HomeMy WebLinkAboutBOLT REPORT - 22-00566 - Titan Steel OfficeInspection Details Date Contractor Inspector Weather Permit Number 03/07/2023 Titan Steel Clark, Josh Sunny na Project Specifications: Snug Tight only Full Tension/Slip Critical Full Tension/Slip Critical: Turn­of­the­Nut method Calibrated Wrench method Direct Tension Indicators ­ Load­Indicating Washers Direct Tension Indicators ­Twist­Off­Bolts (”Lejune” bolts) Bolt Type: ASTM A­325 ASTM A­490 Other Bolt Type Other: Bolt size Diameter Length 3/4"2" 3/4"2­1/4" 3/4"2­1/2" Washer Specifications: Hardened washers Plate washers None required General Conditions Faying surfaces flush and in full contact Faying surfaces free from paint, oil, etc. Visually monitored turn­of­the­nut method Verified Installation equipment and bolts using Skidmore­ Wilhelm tension measuring device Visually Inspected twist­off bolts Washers at slotted holes under turned element Verified a minimum of 2 bolts per connection or 10% of all bolts Reference Drawing Sheet and Detail, and Approved RFI:structural drawing Location(s):rigid frame Notes:reported to Lane and Blake with Titan steel Work inspected was: in compliance in compliance, except as noted in comments section reinspection/retesting required Note: The recording of false, fictitious, or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ High Strength Bolting Report 03/07/2023Report Date: Atlas Technical Consultants, LLC ­ Idaho Falls 1753 E Precision Drive Idaho Falls, ID 83402 Phone: (208) 529­8242 Client: Titan Steel PO Box 326 Rigby, ID 83442 Project: E230363c Titan Steel Office, 3251 Folsom Lane, Rexburg, ID 3251 Folsom Lane Rexburg, ID 83440 NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction. Page 1 of 2Page 1 of 1 Jocelynn Silva