'-3" FD SEWAGE EJECTOR PUMP 14 ' - 7 1 / 4 " 13 ' - 7 1 / 4 " 4" WINDOW WELL DRAIN (TYP.) 4" WINDOW WELL DRAIN (TYP.) 4" WINDOW WELL DRAIN (TYP.) 4" WINDOW WELL DRAIN (TYP.) DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" A.3 BEN B. FOUNDATION PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" FOUNDATION PLAN1 SELECTED OPTIONS W D UP 3' - 4 1 / 2 " 5'-1 1/2"14'-2 1/2"4'-3"15'-1" AIR GAP 1/2" AIR GAP 1" 12 ' - 7 " 14'-11" 18'-9 1/2" 6' - 1 " 19 ' - 8 " 6' - 6 1 / 2 " 6' - 2 1 / 4 " 6' - 2 1 / 4 " 6' - 4 3 / 4 " 13 ' - 2 1 / 4 " 6' - 0 " 40 4 0 S L 40 4 0 S L 40 4 0 S L 40 4 0 S L ? ? ? ? A I R G A P 1 " 1'-3" 3'-0 1/2" 1'-3 1/2" 2'-2" 3'-4" 1'-1 1/2" 2'-0" FURNACE WH SEWAGE EJECTOR PUMP FD 4 '-1 1 /2 " B-VENT 2'-9" 3'-10" 4" A I R G A P 1 " 5 " 30 6 8 D W O 5068 DWO 3 '-1 0 " 2 '-0 " 1 '-8 1 /2 " INSULATE AND DRYWALL WALL BASEMENT MECH. ROOM 5068 DWO WS WALL LEGEND NON-BEARING FRAMING BEARING FRAMING POURED FOUNDATION MASONRY LEDGE DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" A.4 BEN B. BASEMENT PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" BASEMENT PLAN1 FLOOR PLAN NOTES: 1. ALL DIMENSIONS ARE TO THE ROUGH FRAME OF STUDS. 2. CENTER ALL OPENINGS UNLESS OTHERWISE NOTED. 3. THESE PLANS ARE NOT TO BE SCALED FOR CONSTRUCTION PURPOSES. 4. FINAL CABINET LAYOUT WILL BE DESIGNED BY CABINET SUPPLIER. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE ACCURACY OF ALL DETAILS AND DIMENSIONS. 6. VERIFY WITH THE WINDOW MFG. ALL WINDOW SIZES AND EGRESS REQUIREMENTS. SELECTED OPTIONS DN DN DN HB HB DN 40'-0" 20'-0"6'-6"13'-6" 10'-0"10'-0" 3'-0" 3'-6" 2'-6 1/2" 4'-2 1/2" 6'-9" 5 0 '-1 0 " 1 2 '-0 " 8 '-0 " 5 '-0 1 /2 " 5 '-4 1 /2 " 2 '-6 " 1 1 '-7 " 6 '-4 " 4 '-4 " 2 '-8 " 8 '-1 1 " 1 4 '-2 1 /2 " 3 '-7 1 /2 " 1 '-4 3 /4 " 1 '-1 1 7 /8 " 1 '-8 3 /8 " 6 '-1 0 1 /2 " 1 5 '-3 " 5 0 '-1 0 " 3 '-4 " 4 7 '-6 " 1 9 '-0 " 1 '-7 " 5 '-8 1 /2 " 2 1 '-2 1 /2 " 40'-0" 12'-0"11'-9"16'-3" 6'-0" 6'-0" 2'-1" 3'-9 1/2" 3'-9 1/2" 2'-1" 2'-8" 10'-11" 2'-8" 5'-0"10'-4" 8 '-3 1 /2 " 7'-0 1/2" 3'-3 1/2" 5'-0" 2 '-8 " 2 '-6 " 2 '-4 1 /2 " 1'-4" 1 1 1 /1 6 " 8 '-7 " 7 '-1 0 " 2 '-3 1 /2 " 4 '-1 " 6'-0" 3'-10 1/2" 1'-8 1/2" E Q E Q 5 1 /2 " 2 '-7 1 /2 " 2 '-7 1 /2 " 5'-0" 2'-11" 1'-2 1/2" GARAGE 12' -3" X 3' -4"BEDROOM 3 12' -3" X 3' -4" BATH 2 12' -3" X 3' -4" W.I.C. 12' -3" X 3' -4" OWNERS BATH 12' -3" X 3' -4" OWNERS BEDROOM 12' -3" X 3' -4" DINNING ROOM 12' -3" X 3' -4" KITCHEN 12' -3" X 3' -4" FAMILY ROOM 12' -3" X 