HomeMy WebLinkAboutSTRUCTURAL ANALYSIS - 23-00113 - 2211 W 1000 S - Cell Tower UpgradesGPD# 2023702.02.129553.05
February 16, 2023
COMPREHENSIVE STRUCTURAL ANALYSIS REPORT
AT&T DESIGNATION. USID #.
Site FA #:
Client #:
Site Name:
ANALYSIS CRITERIA: Codes:
SITE DATA:
To whom it may concern,
129553
10549689
ID4341
REXBURG WEST
TIA-222-H & 2018 IBC
105 mph (3 -second gust) w/ 0" ice
Ss=0.359, S1=0.141
2211 West 1000 South, Rexburg, ID 83440, Madison County
Latitude 430 48' 32.10" N, Longitude 1110 49' 18.28" W
120' Monopole
GPD is pleased to submit this Comprehensive Structural Analysis Report to determine the structural integrity of the
aforementioned tower. The purpose of the analysis is to determine the suitability of the tower with the existing and proposed
loading configuration detailed in the analysis report.
Analysis Results
Tower Stress Level with Proposed Equipment: 44.3% Pass
Foundation Ratio with Proposed Equipment: 27.1% Pass
We at GPD appreciate the opportunity of providing our continuing professional services to you and Network Real Estate,
LLC. If you have any questions or need further assistance on this or any other projects, please do not hesitate to call.
Respectfully submitted,
Christopher J. Scheks, P.I
Idaho #: 16108
023
520 South Main Street . Suite 2531 . Akron, Ohio 44311 . 330-572-2100 . Fax 330-572-2101 . www.GPDGroup.com
GPD Group, Professional Corporation
Network
Peal Esiaie ILC
GPD GROUP
Professional Corporation
Network Real Estate, LLC
Mac Risley
5055 Hwy N, Suite 200
520 South Main Street, Suite 2531
St. Charles, MO 63304
Akron, OH 44311
(678) 781-5067
mrisley@gpdgroup.com
GPD# 2023702.02.129553.05
February 16, 2023
COMPREHENSIVE STRUCTURAL ANALYSIS REPORT
AT&T DESIGNATION. USID #.
Site FA #:
Client #:
Site Name:
ANALYSIS CRITERIA: Codes:
SITE DATA:
To whom it may concern,
129553
10549689
ID4341
REXBURG WEST
TIA-222-H & 2018 IBC
105 mph (3 -second gust) w/ 0" ice
Ss=0.359, S1=0.141
2211 West 1000 South, Rexburg, ID 83440, Madison County
Latitude 430 48' 32.10" N, Longitude 1110 49' 18.28" W
120' Monopole
GPD is pleased to submit this Comprehensive Structural Analysis Report to determine the structural integrity of the
aforementioned tower. The purpose of the analysis is to determine the suitability of the tower with the existing and proposed
loading configuration detailed in the analysis report.
Analysis Results
Tower Stress Level with Proposed Equipment: 44.3% Pass
Foundation Ratio with Proposed Equipment: 27.1% Pass
We at GPD appreciate the opportunity of providing our continuing professional services to you and Network Real Estate,
LLC. If you have any questions or need further assistance on this or any other projects, please do not hesitate to call.
Respectfully submitted,
Christopher J. Scheks, P.I
Idaho #: 16108
023
520 South Main Street . Suite 2531 . Akron, Ohio 44311 . 330-572-2100 . Fax 330-572-2101 . www.GPDGroup.com
GPD Group, Professional Corporation
121' Monopole - Structural Evaluation Site USID #: 129553
SUMMARY & RESULTS
The purpose of this analysis was to verify whether the existing structure is capable of carrying the proposed loading
configuration as specified by AT&T and commissioned by Network Real Estate, LLC.
This analysis has been performed in accordance with the 2018 International Building Code based upon a 3 -second gust
wind speed of 105 mph. Applicable Standard references and design criteria are listed in Appendices A & B.
The proposed feedlines shall be installed as shown in Appendices A & B for the analysis results to be valid.
TOWER SUMMARY AND RESULTS
Member
Capacity
Results
Monopole
34.5%
Pass
Anchor Rods
31.0%
Pass
Base Plate
44.3%
Pass
Foundation Design
EEI Job #: 84691, dated 5/23/2012
AT&T
Foundation
27.1%
Pass
RECOMMENDATIONS
The tower and its foundation(s) have sufficient capacity to carry the proposed loading configuration. No modifications are
required at this time.
ANALYSIS METHOD
tnxTower (Version 8.1.1.0), a commercially available software program, was used to create a three-dimensional model of
the tower and calculate primary member stresses for various load cases. Selected output from the analysis is included the
report appendices. The following table details the information provided to complete this structural analysis. This analysis
is based solely on this information.
DOCUMENTS PROVIDED
Document
Remarks
Source
MW Data Sheet
AT&T Site Name: REXBURG WEST Rev. 1, updated 10/7/2022
Network Real
Estate, LLC
MW Pass Form
AT&T Site Name: REXBURG WEST, received 2/8/2023
Network Real
Estate, LLC
Tower Design
EEI Job #: 84691, dated 5/23/2012
AT&T
Foundation Design
EEI Job #: 84691, dated 5/23/2012
AT&T
Geotechnical Report
Harper -Leavitt Engineering Site ID: PCTLIDU4276, dated 12/29/2011
AT&T
Previous Tower Analysis
Kimley Horn Project* KHCLE-31359, dated 11/3/2022
AT&T
Tower Mapping
Not Provided
N/A
Previous Mount Analysis
GPD Project #: 2019723.02.129553.03, dated 1/24/2019
AT&T
Mount Mapping
GPD Project #: 2019723.02.129553.03, dated 12/11/2018
AT&T
2/16/2023 Page 2 of 4
121' Monopole - Structural Evaluation Site USID #: 129553
ASSUMPTIONS
This structural analysis is based on the theoretical capacity of the members and is not a condition assessment of the tower.
This analysis is from information supplied, and therefore, its results are based on and are as accurate as that supplied data.
GPD has made no independent determination, nor is it required to, of its accuracy. The following assumptions were made
for this structural analysis.
