Loading...
HomeMy WebLinkAboutCOMCHECK 2 - 22-00059 - Java Espress�( COMcheck Software Version 4.1.5.4 Envelope Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: Location: Rexburg, Idaho Climate Zone: 6b Project Type: New Construction Vertical Glazing / Wall Area: 11% Construction Site: Owner/Agent: Designer/Contractor: Additional Efficiency Package(s) Credits: 1.0 Required 1.0 Proposed Reduced Air Infiltration, 1.0 credit Building Area Floor Area 1 -Retail : Nonresidential 727 Envelope Assemblies Assembly Roof 1: Insulation Entirely Above Deck, [Bldg. Use 1 - Retain Floor 1: Slab -On -Grade: Unheated Fully insulated (uniform R -value across perimeter + under entire slab), [Bldg. Use 1 - Retail] (c) NORTH Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retain Window 1: Metal Frame:Operable, Pert. Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retain (b) EAST Exterior Wall 2: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retain Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retail] (b) Door 2: Glass (> 50% glazing):Metal Frame, Non -Entrance Door, Pert. Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retail] (b) SOUTH Exterior Wall 3: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retail] Window 3: Metal Frame:Fixed, Pert, Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retail] (b) Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Pert. Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retail] (b) WEST Exterior Wall 4: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retain Window 2: Metal Frame:Fixed, Pert. Specs.: Product ID PENDING ID, SHGC 0.25, [Bldg. Use 1 - Retail] (b) Gross Area Cavity Cont. Proposed Budget U. or R Value R -Value U -Factor Factor(.) Perimeter 721 — 38.0 0.026 0.032 137 — 4.0 0.514 0.540 534 19.0 0.0 0.067 0.051 47 — — 0.300 0.430 367 19.0 0.0 0.067 0.051 22 — — 0.300 0.770 31 -- — 0.300 0.430 537 19.0 0.0 0.067 0.051 47 — — 0.300 0.360 31 — — 0.300 0.770 396 19.0 0.0 0.067 0.051 18 — — 0.300 0.360 Project Title: Report date: 02/09/22 Data filename: Z:VobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 1 of 10 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. Envelope• better than code Envelope Compliance Statement Compliance Statement. The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMchP�k n 4.1.5.4 and -to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title gnature Dai Project Title: Report date: 02/09/22 Data filename: Z:VobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 2 of 10 COMcheck Software Version 4.1.5.4 Inspection Checklist Energy Code: 2018 IECC Requirements: 93.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section & Rea.IC Plan Review Complies? Comments/Assumptions ❑Complies ; Requirement will be met. ❑Does Not ❑Not Observable: e❑Not Applicable ; UComplies ; Requirement will be met. r❑Does Not ❑Not Observable ❑Not Applicable ❑Complies ; Requirement will be met. ❑Does Not ❑Not Observable a❑Not Applicable ❑Complies I Requirement will be met. ❑Does Not s❑Not Observable; ❑Not Applicable C103.2 :Plans and/or specifications provide all [PR1)1 "information with which compliance ;can be determined for the building ;envelope and document where exceptions to the standard are ^claimed. C402.4.1 ;The vertical fenestration area <= 30 [PR10)1 :percent of the gross above -grade wall area. , C402.4.1 ;The skylight area <= 3 percent of the [PR1111 :gross roof area. C406 [PR9)1 Plans, specifications, and/or :calculations provide all information ;with which compliance can be ;determined for the additional energy ,efficiency package options. Additional Comments/Assumptions: 1 High Impact (Tier 1) Jj 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Data filename: Z:)jobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Report date: 02/09/22 Page 3 of 10 Section # Footing / Foundation Inspection Complies? Comments/Assumptions & Re .ID C303.2 Slab edge insulation installed per ;❑Complies Requirement will be met. [F04]2 manufacturer's instructions. ❑Does Not ❑Not Observable _ ❑Not Applicable C303.2.1 :Exterior insulation protected against IlComplies ; Requirement will be met. [F06]1 damage, sunlight, moisture, wind, `❑Does Not landscaping and equipment ;maintenance activities. ;❑Not Observable _ E❑Not Applicable C105 Installed slab -on -grade insulation type:❑Complies See the Envelope Assemblies table for values. [F03]2 and R -value consistent with insulation ';[]Does Not specifications reported in plans and UNot Observable COMcheck reports. ❑Not Applicable C402.2.4 Slab edge insulation depth/length. ❑Complies :Requirement will be met. [F07]2 Slab insulation extending away from ❑Does Not building is covered by pavement or I ; See the Envelope Assemblies table for values. >= 10 inches of soil.❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 1 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Report date: 02/09/22 Data filename: Z:VobsVava Expresslldaho -Rexburg - N 2ND\38117N - Drawings & Specs\Sources\IECC.cck Page 4 of 10 Framing/ Rough -In Inspection F Complies? Comments/Assumptions C303.1.3 Fenestration products rated in [FR12]2 accordance with NFRC. C303.1.3 [FR13]1 C402.4.3 [FR10]1 C402.4.3, C402.4.3. 4 [FR8]1 C402.5.1 2.1 [FR19]1 C402,5.2, C402.5.4 [FR18]3 C402.5.7 [FR17]3 ❑Complies :Requirement will be met. ❑Does Not i'❑Not Observable' ,❑Not Applicable Fenestration products are certified as jto performance labels or certificates .❑Complies :Requirement will be met. ❑Does Not provided. ❑Not Observable; ❑Not Applicable ;vertical fenestration SHGC value. ❑Complies ,See the Envelope Assemblies table for values. ❑Does Not ❑Not Observable: ❑Not Applicable Installed vertical fenestration U -factor f❑Complies ;See the Envelope Assemblies table for values. and SHGC consistent with label `❑Does Not ;specifications and as reported in plans ;and COMcheck reports. o❑Not Observable; ❑Not Applicable The building envelope contains a r❑Complies :continuous air barrier that is sealed in ❑Does Not an approved manner and material ❑Not Observable permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an `❑Not Applicable ;approved manner. _ Factory -built fenestration and doors ❑Complies ; Requirement will be met. are labeled as meeting air leakage ❑Does Not requirements. bNot Observable: _ ❑Not Applicable j Vestibules are installed on all building ❑Complies ; Requirement will be met. entrances. Doors have self-closing ❑Does Not devices. ❑Not Observable; ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) _ 3 1 Low Impact (Tier 3) _J Project Title: Report date: 02/09/22 Data filename: Z:VobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 5 of 10 Section # Mechanical Rough-in Inspection Complies? Commet & Req.ID C402.5.5, Stair and elevator shaft vents have []Complies :Requirement will be met. C403.2.4. motorized dampers that automatically `❑Does Not 3 close. Refernece section C403.7.7 for [ME3]3 operational details. ❑Not Observable ❑Not Applicable C403.7.7 Outdoor air and exhaust systems have ❑Complies :Requirement will be met. [ME58]3 motorized dampers that automatically ,❑Does Not shut when not in use and meet maximum leakage rates. Check []Not Observable gravity dampers where allowed. ❑Not Applicable Reference section language for operational details. Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2T -medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Report date: 02/09/22 Data filename: Z:�obsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 6 of 10 Section -- - -- w# ._ i Rough -In Electrical Inspection Complies? Comments/Assumptions C405.6 [EL26]2 C405.7 [EL27]z C405.8.2, C405.8.2. 1 [EL28]2 Low -voltage dry -type distribution❑Complies ;,Requirement will electric transformers meet the ❑Does Not minimum efficiency requirements of Table C405.6. ❑Not Observable ° permitted speed in accordance with []Not Applicable Electric motors meet the minimum tlComplies ; Requirement will efficiency requirements of Tables ❑Does Not j C405.7(1) through C405.7(4). []Not Observable Efficiency verified through certification under an approved certification ❑Not Applicable program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist). , be met. be met. Escalators and moving walks comply o❑Complies Requirement will be met. with ASME A17.1/CSA B44 and have E❑Does Not automatic controls configured to reduce speed to the minimum ❑Not Observable permitted speed in accordance with �,❑Not Applicable ASME A17.1/CSA B44 or applicable local code when not conveying aassenaers. 