Loading...
HomeMy WebLinkAboutREDLINED PLANS - 22-00260 - 7N Apartments - Bldg 1- 4 PlexAuthor Name Author Email Author Phone No.: Cody Jones Cody.Jones@rexburg.org 208-372-2173 Don Allen Don.Allen@rexburg.org 208-372-2174 Description : 670 Carlow - 7N Apartments - Bldg 1 - 4 Plex Address : 670 Carlow Application Type : Document Filename : PLANS - 22-00260 - 670 Carlow - 7N Apartments - Bldg 1-4 - 4Plex.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments A1.1 Free text Cody Jones : Building Open 1 All commercial plans to be stamped by design professional. A1.1 Free text Cody Jones : Building Open 1 Need to have envelope COMM check. A1.1 Free text Cody Jones : Building Open 1 Buildings or structures located in flood area need to have flood certificates. Exterior walls and coverings need to comply with IBC Chapter 24. Dwelling unit sound transmission to comply with Section 1206. Dwelling units shall meet the requirements of Section 1107. Concealed spaces need to be fire blocked and draft stopped as per section 718. A1.1 Free text Cody Jones : Building Open 1 Exterior Exit stairs need to comply with section 1027. A1.1 Free text Cody Jones : Building Open 1 Egress balconies to comply with section 1021. A2.1 Free text Cody Jones : Building Open 2 Glazing near windows need to comply with section 2406.4.5. # 22-00260 New Multi-Family Residence Report Date: 04.18.2022 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments A2.1 Free text Cody Jones : Building Open 2 Fire rated partitions and horizontal assemblies need to be identified and listed assembly identified. All attachments and penetration's will need to be protected according to the listing specified. A4.1 Free text Cody Jones : Building Open 3 windows within an 24" arc of the edge of the door needs to be tempered. A4.1 Comment Cody Jones : Building Open 3 Glass and Glazing meets the requirements of IBC Chapter 24 Report Date: 04.18.2022 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) All commercial plans to be stamped by design professional. Need to have envelope COMM check. Buildings or structures located in flood area need to have flood certificates. Exterior walls and coverings need to comply with IBC Chapter 24. Dwelling unit sound transmission to comply with Section 1206. Dwelling units shall meet the requirements of Section 1107. Concealed spaces need to be fire blocked and draft stopped as per section 718. Exterior Exit stairs need to comply with section 1027. Egress balconies to comply with section 1021. Glazing near windows need to comply with section 2406.4.5. Fire rated partitions and horizontal assemblies need to be identified and listed assembly identified. All attachments and penetration's will need to be protected according to the listing specified. windows within an 24" arc of the edge of the door needs to be tempered.