1. The tower member sizes and shapes are considered accurate as supplied. The material grade is as per data
supplied and/or as assumed and as stated in the materials section.
2. The appurtenance configuration is as supplied, determined from available photos, and/or as modeled in the
analysis. It is assumed to be complete and accurate. All antennas, mounts, coax and waveguides are assumed to
be properly installed and supported as per manufacturer requirements.
3. All mounts, if applicable, are considered adequate to support the loading. No actual analysis of the mount(s) is
performed. This analysis is limited to analyzing the tower only.
4. The soil parameters are as per data supplied or as assumed and stated in the calculations.
5. Foundations are properly designed and constructed to resist the original design loads indicated in the documents
provided.
6. The tower and structures have been properly maintained in accordance with TIA Standards and/or with
manufacturer's specifications.
7. All welds and connections are assumed to develop at least the member capacity unless determined otherwise and
explicitly stated in this report.
8. All prior structural modifications, if applicable, are assumed to be as per data supplied/available and to have been
properly installed.
9. Loading interpreted from photos is accurate to ±5' AGL, antenna size accurate to ±3.3 sf, and coax equal to the
number of existing antennas without reserve.
10. All existing and proposed loading has been taken from the available site photos as well as documents supplied to
GPD at the time of generating this report. All such documents are listed in the Documents Provided Table and are
assumed to be accurate. GPD is not responsible for loading scenarios outside those conveyed in the supplied
documentation.
If any of these assumptions are not valid or have been made in error, this analysis may be affected, and GPD should be
allowed to review any new information to determine its effect on the structural integrity of the tower.
2/16/2023 Page 3 of 4
121' Monopole - Structural Evaluation Site USID #: 129553
DISCLAIMER OF WARRANTIES
GPD has not performed a site visit to the tower to verify the member sizes or antenna/coax loading. If the existing conditions
are not as represented on the tower elevation contained in this report, we should be contacted immediately to evaluate the
significance of the discrepancy. This is not a condition assessment of the tower or foundation. This report does not replace
a full tower inspection. The tower and foundations are assumed to have been properly fabricated, erected, maintained, in
good condition, twist free, and plumb.
The engineering services rendered by GPD in connection with this Comprehensive Structural Analysis are limited to a
computer analysis of the tower structure and theoretical capacity of its main structural members. No allowance was made
for any damaged, bent, missing, loose, or rusted members (above and below ground). No allowance was made for loose
bolts or cracked welds.
This analysis is limited to the designated maximum wind and seismic conditions per the governing tower standards and
code. Wind forces resulting in tower vibrations near the structure's resonant frequencies were not considered in this analysis
and are outside the scope of this analysis. Lateral loading from any dynamic response was not evaluated under a time -
domain based fatigue analysis.
GPD does not analyze the fabrication of the structure (including welding). It is not possible to have all the very detailed
information needed to perform a thorough analysis of every structural sub -component and connection of an existing tower.
GPD provides a limited scope of service in that we cannot verify the adequacy of every weld, plate connection detail, etc.
The purpose of this report is to assess the capability of adding appurtenances usually accompanied by transmission lines
to the structure.
It is the owner's responsibility to determine the amount of ice accumulation in excess of the code specified amount, if any,
that should be considered in the structural analysis.
The attached sketches are a schematic representation of the analyzed tower. If any material is fabricated from these
sketches, the contractor shall be responsible for field verifying the existing conditions, proper fit, and clearance in the field.
Any mentions of structural modifications are reasonable estimates and should not be used as a precise construction
document. Precise modification drawings are obtainable from GPD, but are beyond the scope of this report.
Miscellaneous items such as antenna mounts, etc., have not been designed or detailed as a part of our work. We
recommend that material of adequate size and strength be purchased from a reputable tower manufacturer.
Towers are designed to carry gravity, wind, and ice loads. All members, legs, diagonals, struts, and redundant members
provide structural stability to the tower with little redundancy. Absence or removal of a member can trigger catastrophic
failure unless a substitute is provided before any removal. Legs carry axial loads and derive their strength from shorter
unbraced lengths by the presence of redundant members and their connection to the diagonals with bolts or welds. If the
bolts or welds are removed without providing any substitute to the frame, the leg is subjected to a higher unbraced length
that immediately reduces its load carrying capacity. If a diagonal is also removed in addition to the connection, the unbraced
length of the leg is greatly increased, jeopardizing its load carrying capacity. Failure of one leg can result in a tower collapse
because there is no redundancy. Redundant members and diagonals are critical to the stability of the tower.
GPD makes no warranties, expressed and/or implied, in connection with this report and disclaims any liability arising from
material, fabrication, and erection of this tower. GPD will not be responsible whatsoever for, or on account of, consequential
or incidental damages sustained by any person, firm, or organization as a result of any data or conclusions contained in this
report. The maximum liability of GPD pursuant to this report will be limited to the total fee received for preparation of this
report.
2/16/2023 Page 4 of 4
121' Monopole - Structural Evaluation Site USID #: 129553
APPENDIX A
Tower Analysis Summary Form
2/16/2023
7A
E
E
/
:
t
�
«
)l------
;
Jg
\ \
)
§§r■|■
LU
§
!
■
\§)
§§;;w§{);§(
IL
k
U
U
!
�EEEEEE
§))))))
vj
)l------
;
)
§§r■|■
§
!
■
\§)
0.
IL
k
U
U
!
�EEEEEE
§))))))
)
■
■ ■
k
k
k k
§j
k
ly
LY
CY
/\
2222|
(
!2§\■R�
/ |
E §
kkkkk/}
k k
[
2££££££
£ £
.
