HomeMy WebLinkAboutCOMCHECK 2 - 22-00059 - Java Espress�( COMcheck Software Version 4.1.5.4
Envelope Compliance Certificate
Project Information
Energy Code: 2018 IECC
Project Title:
Location: Rexburg, Idaho
Climate Zone: 6b
Project Type: New Construction
Vertical Glazing / Wall Area: 11%
Construction Site: Owner/Agent: Designer/Contractor:
Additional Efficiency Package(s)
Credits: 1.0 Required 1.0 Proposed
Reduced Air Infiltration, 1.0 credit
Building Area Floor Area
1 -Retail : Nonresidential 727
Envelope Assemblies
Assembly
Roof 1: Insulation Entirely Above Deck, [Bldg. Use 1 - Retain
Floor 1: Slab -On -Grade: Unheated Fully insulated (uniform R -value
across perimeter + under entire slab), [Bldg. Use 1 - Retail] (c)
NORTH
Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retain
Window 1: Metal Frame:Operable, Pert. Specs.: Product ID PENDING
ID, SHGC 0.25, [Bldg. Use 1 - Retain (b)
EAST
Exterior Wall 2: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retain
Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retail] (b)
Door 2: Glass (> 50% glazing):Metal Frame, Non -Entrance Door, Pert.
Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retail] (b)
SOUTH
Exterior Wall 3: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retail]
Window 3: Metal Frame:Fixed, Pert, Specs.: Product ID PENDING ID,
SHGC 0.25, [Bldg. Use 1 - Retail] (b)
Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Pert.
Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retail] (b)
WEST
Exterior Wall 4: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retain
Window 2: Metal Frame:Fixed, Pert. Specs.: Product ID PENDING ID,
SHGC 0.25, [Bldg. Use 1 - Retail] (b)
Gross Area
Cavity
Cont.
Proposed
Budget U.
or
R Value
R -Value
U -Factor
Factor(.)
Perimeter
721
—
38.0
0.026
0.032
137
—
4.0
0.514
0.540
534
19.0
0.0
0.067
0.051
47
—
—
0.300
0.430
367
19.0
0.0
0.067
0.051
22
—
—
0.300
0.770
31
--
—
0.300
0.430
537
19.0
0.0
0.067
0.051
47
—
—
0.300
0.360
31
—
—
0.300
0.770
396
19.0
0.0
0.067
0.051
18
—
—
0.300
0.360
Project Title: Report date: 02/09/22
Data filename: Z:VobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 1 of 10
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c) Slab -On -Grade proposed and budget U -factors shown in table are F -factors.
Envelope• better than code
Envelope Compliance Statement
Compliance Statement. The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2018 IECC requirements in COMchP�k n 4.1.5.4 and -to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title gnature Dai
Project Title: Report date: 02/09/22
Data filename: Z:VobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 2 of 10
COMcheck Software Version 4.1.5.4
Inspection Checklist
Energy Code: 2018 IECC
Requirements: 93.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
& Rea.IC
Plan Review Complies? Comments/Assumptions
❑Complies ; Requirement will be met.
❑Does Not
❑Not Observable:
e❑Not Applicable
;
UComplies ; Requirement will be met.
r❑Does Not
❑Not Observable
❑Not Applicable
❑Complies ; Requirement will be met.
❑Does Not
❑Not Observable
a❑Not Applicable
❑Complies I Requirement will be met.
❑Does Not
s❑Not Observable;
❑Not Applicable
C103.2
:Plans and/or specifications provide all
[PR1)1
"information with which compliance
;can be determined for the building
;envelope and document where
exceptions to the standard are
^claimed.
C402.4.1
;The vertical fenestration area <= 30
[PR10)1
:percent of the gross above -grade wall
area.
,
C402.4.1 ;The skylight area <= 3 percent of the
[PR1111 :gross roof area.
C406
[PR9)1
Plans, specifications, and/or
:calculations provide all information
;with which compliance can be
;determined for the additional energy
,efficiency package options.
Additional Comments/Assumptions:
1 High Impact (Tier 1) Jj 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title:
Data filename: Z:)jobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck
Report date: 02/09/22
Page 3 of 10
Section
#
Footing / Foundation Inspection
Complies? Comments/Assumptions
& Re .ID
C303.2
Slab edge insulation installed per
;❑Complies Requirement will be met.
[F04]2
manufacturer's instructions.
❑Does Not
❑Not Observable
_
❑Not Applicable
C303.2.1
:Exterior insulation protected against
IlComplies ; Requirement will be met.
[F06]1
damage, sunlight, moisture, wind,
`❑Does Not
landscaping and equipment
;maintenance activities.
;❑Not Observable
_
E❑Not Applicable
C105
Installed slab -on -grade insulation type:❑Complies
See the Envelope Assemblies table for values.
[F03]2
and R -value consistent with insulation
';[]Does Not
specifications reported in plans and
UNot Observable
COMcheck reports.