3' -4" ENTRY 12' -3" X 3' -4" HALL 12' -3" X 3' -4" MUD ROOM 12' -3" X 3' -4" STAIRWELL 12' -3" X 3' -4"1 A-08 2 A-08 3068 3068 20M. 50 6 8 6068 SLD 28 6 8 30 6 8 2068 2068 4068 2668 16 6 8 2668 50 6 8 4040 SL 40 4 0 S L 3040 C3040 C 4050 FX2050 SH 2050 SH 2X6 2X 6 2X6 2X 6 2 '-0 " 5 '-4 " 1 1 '-7 " 8'-0" 2 '-0 " 1S&1R 1S & 1 R 1S&1R 1S&1R 1S & 1 R 1S / 1 2 D & 4 S / 1 6 D V3DB12 VSB24VSB24DW ATACC2230 SLOPE FOR WATER SHED SLOPE FOR WATER SHED 1S&1R 5S S LO P E C O N C R E TE 4 " B2 1 SB 3 6 B2 1 W3 6 1 8 W 2 4 4 2 W 3 0 1 8 W 2 4 4 2 W 2 4 4 2 B2 7 3D B 2 4 30 " G A S R A N G E SB 3 0 VS B 3 0 3260TUB-SHWR 3260 SHWR 16070 O.H. 4'-6 1/2" 3'-9 1/2" 10'-11" 2668 DWO PER SITE CONDITIONS PER SITE CONDITIONS PER SITE CONDITIONS 3.5/12 3.5/12 2'-0" 2 '-0 " 2'-0" 2 '-0 " 8'-10" 8'-0" 5'-3" 4'-0 1/2" 3'-6" 2'-1" 10'-6" 4'-9"2'-0"2668 3 '-4 1 /2 " 3'-7 5/8" TH TB 2 4 1'-9 13/16"1'-9 13/16" 5 '-2 " PLACE 1/2" CONDUIT FOR SPRINKILER SYSTEM SEE ELECTRICAL PLAN FOR PLACEMENT 1S / 1 2 D & BA S K E T C E N T E R WALL LEGEND NON-BEARING FRAMING BEARING FRAMING POURED FOUNDATION MASONRY LEDGE DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" A.5 BEN B. 1ST FLOOR PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" 1ST FLOOR PLAN1 FLOOR PLAN NOTES: 1. ALL DIMENSIONS ARE TO THE ROUGH FRAME OF STUDS. 2. CENTER ALL OPENINGS UNLESS OTHERWISE NOTED. 3. THESE PLANS ARE NOT TO BE SCALED FOR CONSTRUCTION PURPOSES. 4. FINAL CABINET LAYOUT WILL BE DESIGNED BY CABINET SUPPLIER. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE ACCURACY OF ALL DETAILS AND DIMENSIONS. 6. VERIFY WITH THE WINDOW MFG. ALL WINDOW SIZES AND EGRESS REQUIREMENTS. SELECTED OPTIONS 5:125:12 5: 1 2 5: 1 2 5:12 5:12 RIDGE RI D G E RI D G EVALLEYVALLEYVALLEY V ALLEY VENTED SOFFIT TYP. B-VENT DOWNSPOUT (TYP) DOWNSPOUT (TYP) DOWNSPOUT (TYP)DOWNSPOUT (TYP) DOWNSPOUT (TYP) DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" A.7 BEN B. ROOF PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 SELECTED OPTIONS ROOF PLAN NOTES: 1. ALL ROOF OVERHANGS ARE TO BE AT 1'-0" U.N.O. 2. THESE PLANS ARE NOT TO BE SCALED FOR CONSTRUCTION PURPOSES. 