]||||§2
| |
121' Monopole - Structural Evaluation Site USID #: 129553
APPENDIX B
Tower Analysis Output File
2/16/2023
120.0 ft
79.0 ft
34.0 ft
0.0 ft
DESIGNED APPURTENANCE LOADING
TYPE
0
TYPE
o
N
o
o
n
V
N
uoi
m
M
119
M
119
o
N
119
80010992 w/ Mount Pipe
c
w
o
T
119
N
119
m
M
DC6-48-60-18-8C-EV
V
n
¢
d
119
AEQK+AEQU Stacked w/ 8' Mount
119
O
119
M
V
V
Appurtenances @ 120'
119
AEQK+AEQU Stacked w/ 8' Mount
0
v
Pipe
N
oo
99:5
(2) Pipe Mount 8'x2.375"
M
Tower Section from 80'- 121'
o
M
119
n
O
(2) Pipe Mount 8'x2.375"
119
Tower Section from 35'- 80'
56.5
(2) Pipe Mount 4'x2.375"
O
Appurtenances @ 26'
25
ci
VHLPX4-11W
25
(2) Pipe Mount 4'x2.375"
T
a
s
(2) Pipe Mount 4'x2.375"
119
Pipe Mount 4'x2.375"
16
AHLBA
119
Feedlines from 1'- 35'
17
AHLBA
119
Tower Section from T- 35'
17
AHLBA
o
�
a
c
119
p
10
AHFIB
Appurtenances @ 11'
10
U1
J
Z
H
Co
H
m
a
120.0 ft
79.0 ft
34.0 ft
0.0 ft
DESIGNED APPURTENANCE LOADING
TYPE
ELEVATION
TYPE
ELEVATION
MTS 14.5' LP Platform
119
AHFIB
119
80010992 w/ Mount Pipe
119
AHNA
119
80010992 w/ Mount Pipe
119
AHNA
119
80010992 w/ Mount Pipe
119
AHNA
119
AEQK+AEQU Stacked w/ 8' Mount
119
DC6-48-60-18-8C-EV
119
Pipe
DC6-48-60-18-8C-EV
119
AEQK+AEQU Stacked w/ 8' Mount
119
DC9-48-60-24-8C-EV
119
Pipe
Appurtenances @ 120'
119
AEQK+AEQU Stacked w/ 8' Mount
119
Pipe
Feedlines from 80'- 121'
99:5
(2) Pipe Mount 8'x2.375"
119
Tower Section from 80'- 121'
99.5
(2) Pipe Mount 8'x2.375"
119
Feedlines from 35'- 80'
56.5
(2) Pipe Mount 8'x2.375"
119
Tower Section from 35'- 80'
56.5
(2) Pipe Mount 4'x2.375"
119
Appurtenances @ 26'
25
VHLPX4-11W
25
(2) Pipe Mount 4'x2.375"
119
(2) Pipe Mount 4'x2.375"
119
Pipe Mount 4'x2.375"
25
AHLBA
119
Feedlines from 1'- 35'
17
AHLBA
119
Tower Section from T- 35'
17
AHLBA
119
(2) GPS
10
AHFIB
119
Pipe Mount 4'x2.375"
10
AHFIB
119
Appurtenances @ 11'
10
MATERIAL STRENGTH
GRADE Fy Fu GRADE Fy Fu
A572-65 165 ksi 180 ksi
TOWER DESIGN NOTES
1. Tower is located in Madison County, Idaho.
2. Tower designed for Exposure C to the TIA-222-H Standard.
3. Tower designed for a 105 mph basic wind in accordance with the TIA-222-H Standard.
4. Deflections are based upon a 60 mph wind.
5. Tower Risk Category II.
6. Topographic Category 1 with Crest Height of 0.00 ft
7. TOWER RATING: 34.5%
ALL REACTIONS
ARE FACTORED
AXIAL
28 K
4EAR MOMENT
K 175 kip -ft
SEISMIC
AXIAL
26 K
EAR'MOMENT
K 1056 kip -ft
TORQUE 2 kip -ft
REACTIONS - 105 mph WIND
GPD
520 South Main Street Suite 2531
Akron, Ohio 44311
Phone: (330) 572-2100
129553 REXBURG WEST
Project: 2023702.02.129553.05
trent: Network Real Estate, LLC IDrawn by: NMiller I App'd:
code: TIA-222-H IDate: 02/16/23 Scat': NTS
Round
Safety SbW fMlg�
Feed Line Plan
Flat App In Face App Out Face
GPD
520 South Main Street Suite 2531
Akron, Ohio 44311
Phone: (330) 572-2100
129553 REXBURG WEST
Project: 2023702.02.129553.05
trent: Network Real Estate, LLC IDrawn by: NMiller App'd:
code: TIA-222-H IDate: 02/16/23 Scale: NTS
120.00
Q
0
Round
Face A
Flat
Feed Line Distribution Chart
0'- 120'
App In Face App Out Face Truss Leg
Face B Face C
a �
25.00
U)
N d
�
V
-- --
--
25.00
25.00
-- --
J
U
F
o_
J
W_
O
N
8.00
8.00
GPD 129553 REXBURG WEST
520 South Main Street Suite 2531 Protect' 2023702.02.129553.05
Akron, Ohio 44311 Client: Network Real Estate, LLC Drawn by: NMiller App'd:
Phone: (330) 572-2100 code: TIA-222-H Date: 02/16/23 1 Spate: NTS
tnxTower
Job
129553 REXBURG WEST
Page
1 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone: (330) 572-2100
FAX: (330) 572-2101
Network Real Estate, LLC
N M l l l e r
Tower Input Data
The tower is a monopole.
This tower is designed using the TIA-222-H standard.
The following design criteria apply:
Tower is located in Madison County, Idaho.
Tower base elevation above sea level: 4849.00 ft.
Basic wind speed of 105 mph.
Risk Category Il.
Exposure Category C.
Simplified Topographic Factor Procedure for wind speed-up calculations is used.
Topographic Category: 1.
Crest Height: 0.00 ft.
Deflections calculated using a wind speed of 60 mph.
A non-linear (P -delta) analysis was used.
Pressures are calculated at each section.
Stress ratio used in pole design is 1.
Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered.
Consider Moments - Legs
Consider Moments - Horizontals
Consider Moments - Diagonals
Use Moment Magnification
Use Code Stress Ratios
Use Code Safety Factors - Guys
Escalate Ice
Always Use Max Kz
Use Special Wind Profile
Include Bolts In Member Capacity
Leg Bolts Are At Top Of Section
Secondary Horizontal Braces Leg
Use Diamond Inner Bracing (4 Sided)
SR Members Have Cut Ends
SR Members Are Concentric
Options
Distribute Leg Loads As Uniform
Assume Legs Pinned
Assume Rigid Index Plate
Use Clear Spans For Wind Area
Use Clear Spans For KL/r
Retension Guys To Initial Tension
Bypass Mast Stability Checks
Use Azimuth Dish Coefficients
Project Wind Area of Appurt.
