Loading...
HomeMy WebLinkAbout22-06-33 CB Shop, Thompson Farm Road - Approval Letter 08082022STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY 900 N Skyline, Suite B, ldaho Falls, lD 83402 (208) s28-26s0 Brad Little, Governor Jess Byrne, Director By email : jeff@ch ristensen bodyshop.com Jeff Christensen 940 North 2nd East Rexburg, lD 83440 August 8,2022 Subject:Approved for Construction - CB Shop - Thompson Farm Road, Water and Wastewater lmprovements DEq No. 22-06-33 Dear Jeff The ldaho Department of Environmental Quality (DEa) received plans and specifications entitled CB Shop - Thompson Farm Road, submitted by J. Freiberg Engineering to DEQ on July 17 ,2O22.The approved plans and specifications were sealed and signed byJeff Freiberg, P.E. on March 27,2022. The project generally includes water, wastewater, and stormwater. DEQ has reviewed the plans and specifications for general conformance with DEQ Rulesl and determined it to be approved for construction subject to the following conditions: Standard Conditions: A. DECs construction approval expires after one calendar year from the date of this letter. For construction to proceed beyond this date, an extension request or new plans and specifications must be submitted to DEQ for review and approval before construction may proceed. B. Any material deviations from the approved plans and specifications must be reviewed and approved by DEQ before construction. C. We attached a copy of the approved drawings for you. An additional copy has been sent to your engineer. The owner is required to maintain one copy of the approved plans and specifications and this DEQ approval letter on-site during construction at all times. The owner must ensure that the contractor, construction inspector, and certifying engineer are aware of the approval conditions. D. Construction must be inspected by an ldaho-licensed Professional Engineer, or designee, to the extent required to confirm material compliance with approved plans. An ldaho-licensed Professional Engineer representing the system must submit record drawings, or a statement of material compliance, to DEQwithin 30 days after construction completion. E. This approval pertains only to drinking water and wastewater infrastructure and does not relieve the owner, engineer, or the contractor of the responsibility to comply with all current applicable federal, state, and local laws, rules, regulations, or ordinances. ll. Sanitarv Restrictions: A. DEQ recommends the release of sanitary restrictions for the parcels being served by this project. DEQ recommends that Public Health utilize the Example No. 4 Certificate of Approval on the 1 IDAPA 58.01.08 - ldaho Rules for Public Drinking Water Systems, IDAPA 58.01.16 - Wastewater Rules Page 2 of 2 plat, as shown below. CERTI F ICATE OF AP PROVAL Sanitary restrictions as required by ldoho Code, Title 50, Chapter 73 have been satisfied based on the Department of Environmental Quality @Ea) approval of the design plans ond specificotions and the conditions imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is cautioned that at the time of this approval, no drinking water or sewer/septic facilities were constructed. Building construction con be allowed with appropriate building permits if drinking water or sewer facilities have since been constructed or if the developer is simultaneously constructing those facilities. lf the developer fails to construct facilities or meet the other conditions of DEQ then sanitary restrictions moy be reimposed, in accordance with Section 50-7326, ldaho Code, by the issuonce of a certificate of disapproval, and no construction of ony building or shelter requiring drinking woter or sewer/septic facilities shall be allowed.l I I l. Project-Specific Conditions: A. DEQ has not conducted design review for stormwater plans and specifications and has made no determination regarding whether the plans and specifications include appropriate best management practices (BMPs)to protect ground water and surface water quality. lf the project is anticipated to disturb at least one acre of land, or is part of a larger project that disturbs one acre or more of land, the project must obtain coverage under the ldaho Pollution Discharge Elimination System (IPDES) Construction General Permit. Stormwater events that occur during construction should be managed according to the site specific Stormwater Pollution Prevention Plan, and other requirements of the General Permit. To submit a Notice of lntent for permit coverage under the Construction General Permit, apply online at htto://www2.deo.ida ho.sov/water/IPDES/ Please reference project No. 22-06-33 when submitting any further correspondence regarding this project. lf you have any questions regardingthis letter or if we can be of further assistance, please call me at (208) 528-2650 or email me at carlin.feisthamel@deq.idaho.sov. Sincerely, Carlin Feisthamel, P.E. Regional Engineering Manager EDMS: 2022AFMLI2O Encl: One Set of the DEQ-Approved Plans and Specifications Troy Saffle, Regional Administrator,trov.saffle@de q.idaho.eov Jeff Freiberg, P.E., J. Freiberg Engineering , jeff@jfreibergengineering.com City of Rexbu rg, publicworks@ rexbu rg.org Kellye Johnson, EIPHD, kiohnson@eiph.eov John Nielsen, Idaho Plumbing Bureau iohn.nielsen@dopl.idaho. sov c: