Loading...
HomeMy WebLinkAboutREDLINED REVISED PLANS - 22-00260 - 7N Apartments - Bldg 1 - 4 PlexAuthor Name Author Email Author Phone No.: Alex Owens Alex.Owens@rexburg.org 208-372-2330 Cody Jones Cody.Jones@rexburg.org 208-372-2173 Description : 7N Apartments - Bldg 1 - 4 Plex Address : 676 Carlow Dr Units 1101-1102, 1201-1202 Application Type : Document Filename : Plans Rev. (1) 5.02.2022–22-00260.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments A1.1 Free text Cody Jones : Building Open 1 Need to have envelope COMM check or prescriptive insulation formed signed. Need engineered truss plans reviewed and approved by building engineer. Buildings or structures in flood areas need to have flood certificates. A1.1 Free text Cody Jones : Building Open 1 Egress Balcony to comply with section 1021. A1.1 Comment Cody Jones : Building Open 1 Exterior Exit Stairs & Ramps comply with IBC Section 1027 A1.1 Free text Cody Jones : Building Open 1 Exterior walls less then 10 feet from adjacent building or lot line needs to have a minimum of one hour protection. A2.1 Free text Cody Jones : Building Open 2 Please make sure dog house is large enough for required access and equipment. A6.1 Free text Cody Jones : Building Open 5 2 layers required. A6.1 Free text Cody Jones : Building Open 5 Fire partitions and horizontal assemblies need to be identified and listed assembly from the GA-600 Fire resistance design manual noted on plans. A2.1 Free text Alex Owens : Electrical Open 10 Available fault current calculation needed for plan review. # 22-00260 New Multi-Family Residence Report Date: 05.04.2022 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments A2.1 Free text Alex Owens : Electrical Open 10 Notes: All electrical work and wiring methods to comply with 2017 NEC. A concrete encased electrode ("UFFER" ground) is required on all buildings that have a foundation. Receptacle locations/spacing to comply with requirements of 210.52. Report Date: 05.04.2022 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) Need to have envelope COMM check or prescriptive insulation formed signed. Need engineered truss plans reviewed and approved by building engineer. Buildings or structures in flood areas need to have flood certificates. Egress Balcony to comply with section 1021. Exterior walls less then 10 feet from adjacent building or lot line needs to have a minimum of one hour protection. Please make sure dog house is large enough for required access and equipment. 2 layers required. Fire partitions and horizontal assemblies need to be identified and listed assembly from the GA-600 Fire resistance design manual noted on plans. Available fault current calculation needed for plan review. Notes: All electrical work and wiring methods to comply with 2017 NEC. A concrete encased electrode ("UFFER" ground) is required on all buildings that have a foundation. Receptacle locations/spacing to comply with requirements of 210.52.