Amocalc Torque Arm Areas
Add IBC .6D+W Combination
Sort Capacity Reports By Component
Triangulate Diamond Inner Bracing
Treat Feed Line Bundles As Cylinder
Ignore KL/ry For 60 Deg. Angle Legs
Use ASCE 10 X -Brace Ly Rules
Calculate Redundant Bracing Forces
Ignore Redundant Members in FEA
SR Leg Bolts Resist Compression
All Leg Panels Have Same Allowable
Offset Girt At Foundation
Consider Feed Line Torque
Include Angle Block Shear Check
Use TIA-222-H Bracing Resist. Exemption
Use TIA-222-H Tension Splice Exemption
Poles
Include Shear -Torsion Interaction
Always Use Sub -Critical Flow
Use Top Mounted Sockets
Pole Without Linear Attachments
Pole With Shroud Or No Appurtenances
Outside and Inside Corner Radii Are
Known
Tapered Pole Section Geometry
Section
Elevation
Section
Splice
Number
Top
Bottom
Wall
Bend
Pole Grade
Length
Length
of
Diameter
Diameter
Thickness
Radius
ft
ft
ft
Sides
in
in
in
in
L1
120.00-79.00
41.00
5.00
18
29.4375
36.8750
0.2500
1.0000
A572-65
(65 ksi)
L2
79.00-34.00
50.00
6.00
18
35.4680
44.5000
0.3125
1.2500
A572-65
(65 ksi)
L3
34.00-0.00
40.00
18
42.7912
50.0000
0.3125
1.2500
A572-65
(65 ksi)
tnxTower
Job
129553 REXBURG WEST
Page
2 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone: (330) 572-2100
FAX: (330) 572-2101
Network Real Estate, LLC
N M l l l e r
Tapered Pole Properties
Section
Tip Dia.
in
Area
int
I
in
r
in
C
in
1/C
in3
J
in
RIQ
int
w
in
w/t
L1
29.8531
23.1603
2492.7291
10.3616
14.9543
166.6903
4988.7381
11.5823
4.7410
18.964
in in
37.4053
29.0619
4925.1253
13.0019
18.7325
262.9187
9856.7312
14.5337
6.0500
24.2
L2
36.8841
34.8698
5444.6979
12.4802
18.0177
302.1854
10896.5600
17.4382
5.6924
18.216
Of Face)
45.1383
43.8285
10811.6677
15.6866
22.6060
478.2654
21637.5616
21.9184
7.2820
23.302
L3
44.5011
42.1335
9605.2083
15.0799
21.7379
441.8644
19223.0554
21.0708
6.9812
22.34
1
50.7231
49.2838
15372.1931
17.6391
25.4000
605.2045
30764.6134
24.6466
8.2500
26.4
Tower
Gusset
Gusset Gusset Grade Adjust. Factor Adjust. Weight Mult. Double Angle
Double Angle
Double Angle
Elevation
Area
Thickness Af Factor Stitch Bolt
Stitch Bolt
Stitch Bolt
Diameter
(per face)
A, Spacing
Spacing
Spacing
120.00 - 8.00
in in
Diagonals
Horizontals
Redundants
ft
ft,
in in
in
in
Ll
1 1 1
120.00-79.00
Surface Ar
25.00 - 8.00 2
2 0.000
1.2800
L2 79.00-34.00
CaAa (Out
1 I 1
0.08
0.000
L3 34.00-0.00
A
1 I I
No
Of Face)
Feed Line/Linear Appurtenances - Entered As Round Or Flat
Description Sector Exclude
Component
Placement Total
Number Start/End
Width or Perimeter
Weight
From
Type
Number
Per Row Position
Diameter
From
Torque
Number
ft
120.00 - 8.00
in in
plf
Calculation
Torque
FOAM)
ft
ftZ/ft
p f
Calculation
EW90 (ELLIPTICAL) C No
Surface Ar
25.00 - 8.00 2
2 0.000
1.2800
0.320
CaAa (Out
(CaAa)
0.08
0.000
178 Pair
A
Feed Line/Linear Appurtenances - Entered As Area
Description
Face
Allow
Exclude
Component
Placement Total
CaAa
Weight
or
Shield
From
Type
Number
Inside Pole
120.00 - 8.00
9
Leg
0.00
Torque
FOAM)
ft
ftZ/ft
p f
Calculation
RET Cable
A
Step Pegs
C
No
No
CaAa (Out
120.00 - 8.00 1 No Ice
0.08
2.720
178 Pair
A
No
No
Of Face)
120.00 - 8.00
2
No Ice
Safety Line (3/8")
C
No
No
CaAa (Out
120.00 - 8.00 1 No Ice
0.04
0.220
1
No Ice
0.00
0.330
Of Face)
A
No
No
*a*
LDF7-50A (1-5/8
A
No
No
Inside Pole
120.00 - 8.00
9
No Ice
0.00
0.820
FOAM)
RET Cable
A
No
No
Inside Pole
120.00 - 8.00
1
No Ice
0.00
0.080
178 Pair
A
No
No
Inside Pole
120.00 - 8.00
2
No Ice
0.00
0.150
#6 AWG
C
No
No
Inside Pole
120.00 - 8.00
1
No Ice
0.00
0.330
24 Pair
A
No
No
Inside Pole
120.00 - 8.00
1
No Ice
0.00
0.150
#8 AWG
C
No
No
Inside Pole
120.00 - 8.00
4
No Ice
0.00
0.330
tnxTower
Job
129553 REXBURG WEST
Page
3 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone: (330) 572-2100
FAX: (330) 572-2101
Network Real Estate, LLC
N M l l l e r
Feed Line/Linear Appurtenances Section Areas
Tower
Tower
Face
AR
AF
CdA,
C444
Weight
Section
Elevation
Ice
Ice
In Face
Out Face
in
in
ft
Ll
ft,
ft,
ft,
ft,
K
L1
120.00-79.00
A
0.000
0.000
0.000
0.000
0.324
-0.5774
1.3261
B
0.000
0.000
0.000
0.000
0.000
Appurtenances @ 26'
25.00
C
0.000
0.000
0.000
4.817
0.188
L2
79.00-34.00
A
0.000
0.000
0.000
0.000
0.356
Feedlines from 80'- 121'
99.50
B
0.000
0.000
0.000
0.000
0.000
C
0.000
0.000
0.000
5.287
0.207
L3
34.00-0.00
A
0.000
0.000
0.000
0.000
0.206
B
0.000
0.000
0.000
0.000
0.000
C
0.000
0.000
4.352
3.055
0.130
Feed Line Center of Pressure
Section
Elevation
CPA
CPz
CPA
CPz
L3
11
EW90 (ELLIPTICAL)
8.00-25.00
Ice
Ice
ft
in
in
in
in
Ll
120.00-79.00
-0.7798
0.4502
-0.4847
0.2798
L2
79.00-34.00
-0.7875
0.4547
-0.4877
0.2816
L3
34.00-0.00
-0.5774
1.3261
-0.3611
0.8294
Note: For pole sections, center of pressure calculations do not consider feed line shielding.