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE ACCURACY OF ALL DETAILS AND DIMENSIONS. Ideal Min NFVA Needed NFVA Turtle Back Vents GAF Snow Country Cobra Exhaust Vent Vent Sure Owens James Hardie LP Smart Side Aluminum Center Lanced Aluminum Lanced Baffels *Net Free Ventalation Area Vented Roof Area Sq Ft 2015.15 Sq Ft 484 Sq In 967.3 Sq In 9 EACH 17 EACH 27 LF 54 LF 35 LF 69 LF 39 LF 78 LF 97 LF 194 LF 49 LF 97 LF 121 LF 242 LF 38 LF 75 LF 22 EACH 43 EACH (1/300) Ratio 300 Ratio 150 Ratio 60 NFVA Each 18 NFVA SQ IN 14.1 NFVA SQ IN 12.5 NFVA SQ IN 5 NFVA SQ IN 10 NFVA SQ IN 4 NFVA SQ IN 13 NFVA SQ IN 22.5 NFVA Each (ON ARCH D PAPER)1/4" = 1'-0" ROOF PLAB1 BEDROOM 2BATH 2ENTRY STAIRWELLMUD ROOM BASEMENTBASEMENT GARAGE MUD ROOMKITCHENDINNING ROOM BASEMENT 0' - 0" F.F. 1ST FLOOR 0' - 0" F.F. 1ST FLOOR 8' - 1 1/8" A.F.F. 1ST FLOOR PLATE 8' - 1 1/8" A.F.F. 1ST FLOOR PLATE -10' - 2 1/8" T.O. FOOTING -10' - 2 1/8" T.O. FOOTING -9' - 10 1/8" BASEMENT -9' - 10 1/8" BASEMENT -1' - 2 1/8" T.O. FOUNDATION -1' - 2 1/8" T.O. FOUNDATION 6' - 10" A.F.F. 1ST WINDOW HEIGHT 6' - 10" A.F.F. 1ST WINDOW HEIGHT STAIRWELL 11'-3" DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" A.8 BEN B. HOUSE SECTIONS RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 TYPICAL CONSTRUCTION: A. ROOF CONSTRUCTION: COMPOSITION ROOF SHINGLES ON ROOFING UNDERLAYMENT ON EXTERIOR ROOF SHEATHING ON ROOF TRUSSES @24" O.C. (AS NOTED ON STRUCTURAL DRAWINGS). CEILING: GYPSUM BOARD. B1. SIDING WALL CONSTRUCTION: SIDING - PER BUILDER (PER ELEVATION) OVER WEATHER RESISTANT BARRIER ON EXTERIOR SHEATHING ON WOOD STUDS OR AS NOTED ON STRUCTURAL DRAWINGS. INTERIOR 5/8" GYPSUM BOARD OVER VAPOR RETARDANT BARRIER. B2. CEMENT PLASTER WALL CONSTRUCTION: CEMENT PLASTER PANEL - PER BUILDER (PER ELEVATION) OVER WEATHER RESISTANT BARRIER ON EXTERIOR SHEATHING ON WOOD STUDS OR AS NOTED ON DRAWINGS. INTERIOR: 5/8" GYPSUM BOARD OVER VAPOR RETARDANT BARRIER. B3. STONE VENEER WALL CONSTRUCTION: ADHERED SYNTHETIC STONE VENEER (INSTALLED PER MFR'S SPECS.) OVER WEATHER RESISTANT BARRIER ON EXTERIOR SHEATHING ON WOOD STUDS OR AS NOTED ON DRAWINGS. INTERIOR: 5/8" GYPSUM BOARD OVER VAPOR RETARDANT BARRIER. C. TYPICAL FLOOR CONSTRUCTION: FINISHED FLOORING ON 3/4" T&G O.S.B. SHEATHING ON FLOOR TRUSSES (SEE STRUCTURAL DRAWING FOR SIZING AND SPACING.) CEILING: GYPSUM BOARD (WHERE FINISHED). D. SEE STRUCTURAL DRAWINGS (BY OTHERS) FOR FOUNDATIONS, FOOTINGS, SLAB ON GRADE, FLOOR FRAMING, ROOF FRAMING DESIGN AND ADDITIONAL STRUCTURAL INFORMATION. SELECTED OPTIONS (ON ARCH D PAPER)1/4" = 1'-0" HOUSE SECTION 11 (ON ARCH D PAPER)1/4" = 1'-0" HOUSE SECTION 22 (ON ARCH D PAPER)1/4" = 1'-0" STAIR SECTION3 3 GF I W DGF I UP 3 4 D PANEL K K K K K CS TO LIGHT AND SWITCH ABOVE K AV CONTROL ELECTRICAL LEGEND SINGLE