❑Not Applicable
C402.2.4 Slab edge insulation depth/length. ❑Complies :Requirement will be met.
[F07]2 Slab insulation extending away from ❑Does Not
building is covered by pavement or I ; See the Envelope Assemblies table for values.
>= 10 inches of soil.❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact (Tier 1) 1 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Report date: 02/09/22
Data filename: Z:VobsVava Expresslldaho -Rexburg - N 2ND\38117N - Drawings & Specs\Sources\IECC.cck Page 4 of 10
Framing/ Rough -In Inspection F Complies? Comments/Assumptions
C303.1.3 Fenestration products rated in
[FR12]2 accordance with NFRC.
C303.1.3
[FR13]1
C402.4.3
[FR10]1
C402.4.3,
C402.4.3.
4
[FR8]1
C402.5.1
2.1
[FR19]1
C402,5.2,
C402.5.4
[FR18]3
C402.5.7
[FR17]3
❑Complies :Requirement will be met.
❑Does Not
i'❑Not Observable'
,❑Not Applicable
Fenestration products are certified as
jto performance labels or certificates
.❑Complies :Requirement will be met.
❑Does Not
provided.
❑Not Observable;
❑Not Applicable
;vertical fenestration SHGC value.
❑Complies ,See the Envelope Assemblies table for values.
❑Does Not
❑Not Observable:
❑Not Applicable
Installed vertical fenestration U -factor
f❑Complies ;See the Envelope Assemblies table for values.
and SHGC consistent with label
`❑Does Not
;specifications and as reported in plans
;and COMcheck reports.
o❑Not Observable;
❑Not Applicable
The building envelope contains a r❑Complies
:continuous air barrier that is sealed in ❑Does Not
an approved manner and material ❑Not Observable
permeability <= 0.004 dfm/ft2. Air
barrier penetrations are sealed in an `❑Not Applicable
;approved manner. _
Factory -built fenestration and doors ❑Complies ; Requirement will be met.
are labeled as meeting air leakage ❑Does Not
requirements.
bNot Observable:
_ ❑Not Applicable j
Vestibules are installed on all building ❑Complies ; Requirement will be met.
entrances. Doors have self-closing ❑Does Not
devices.
❑Not Observable;
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) _ 3 1 Low Impact (Tier 3) _J
Project Title: Report date: 02/09/22
Data filename: Z:VobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 5 of 10
Section
# Mechanical Rough-in Inspection Complies? Commet
& Req.ID
C402.5.5, Stair and elevator shaft vents have []Complies :Requirement will be met.
C403.2.4. motorized dampers that automatically `❑Does Not
3 close. Refernece section C403.7.7 for
[ME3]3 operational details. ❑Not Observable
❑Not Applicable
C403.7.7 Outdoor air and exhaust systems have ❑Complies :Requirement will be met.
[ME58]3 motorized dampers that automatically ,❑Does Not
shut when not in use and meet
maximum leakage rates. Check []Not Observable
gravity dampers where allowed. ❑Not Applicable
Reference section language for
operational details.
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2T -medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Report date: 02/09/22
Data filename: Z:�obsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 6 of 10
Section -- - --
w# ._ i Rough -In Electrical Inspection Complies? Comments/Assumptions
C405.6
[EL26]2
C405.7
[EL27]z
C405.8.2,
C405.8.2.
1
[EL28]2
Low -voltage dry -type distribution❑Complies
;,Requirement will
electric transformers meet the
❑Does Not
minimum efficiency requirements of
Table C405.6.
❑Not Observable °
permitted speed in accordance with
[]Not Applicable
Electric motors meet the minimum
tlComplies ; Requirement will
efficiency requirements of Tables
❑Does Not j
C405.7(1) through C405.7(4). []Not Observable
Efficiency verified through certification
under an approved certification
❑Not Applicable
program or the equipment efficiency
ratings shall be provided by motor
manufacturer (where certification
programs do not exist).
,
be met.
be met.
Escalators and moving walks comply
o❑Complies Requirement will be met.
with ASME A17.1/CSA B44 and have
E❑Does Not
automatic controls configured to
reduce speed to the minimum
❑Not Observable
permitted speed in accordance with
�,❑Not Applicable
ASME A17.1/CSA B44 or applicable
local code when not conveying
aassenaers.
1
C405.9 Total voltage drop across the
[EL29]2 combination of feeders and branch
circuits <= 5%.
Additional Comments/Assumptions:
IJComplies ;Requirement will be met.
e❑Does Not
6
❑Not Observable'
❑Not Applicable
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) 1
Project Title: Report date: 02/09/22
Data filename: Z:YobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 7 of 10
Insulation Inspection
ID
C303.1 ;Roof insulation installed per
[IN311 :manufacturer's instructions. Blown or
;poured loose -fill insulation is installed
,only where the roof slope is <=3 in
:12.