Shielding Factor Ka
Tower
Section
Feed Line
Record No.
Description
Feed LineK"
Segment Elev.
No Ice
&
Ice
L3
11
EW90 (ELLIPTICAL)
8.00-25.00
10000
1.0000
User Defined Loads - Seismic
Description
Elevation
Offset
ALimuth
E„
E,,,
Eh_
Eh
From
Angle
Centroid
ft
ft
oK
K
K
K
Appurtenances (a� 120'
119.00
0.000
0.000
0.279
0.000
0.000
0.735
Appurtenances @ 26'
25.00
0.000
0.000
0.008
0.000
0.000
0.002
Appurtenances @ I F
10.00
0.000
0.000
0.002
0.000
0.000
0.000
Feedlines from 80'- 121'
99.50
0.000
0.000
0.037
0.000
0.000
0.073
tnxTower
Job
129553 REXBURG WEST
Page
4 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone: (330) 572-2100
FAX.- (330) 572-2101
Network Real Estate, LLC
1
N M l l l e r
Description
Elevation
Offset
Azimuth
E„
Eh�
Ehz
El,
CA_4
Side
�_7
ft
Weight
K
From
Angle
None
0.000
119.00
No Ice
17.46
Centroid
1.349
80010992 w/ Mount Pipe
A
From Leg
4.00
0.000
ft
ft
oK
10.70
K
K
K
Feedlines from 35'- 80'
56.50
0.000
0.000
0.041
0.000
0.000
0.032
Feedlines from F- 35'
17.00
0.000
0.000
0.024
0.000
0.000
0.003
Tower Section from 80' - 121'
99.50
0.000
0.000
0.264
0.000
0.000
0.518
Tower Section from 35'- 80'
56.50
0.000
0.000
0.485
0.000
0.000
0.375
Tower Section from V- 35'
17.00
0.000
0.000
0.450
0.000
0.000
0.048
Discrete Tower Loads
Description
Face
or
Leg
Offset
Type
Offsets:
Horz
Lateral
Vert
ft
ft
ft
Azimuth
Adjustment
°
Placement
ft
C4A_4
Front
ft,
CA_4
Side
�_7
ft
Weight
K
MTS 14.5' LP Platform
C
None
0.000
119.00
No Ice
17.46
17.46
1.349
80010992 w/ Mount Pipe
A
From Leg
4.00
0.000
119.00
No Ice
19.50
10.70
0.168
0.000
2.000
80010992 w/ Mount Pipe
B
From Leg
4.00
0.000
119.00
No Ice
19.50
10.70
0.168
0.000
2.000
80010992 w/ Mount Pipe
C
From Leg
4.00
0.000
119.00
No Ice
19.50
10.70
0.168
0.000
2.000
AEQK+AEQU Stacked w/ 8'
A
From Leg
4.00
0.000
119.00
No Ice
16.76
12.10
0.327
Mount Pipe
0.000
3.000
AEQK+AEQU Stacked w/ 8'
B
From Leg
4.00
0.000
119.00
No Ice
16.76
12.10
0.327
Mount Pipe
0.000
3.000
AEQK+AEQU Stacked w/ 8'
C
From Leg
4.00
0.000
119.00
No Ice
16.76
12.10
0.327
Mount Pipe
0.000
3.000
(2) Pipe Mount 8'x2.375"
A
From Leg
4.00
0.000
119.00
No Ice
1.90
1.90
0.034
0.000
0.000
(2) Pipe Mount 8'x2.375"
B
From Leg
4.00
0.000
119.00
No Ice
1.90
1.90
0.034
0.000
0.000
(2) Pipe Mount 8'x2.375"
C
From Leg
4.00
0.000
119.00
No Ice
1.90
1.90
0.034
0.000
0.000
(2) Pipe Mount 4'x2.375"
A
From Leg
4.00
0.000
119.00
No Ice
0.87
0.87
0.019
0.000
0.000
(2) Pipe Mount 4'x2.375"
B
From Leg
4.00
0.000
119.00
No Ice
0.87
0.87
0.019
0.000
0.000
(2) Pipe Mount 4'x2.375"
C
From Leg
4.00
0.000
119.00
No Ice
0.87
0.87
0.019
0.000
0.000
AHLBA
A
From Leg
4.00
0.000
119.00
No Ice
2.23
1.32
0.077
0.000
2.000
tnxTower
Job
129553 REXBURG WEST
Page
5 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone: (330) 572-2100
FAX: (330) 572-2101
Network Real Estate, LLC
1
1 N M l l l e r
Description
Face
Offset
Offsets:
Azimuth
Placement
C.4A_4
C4A_4
Weight
or
Type
Horz
Adjustment
Front
Side
Leg
Lateral
Vert
ft
°
ft
fta
ft2
K
ft
.t
AHLBA
B
From Leg
4.00
0.000
119.00
No Ice
2.23
1.32
0.077
0.000
2.000
AHLBA
C
From Leg
4.00
0.000
119.00
No Ice
2.23
1.32
0.077
0.000
2.000
AHFIB
A
From Leg
4.00
0.000
119.00
No Ice
3.68
2.31
0.088
0.000
2.000
AHFIB
B
From Leg
4.00
0.000
119.00
No Ice
3.68
2.31
0.088
0.000
2.000
AHFIB
C
From Leg
4.00
0.000
119.00
No Ice
3.68
2.31
0.088
0.000
2.000
AHNA
A
From Leg
4.00
0.000
119.00
No Ice
1.79
1.15
0.043
0.000
2.000
AHNA
B
From Leg
4.00
0.000
119.00