1 C405.9 Total voltage drop across the [EL29]2 combination of feeders and branch circuits <= 5%. Additional Comments/Assumptions: IJComplies ;Requirement will be met. e❑Does Not 6 ❑Not Observable' ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) 1 Project Title: Report date: 02/09/22 Data filename: Z:YobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 7 of 10 Insulation Inspection ID C303.1 ;Roof insulation installed per [IN311 :manufacturer's instructions. Blown or ;poured loose -fill insulation is installed ,only where the roof slope is <=3 in :12. C402.2.1 ;Insulation installed on a suspended [IN20]1 'ceiling having ceiling tiles is not being ;specified for roor/ceiling assemblies. ;Continuous insulation board installed :in 2 or more layers with edge joints ! offset between layers. C303.1 Building envelope insulation is labeled [IN10]2 with R -value or insulation certificate providing R -value and other relevant data. C303.2 'Above -grade wall insulation installed [IN711 :per manufacturer's instructions. ; ; C303.2.1 [IN14]2 C105 [IN6]1 C402.2.3 [IN8]2 C402.2.6 [IN18]3 Complies? ❑Complies ; Requirement will ❑Does Not k❑Not Observable []Not Applicable ❑Complies ; Requirement will ❑Does Not ❑Not Observable; ❑Not Applicable j ; ❑Complies ; Requirement will ❑Does Not ; ❑Not Observable; ❑Not Applicable ❑Complies I Requirement will ❑Does Not ❑Not Observable ❑Not Applicable Comments/Assumptions be met. be met. be met. be met. Exterior insulation is protected from 9❑Complies ; Requirement will be met. damage with a protective material. =❑Does Not Verification for exposed foundation UNot Observable insulation may need to occur during IDNot Applicable Foundation Inspection. ; Installed above -grade wall insulation TIComplies ;See the Envelope Assemblies table for values. ;type and R -value consistent with °❑Does Not ;insulation specifications reported in '❑Not Observable: :plans and COMcheck reports. ❑Not Applicable Installed floor insulation type and R- _ `❑Complies ;See the Envelope Assemblies table for values. value consistent with insulation ❑Does Not specifications reported in plans and i,❑Not Observable COMcheck reports. ❑Not Applicable Radiant panels and associated ❑Complies ; Requirement will be met. components, designed for heat ;❑Does Not transfer from the panel surfaces to the ❑Not Observable ; occupants or indoor space are insulated with a minimum of R-3.5. []Not Applicable ; C105 :Installed roof insulation type and R- S❑Complies ' See the Envelope Assemblies table for values. [IN2]1 :value consistent with insulation o❑Does Not ;specifications reported in plans and ;COMcheck reports. For some ceiling °,❑Not Observable ENot Applicable !systems, verification may need to ;occur during Framing Inspection. C402.5.1. ;All sources of air leakage in the °❑Complies ; Requirement will be met. 1 building thermal envelope are sealed, y❑Does Not [IN1]1 ;caulked, Basketed, weather stripped []Not Observable Eor wrapped with moisture vapor- permeable wrapping material to ❑Not Applicable minimize air leakage. Additional Comments/Assumptions: r1l High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Report date: 02/09/22 Data filename: Z:VobsVava Express\Idaho -Rexburg - N 2ND\18117N - Drawings & Specs\Sources\IECC.cck Page 8 of 10 Section # Final Inspection Complies? Comments/Assumptions & Re .ID C402.5.6 9 Weatherseals installed on all loading ❑Complies ; Requirement will be met. [1137]1 `dock cargo door openings and provide UDoes Not :direct contact along the top and sides !of vehicles parked in the doorway. ❑Not Observable: ❑Not Applicable C402.5.8 Recessed luminaires in thermal ❑Complies ; Requirement will [F126]3 envelope to limit infiltration and be IC '❑Does Not rated and labeled. Seal between interior finish and luminaire housing. ❑Not Observable _ „❑Not Applicable C406.9 '.Reduced air infiltration. Air infiltration 'l❑Complies [F156]1 :verified by whole -building ❑Does Not ;pressurization testing conducted in ;accordance with ASTM E779 or ASTM []Not Observable E1827 by an independent third party. ❑Not Applicable ;The measured air -leakage rate of the ; ,building envelope is <= 0.25 cfm/ft2 under a pressure differential of 0.3 inches water column, with the calculated surface area being the sum ; of the above- and below -grade ;building envelope. Comprehensive :report documentation will be ; !submitted to the code official and the 'building owner. ; C408.1.1 ;Building operations and maintenance ❑Complies [FI57]1 !documents will be provided to the o❑Does Not ;owner. Documents will cover o ; manufacturers' information, !❑Not Observable: =specifications, programming !'❑Not Applicable !procedures and means of illustrating to owner how building, equipment and ;systems are intended to be installed, ; maintained, and operated. , Additional Comments/Assumptions: be met. Requirement will be met. 11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Report date: 02/09/22 Data filename: Z:Vobsyava Expresslldaho -Rexburg - N 2ND\18117N - Drawings & Specs\SourcesllECC.cck Page 9 of 10 Project Title: Report date: 02/09/22 Data filename: Z:\lobs�ava Expresslldaho -Rexburg - N 2ND118117N - Drawings & Specs\Sources\IECC.cck Page 10 of 10