POLE SWITCH 3-WAY SWITCH 4-WAY SWITCH DIMMER SWITCH 220 VOLT OUTLET WEATHERPROOF OUTLET CEILING OUTLET FLOOR OUTLET SMOKE DETECTOR TELEVISION OUTLET CARBON MONOXIDE & SMOKE COMBO NETWORK OUTLET TELEPHONE OUTLET SERVICE PANEL GARBAGE DISPOSAL FLOOD LIGHT DOUBLE SCONCEBATH FAN WALL MOUNT LIGHT SINGLE SCONCE BATH FAN & LIGHT COMBO PULL CHAIN LIGHT KEYLESS LIGHT FLUSH MOUNT LIGHT UNDER CABINET LIGHT HANGING LIGHTPENDANT LIGHT RECESSED CAN LIGHT RECESSED EYEBALL LIGHT FLR CLG WPGFI GROUND FAULT OUTLETGFI DUPLEX OUTLET CSS HANGINGP PC K CEILING FAN LIGHTED CEILING FAN TV PH 220 AV CONTROL AV CONTROL BOX NOTES: -LAYOUT ALL OF ELECTRICAL ITEMS SHALL BE DONE WITH CONTRACTOR PRIOR TO START OF WORK. -VERIFY CABINET LAYOUT USING ONLY APPROVED CABINET DRAWINGS FROM CABINET MANUFACTURE. -WIRE SMOKE DETECTORS IN SERIES. -DROP ADDITIONAL WIRE FRO CHIME INTO BASEMENT FOR FUTURE FINISH. -RUN 12 WIRE MIN. LOW VOLTAGE SPRINKLER WIRE TO IRRIGATION LINE. -PACK OUT PLUGS 3" MIN. FROM CORNERS HEIGHTS: -THERMOSTATS = 60" AFF TO CENTER LINE -OUTLETS = 16" TO TOP OF BOX -SWITCHES = 48" TO TOP OF BOX -BATHROOM VANITY LIGHTS = 84" AFF FOR 8' CEILINGS; 96" AFF FOR 9' CEILINGS -PENDANT LIGHTS = 72"-74" AFF TO BOTTOM OF GLASS -KIT. SWITCH/OUTLETS = w/ TILE LISTELLE 38" TO BOTTOM OF BOX; w/ OUT LISTELLE 44" TO BOTTOM OF BOX -ALL APPLIANCES NEED TO BE INSTALLED PER MANUFACTURES RECOMMENDATIONS FM R LIGHT FIXTURE TYPES: -# = LIGHTS BULBS -C = CHANDELIER -S = SCONCE -VB = VANITY BAR -FM = FLUSH MOUNT -LED-P = LED PUCK LIGHT -SF = SIMI FLUSH -P = PENDENT -K = KEYLESS -JJ = JELLY JAR -R = RECESSED -WP-R = WATERPROOF RECESSED -LCF = LIGHTED CEILING FAN -LCF-RI = LIGHT WITH ROUGH-IN FAN TRIPLE SCONCE QUAD SCONCE (ON ARCH D PAPER)1/4" = 1'-0" BASEMENT ELECTRICAL PLAN1 DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" E.1 BEN B. BASEMENT ELECTRICAL PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 SELECTED OPTIONS 4 3 4 3 33 4 DN DN DN HB HB 3 DN 3 3 3 4 D 42" GFI 220 42" GFI GFI GFI MICRO GFI 42" GFI TO LIGHT AND SWITCH BELOW R R R R R P P R R R R 2-FM KK R 3-FM R 3-FM WP-R 3-FM 3-LCF 3-LCF OWNERS BEDROOM OWNERS BATH W.I.C. FAMILY ROOM DINNING ROOM KITCHEN MUD ROOM GARAGE ENTRY HALL BEDROOM 3 BEDROOM 2 BATH 2 R GFI GFI GFI GFI WPGFI R WPGFI CS S S S PLACE 1/2" CONDUIT FOR SPRINKILER SYSTEM SPRINKELER BOX ELECTRICAL LEGEND SINGLE POLE SWITCH 3-WAY SWITCH 4-WAY SWITCH DIMMER SWITCH 220 VOLT OUTLET WEATHERPROOF OUTLET CEILING OUTLET FLOOR OUTLET