No Ice
1.79
1.15
0.043
0.000
2.000
AHNA
C
From Leg
4.00
0.000
119.00
No Ice
1.79
1.15
0.043
0.000
2.000
DC6-48-60-18-8C-EV
A
From Leg
4.00
0.000
119.00
No Ice
1.14
1.14
0.026
0.000
2.000
DC6-48-60-18-8C-EV
B
From Leg
4.00
0.000
119.00
No Ice
1.14
1.14
0.026
0.000
2.000
DC9-48-60-24-8C-EV
C
From Leg
4.00
0.000
119.00
No Ice
2.74
4.78
0.026
0.000
2.000
Pipe Mount 4'x2.375"
C
From Leg
0.50
0.000
25.00
No Ice
0.87
0.87
0.019
0.000
0.000
Pipe Mount 4'x2.375"
C
From Leg
0.50
0.000
10.00
No Ice
0.87
0.87
0.019
0.000
0.000
(2) GPS
C
From Leg
0.50
0.000
10.00
No Ice
0.14
0.14
0.001
0.000
3.000
Dishes
tnxTower
Job
129553 REXBURG WEST
Page
6 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone: (330) 572-2100
FAX: (330) 572-2101
Network Real Estate, LLC
N M l l l e r
Description Face Dish Offset Offsets: Azimuth 3 dB Elevation Outside Aperture Weight
or Type Type Horz Adjustment Beam Diameter Area
Leg Lateral Width
Vert
At o o ft ft ftz x
VHLPX4-11 W C Paraboloid From 1.00 20.110 25.00 4.11 No Ice 13.26 0.088
w/Shroud (HP) Leg 0.000
0.000
Load Combinations
Comb. Description
No.
1 Dead Only
2 1.2 Dead+1.0 Wind 0 deg - No Ice
3 0.9 Dead+1.0 Wind 0 deg - No Ice
4 1.2 Dead+1.0 Wind 30 deg - No Ice
5 0.9 Dead+1.0 Wind 30 deg - No Ice
6 1.2 Dead+1.0 Wind 60 deg - No Ice
7 0.9 Dead+1.0 Wind 60 deg - No Ice
8 1.2 Dead+1.0 Wind 90 deg - No Ice
9 0.9 Dead+1.0 Wind 90 deg - No Ice
10 1.2 Dead+1.0 Wind 120 deg - No Ice
11 0.9 Dead+1.0 Wind 120 deg -No Ice
12 1.2 Dead+1.0 Wind 150 deg - No Ice
13 0.9 Dead+1.0 Wind 150 deg - No Ice
14 1.2 Dead+1.0 Wind 180 deg -No Ice
15 0.9 Dead+1.0 Wind 180 deg -No Ice
16 1.2 Dead+1.0 Wind 210 deg -No Ice
17 0.9 Dead+1.0 Wind 210 deg - No Ice
18 1.2 Dead+1.0 Wind 240 deg - No Ice
19 0.9 Dead+1.0 Wind 240 deg -No Ice
20 1.2 Dead+1.0 Wind 270 deg - No Ice
21 0.9 Dead+1.0 Wind 270 deg - No Ice
22 1.2 Dead+1.0 Wind 300 deg - No Ice
23 0.9 Dead+1.0 Wind 300 deg - No Ice
24 1.2 Dead+1.0 Wind 330 deg - No Ice
25 0.9 Dead+1.0 Wind 330 deg - No Ice
26 Dead+Wind 0 deg - Service
27 Dead+Wind 30 deg - Service
28 Dead+Wind 60 deg - Service
29 Dead+Wind 90 deg - Service
30 Dead+Wind 120 deg - Service
31 Dead+Wind 150 deg - Service
32 Dead+Wind 180 deg - Service
33 Dead+Wind 210 deg - Service
34 Dead+Wind 240 deg - Service
35 Dead+Wind 270 deg - Service
36 Dead+Wind 300 deg - Service
37 Dead+Wind 330 deg - Service
38 1.2 Dead+1.0 Ev+1.0 Eh 0 deg
39 0.9 Dead -1.0 Ev+1.0 Eh 0 deg
40 1.2 Dead+1.0 Ev+1.0 Eh 30 deg
41 0.9 Dead -1.0 Ev+1.0 Eh 30 deg
42 1.2 Dead+1.0 Ev+1.0 Eh 60 deg
43 0.9 Dead -1.0 Ev+1.0 Eh 60 deg
44 1.2 Dead+1.0 Ev+1.0 Eh 90 deg
45 0.9 Dead -1.0 Ev+1.0 Eh 90 deg
46 1.2 Dead+1.0 Ev+1.0 Eh 120 deg
47 0.9 Dead -1.0 Ev+1.0 Eh 120 deg
48 1.2 Dead+1.0 Ev+1.0 Eh 150 deg
tnxTower
Job
129553 REXBURG WEST
Page
7 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone. (330) 572-2100
FAX (330) 572-2101
Network Real Estate, LLC
NMiller
Comb. Description
No.
49 0.9 Dead -1.0 Ev+1.0 Eh 150 deg
50 1.2 Dead+1.0 Ev+1.0 Eh 180 deg
51 0.9 Dead -1.0 Ev+1.0 Eh 180 deg
52 1.2 Dead+1.0 Ev+1.0 Eh 210 deg
53 0.9 Dead -1.0 Ev+1.0 Eh 210 deg
54 1.2 Dead+1.0 Ev+1.0 Eh 240 deg
55 0.9 Dead -1.0 Ev+1.0 Eh 240 deg
56 1.2 Dead+1.0 Ev+1.0 Eh 270 deg
57 0.9 Dead -1.0 Ev+1.0 Eh 270 deg
58 1.2 Dead+1.0 Ev+1.0 Eh 300 deg
59 0.9 Dead -1.0 Ev+1.0 Eh 300 deg
60 1.2 Dead+1.0 Ev+1.0 Eh 330 deg
61 0.9 Dead -1.0 Ev+1.0 Eh 330 deg
Maximum Tower Deflections - Service Wind
Section
Elevation
Horz.