C402.2.1 ;Insulation installed on a suspended
[IN20]1 'ceiling having ceiling tiles is not being
;specified for roor/ceiling assemblies.
;Continuous insulation board installed
:in 2 or more layers with edge joints
! offset between layers.
C303.1 Building envelope insulation is labeled
[IN10]2 with R -value or insulation certificate
providing R -value and other relevant
data.
C303.2 'Above -grade wall insulation installed
[IN711 :per manufacturer's instructions.
;
;
C303.2.1
[IN14]2
C105
[IN6]1
C402.2.3
[IN8]2
C402.2.6
[IN18]3
Complies?
❑Complies ; Requirement will
❑Does Not
k❑Not Observable
[]Not Applicable
❑Complies ; Requirement will
❑Does Not
❑Not Observable;
❑Not Applicable j
;
❑Complies ; Requirement will
❑Does Not
;
❑Not Observable;
❑Not Applicable
❑Complies I Requirement will
❑Does Not
❑Not Observable
❑Not Applicable
Comments/Assumptions
be met.
be met.
be met.
be met.
Exterior insulation is protected from
9❑Complies ; Requirement will be met.
damage with a protective material.
=❑Does Not
Verification for exposed foundation
UNot Observable
insulation may need to occur during
IDNot Applicable
Foundation Inspection.
;
Installed above -grade wall insulation
TIComplies ;See the Envelope Assemblies table for values.
;type and R -value consistent with
°❑Does Not
;insulation specifications reported in
'❑Not Observable:
:plans and COMcheck reports.
❑Not Applicable
Installed floor insulation type and R-
_
`❑Complies ;See the Envelope Assemblies table for values.
value consistent with insulation
❑Does Not
specifications reported in plans and
i,❑Not Observable
COMcheck reports.
❑Not Applicable
Radiant panels and associated
❑Complies ; Requirement will be met.
components, designed for heat
;❑Does Not
transfer from the panel surfaces to the
❑Not Observable ;
occupants or indoor space are
insulated with a minimum of R-3.5.
[]Not Applicable ;
C105
:Installed roof insulation type and R-
S❑Complies ' See the Envelope Assemblies table for values.
[IN2]1
:value consistent with insulation
o❑Does Not
;specifications reported in plans and
;COMcheck reports. For some ceiling
°,❑Not Observable
ENot Applicable
!systems, verification may need to
;occur during Framing Inspection.
C402.5.1.
;All sources of air leakage in the
°❑Complies ; Requirement will be met.
1
building thermal envelope are sealed,
y❑Does Not
[IN1]1
;caulked, Basketed, weather stripped
[]Not Observable
Eor wrapped with moisture vapor-
permeable wrapping material to
❑Not Applicable
minimize air leakage.
Additional Comments/Assumptions:
r1l High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Report date: 02/09/22
Data filename: Z:VobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 8 of 10
Section
# Final Inspection Complies? Comments/Assumptions
& Re .ID
C402.5.6 9 Weatherseals installed on all loading ❑Complies ; Requirement will be met.
[1137]1 `dock cargo door openings and provide UDoes Not
:direct contact along the top and sides
!of vehicles parked in the doorway. ❑Not Observable:
❑Not Applicable
C402.5.8 Recessed luminaires in thermal ❑Complies ; Requirement will
[F126]3 envelope to limit infiltration and be IC '❑Does Not
rated and labeled. Seal between
interior finish and luminaire housing. ❑Not Observable
_ „❑Not Applicable
C406.9 '.Reduced air infiltration. Air infiltration 'l❑Complies
[F156]1 :verified by whole -building ❑Does Not
;pressurization testing conducted in
;accordance with ASTM E779 or ASTM []Not Observable
E1827 by an independent third party. ❑Not Applicable
;The measured air -leakage rate of the ;
,building envelope is <= 0.25 cfm/ft2
under a pressure differential of 0.3
inches water column, with the
calculated surface area being the sum ;
of the above- and below -grade
;building envelope. Comprehensive
:report documentation will be ;
!submitted to the code official and the
'building owner. ;
C408.1.1 ;Building operations and maintenance ❑Complies
[FI57]1 !documents will be provided to the o❑Does Not
;owner. Documents will cover o
; manufacturers' information, !❑Not Observable:
=specifications, programming !'❑Not Applicable
!procedures and means of illustrating
to owner how building, equipment and
;systems are intended to be installed,
; maintained, and operated.
,
Additional Comments/Assumptions:
be met.
Requirement will be met.
11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Report date: 02/09/22
Data filename: Z:Vobsyava Expresslldaho -Rexburg - N 2ND\18117N - Drawings & Specs\SourcesllECC.cck Page 9 of 10
Project Title: Report date: 02/09/22
Data filename: Z:\lobs�ava Expresslldaho -Rexburg - N 2ND118117N - Drawings & Specs\Sources\IECC.cck Page 10 of 10