SMOKE DETECTOR TELEVISION OUTLET CARBON MONOXIDE & SMOKE COMBO NETWORK OUTLET TELEPHONE OUTLET SERVICE PANEL GARBAGE DISPOSAL FLOOD LIGHT DOUBLE SCONCEBATH FAN WALL MOUNT LIGHT SINGLE SCONCE BATH FAN & LIGHT COMBO PULL CHAIN LIGHT KEYLESS LIGHT FLUSH MOUNT LIGHT UNDER CABINET LIGHT HANGING LIGHTPENDANT LIGHT RECESSED CAN LIGHT RECESSED EYEBALL LIGHT FLR CLG WPGFI GROUND FAULT OUTLETGFI DUPLEX OUTLET CSS HANGINGP PC K CEILING FAN LIGHTED CEILING FAN TV PH 220 AV CONTROL AV CONTROL BOX NOTES: -LAYOUT ALL OF ELECTRICAL ITEMS SHALL BE DONE WITH CONTRACTOR PRIOR TO START OF WORK. -VERIFY CABINET LAYOUT USING ONLY APPROVED CABINET DRAWINGS FROM CABINET MANUFACTURE. -WIRE SMOKE DETECTORS IN SERIES. -DROP ADDITIONAL WIRE FRO CHIME INTO BASEMENT FOR FUTURE FINISH. -RUN 12 WIRE MIN. LOW VOLTAGE SPRINKLER WIRE TO IRRIGATION LINE. -PACK OUT PLUGS 3" MIN. FROM CORNERS HEIGHTS: -THERMOSTATS = 60" AFF TO CENTER LINE -OUTLETS = 16" TO TOP OF BOX -SWITCHES = 48" TO TOP OF BOX -BATHROOM VANITY LIGHTS = 84" AFF FOR 8' CEILINGS; 96" AFF FOR 9' CEILINGS -PENDANT LIGHTS = 72"-74" AFF TO BOTTOM OF GLASS -KIT. SWITCH/OUTLETS = w/ TILE LISTELLE 38" TO BOTTOM OF BOX; w/ OUT LISTELLE 44" TO BOTTOM OF BOX -ALL APPLIANCES NEED TO BE INSTALLED PER MANUFACTURES RECOMMENDATIONS FM R LIGHT FIXTURE TYPES: -# = LIGHTS BULBS -C = CHANDELIER -S = SCONCE -VB = VANITY BAR -FM = FLUSH MOUNT -LED-P = LED PUCK LIGHT -SF = SIMI FLUSH -P = PENDENT -K = KEYLESS -JJ = JELLY JAR -R = RECESSED -WP-R = WATERPROOF RECESSED -LCF = LIGHTED CEILING FAN -LCF-RI = LIGHT WITH ROUGH-IN FAN TRIPLE SCONCE QUAD SCONCE DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" E.2 BEN B. 1ST FLOOR ELECTRICAL PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" 1ST FLOOR ELECTRICAL PLAN1 SELECTED OPTIONS 45 ' TJ I 2 1 0 45 ' TJ I 2 1 0 45 ' TJ I 2 1 0 45 ' TJ I 2 1 0 45 ' TJ I 2 1 0 45 ' TJ I 2 1 0 45 ' TJ I 2 1 0 45 ' TJ I 2 1 0 45 ' TJ I 2 1 0 36 ' TJ I 2 1 0 36 ' TJ I 2 1 0 36 ' TJ I 2 1 0 31 ' TJ I 2 1 0 31 ' TJ I 2 1 0 20 ' TJ I 2 1 0 20 ' TJ I 2 1 0 20 ' TJ I 2 1 0 20 ' TJ I 2 1 0 20 ' TJ I 2 1 0 20 ' TJ I 2 1 0 20 ' TJ I 2 1 0 22 ' TJ I 2 1 0 22 ' TJ I 2 1 0 27 ' TJ I 2 1 0 27 ' TJ I 2 1 0 27 ' TJ I 2 1 0 27 ' TJ I 2 1 0 27 ' TJ I 2 1 0 27 ' TJ I 2 1 0 40'-0" 12'-0"11'-9"16'-3" 2 '-0 " 5 '-4 " 4 4 '-6 " 40'-0" 19'-6 1/2"6'-11 1/2"13'-6" 4 4 '-6 " 8 '-1 1 " 5 '-1 1 1 /2 " 2 6 '-3 1 /2 " 3 '-4 " 5 1 /2 " 1 3 / 4 " x 1 1 7 / 8 " L V L 1 1/4"x11 7/8" LSL 1 1 / 4 " x 1 1 