Gov.
Tilt
Twist
No.
Deflection
Load
ft
in
Comb.
Comb.
°
L1
120-79
6.9026
31
0.457
0.002
L2
84-34
3.6746
31
0.377
0.001
L3
40-0
0.9191
36
0.202
0.000
Critical Deflections and Radius of Curvature - Service Wind
Elevation
Appurtenance
Gov.
Deflection
Tilt
Twist
Radius of
Deflection
Load
Curvature
ft
Comb.
Comb.
in
L1
°
ft
119.00
MTS 14.5' LP Platform
31
6.8089
0.455
0.002
128450
99.50
Feedlines from 80'- 121'
31
5.0085
0.417
0.001
31329
56.50
Feedlines from 35'- 80'
36
1.7299
0.277
0.001
11679
25.00
VHLPX4-11 W
36
0.4485
0.128
0.000
15479
17.00
Feedlines from F- 35'
36
0.2755
0.088
0.000
22764
10.00
Pipe Mount 4'x2.375"
36
0.1523
0.052
0.000
38699
Maximum Tower Deflections - Design Wind
Section
Elevation
Horz.
Gov.
Tilt
TiOst
No.
Deflection
Load
ft
in
Comb.
o°
L1
120-79
23.6785
12
1.567
0.006
L2
84-34
12.6057
12
1.295
0.003
L3
40-0
3.1514
12
0.692
0.002
Critical Deflections and Radius of Curvature - Design Wind
tnxTower
Job
129553 REXBURG WEST
Page
8 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone: (330) 572-2100
FAX: (330) 572-2101
Network Real Estate, LLC
1
1 N M l l l e r
Elevation
Appurtenance
Gov.
Deflection
Tilt
Twist
Radius of
P„
OP"
Load
No.
0M-
kiP-ft
Curvature
ft
1362.325
Comb.
in
o
oft
2514.250
119.00
MTS 14.5' LP Platform
12
23.3571
1.560
0.006
37504
99.50
Feedlines from 80'- 121'
12
17.1815
1.429
0.004
9147
56.50
Fcedlines from 35'- 80'
12
5.9339
0.949
0.002
3406
25.00
Vf]LPX4-11W
12
1.5374
0.440
0.001
4512
17.00
Feedlines from F- 35'
12
0.9441
0.301
0.001
6634
10.00
Pipe Mount 4'x2.375"
12
0.5219
0.178
0.000
11278
Compression Checks
Pole Design Data
Section
Elevation
Size
L
L„
Kl/r
A
P„
OP"
Ratio
No.
0M-
kiP-ft
kip -ft
oM
1362.325
0.155
0.000
1362.325
P„
2514.250
ft
0.000
ft
ft
3146.217
int
K
K
op"
L1
120-79(l)
TP36.875x29.4375x0.25
41.00
0.00
0.0
28.3422
-8.792
1658.020
0.005
L2
79-34(2)
TP44.5x35.468x0.3125
50.00
0.00
0.0
42.7534
-17.044
2501.080
0.007
L3
34-0(3)
TP W2.791M.3125
40.00
0.00
0.0
49.2838
-26.338
2883.100
0.009
Section Elevation Size
No.
ft
L1 120-79(l)
L2 79-34(2)
L3 34-0(3)
Pole Bending Design Data
M -
kap ft
TP36.875x29.4375x0.25 210.595
TP44.5x35.468x0.3125 589.537
TP50x42.7912xO.3125 1055.767
oM ,-
Ratio
M y
OMS,
Ratio
Ratio
M,
OT„
Ratio
My
kip ft
0M-
kiP-ft
kip -ft
oM
1362.325
0.155
0.000
1362.325
0.000
2514.250
0.234
0.000
2514.250
0.000
3146.217
0.336
0.000
3146.217
0.000
Pole Shear Design Data
Section
Elevation
Size
Actual
i ,
Ratio
Actual
OT„
Ratio
No.
V
V
T
T
p
J°
K
K
0V,
up
�J`
{
loft
OT.
L1
120-79(l)
TP36.875x29.4375x0.25
7.020
497.406
0.014
0.739
1555.883
0.000
L2
79-34(2)
TP44.5x35.468x0.3125
10.188
750.323
0.014
0.978
2832.317
0.000
L3
34-0(3)
TP50x42.7912xO.3125
13.047
864.931
0.015
1.617
3763.642
0.000
Pole Interaction Design Data
tnxTower
Job
129553 REXBURG WEST
Page
9 of 9
GPD
520 South Main Street Suite 2531
Project
2023702.02.129553.05
Date
10:09:10 02/16/23
Akron, Ohio 44311
Client
Designed by
Phone: (330) 572-2100
FAX: (330) 572-2101
Network Real Estate, LLC
N M l l l e r
Section
Elevation
Ratio
Ratio
Ratio
Ratio
Ratio
Comb.
Allow.
Criteria
No.
Type
P„
M
M31
V
T
Stress
Stress
120-79
Pole
ft
OP.
OM—
OM,,
0 V
OT„
Ratio
Ratio
Pole
L1
120-79(l)
0.005
0.155
0.000
0.014
0.000
0.160
1.000
io
3
-26.338
2883.100
34.5
Pass
4.8.2
L2
79-34(2)
0.007
0.234
0.000
0.014
0.000
0.241
1.000
F'
Pole (L3)
34.5
Pass
V
4.8.2
L3
34-0(3)
0.009
0.336
0.000
0.015
0.000
0.345
1.000
i
V
4.8.2
Section Capacity Table
Section
Elevation
Component
Size
Critical
P
OPall ,
o
Pass
No.
