Loading...
HomeMy WebLinkAboutREDLINED PLAN CORRECTIONS 8-17-2022 - 22-00292 - Chad Erikson - New Commercial BldgAuthor Name Author Email Author Phone No.: Cody Jones Cody.Jones@rexburg.org 208-372-2173 Alex Owens Alex.Owens@rexburg.org 208-372-2330 Todd Smith Todd.Smith@rexburg.org 208-372-2181 Description : Chad Erickson - New Commercial Bldg Address : 309 Profit St Suites 1101-1104 Application Type : Document Filename : Building plan Corrections.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments E1.0 Callout Alex Owens : Electrical Open 10 Available fault current calculation needed # 22-00292 New Commercial Building As per Resolution 2022-07, adopted April 6, 2022, new development is required to follow standards for the installation of fiber conduit and distribution boxes. Location of conduit and distribution boxes need to be identified and shown on plans. Report Date: 07.14.2022 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) Author Name Author Email Author Phone No.: Alex Owens Alex.Owens@rexburg.org 208-372-2330 Cody Jones Cody.Jones@rexburg.org 208-372-2173 Don Allen Don.Allen@rexburg.org 208-372-2174 Description : Chad Erickson New Commercial Bldg Address : 309 Profit St Suites 1101-1104 - Rexburg Business Park PH2 Blk 2 Lot 3 Application Type : Document Filename : Building Plans.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments G1.1 Free text Cody Jones : Building Open 1 Need an Envelope COMM check or prescriptive insulation form signed. Exit lighting and Exit signs need to comply with Sections 1008 and 1013. All if any concealed spaces need fire blocked and draft stopped. G1.1 Free text Cody Jones : Building Open 1 Construction type VB? Building B occupancy? Total occupant load 72? A1.1 Free text Cody Jones : Building Open 2 Restrooms need to meet all ADA requirements. Buildings with an occupant load of more than 15 requires a drinking fountain. A1.1 Free text Cody Jones : Building Open 2 If construction type is VB, areas exceeds allowable area as per table 506.3, will need to install a listed assembly fire separation. # 22-00292 New Commercial Building Report Date: 05.09.2022 Approval of plans does not constitute approval of variance from code Page 1 of 2 See Com check attached Acknowledged Acknowledged Building type to be IIB warehouse occupancy 21 A portable water station will be provided for the space Construction type to be IIB Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments A3.1 Free text Cody Jones : Building Open 4 Damp proofing and water proofing needs to comply with Section 1805 Site grading to meet requirements of Section 1804.4 A4.1 Free text Cody Jones : Building Open 5 Landings at doors to need to meet the requirements of section 1010. C2 Free text Cody Jones : Building Open 7 Special inspector needs to be identified as per 1704.2.1. G1.1 Free text Alex Owens : Electrical Open 1 No electrical plans provided. Please provide electrical plans including service size, available fault current calculation for the service, wiring method (whether nm cable, mc cable, or conduit is required/acceptable). All work must comply with 2017 NEC requirements. Report Date: 05.09.2022 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) Acknowledged Acknowledged Acknowledged See attached electrical riser plan Connect Engineering is under contract COMcheck Software Version COMcheckWeb Envelope Compliance Certificate Project Title: 2018 IECC Project Type:New Construction Vertical Glazing / Wall Area:7% Location:Rexburg, Idaho Climate Zone:6b Construction Site:Owner/Agent:Designer/Contractor: Project Information Energy Code: Chad Erikson Credits: 1.0 Required 1.0 Proposed Enhanced Envelope Performance, 1.0 credit Additional Efficiency Package(s) Building Area Floor Area 1-Warehouse : Nonresidential 10800 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof: Metal Building, Standing Seam, Single Insulation Layer with Thermal Blocks (e), [Bldg. Use 1 - Warehouse] 10800 0.0 36.0 0.027 0.031 Floor: Unheated Slab-On-Grade, Vertical 3 ft., [Bldg. Use 1 - Warehouse] (d) 380 ---10.0 0.510 0.540 NORTH Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber (compressed at girt), [Bldg. Use 1 - Warehouse] 8160 0.0 30.0 0.032 0.052 Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID 550, SHGC 0.33, [Bldg. Use 1 - Warehouse] (c) 508 ------0.340 0.360 Door: Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]98 ------0.340 0.370 Door: Other (U-Factor option), Garage door 14% glazing, [Bldg. Use 1 - Warehouse] 286 ------0.340 0.310 Door: Glass (over 50% glazing): Metal Frame, Entrance Door, Perf. Specs.: Product ID 6060-T6, SHGC 0.33, [Bldg. Use 1 - Warehouse] (c) 84 ------0.340 0.770 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)'Other' components require supporting documentation for proposed U-factors. (c)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (d)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. (e)Thermal spacer block with minimum R-3.5 must be installed above the purlin/batt, and the roof deck secured to the purlins. Project Title: Data filename: Chad Erikson 06/13/22Report date: 81 ofPage Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 4% better than code Project Title: Data filename: Chad Erikson 06/13/22Report date: 82 ofPage Ryan Malm A.I.T.06/27/2022 CI T Y R E V I E W 6 / 2 7 / 2 0 2 2 CI T Y R E V I E W 6 / 2 7 / 2 0 2 2 CI T Y R E V I E W 6 / 2 7 / 2 0 2 2 CI T Y R E V I E W 6 / 2 7 / 2 0 2 2 3 3 3 3 4 1 1 1 1 2 2 2 2 C O M M B O A R D M U L T I M E T E R P A C K . S E E P O W E R R I S E R M M P C O N S U L T A N T S : T E P 8 8 9 J U N E 2 0 2 2 1152 BOND AVENUE - Suite A REXBURG, IDAHO 83440 VOICE (208) 359-2309 FAX (208) 359-2271WWW.JRWA.COM E D L R E E N I G N E OH A D I F O E T A T E N Y A P D D O T 8 2 7 0 S R E T S I G E R A N O I S S E F ORP REXBURG,IDAHO M E C H A N I C A L E N G I N E E R I N G E L E C T R I C A L E N G I N E E R I N G O R I G I N A L S I G N E D B Y : T O D D E . P A Y N E D A T E D O R I G I N A L S I G N E D : 8 - 1 1 - 2 0 2 2 O N F I L E A T : P A Y N E E N G I N E E R I N G I N C . CHAD ERIKSON NEW BUILDING P . E . J O B # 2 2 8 5 P o c a t e l l o , I d a h o 8 3 2 0 1 E n g i n e e r i n g I n c . 1 8 2 3 E . C e n t e r t e l ( 2 0 8 ) 2 3 2 - 4 4 3 9 C o n s u l t i n g E n g i n e e r s w w w . p a y n e e n g i n e e r i n g i n c . c o m E 1 . 0 ELECTRICAL PLAN K E Y N O T E S 1 2 " C O N D U I T F R O M C O M M B O A R D T O E A C H T E N A N T S P A C E F O R I T S E R V I C E S . S T U B 3 6 " B E Y O N D D E M I S I N G W A L L . 3 " C O N D U I T S T U B B E D 3 F T . B E Y O N D D E M I S I N G W A L L F O R F U T U R E T E N A N T . P O W E R ( 2 0 0 A ) F R O M M U L T I - M E T E R P A C K . 3 / 4 " C O N D U I T S T U B B E D T H R O U G H W A L L F O R F U T U R E P O W E R C O N D U C T O R S T O R E C E P T A C L E . P R O V I D E A N D I N S T A L L ( 1 ) 4 " A N D ( 2 ) 2 " C O N D U I T S W I T H P U L L R O P E F R O M C O M M . B O A R D T O P R O P E R T Y L I N E F O R C O M M . S E R V I C E S . C O O R D I N A T E W I T H S I T E . 2 3 4 S C A L E : M A I N P L A N - E L E C T R I C A L 1 / 8 " = 1 ' - 0 " 1 6 ' 8 ' 0 " M M M G R O U N D P E R N E C 6 0 0 A M P M U L T I - M E T E R P A C K ( 2 ) S E T S 4 " C . , 3 - # 5 0 0 A L POWER COMPANYTRANSFORMER 3 " C O N D U I T T O E A C H T E N A N T S P A C E NO SCA L E POW E R R I S E R D I A G R A M CONC. PAD BY E.C. 2 0 0 A 2 0 0 A 2 0 0 A 1 2 0 / 2 4 0 V 1 Ø 3 W C O N D U I T T O E X T E N D A M I N . S E R V I C E G R O U N D I N G D E T A I L O F 3 " A B O V E M U D S I L L G R N D . C L A M P & C O N N E C T O R W / R E V E R S I B L E C O N T A C T P L A T E C O N D U I T T O W A T E R 1 " G R N D . S E R V I C E ( 2 0 ' M I N . L E N G T H ) # 2 / O B A R E C O P P E R W I R E 1 " R I G I D P V C C O N D U I T S E R V I C E G R N D . C O N D U C T O R ( C O N T I N U O U S ) T Y P I C A L C O N C R E T E F O U N D A T I O N F O O T I N G 2" MIN. 3" MAX. C O N D U I T T O G R N D R O D 1 " G R N D S E R V I C E M A I N F I N I S H E D F L O O R C O P P E R G R N D R O D 5 / 8 " x 1 0 " 1'-0 F L O O R ( C O N T I N U O U S ) G R N D C O N D U C T O R P A N E L G R N D L U G S B L D G . G R N D T O M A I N W A T E R M A I N M 2 0 0 A 1 6 , 6 7 4 A F C