7 / 8 " L S L 1 1/4"x11 7/8" LSL 1 1 / 4 " x 1 1 7 / 8 " L S L 1 1/4"x11 7/8" LSL 1 1/4"x11 7/8" LSL 1 1/4"x11 7/8" LSL 1 1 / 4 " x 1 1 7 / 8 " L S L 1 1 / 4 " x 1 1 7 / 8 " L S L 1 1 / 4 " x 1 1 7 / 8 " L S L 1 1/4"x11 7/8" LSL (2) 1 1/4"x11 7/8" LSL 1 1/4"x11 7/8" LSL 2 1 3/4"x11 7/8" LVL 1 1 / 4 " x 1 1 7 / 8 " L S L (2) 1 3/4"x11 7/8" LVL 6 '-5 " 4'-2 13/16" 2'-11 1/2" 3'-0" 4'-2" 8 '-8 " 2 '-1 0 " 2 '-8 1 /2 " 4'-8 1/2" 7'-1 1/2" B-VENT 11 7/8" FLOOR SYSTEM (3) 1 3/4"x11 7/8" LVL DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" S.1 BEN B. 1ST FLOOR FRAMING PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" 1ST FLOOR FRAMING PLAN1 GENERAL SHEET NOTES: 1. SEE SHEET S000 FOR GENERAL FLOOR FRAMING REQUIREMENTS. 2. SEE SHEET S000 FOR JOIST LOADING PROVISIONS. 3. ALL LUMBER SPECIFIED ON DRAWINGS IS INTENDED FOR DRY USE ONLY, UNO. ALL WATERPROOFING AND FIRE SAFETY SYSTEMS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND ARE TO BE DESIGNED AND DETAILED BY OTHERS. 4. EXTERIOR WALLS ARE TO BE 2x6 OR 2x4 WHERE SHOWN PER THE ARCHITECTURAL DRAWINGS. • MIN. 2x6 SPF# 2 WITH MAX. 24" O.C. STUD SPACING UNO. • MIN. 2x4 SPF# 2 WITH MAX. 16" O.C. STUD SPACING UNO. 5. ALL INTERIOR BEARING WALLS SHALL BE MIN. 2x4 SPF# 2 WITH MAX. 16" O.C. STUD SPACING UNO. IF THE WALL IS NOT SHEATHED WITH MIN. 1/2" GYPSUM BOARD ON AT LEAST 1 SIDE, MID-HEIGHT BLOCKING SHALL BE INSTALLED BETWEEN THE STUDS. 6. ALL HEADERS TO HAVE (1) JACK AND (1) KING STUD UNO. 7. IF A HEADER IS NOT SPECIFIED, CONTACT EOR. 8. FASTEN ALL MULTI-PLY STUD GROUPS SPECIFIED HEREIN WITH (2) ROWS OF 10d NAILS AT 8" O.C. STAGGERED. 9. SOLID BLOCK BELOW ALL POINT LOADS WITH 2x SPF# 2 MATERIAL WITH MIN. QUANTITY OF BLOCKING TO MATCH QUANTITY OF POSTS ABOVE. 10. HANGERS TO BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. 11. SPECIAL POSTS SUCH AS PSL OR LSL ARE TO BE INSTALLED AS FOLLOWS. • WALL PANEL TOP PLATES SHALL BE DISCONTINUOUS TO ALLOW FOR SPECIAL POST TO BE INSTALLED SO THAT THE BEAM OR TRUSS THE SPECIAL POST IS SUPPORTING HAS DIRECT CONTACT WITH THE SPECIAL POST. • ADJACENT WALL STUDS SHALL BE FASTENED TO THE SPECIAL POST WITH 10d NAILS AT 8" O.C. STAGGERED. 12. NEVER ALTER OR CUT INTO A FLANGE OF ANY JOIST. 13. SEE JOIST MANUFACTURER'S INSTALLATION GUIDE AND DETAILS FOR NAILING AND FABRICATION SPECIFICATIONS. SELECTED OPTIONS DOWNSPOUT (TYP) DOWNSPOUT (TYP)DOWNSPOUT (TYP) DOWNSPOUT (TYP) DOWNSPOUT (TYP) DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" S.2 BEN B. ROOF FRAMING PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 GENERAL SHEET NOTES: 1. SEE SHEET S000 FOR GENERAL FLOOR FRAMING REQUIREMENTS. 2. SEE SHEET S000 FOR JOIST LOADING PROVISIONS. 3. ALL LUMBER SPECIFIED ON DRAWINGS IS INTENDED FOR DRY USE ONLY, UNO. ALL WATERPROOFING AND FIRE SAFETY SYSTEMS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND ARE TO BE DESIGNED AND DETAILED BY OTHERS. 4. EXTERIOR WALLS ARE TO BE 2x6 OR 2x4 WHERE SHOWN PER THE ARCHITECTURAL DRAWINGS. • MIN. 2x6 SPF# 2 WITH MAX. 24" O.C. STUD SPACING UNO. • MIN. 2x4 SPF# 2 WITH MAX. 16" O.C. STUD SPACING UNO. 5. ALL INTERIOR BEARING WALLS SHALL BE MIN. 2x4 SPF# 2 WITH MAX. 16" O.C. STUD SPACING UNO. IF THE WALL IS NOT SHEATHED WITH MIN. 1/2" GYPSUM BOARD ON AT LEAST 1 SIDE, MID-HEIGHT BLOCKING SHALL BE INSTALLED BETWEEN THE STUDS. 6. ALL HEADERS TO HAVE (1) JACK AND (1) KING STUD UNO. 7. IF A HEADER IS NOT SPECIFIED, CONTACT EOR. 8. FASTEN ALL MULTI-PLY STUD GROUPS SPECIFIED HEREIN WITH (2) ROWS OF 10d NAILS AT 8" O.C. STAGGERED. 9. SOLID BLOCK BELOW ALL POINT LOADS WITH 2x SPF# 2 MATERIAL WITH MIN. QUANTITY OF BLOCKING TO MATCH QUANTITY OF POSTS ABOVE. 10. HANGERS TO BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. 11. SPECIAL POSTS SUCH AS PSL OR LSL ARE TO BE INSTALLED AS FOLLOWS. • WALL PANEL TOP PLATES SHALL BE DISCONTINUOUS TO ALLOW FOR SPECIAL POST TO BE INSTALLED SO THAT THE BEAM OR TRUSS THE SPECIAL POST IS SUPPORTING HAS DIRECT CONTACT WITH THE SPECIAL POST. • ADJACENT WALL STUDS SHALL BE FASTENED TO THE SPECIAL POST WITH 10d NAILS AT 8" O.C. STAGGERED. 12. NEVER ALTER OR CUT INTO A FLANGE OF ANY JOIST. 13. SEE JOIST MANUFACTURER'S INSTALLATION GUIDE AND DETAILS FOR NAILING AND FABRICATION SPECIFICATIONS. SELECTED OPTIONS (ON ARCH D PAPER)1/4" = 1'-0" 1ST FLOOR FRAMING PLAN1 10 x 6 10 x 6 10 x 6 10 x 6 B-VENT DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" M.1 BEN B. BASEMENT HVAC PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" BASEMENT HVAC PLAN1 5" 10 x 6 10 x 6 10 x 6 10 x 6 10 x 6 10 x 6 10 x 6 10 x 6 10 x 6 10 x 6 10 x 6 10 x 6 B-VENT DRAWN BY: SCALE: PROJECT: 866 N 4th St. Suite #2 Laramie, WY 82072 www.newpeakhomes.com DATE: PROJECT NO REVISION DATE NOTES: Pr i n t e d o n 1 2 x 1 8 a r e h a l f s c a l e p r i n t s 1/4" = 1'-0" M.2 BEN B. 1ST FLOOR HVAC PLAN RX -01326 STONE 13RM QS REXBURG, ID 83440 5/13/2022 ©2022 (ON ARCH D PAPER)1/4" = 1'-0" 1ST FLOOR HVAC PLAN1