t
Type
Element
K
K
Capacity
Fail
L1
120-79
Pole
TP36.875x29.4375x0.25
1
-8.792
1658.020
16.0
Pass
L2
79-34
Pole
TP44.505.468x0.3125
2
-17.044
2501.080
24.1
Pass
L3
34-0
Pole
TP50x42.7912x0.3125
3
-26.338
2883.100
34.5
Pass
Summary
Pole (L3)
34.5
Pass
RATING =
34.5
Pass
121' Monopole - Structural Evaluation Site USID #: 129553
APPENDIX C
Additional Calculations
2/16/2023
Pier and Pad Foundation
TIA-222 Revision: H Top & Bot. Pad Rein. Different?: ❑
Tower Type: Monopole Block Foundation?: ❑
Rectangular Pad?: ❑
Superstructure Analysis Reactions
Compression, Pcomp_
26
kips
Base Shear, Vu comp:
13
kips
Pier Rebar Size, Sc:
10
Pier Rebar Quantity, mc:
34
Pier Tie/Spiral Size, St:
4
Moment, M.:
1056
ft -kips
Tower Height, H: 1
120
Ift
Neglected Depth, N:
4.17
ft
BP Dist. Above Fdn, bpd;st:
6
Iin
Pier Properties
Pier Shape:
Circular
Pier Diameter, dpier:
6 ft
Ext. Above Grade, E:
0.5 ft
Pier Rebar Size, Sc:
10
Pier Rebar Quantity, mc:
34
Pier Tie/Spiral Size, St:
4
Pier Tie/Spiral Quantity, mt:
7
Pier Reinforcement Type:
Tie
Pier Clear Cover, ccpi,,:
3 in
• Properties
Depth, D:
6 ft
Pad Width, Wt:
24 ft
Pad Thickness, T:
2.5 ft
Pad Rebar Size (Bottom dir. 2), SP2:
8
Pad Rebar Quantity (Bottom dir. 2), mpZ:
25
Pad Clear Cover, ccpad:
3 n
PropertiesMaterial
Rebar Grade, Fy: 60 Eks�]
Concrete Compressive Strength, F'c: 4 Dry Concrete Density, bc: 150
Soil Properties
Total Soil Unit Weight, y:
110
pcf
Ultimate Net Bearing, Qnet:
6.000
ksf
Cohesion, Cu:
0.000
ksf
Friction Angle, cp:
34
degrees
SPT Blow Count, Nbiow.:
6.6%
Pass
Base Friction, /c:
5.00
1.32
Neglected Depth, N:
4.17
ft
Foundation Bearing on Rock?
No
24.8%
Groundwater Depth, gw:
N/A
ft
Version 4.1.1
Foundation
Capacity
Demand
Rating
Check
Lateral (Sliding) (kips)
196.49
13.00
6.6%
Pass
Bearing Pressure (ksf)
5.00
1.32
26.4%
Pass
Overturning (kip'ft)
4623.78
1147.00
24.8%
Pass
Pier Flexure (Comp.) (kip'ft)
5617.30
1108.00
19.7%
Pass
Pier Compression (kip)
17996.05
46.36
0.3%
Pass
Pad Flexure (kip'ft)
2212.54
419.10
18.9%
Pass
Pad Shear- 1 -way (kips)
696.71
68.15
9.8%
Pass
Pad Shear - 2 -way (Comp) (ksi)
0.190
0.021
11.3%
Pass
Flexural 2 -way (Comp) (kip *ft)
2450.02
664.80
27.1% 1
Pass
<--Toggle between Gross and Net
Structural Rating: 27.1%
Soil Rating: 26.4%
121' Monopole - Structural Evaluation Site USID #: 129553
APPENDIX D
Seismic Calculations
2/16/2023
Analysis Method
GPD Job Number
Site Name
Site Number
City
State
County
Tower Type
Base OD
Base Thickness
# of Sides
Base Elevation
Structure Height (ft)
TL
Ss
Si
Site Classification
Risk Category
Importance Factor (1)
Fa
F„
SDS
SD1
Wt
Wu
WL
9
lave
E
Redundancy Factor (p)
f1
R
Sam
Earthquake LRFD Load Factor
Discrete Appurtenances
Appurtenances @ 120'
Appurtenances @ 26'
Appurtenances @ 11'
Linear Appurtenances
Feedlines from 80'- 121'
Feedlines from 35'- 80'
Feedlines from V- 35'
Structure Components
Tower Section from 80'- 121'
Tower Section from 35'- 80'
Tower Section from V- 35'
Totals
Seismic Calculations (TIA-222-H-11
Equivalent Lateral Force Procedure (Section 2.7.7.1, TIA-222-H)
2023702.02.129553.05
REXBURG WEST
ID4341
Rexburg
ID
Madison
Monopole
50 in Top OD
0.3125 in Top Thickness
18
1 f
120
6 sec (Figures B-19 to B-21, TIA-222-H)
0.359 (ASCE Hazard Tool)
0.141 (ASCE Hazard Tool)
D (Table 2-10, TIA-222-H)
II (Table 2-1, TIA-222-H)
1 (Table 2-3, TIA-222-H)
1.513 (Table 2-11, TIA-222-H, interpolation allowed)
2.318 (Table 2-12, TIA-222-H, interpolation allowed)
0.362 (2.7.5, TIA-222-H)
0.218 (2.7.5, TIA-222-H)
21.952 Kips
3.854 Kips
18.098 Kips
386.4 in/s2
8929.46 in'
29000 ksi
1.0 (2.7.7, TIA-222-H)
0.560 Hz (2.7.7.1.3, TIA-222-H)
1.5 (2.7.7.1, TIA-222-H)
0.122 (2.7.7.2.1, TIA-222-H)
1 (2.3.2, TIA-222-H)
29.4375 in
0.25 in
w K 1221 z ftCc Fsz E k E k
3.854 120 0.412 0.7349 0.735 0.279
0.107 26 0.001 0.0016 0.002 0.008
0.021 11 0.000 0.0001 0.000 0.002
0.512 100.5 0.041 0.0728 0.073 0.037
0.563 57.5 0.018 0.0316 0.032 0.041
0.336 18 0.001 1 0.0026 1 0.003 0.024
3.643 100.5 0.290 0.5177 0.518 0.264
6.695 57.5 0.210 0.3754 0.375 0.485
6.221 18 0.027 0.0485 0.048 0.450
21.952 1.f9 17=
Base Shear per the Equivalent Lateral Force Procedure, Vs 1 1.79 kips