Loading...
HomeMy WebLinkAboutENGINEER LETTER - 22-00059 - Java Espress REAL WORLD SOLUTIONS FOR REAL WORLD PROBLEMS February 21, 2022 RE: Project: Java Express PE Job #2021-12305 To whom it may concern, This letter is to address specific changes based on comments called out by the city of Rexburg on the Java Express. All repairs or modifications are to be done in accordance with the 2018 IBC. Per specific comments called by the city of Rexburg, there have been some changes for the Java Express project located in Rexburg, Idaho. Changes are as follows: (1) A third-party Special Inspector will be needed for the bolt ups since project calls for ASTM A325 type 1 bolts on page S0.0 of stamped project drawings. a. Attached is a Statement of Special Inspections addressing the bolt inspection needed. (2) Per page S0.0, Section B. Foundations, Subsection 7., on stamped drawings, the city inspector calls for the grade needing to be sloped six inches in the first 10 feet. a. This is a Civil matter, will be a civil issue and may require a civil engineers analyzation. (3) On page S0.0 the ground snow load for the Java Express was initially set for 35 psf, and city inspection calls for a ground snow load of 50 psf. There have been changes by setting the roof snow load to 50 psf. a. Upon revision, the H103 and H106 headers on page S1.1 of stamped drawings will require modification to carry load. The H103 header will need to be modified to (3) 2 x 6 DF No. 2. The H106 header will need to be modified to (3) 2 x 10 DF No. 2. (4) Modifications on page SD1.0 of stamped drawings will also need to be made for the foundation walls. a. The city ordinance calls for the top horizontal to be in the top six inches above rebar. This was added to sheet SD1.0 Please contact me with any questions, comments, or concerns. Sincerely, Shawn Reeder, PE Lazaro Hernandez